Search NASA⌕ Search

SEARCH · Search NASA

Results for “Reference Model 2”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,729 records · Page 96

First Ever Field Pilot on Alaska's North Slope to Validate the Use of Polymer Floods for Heavy Oil EOR a.k.a Alaska North Slope Field Laboratory (ANSFL)

Alaska’s high viscosity oil resources that range between 20–30+ billion barrels represent about a third of known North Slope original oil in place (OOIP). These resources are primarily concentrated in the Schrader Bluff formation (also called West Sak on the Western North Slope) and Ugnu reservoirs and are categorized as “viscous oils” and “heavy oils” owing to their in-situ viscosities between 5–10,000 cP and up to a million+ cP respectively. The viscous oil deposits are relatively deeper (2,000 – 5,000 ft), whereas the heavy oils are somewhat shallower (2,000 – 4,000 ft). The typically shallow depths and the proximity to the continuous permafrost results in relatively lower formation temperatures and pressures, and consequently higher viscosities. The vertical depth vs. viscosity delineated in Paskvan et al. (2016) differentiates the viscous and heavy oils. As depicted in Paskvan et al. (2016), currently the main focus (referred to as “developing”) is on the viscous oils in the Schrader Bluff formation in the Milne Point Unit (MPU). Notwithstanding this Alaska North Slope (ANS) specific categorization, we use the industry adopted, all-inclusive term “heavy oil” for all high viscosity oils. Resource characterization and additional details can be found in topical publications of Paskvan et al. (2016) and Targac et al. (2005). Despite the vast resource base, the development pace, vis-à-vis the production of heavy oils has been very slow and limited due to multiple factors such as cost, logistics, challenging arctic environment, poor waterflood sweep efficiency due to mobility contrasts, and significantly high minimum miscibility pressures (MMP). Most importantly, typical or standard thermal methods that are commonplace elsewhere (Canada, California) are inapplicable due to the continuous permafrost. As a consequence, cumulative production of heavy and viscous oils is a little over 1% of OOIP slope wide and currently, there is hardly any production from Ugnu. However, on a broader level, these unfavorable factors are outweighed by the fact that (1) these resources, within the established infrastructure, are too large to ignore because of their strategic importance to the Nation and the State of Alaska and (2) Prudhoe Bay type diluent crude oil is still available for heavy oil transport through the Trans Alaska Pipeline System (TAPS). Similarly, from a reservoir standpoint, the following factors also are important offsets: (1) favorable rock characteristics of Schrader Bluff; (2) the promise demonstrated by the initial scoping studies (Seright 2010, 2011) suggesting significant increase of heavy oil recovery using polymer flooding; (3) successful field implementation in Canada, China and elsewhere in the world, and (4) availability of the existing pairs of horizontal injector-producer in Schrader Bluff The foregoing was recognized as the best readily available opportunity for significant investment by the US Department of Energy and the field operator Hilcorp Alaska LLC to conduct the first ever field scale experiment to test the polymer flooding technology to unlock the vast heavy oil resources on ANS. With this primary goal in mind, the research team embarked on a ~4.5 years long project that focused on the field polymer pilot complemented by supporting laboratory and simulation studies. As documented in this final report, over the course of the project, many lessons have been learned and valuable field and supporting laboratory data has been collected, which also is complemented by numerical reservoir simulations. We have been able to establish the injectivity of polymer solution, evidence of significant reduction in the water cut of previously waterflooded pattern, effective propagation of a hydrolyzed polyacrylamide (HPAM), benefits of low salinity water, provide practical guidance on handling of produced fluids containing breakthrough polymer, fit-for-purpose forecast-worthy history matched simulation model, polymer EOR benefit of 700-1000 bopd over waterflood, and most importantly a low polymer utilization factor of ~1.7 lb/stb. In summary this project is deemed as a scientific, technical and economic success, having met all objectives, fulfilled deliverables and within budget, providing impetus to apply polymer EOR throughout the Milne Point Field paving the way for even heavier viscosity oils in the Ugnu area, eventually extending the economic life of TAPS.

02 PETROLEUM↗

Atmospheric Radiation Measurement Program Climate Research Facility Operation quarterly report July 1 - September 30, 2010.

