Search NASA⌕ Search

SEARCH · Search NASA

Results for “OPERATION AND MAINTENANCE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,729 records · Page 96

Production Facility Prototype Blower Installation Report with 1000 Hour Test Results

The roots blower in use at ANL for in-beam experiments and also at LANL for flow tests was sized for 12 mm diameter disks and significantly less beam heating. Currently, the disks are 29 mm in diameter, with a 12 mm FWHM Gaussian beam spot at 42 MeV and 2.86 μA on each side of the target, 5.72 μA total. The target design itself is reported elsewhere. With the increased beam heating, the helium flow requirement increased so that a larger blower was needed for a mass flow rate of 400 g/s at 2.76 MPa (400 psig). An Aerzen GM 12.4 blower was selected, and is currently being installed at the LANL facility for target and component flow testing. This report describes this blower/motor/pressure vessel package and the status of the facility preparations. The blower has been operated for 1000 hours as a preliminary investigation of long term performance, operation and possible maintenance issues. The blower performed well, with no significant change in blower head or mass flow rate developed under the operating conditions. Upon inspection, some oil had leaked out of the shaft seal of the blower. The shaft seal and bearing race have been replaced. Test results and conclusions are reported.

43 PARTICLE ACCELERATORS↗

Production Facility Prototype Blower Installation Report with 1000 Hr Test Results

The roots blower in use at ANL for in-beam experiments and also at LANL for flow tests was sized for 12 mm diameter disks and significantly less beam heating. Currently, the disks are 29 mm in diameter, with a 12 mm FWHM Gaussian beam spot at 42 MeV and 2.86 μA on each side of the target, 5.72 μA total. The target design itself is reported elsewhere. With the increased beam heating, the helium flow requirement increased so that a larger blower was needed for a mass flow rate of 400 g/s at 2.76 MPa (400 psig). An Aerzen GM 12.4 blower was selected, and is currently being installed at the LANL facility for target and component flow testing. This report describes this blower/motor/pressure vessel package and the status of the facility preparations. The blower has been operated for 1000 hours as a preliminary investigation of long-term performance, operation and possible maintenance issues. The blower performed well, with no significant change in blower head or mass flow rate developed under the operating conditions. Upon inspection, some oil had leaked out of the shaft seal of the blower. The shaft seal and bearing race have been replaced.

43 PARTICLE ACCELERATORS↗

Production Facility Prototype Blower 1000 Hour Test Results

The roots blower in use at ANL for in-beam experiments and also at LANL for flow tests was sized for 12 mm diameter disks and significantly less beam heating. Currently, the disks are 29 mm in diameter, with a 12 mm FWHM Gaussian beam spot at 42 MeV and 2.86 μA on each side of the target, 5.72 μA total. The target design itself is reported elsewhere. With the increased beam heating, the helium flow requirement increased so that a larger blower was needed for a mass flow rate of 400 g/s at 2.76 MPa (400 psig). An Aerzen GM 12.4 blower was selected, and is now installed at the LANL facility for target and component flow testing. Two extended tests of >1000 hr operation have been completed. Those results and discussion thereof are reported herein. Also included in Appendix A is the detailed description of the blower and its installation, while Appendix B documents the pressure vessel design analysis. The blower has been operated for 1000 hours as a preliminary investigation of long-term performance, operation and possible maintenance issues. The blower performed well, with no significant change in blower head or mass flow rate developed under the operating conditions. Upon inspection, some oil had leaked out of the shaft seal of the blower. The shaft seal and bearing race have been replaced. Test results and conclusions are in Appendix B.