Individual raw datastreams from instrumentation at the Atmospheric Radiation Measurement (ARM) Climate Research Facility fixed and mobile sites are collected and sent to the Data Management Facility (DMF) at Pacific Northwest National Laboratory (PNNL) for processing in near real-time. Raw and processed data are then sent approximately daily to the ARM Archive, where they are made available to users. For each instrument, we calculate the ratio of the actual number of data records received daily at the Archive to the expected number of data records. The results are tabulated by (1) individual datastream, site, and month for the current year and (2) site and fiscal year (FY) dating back to 1998. The U.S. Department of Energy (DOE) requires national user facilities to report time-based operating data. The requirements concern the actual hours of operation (ACTUAL); the estimated maximum operation or uptime goal (OPSMAX), which accounts for planned downtime; and the VARIANCE [1-(ACTUAL/OPSMAX)], which accounts for unplanned downtime. The OPSMAX time for the fourth quarter of FY2010 for the Southern Great Plains (SGP) site is 2097.60 hours (0.95 2208 hours this quarter). The OPSMAX for the North Slope of Alaska (NSA) locale is 1987.20 hours (0.90 2208) and for the Tropical Western Pacific (TWP) locale is 1876.80 hours (0.85 2208). The first ARM Mobile Facility (AMF1) deployment in Graciosa Island, the Azores, Portugal, continues, so the OPSMAX time this quarter is 2097.60 hours (0.95 x 2208). The differences in OPSMAX performance reflect the complexity of local logistics and the frequency of extreme weather events. It is impractical to measure OPSMAX for each instrument or datastream. Data availability reported here refers to the average of the individual, continuous datastreams that have been received by the Archive. Data not at the Archive are caused by downtime (scheduled or unplanned) of the individual instruments. Therefore, data availability is directly related to individual instrument uptime. Thus, the average percentage of data in the Archive represents the average percentage of the time (24 hours per day, 92 days for this quarter) that the instruments were operating this quarter. Table 1 shows the accumulated maximum operation time (planned uptime), actual hours of operation, and variance (unplanned downtime) for the period July 1-September 30, 2010, for the fixed sites. Because the AMF operates episodically, the AMF statistics are reported separately and not included in the aggregate average with the fixed sites. This fourth quarter comprises a total of 2208 possible hours for the fixed and mobile sites. The average of the fixed sites exceeded our goal this quarter. The Site Access Request System is a web-based database used to track visitors to the fixed and mobile sites, all of which have facilities that can be visited. The NSA locale has the Barrow and Atqasuk sites. The SGP site has historically had a Central Facility, 23 extended facilities, 4 boundary facilities, and 3 intermediate facilities. Beginning in the second quarter of FY2010, the SGP began a transition to a smaller footprint (150 km x 150 km) by rearranging the original instrumentation and new instrumentation made available through the American Recovery and Reinvestment Act of 2009 (ARRA). The Central Facility and 4 extended facilities will remain, but there will be up to 12 new surface characterization facilities, 4 radar facilities, and 3 profiler facilities sited in the smaller domain. This new configuration will provide observations at scales more appropriate to current and future climate models. The transition to the smaller footprint is ongoing through this quarter. The TWP locale has the Manus, Nauru, and Darwin sites. These sites will also have expanded measurement capabilities with the addition of new instrumentation made available through ARRA funds. It is anticipated that the new instrumentation at all the fixed sites will be in place by the end of calendar year 2011. AMF1 continues its 20-month deployment in Graciosa Island, the Azores, Portugal, that began on May 1, 2009. The AMF will also have additional observational capabilities by the end of 2011. The second ARM Mobile Facility (AMF2) was deployed this quarter to Steamboat Springs, Colorado, in support of the Storm Peak Lab Cloud Property Validation Experiment (STORMVEX). The first field deployment of the second ARM Mobile Facility will be used to validate ARM-developed algorithms that convert the remote sensing measurements to cloud properties for liquid and mixed phase clouds. Although AMF2 is being set up this quarter, the official start date of the field campaign is not until November 1, 2010. This quarterly report provides the cumulative numbers of scientific user accounts by site for the period October 1, 2009-September 30, 2010.

54 ENVIRONMENTAL SCIENCES↗

Sediment Properties: E-Area Completion Project

To accommodate a future need for additional waste disposal facilities at the Savannah River Site, the Solid Waste Management Division (SWMD) designated nine additional plots for development (Kasraii 2007; SRS 2010); these plots are collectively known as the E Area Completion Project (ECP). Subsurface samples were collected from ECP plots 6, 7, 8 and 9 (Figure 1) for chemical and physical property analyses to support Performance Assessment (PA) and Special Analyses (SA) modeling. This document summarizes the sampling and analysis scheme and the resultant data, and provides interpretations of the data particularly in reference to existing soil property data. Analytical data in this document include: gamma log, cone penetrometer log, grain size (sieve and hydrometer), water retention, saturated hydraulic conductivity (falling head permeameter), porosity, dry bulk density, total organic carbon, x-ray diffraction, and x-ray fluorescence data. SRNL provided technical and safety oversight for the fieldwork, which included completion of eight soil borings, four geophysical logs, and the collection of 522 feet of core and 33 Shelby tubes from ECP plots 6, 7, 8, and 9. Boart Longyear provided sonic drilling and logging services. Two soil borings were completed at each location. The first set of boreholes extended into (but did not fully penetrate) the Warley Hill Formation. These boreholes were continuously cored, then geophysically (gamma ray) logged. The recovered core was split, photographed, and described; one half of the core was archived at SRS's Core Lab facilities, and the remaining half was consumed as necessary for testing at SRS and off-site labs. Core descriptions and geophysical data were used to calculate target elevations for Shelby tube samples, which were obtained from the second set of boreholes. Shelby tubes were shipped to MACTEC Engineering and Consulting Inc. (MACTEC) in Atlanta for physical property testing. SRNL deployed their Site Characterization and Analysis Penetrometer System (SCAPS) cone penetrometer test (CPT) truck at ECP plots 6, 7, 8 and 9 to collect inferred lithology data for the vadose zone. Results from this study are used to make recommendations for future modeling efforts involving the ECP plots. The conceptual model of the ECP hydrogeology differs from the conceptual model of the current ELLWF disposal area in that for the ECP plots, the topography (ground surface) is generally lower in elevation; The Upland and top of Tobacco Road lithostratigraphic units are missing (eroded); The water table occurs lower in elevation (i.e., it occurs in lower stratigraphic units); and the Tan Clay Confining Zone (TCCZ) often occurs within the vadose zone (rather than in the saturated zone). Due to the difference in the hydrogeology between the current ELLWF location and the ECP plots, different vadose zone properties are recommended for the ECP plots versus the properties recommended by Phifer et al. (2006) for the current disposal units. Results from this study do not invalidate or conflict with the current PA's use of the Upper and Lower Vadose Zone properties as described by Phifer et al. (2006) for the current ELLWF disposal units. The following modeling recommendations are made for future modeling of the ECP plots where vadose zone properties are required: (1) If a single vadose zone property is preferred, the properties described by Phifer et al. (2006) for the Upper Vadose Zone encompass the general physical properties of the combined sands and clays in the ECP vadose zone sediments despite the differences in hydrostratigraphic units. (2) If a dual zone system is preferred, a combination of the Lower Zone properties and the Clay properties described by Phifer et al. (2006) are appropriate for modeling the physical properties of the ECP vadose zone. The Clay properties would be assigned to the Tan Clay Confining Zone (TCCZ) and any other significant clay layers, while the Lower Zone properties would be assigned for the remainder of the vadose zone. No immediate updates or changes are recommended for the saturated zone properties for modeling of the ECP plots. The hydrogeology and saturated hydraulic conductivity values resulting from the ECP work are consistent with existing data for the area. The following recommendations are provided for consideration in future work: (1) When the database is next updated, we recommend checking/refining hydrostratigraphic interpretations (picks) in addition to revising physical property data for both the vadose zone and saturated zone. (2) Results from this work suggest that separate ECP vadose zone properties may be appropriate for the various ECP plots. Consideration should be given to the fact that the plots toward the northwest (ECP plots 6, 7 and 8) all have the TCCZ within the vadose zone whereas the TCCZ occurs within the saturated zone to the east (ECP plot 9). (3) Further data may be needed at ECP plot 7.

54 ENVIRONMENTAL SCIENCES↗

Idaho National Laboratory Integrated Multisite SSHAC Level 3: Probabilistic Volcanic Hazards Assessment

The Idaho National Laboratory (INL) resides on the eastern Snake River Plain (ESRP), part of the Snake River Plain (SRP) with a complex origin and geologic history of volcanism. Much of the Quaternary (last 2.58 million years) volcanism within 400 km of INL is genetically associated with a major thermal anomaly referred to as the Yellowstone hotspot, which is currently located more than 180 km northeast of INL. Near INL, local volcanic sources include silicic domes near its southern border, and numerous dike-fed basaltic vents of the ESRP, some of which are near or within the INL boundaries. Quantitative probabilistic assessments of screened-in volcanic hazardous phenomena for nine different facility complexes at the INL are presented for a Senior Seismic Hazard Analysis Committee (SSHAC) Level 3 (SL3) study. The comprehensive, integrated multisite SSHAC study consists of a single regional Probabilistic Volcanic Hazards Assessment (PVHA) that pertains to all nine INL facility complexes, with site-specific information developed at each respective area of interest (AOI), referred to as the "INL facility AOI" (Figure ES-1). Hazard products are generated for specified INL facility AOIs for use by multiple stakeholders from different agencies in risk-informed decision-making regarding site selection, operations, and design of nuclear facilities at INL, consistent with U.S. Department of Energy (DOE) and U.S. Nuclear Regulatory Commission (NRC) regulatory guidance. The study also serves as the basis for future periodic safety assessments required for existing DOE facilities, such as 10-year evaluations of natural-phenomena hazards. Elements of the INL PVHA including initial characterization, screening, quantitative assessments of eruption and hazard potential, and consideration of facility needs are conducted using the three phases of the SSHAC process: evaluation, integration, and documentation. As per regulatory guidance, the SSHAC framework provided the necessary processes and procedures for the PVHA Technical Integration (TI) team, at three workshops, five formal working meetings and many TI team remote meetings, to conduct initial characterization, screen the volcanic hazards, create PVHA model inputs, exercise those models in the PVHA, consider facility-specific volcanic hazard needs, and perform final hazard calculations. The Participatory Peer Review Panel (PPRP) provided independent oversight and performed process and technical reviews of the PVHA throughout its duration. The study included an extensive New Data Collection and Analyses (NDCA) program developed by the PVHA TI team to reduce uncertainties in hazard-significant elements in the PVHA model. NDCA activities generated 20 reports providing important contributory datasets and results to the project database for characterizing the ESRP. For example, a report compiling the dimensions of ESRP shield volcanoes and lava fields was used to construct volcanic footprints (areas of impact), was compared with data from INL subsurface cores, and was used to validate the results of lava-flow inundation modeling on the contemporary terrain. Another example is the acquisition of aeromagnetic data over INL and its surrounding area, with maps of buried magmatic features (e.g., subsurface volcanoes and swarms of feeder dikes) that informed the PVHA conceptual model of volcanism. The SSHAC evaluation process was used to conduct all elements of the PVHA including initial characterization and screening. Existing data and NDCA activities provided the foundation to develop the tectonomagmatic conceptual model of volcanism for the region of geographical interest in the SRP and Yellowstone hotspot volcanic system, and for considering volcanoes in the western US. Considering Quaternary volcanic sources active during this period, the screening approach identified and evaluated magma compositions, types of eruptive and intrusive phenomena, types of hazardous phenomena, and proximity of sources to INL. The PVHA TI team evaluated 18 types of magmatic sources in terms of 20 potentially hazardous phenomena, resulting in 360 screening decisions. The screening process resulted in 140 screened-in hazardous volcanic phenomena for Quaternary volcanic sources 1) proximal to INL facility complexes in the ESRP (64 basaltic and 54 silicic), 2) regional sources associated with the Yellowstone caldera system and Blackfoot Reservoir volcanic field (7), and 3) more distal sources from thirteen Cascade volcanoes and two volcanoes at Long Valley caldera (CA).