43 PARTICLE ACCELERATORS↗

NATIONAL GEOTHERMAL DATA SYSTEM: AN EXEMPLAR OF OPEN ACCESS TO DATA

The formal launch of National Geothermal Data System (NGDS – www.geothermaldata.org) in 2014 will provide open access to technical geothermal-relevant data from all of the Department of Energy- sponsored geothermal development and research projects and geologic data from all 50 states. By making data easily discoverable and accessible this system will open new exploration opportunities and shorten project development. The prototype data system currently includes multiple data nodes, and nationwide data online and available to the public, indexed through a single catalog under construction at http://search.geothermaldata.org. Data from state geological surveys and partners includes more than 5 million records online, including 1.48 million well headers (oil and gas, water, geothermal), 732,000 well logs, and 314,000 borehole temperatures and is growing rapidly. There are over 250 Web services and another 138 WMS (Web Map Services) registered in the system as of August, 2013. Additional data record is being added by companion projects run by Boise State University, Southern Methodist University, and the USGS. The National Renewable Energy Laboratory is managing the Geothermal Data Repository, an NGDS node that will be a clearinghouse for data from hundreds of DOE-funded geothermal projects. NGDS is built on the US Geoscience Information Network (USGIN) data integration framework, which is a joint undertaking of the USGS and the Association of American State Geologists (AASG). NGDS is fully compliant with the White House Executive Order of May 2013, requiring all federal agencies to make their data holdings publicly accessible online in open source, interoperable formats with common core and extensible metadata. The National Geothermal Data System is being designed, built, deployed, and populated primarily with grants from the US Department of Energy, Geothermal Technologies Office. To keep this operational system sustainable after the original implementation will require four core elements: continued serving of data and applications by providers; maintenance of system operations; a governance structure; and an effective business model. Each of these presents a number of challenges currently under consideration.

15 GEOTHERMAL ENERGY↗

Shallow Water Optical Water Quality Buoy

This NASA grant was funded as a result of an unsolicited proposal submission to Kennedy Space Center. The proposal proposed the development and testing of a shallow water optical water quality buoy. The buoy is meant to work in shallow aquatic systems (ponds, rivers, lagoons, and semi-enclosed water areas where strong wind wave action is not a major environmental During the project period of three years, a demonstration of the buoy was conducted. The last demonstration during the project period was held in November, 1996 when the buoy was demonstrated as being totally operational with no tethered communications line. During the last year of the project the buoy was made to be solar operated by large gel cell batteries. Fund limitations did not permit the batteries in metal enclosures as hoped for higher wind conditions, however the system used to date has worked continuously for in- situ operation of over 18 months continuous deployment. The system needs to have maintenance and somewhat continuous operational attention since various components have limited lifetime ages. For example, within the last six months the onboard computer has had to be repaired as it did approximately 6 months after deployment. The spectrograph had to be repaired and costs for repairs was covered by KB Science since no ftmds were available for this purpose after the grant expired. Most recently the computer web page server failed and it is currently being repaired by KB Science. In addition, the cell phone operation is currently being ftmded by Dr. Bostater in order to maintain the system's operation. The above points need to be made to allow NASA to understand that like any sophisticated measuring system in a lab or in the field, necessary funding and maintenance is needed to insure the system's operational state and to obtain quality factor. The proposal stated that the project was based upon the integration of a proprietary and confidential sensor and probe design that was developed by KB Science and Engineering and is currently patented by KB Science. The buoy's purpose was to collected hyperspectral optical signatures for analysis and resulting estimation of water quality parameters such as chlorophyll-a, seston and dissolved organic matter (DOC). The ultimate goal of the project was to develop a buoy that would integrate a probe to measure upwelling light from a source and thus relate this backscattered light to water quality parameters.

Bostater, Charles↗

A study of dirigibles for use in the Peruvian Selva Central Region

The potential for dirigibles as transports in the Selva Central region of Peru was evaluated by means of a mission and economic analysis. A total requirement to transport over 19 million tons (t) of agricultural produce, lumber, and meat was projected by the year 2004. A primary route involving zones for loading and delivering this cargo was identified. Although dirigibles are capable of short field operation, all existing airfields must be enlarged in width to allow for all conditions of wind and weather and to provide space for overnight mooring. A maintenance base and operations headquarters, complete with hangar and other service facilities would be required. The quantities of cargo to be carried establish requirements for fleets of dirigibles of various sizes and capacities. Cargo capacities of 5 to 100 tons were identified. Fleet sizes up to 106 dirigibles (in 20 t capacities) would be required. Dirigibles were assumed to be of the nonrigid type except in the 100 t category for which rigid characteristics were assumed. A method of determining dirigible costs was developed. The values derived were then applied to an economic analysis to determine initial investment and operating costs. It was found that larger dirigibles of approximately 20 t capacities or higher could offer significant cost benefits over airplanes, provided cruise speeds were higher than 100 km/hr.