58 GEOSCIENCES↗

Development of Pseudorandom Binary Arrays for Calibration of Surface Profile Metrology Tools

Optical metrology tools, especially for short wavelengths (extreme ultraviolet and x-ray), must cover a wide range of spatial frequencies from the very low, which affects figure, to the important mid-spatial frequencies and the high spatial frequency range, which produces undesirable scattering. A major difficulty in using surface profilometers arises due to the unknown point-spread function (PSF) of the instruments [G. D. Boreman, Modulation Transfer Function in Optical and Electro-Optical Systems (SPIE, Bellingham, WA, 2001)] that is responsible for distortion of the measured surface profile. Generally, the distortion due to the PSF is difficult to account for because the PSF is a complex function that comes to the measurement via the convolution operation, while the measured profile is described with a real function. Accounting for instrumental PSF becomes significantly simpler if the result of measurement of a profile is presented in the spatial frequency domain as a power spectral density (PSD) distribution [J. W. Goodman, Introduction to Fourier Optics, 3rd ed. (Roberts and Company, Englewood, CO, 2005)]. For example, measured PSD distributions provide a closed set of data necessary for three-dimensional calculations of scattering of light by the optical surfaces [E. L. Church et al., Opt. Eng. (Bellingham) 18, 125 (1979); J. C. Stover, Optical Scattering, 2nd ed. (SPIE Optical Engineering Press, Bellingham, WA, 1995)]. The distortion of the surface PSD distribution due to the PSF can be modeled with the modulation transfer function (MTF), which is defined over the spatial frequency bandwidth of the instrument. The measured PSD distribution can be presented as a product of the squared MTF and the ideal PSD distribution inherent for the system under test. Therefore, the instrumental MTF can be evaluated by comparing a measured PSD distribution of a known test surface with the corresponding ideal numerically simulated PSD. The square root of the ratio of the measured and simulated PSD distributions gives the MTF of the instrument. The applicability of the MTF concept to phase map measurements with optical interferometric microscopes needs to be experimentally verified as the optical tool and algorithms may introduce nonlinear artifacts into the process. In previous work [V. V. Yashchuk et al., Proc. SPIE 6704, 670408 (2007); Valeriy V. Yashchuk et al., Opt. Eng. (Bellingham) 47, 073602 (2008)] the instrumental MTF of a surface profiler was precisely measured using reference test surfaces based on binary pseudorandom (BPR) gratings. Here, the authors present results of fabricating and using two-dimensional (2D) BPR arrays that allow for a direct 2D calibration of the instrumental MTF. BPR sequences are widely used in engineering and communication applications such as global position systems and wireless communication protocols. The ideal BPR pattern has a flat 'white noise' response over the entire range of spatial frequencies of interest. The BPR array used here is based on the uniformly redundant array (URA) prescription [E. E. Fenimore and T. M. Cannon, Appl. Opt. 17, 337 (1978)] initially used for x-ray and gamma ray astronomy applications. The URA's superior imaging capability originates from the fact that its cyclical autocorrelation function very closely approximates a delta function, which produces a flat PSD. Three different size BPR array patterns were fabricated by electron beam lithography and induction coupled plasma etching of silicon. The basic size units were 200, 400, and 600 nm. Two different etch processes were used, CF{sub 4}/Ar and HBr, which resulted in undercut and vertical sidewall profiles, respectively. The 2D BPR arrays were used as standard test surfaces for MTF calibration of the MicroMap{trademark}-570 interferometric microscope using all available objectives. The MicroMap{trademark}-570 interferometric microscope uses incoherent illumination from a tungsten filament source and common path modulated phase shifting interference to produce a set of interferograms detected on a change coupled device. Mathematical algorithms applied to the datasets yield the surface phase map. The HBr etched two-dimensional BPR arrays have proven to be a very effective calibration standard making possible direct calibration corrections without the need of additional calculation considerations, while departures from the ideal vertical sidewall require an additional correction term for the CF{sub 4}/Ar etched samples [Samuel K. Barber et al., Abstract to Optics and Photonics 2009: Optical Engineering and Applications Symposium, San Diego, CA, 2-6 August 2009]. Initial surface roughness of low cost 'prime' wafers limits low magnification calibration but should not be a limitation if better polished samples are used.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Indoor Radon Measurements from Residential Buildings with Basements in a Community with Potential LLRW Contamination - 19566

The Port Hope Area Initiative (PHAI) represents the Government of Canada's commitment to the cleanup and safe, local, long-term management of historic low-level radioactive waste (LLRW) in two Southern Ontario municipalities-Port Hope and Clarington. The PHAI (see reference for internet address) is based on community-recommended solutions for the cleanup and safe long-term management of approximately 1.7 million cubic meters of LLRW. It is currently one of Canada's largest environmental remediation projects at a cost of over one billion dollars. Canadian Nuclear Laboratories (CNL) is implementing the PHAI on behalf of Atomic Energy of Canada Limited, a Federal Crown Corporation. An initial characterization and remediation program in the urban area of Port Hope was conducted from 1976 to 1981. The waste is the result of radium and uranium processing in Port Hope by the former Federal Crown Corporation Eldorado Nuclear Limited between 1933 and 1988. One contaminant of concern in the LLRW is radium-226 (Ra-226) which may lead to elevated indoor levels of radon-222 (Rn-222) indoors. As part of CNL's implementation of the PHAI, Arcadis is conducting the Port Hope Project Property Radiological Survey of approximately 4,800 small-scale sites to identify 1) properties that have not been affected by historic operations and 2) properties that have residual historic low-level radioactive waste impacts requiring remediation either for soils or for interior contamination or both. Over the last six years, a component of the Small Scale Sites (SSS) characterization surveys have measured radon concentrations in essentially all buildings in Port Hope using alpha-track detectors. All properties had subsurface characterization including analytical characterization and lithology following the radon measurement reporting to measure if soil concentrations exceeded the PHAI Cleanup Criteria (PHAI CC) for Ra-226 of 0.29 Bq/g. Buildings with radon gas exceeding a trigger level of 200 becquerels per cubic meter (Bq/m{sup 3}) or those with ventilation systems required investigation of soil concentrations around the perimeter of the building. Ra-226 concentrations above the background level of 0.05 Bq/g due to LLRW sources were forwarded to create remedial action plans (RAPs) to remove the contamination near the building. The SSS surveys provide a substantive data set on the approximately 3,000 properties measured to date with interior Rn-222 gas measurements and descriptions of the physical characteristics of the buildings, the lithology of soils near the buildings and the measurements of Ra-226 concentration in the soils on the property. Consideration of the potential for contribution from non-LLRW Ra-226 from natural sources or coal ash was required on some properties. This paper describes the data and exploratory analysis of the relationship(s) between LLRW and non-LLRW factors that affect the variation in indoor radon concentrations. Historical information on the urban area, the measured Ra-226 concentration and the age of the building were correlated with radon concentrations. A large variety of native soils are found in the complex terrain and the type of native soil was correlated with the radon concentrations. A statistical analysis to address the impact of co-related explanatory variables to model indoor radon concentrations is planned when the SSS activities are complete. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Geodyn Material Library: Pseudocap models for dry porous tocks

This report describes the second edition of the Pseudocap Strength models for porous rocks implemented in GEODYN material library. The first model was developed in 2007 and calibrated for concrete. Then, the model parameters were calibrated based on triaxial tests reported for limestones and sandstones of various porosities. In these models some key parameters were chosen as functions of the reference porosity,Φ. Since then multiple modifications were implemented in the model, therefore, it has been recalibrated for some common porous materials such as limestones, sandstones, alluvium, tuffs and granite. Two types of models are described in this repot. The first type (called Pseudocap Model or PM) is for rocks from a specific location. Parameters were calibrated for several specific geologic materials. The second type (called Generic Pseudocap Model or GPM) is useful for the sites where only basic information (rock type, porosity) is available. Generic models include built-in correlations between porosities and other mechanical properties observed for certain rock types. The models of both types were validated by comparing not only to quasi-static triaxial tests for these materials but also to shock Hugoniot data and spherical explosion data for some materials. All models were derived in the frame of isotropic plasticity. They are designed to be used in explicit finite element/difference codes. Tangent stiffness tensor is not provided but can be calculated numerically for the model to be used in implicit finite element codes. For an isotropic material the stress can be decomposed into volumetric and deviatoric parts. The volumetric part is modeled using an Equation of state (EOS) which calculates the pressure and the bulk sound speed as functions of the internal specific energy and density. Here a simple, Mie-Gruneisen EOS is presented, but tabulated EOS (LEOS) provided by the library can be used as well. The stress is limited by the yield surface which depends on three invariants of the stress tensor and specific internal energy. In addition, to capture the strain-rate dependence a simple multiplier is used for the yield surface which depends on the equivalent plastic strain rate. The failure surface (the ultimate yield, Y f , defined later) is chosen in the Hoek-Brown form, commonly used in rock mechanics. It includes measurable parameters such as Unconfined Compressive Strength (UCS) as well as scale parameters characterizing the quality of the rock such as GSI (Geologic Strength Index). Thus, even though the model is calibrated for small samples it offers a way to extrapolate the strength to the field scale using geological characterization of the rock mass. The model captures effects of brittle-ductile transition in rocks by introducing a cap multiplier to the yield function. The rate of dilatancy (bulking) is proportional to the slope of the yield surface affected by the cap. Therefore, it takes place only at low confinements when the pressure is less than the brittle-ductile transition pressure, P BD . On the contrary, the porous compaction takes place at pressures higher than P BD . The cap moves as the porosity is compacted or new porosity is generated due to dilatancy. The porous compaction is modeled using an evolution equation which includes deviatoric stress so that the onset of compaction corresponds to the cap surface. The model captures effects of shear-enhanced compaction which is an important for porous rocks. Section 2 describes the modeling framework and Section 3 presents the model calibration procedure. Section 4 compares experimental data for various rocks versus model predictions. The model parameters used for this comparison are given in Appendix. The files with material constants are available with the latest GEODYN material library distribution.