Mayer, N. J.↗

A study of dirigibles for use in the Peruvian Selva Central region

The potential for dirigibles as transports in the Selva Central region of Peru was evaluated by means of a mission and economic analysis. A total requirement to transport over 19 million tons (t) of agricultural produce, lumber and meat was projected by the year 2004. A primary route involving zones for loading and delivering this carbo was identified. Although dirigibles are capable of short field operation, all existing airfields must be enlarged in width to allow for all conditions of wind and weather and to provide space for overnight mooring. A maintenance base and operations headquarters, complete with hangar and other service facilities would be required. The quantities of cargo capacities of 5 to 100 tons were identified. Fleet sizes up to 106 dirigibles (in 20 t capacities) would be required. Dirigibles were assumed to be of the nonrigid type except in the 100 t category for which rigid characteristics were assumed. A method of determining dirigible costs was developed. The values derived were then applied to an economic analysis to determine initial investment and operating costs. It was found that larger dirigibles of approximately 20 t capacities or higher could offer significant cost benefits over airplanes, provided cruise speeds were higher than 100km/hr.

Mayer, N. J.↗

Lessons Learned From Ventilation and Glovebox Flooding Via Overfilling of the Wet Vacuum System in a Plutonium Facility

In the summer of 2021, operations personnel requested maintenance personnel to fill a wet vacuum (Wetvac) seal water tank in a plutonium facility at Los Alamos National Laboratory (LANL). After the filling was finished, the fill valve of the Wetvac seal water tank was left open and a ‘dead-man’ valve on an isolation line failed to close properly. After a series of other failures, the water exited the glovebox and contaminated three rooms of the first floor of the facility and an underlying area in the basement. A retrospective analysis of this event determined that there was no risk of a criticality due to the inherent design features of the ventilation system. This paper will explain the driving factors behind how this event was able to happen, as well as some of the major lessons learned that can be universally applied to other nuclear facilities. One of the main causes of the event was the delegation of work to maintenance personnel that were not qualified for the work being asked of them. Additionally, there was a lack of coordination between criticality safety engineers and facility operations equipment owners regarding equipment and connections present on the seal water tanks for the Wetvac, specifically the presence of overflow drain lines. The respective criticality safety evaluation credited an overflow drain line being present on the seal water tanks that was later found to have not been present. Lastly, there are lessons to be learned regarding equipment configuration and designing systems with safety in mind.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Radiation Mapping at JET and ITER using advanced computational acceleration techniques and tools - Paper 63

The Applied Radiation Physics group at the Culham Centre for Fusion Energy (CCFE) have developed and applied state-of-the-art radiation mapping methods and tools to enable complex shielding calculations in fusion devices during plasma operations, and associated maintenance in the device and surrounding areas. Here, we present the description and application of those tools to produce radiation maps both to support the JET safety case (the EU experimental tokamak device based at Culham) and the planned DT campaign in the next few years; and the ITER device. Radiation mapping of fusion facilities are essential for assessing radiation hardness of electronics during operations, and to define safe working dose limits to staff during routine maintenance. At CCFE the Monte Carlo radiation transport code MCNP6 is one of the codes used to perform radiation transport calculations. Due to the size and complexity of the JET and ITER devices, and their surrounding buildings, a suite of tools have been created at CCFE to reduce the computational requirements of the calculations. This paper describes three of these tools, which have been developed and applied to nuclear and radiological field mapping in fusion devices. The results presented in this paper highlight the application of three methods that have been used to improve the computational efficiency and capabilities for radiation mapping in fusion devices such as JET and ITER. These methods are Global Variance Reduction, the Surface Source Mesh routine and the Smeared Source routine. This paper demonstrates the three techniques used in combination, enabling a very computationally challenging fusion problem to become tractable (with acceptable computing effort), also enabling improved capability to allow the mapping of radiations fields during transport operations for activated materials. (authors)