58 GEOSCIENCES↗

Chemical Composition and PCT Data for the Initial Set of Hanford Enhanced Waste Loading Glasses

In this report, the Savannah River National Laboratory provides chemical analyses and Product Consistency Test results for 20 simulated high level waste glasses fabricated by the Pacific Northwest National Laboratory. The results of these analyses will be used as part of efforts to revise or extend the validation ranges of the current Hanford Waste Treatment and Immobilization Plant glass property models to cover a broader span of waste compositions. The measured chemical composition data are reported and compared with the targeted values for each component for each glass. Two components of the study glasses, fluorine and silver, were not measured since each of these species would have required the use of an additional preparation method and their measured values were likely to be near or below analytical detection limits. Some of the glasses were difficult to prepare for chemical analysis. A sodium peroxide fusion dissolution method was successful in completely dissolving the glasses. Components present in the glasses in minor concentrations can be difficult to measure using this dissolution method due to dilution requirements. The use of a lithium metaborate preparation method for the minor components (planned for use since it is typically successful in digesting Defense Waste Processing Facility HLW glasses) resulted in an unacceptable amount of undissolved solids remaining in the sample solutions. An acid dissolution method was used instead, which provided more thorough dissolution of the glasses, although a small amount of undissolved material remained for some of the study glasses. The undissolved material was analyzed to determine those components of the glasses that did not fully dissolve. These components (e.g., calcium and chromium) were present in sufficient quantities to be reported from the measurements resulting from the sodium peroxide fusion preparation method, which did not leave undissolved material. Overall, the analyses resulted in sums of oxides that ranged from about 98 to 101.5 wt % for the study glasses, indicating excellent recovery of all the components in the chemical composition analyses. Comparisons of the targeted and measured chemical compositions indicated that, in general, the measured values for the glasses met the targeted concentrations. Exceptions were Cr 2 O 3 , MgO, and P 2 O 5 . The measured values for Cr 2 O 3 were somewhat low when compared to the targeted values for all of the study glasses targeting Cr 2 O 3 concentrations above 0.5 wt %. Many of the measured MgO and P 2 O 5 values were below the targeted values for those glasses that contained these components. Two of the study glasses exhibited differences from the targeted compositions that may indicate a batching error. Glasses EWG-HAI-Centroid-2 and EWG-OL-1672 had measured values for Al 2 O 3 and SiO 2 that were lower than the targeted values, and measured values for B 2 O 3 that were higher than the targeted values. Glass EWG-HAI-Centroid-2 also had a measured value for Fe 2 O 3 that was lower than the targeted value. A review of the PCT data, including standards and blanks, revealed no issues with the performance of the tests. The PCT results were normalized to both the targeted and measured compositions of the study glasses. Comparisons of the normalized PCT results for both the quenched and Canister Centerline Cooled versions of the study glasses are made with the Environmental Assessment benchmark glass for reference.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vitrification of Hanford Tank 241-AP-101 Waste and Simulant

Hanford tank 241-AP-101 (referred to herein as AP-101) is the second Hanford radioactive tank waste planned to be processed and vitrified. A simulant version of AP 101 waste was formulated from the best-basis inventory (BBI) for the Hanford Tank 241-AP-101 liquid with an assumed target dilution of the waste from the BBI sodium molarity of 8.61 M to the desired 5.5 M Na. After the addition of glass-forming chemicals (GFCs), the simulant melter feed was processed in a non-radioactive, continuous laboratory-scale melter (CLSM) system. The AP-101 simulant melter feed was charged into the CLSM for 6.11 h of processing, which produced 6.55 kg of glass, for an average glass production rate of 2275 kg m 2 d -1 . Since there were no processing issues with the AP-101 simulant melter feed, AP-101 melter feed made with actual waste was then processed in a CLSM system built into a contamination area in a radioactive environment. The melting behavior characteristics appeared similar for both the simulant and waste melter feeds. The AP-101 waste melter feed was charged into the CLSM for 12.14 h of processing, which produced 8.75 kg of glass, for an average glass production rate of 1530 kg m 2 d -1 . During the AP-101 waste melter feed charging, the pump used to move the feed reached a maximum and it is believed that if the pump had a greater capacity, a greater average glass production rate could have been achieved. A constituent of interest present in low quantities in the AP-101 waste is 99 Tc or its non-radioactive surrogate, Re, added to the AP-101 simulant. Analysis for the quantities of 99 Tc and Re in the AP-101 glass product resulted in an average single-pass retention from the melter feed during relative chemical steady state of 55 ± 2 % for 99 Tc and 45 ± 2 % for Re. Compared to the processing of other melter feeds, the retention of 99 Tc in the AP-101 glass was greater than in both AP-107 and AP-105 glass, while the retention of Re in the AP-101 was less than in the AP-107 glass, but greater than in the AP-105 glass. A spike of I was added into the AP-101 melter feed that could be detected above the analysis detection limits. However, the iodine was only detectable above the ~6 ppm limit in one glass pour: the pour immediately following the burn off of the cold cap, where the I level reached ~30 ppm. This event was significant because the glass was poured immediately after burn off and thus it is presumed that the iodine had yet to volatilize from the glass melt while idling. It is recommended to perform future tests with I spikes at greater levels so that it can be detected in additional glass pours to determine if the expected 50 % retention of I used in the Kim et al. glass models can be confirmed. Offgas liquid samples were analyzed for acetonitrile, which was present at greater concentrations in CLSM liquids than in other scaled melter systems. This result was expected based on unique conditions with the CLSM system including a small plenum space leading to low residence time for offgas and the rapidity of offgas cooling upon exiting the CLSM vessel due to the location and environment. About 90 % of the total acetonitrile captured during both the AP-101 simulant and waste CLSM runs was found in the offgas condensate and demister liquids, thus it is recommended that only those liquids be sent for analysis if future testing to study the presence of acetonitrile in offgas products is desired.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Corrosion of Structural Materials for Advanced Supercritical Carbon- Dioxide Brayton Cycle