61 RADIATION PROTECTION AND DOSIMETRY↗

Integrating O/S models during conceptual design, part 3

Space vehicles, such as the Space Shuttle, require intensive ground support prior to, during, and after each mission. Maintenance is a significant part of that ground support. All space vehicles require scheduled maintenance to ensure operability and performance. In addition, components of any vehicle are not one-hundred percent reliable so they exhibit random failures. Once detected, a failure initiates unscheduled maintenance on the vehicle. Maintenance decreases the number of missions which can be completed by keeping vehicles out of service so that the time between the completion of one mission and the start of the next is increased. Maintenance also requires resources such as people, facilities, tooling, and spare parts. Assessing the mission capability and resource requirements of any new space vehicle, in addition to performance specification, is necessary to predict the life cycle cost and success of the vehicle. Maintenance and logistics support has been modeled by computer simulation to estimate mission capability and resource requirements for evaluation of proposed space vehicles. The simulation was written with Simulation Language for Alternative Modeling II (SLAM II) for execution on a personal computer. For either one or a fleet of space vehicles, the model simulates the preflight maintenance checks, the mission and return to earth, and the post flight maintenance in preparation to be sent back into space. THe model enables prediction of the number of missions possible and vehicle turn-time (the time between completion of one mission and the start of the next) given estimated values for component reliability and maintainability. The model also facilitates study of the manpower and vehicle requirements for the proposed vehicle to meet its desired mission rate. This is the 3rd part of a 3 part technical report.

Ebeling, Charles E.↗

RH Packaging Program Guidance (Rev. 3)

The purpose of this program guidance document is to provide the technical requirements for use, operation, inspection, and maintenance of the Remote Handled-Transuranic (RH-TRU) 72-B Waste Shipping Package (also known as the "RH-TRU 72-B") and directly related components. This document complies with the requirements as specified in the RH-TRU 72-B Safety Analysis Report for Packaging (SARP), and Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9212. If there is a conflict between this document and the SARP and/or C of C, the C of C shall govern. The C of C states: "...each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application." It further states: "...each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application." Chapter 9.0 of the SARP tasks the Waste Isolation Pilot Plant (WIPP) Management and Operating (M&O) Contractor with assuring the packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) §71.8, "Deliberate Misconduct." Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required. In accordance with 10 CFR Part 71, "Packaging and Transportation of Radioactive Material," certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21, "Reporting of Defects and Noncompliance," regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these regulations are conducted. This document details the instructions to be followed to operate, maintain, and test the RH-TRU 72-B packaging. This Program Guidance standardizes instructions for all users. Users shall follow these instructions or equivalent approved instructions. Following these instructions assures that operations meet the requirements of the SARP.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A classification procedure for the effective management of changes during the maintenance process

During software operation, maintainers are often faced with numerous change requests. Given available resources such as effort and calendar time, changes, if approved, have to be planned to fit within budget and schedule constraints. In this paper, we address the issue of assessing the difficulty of a change based on known or predictable data. This paper should be considered as a first step towards the construction of customized economic models for maintainers. In it, we propose a modeling approach, based on regular statistical techniques, that can be used in a variety of software maintenance environments. The approach can be easily automated, and is simple for people with limited statistical experience to use. Moreover, it deals effectively with the uncertainty usually associated with both model inputs and outputs. The modeling approach is validated on a data set provided by NASA/GSFC which shows it was effective in classifying changes with respect to the effort involved in implementing them. Other advantages of the approach are discussed along with additional steps to improve the results.

Briand, Lionel C.↗

D and D of the Callisto PWR Loop as part of the Refurbishment of the BR2 Research Reactor - 16168

Research reactor BR2 is undergoing a thorough maintenance and modernisation operation until mid-2016. In order to be able to use the reactor safely and efficiently in the coming period of 10 years, a preventive replacement of the beryllium matrix was required as a major step in the refurbishment. At the same time, a number of preventive maintenance and modernisation activities have been defined, including the dismantling of the CALLISTO (Capability for Light Water Irradiation in Steady State and Transient Operation) PWR experimental facility for in-pile studies installed into BR2 for more than 20 years. The CALLISTO end of life decommissioning strategy aims for waste, cost and dose uptake minimisation and includes: - the unloading and removal of the in-pile sections; - a closed-loop full system decontamination for dose reduction; - the complete dismantling of the loop; - the further sorting and segmentation in a dedicated workshop; - a hard chemical batch-wise decontamination for unconditional clearance. The operation is planned in the period of mid-2015 until mid-2016. The paper will describe in detail these subsequent steps, with a focus on decontamination and dismantling. Lessons learned and potential benefits towards the D and D of commercial PWR will be highlighted. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Model-Based Investigation of Multi-Fault Interactions and Performance Degradation in Residential Heat Pump Systems

Faults in heat pump systems can significantly degrade performance, reduce efficiency, and accelerate component wear, leading to higher operating costs and maintenance demands. While numerous studies have investigated the impact of individual faults, the interactions between multiple concurrent faults remain insufficiently understood, despite their common occurrence in real-world operation. This study conducts a comprehensive simulation analysis of multiple simultaneous faults in a vapor compression heat pump using a validated heat pump design model (HPDM) tool. Detailed component-level modeling methods are implemented to examine performance sensitivity under combinations of refrigerant flow and heat exchanger faults. The results reveal complex fault interactions that can mask or amplify system deviations, challenging conventional diagnostic approaches. Findings from this work provide meaningful insights for the development of more robust fault detection and diagnosis algorithms, supporting improved reliability and energy efficiency in next-generation heat pump technologies.

Hu, Yifeng [ORNL] (ORCID:0000000242875185)↗

CH Packaging Program Guidance

The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II), a HalfPACT shipping package, and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP), HalfPACT SARP, and U.S. Nuclear Regulatory Commission (NRC) Certificates of Compliance (C of C) 9218 and 9279, respectively. In the event of a conflict between this document and the SARP or C of C, the C of C shall govern. The C of Cs state: "each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application." They further state: "each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application." Chapter 9.0 of the SARP charges the U.S. Department of Energy (DOE) or the Waste Isolation Pilot Plant (WIPP) management and operating (M&O) contractor with assuring packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) §71.8. Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required. In accordance with 10 CFR Part 71, certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21 regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these regulations are conducted. This document provides the instructions to be followed to operate, maintain, and test the TRUPACT-II and HalfPACT packaging. The intent of these instructions is to standardize operations. All users will follow these instructions or equivalent instructions that assure operations are safe and meet the requirements of the SARPs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH Packaging Program Guidance

The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II), a HalfPACT shipping package, and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP), HalfPACT SARP, and U.S. Nuclear Regulatory Commission (NRC) Certificates of Compliance (C of C) 9218 and 9279, respectively. In the event of a conflict between this document and the SARP or C of C, the C of C shall govern. The C of Cs state: "each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the pplication." They further state: "each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application." Chapter 9.0 of the SARP charges the U.S. Department of Energy (DOE) or the Waste Isolation Pilot Plant (WIPP) management and operating (M&O) contractor with assuring packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) §71.8. Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required. In accordance with 10 CFR Part 71, certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21 regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these regulations are conducted. This document provides the instructions to be followed to operate, maintain, and test the TRUPACT-II and HalfPACT packaging. The intent of these instructions is to standardize operations. All users will follow these instructions or equivalent instructions that assure operations are safe and meet the requirements of the SARPs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