The supercritical carbon-dioxide (referred to as SC-CO 2 hereon) Brayton cycle is being considered for power conversion systems for a number of nuclear reactor concepts, including the sodium fast reactor (SFR), fluoride saltcooled high temperature reactor (FHR), and high temperature gas reactor (HTGR), and several types of small modular reactors (SMR). The SC-CO 2 direct cycle gas fast reactor has also been recently proposed. The SC-CO 2 Brayton cycle (discussed in Chapter 1) provides higher efficiencies compared to the Rankine steam cycle due to less compression work stemming from higher SC-CO 2 densities, and allows for smaller components size, fewer components, and simpler cycle layout. For example, in the case of a SFR using a SC-CO 2 Brayton cycle instead of a steam cycle would also eliminate the possibility of sodium-water interactions. The SC-CO 2 cycle has a higher efficiency than the helium Brayton cycle, with the additional advantage of being able to operate at lower temperatures and higher pressures. In general, the SC-CO 2 Brayton cycle is well-suited for any type of nuclear reactor (including SMR) with core outlet temperature above ~ 500°C in either direct or indirect versions. In all the above applications, materials corrosion in high temperature SC-CO 2 is an important consideration, given their expected lifetimes of 20 years or longer. Our discussions with National Laboratories and private industry early on in this project indicated materials corrosion to be one of the significant gaps in the implementation of SC-CO 2 Brayton cycle. Corrosion can lead to a loss of effective load-bearing wall thickness of a component and can potentially lead to the generation of oxide particulate debris which can lead to three-body wear in turbomachinery components. Another environmental degradation effect that is rather unique to CO 2 environment is the possibility for simultaneous occurrence of carburization during oxidation of the material. Carburization can potentially lead to embrittlement of structural alloys in SC-CO 2 Brayton cycle. An important consideration in regards to corrosion is that the temperatures can vary widely across the various sections of the SC-CO 2 Brayton cycle, from room temperature to 750°C, with even higher temperatures being desirable for higher efficiencies. Thus the extent of corrosion and corrosion mechanisms in various components and SC-CO 2 Brayton cycle will be different, requiring a judicious selection of materials for different sections of the cycle. The goal of this project was to address materials corrosion-related challenges, identify appropriate materials, and advance the body of scientific knowledge in the area of high temperature SC-CO 2 corrosion. The focus was on corrosion of materials in SC-CO 2 environment in the temperature range of 450°C to 750°C at a pressure of 2900 psi for exposure duration for up to 1000 hours. The Table below lists the materials tested in the project. The materials were selected based on their high temperature strength, their code certification status, commercial availabilities, and their prior or current usage in the nuclear reactor industry. Additionally, pure Fe, Fe-12%Cr, and Ni-22%Cr were investigated as simple model materials to more clearly understand corrosion mechanisms. This first phase of the project involved testing in research grade SC-CO 2 (99.999% purity). Specially designed autoclaves with high fidelity temperature, pressure, and flow control capabilities were built or modified for this project.

36 MATERIALS SCIENCE↗

Microchannel-based Membrane-less Extraction of Li from Unconventional Lithium Sources & the Separation of REE

This final report provides an overview of the Project's entire duration, covering July 1, 2021 to December 31, 2023. It primarily focuses on the achievements, technological developments, and unique challenges the team faced while working on separating and extracting Lithium from produced waters. The project's primary aim was to create an integrated, high-throughput, membrane-less, and modular microfluidic platform that could extract Lithium from unconventional sources. We have successfully met all goals and milestones envisioned in the SOPO document. The most critical primary milestones, including the Go-No-Go milestone (refer to the Gantt chart in the Appendices), were successfully accomplished. We demonstrated phase separation (>90%) and extraction (>85%) performance in the MPSE using synthetic, and representative produced water composition feed at 50 ml/min total flow through MPSE 36. We have also performed a parametric study of the MPSE operations, beyond the scope of SOPO, exploring operating conditions of current and broader interest. The extended investigation of operational parameters is concurrent with our efforts to seek further development of the MPSE technology beyond the scope of the Project. Along these lines of development, we have made efforts to be responsive to DOE calls for technological developments of other types of resources (beyond PW) for the recovery of Critical Materials and higher TRL development (beyond TRL 4). During the work on this Project, we developed and implemented three innovative technical approaches that emerged from our efforts to successfully meet the Project milestones. The innovative & original technical approaches developed and implemented in this Project are now the contributions to process engineering that could be clearly credited to the Project. First, Convergent Design Approach is a comprehensive feedforward & feedback loop of four design phases: i) design for functionality, ii) design for manufacturing, iii) design for sustainability, and iv) design for market. Next was Process Intensification. A major aim of this Project was to create an innovative phase separation & extraction microscale-based technology for Li separation – thus the words microchannel-based in the Project title. A microscale-based technology is intrinsically in the center of the Process Intensification domain as defined by its unique principles. Therefore, Process Intensification was implicitly envisioned in the Project’s SOPO. Lastly, Time Scale Analysis is a novel tool for discovering the needs and directions of Process Intensification implementations in any process technology. This Project is fully credited for developing and implementing the three novel technical approaches mentioned above. These are general contributions to process engineering that emerged from this Project. Beyond the original SOPO scope, the OSU-U.Pitt research group utilized a Convergent Design methodology, integrating first-principles mathematical modeling with experimental validation on the Minimum Development Vehicle. By creating these Digital Twins, the team rapidly assessed manufacturing iterations to support TEA analysis. This framework further enabled the development of advanced Surface Modification Techniques, where hydrophobic and oleophobic coating strategies were optimized via Digital Twin tools and validated through rigorous 100-hour longevity testing. TEA Analysis: The closing efforts of this Project were focused on the TEA analysis. TEA analysis had two primary functions: i) enabling critical assessments of design variations withing 10 the Concurrent Design Approach, thus enabling evolution of the MPSE design to reach faster- better-cheaper alternatives; and ii) to create a bridge between the accomplishments of this Project and future projects of higher TRL, beyond TRL 6 level. It is important to note that the TEA model created in the Project stirred the technological solutions for the recovery of critical materials toward a vision of a very profitable modular plant that has unique zero-waste water discharge signature. More importantly, thanks to our experimental performance data and conservative assumptions, the TEA model predicts minimal technological and investment risks. Low cost of a modular unit of a nominal capacity of [1000 tons of Li 2 CO 3 /year] positions the MPSE based technology within the reach of community investors, thus offering a paradigm shift in the development of critical technologies. The project successfully navigated two primary challenges: solvent selection and manufacturing adaptation. Restricted by the SOPO to existing literature for lithium recovery, the team identified a critical need for a "material excellence program" to develop next-generation solvents, eventually concluding with a preliminary investigation into promising Ionic Liquids (ILs). Simultaneously, COVID-19 supply chain disruptions forced a pivot from traditional manufacturing to advanced additive methods at ATAMI-OSU. By transitioning from stainless steel to 3D-printed polymer substrates, the team achieved a transformative three-order-of- magnitude reduction in manufacturing costs and compressed prototyping timelines from several months to just two days. The MPSE technology offers significant energy, environmental, and economic advantages by overcoming the traditional bottlenecks of phase-separation hardware and contactor size. Unlike conventional mixer-settlers or membrane-based systems, MPSE operates without moving parts or fouling-prone membranes, achieving robust performance even with challenging, viscous, or particulate-heavy feeds. Key performance metrics include an energy intensity reduction of 5–50x (3–40 kJ/m 3 ) compared to incumbent technologies and a dramatic reduction of processing time to under 60 seconds, which drastically reduces the physical plant footprint. These technical efficiencies translate into superior economic outcomes; for a 100 t/year Li 2 CO 3 facility, implementing MPSE is projected to nearly halve contactor CAPEX (from $\$$6.08M to $\$$3.01M) and significantly increase the project's Net Present Value (NPV), derisking new investment and enabling distributed critical-mineral processing configurations. The commercialization of MPSE technology is being spearheaded by Vigsur Dynamics Inc., which has adopted a structured, parallel approach to technical and business development since its formation in January 2026. Following extensive customer discovery and engagement with the Oregon State University accelerator, Vigsur Dynamics is working to establish a business model that transitions from pilot demonstrations to modular hardware sales, ultimately aiming for a "build-own-operate" service strategy. Current technical milestones—including 100 hours of continuous operation, superior energy efficiency, and successful 6-unit modular scale-up— provide a foundation for this transition. Backed by ongoing IP licensing and a growing network of industrial and venture advisors, the company is actively de-risking the platform to replace conventional mixer-settler systems in the critical minerals market.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Distributed fiber sensing systems for 3D combustion temperature field monitoring in coal-fired boilers using optically generated acoustic waves (Final Report)

In this project, we have developed and tested three kinds of fiber optic sensing systems for real time monitoring of temperature variations within an industrial scale boiler furnace. The fiber optic sensing systems target spatial and temporal distributions of high temperature profiles in a boiler furnace in fossil power plants. The reconstructed temperature profile will provide critical input for the control mechanisms to optimize the combustion process. This temperature profile will address the essential problem for fossil power plants in achieving higher efficiency and fewer pollutant emissions. Acoustic pyrometer systems have been used to reconstruct temperature field of power plant boilers based on measuring TOF (times-of-flight) of sound waves along some straight paths in a 2D cross-section of the boiler. In this project, optically generated acoustic signals from a fiber optic sensing system have replaced the acoustic signals generated from an electrical transducer. A 3D reconstruction algorithm replaced the previous 2D model. In this project, three kinds of fiber optic sensing systems have been developed and tested. They are fiber optic sensing system I, fiber optic sensing system II (Distributed Sensing System I) and fiber optic sensing system III (Distributed Sensing System II). For fiber optic sensing system I, the fiber optic ultrasound generator acts as a signal generator. A microphone, hydrophone or other electronic devices serve as a signal receiver. In this system, there are one generator and one receiver. Distance test, water temperature test, air temperature test, air temperature reconstruction, and GE ISBF pilot test were performed by Fiber optic sensing system I. The fiber optic sensing system I successfully detected temperature in all these tests. We got 2D temperature reconstruction results by using the fiber optic sensing system I and it matched the reference data. The fiber optic sensing system I successfully survived in GE ISBF boiler environment (480 °F). For fiber optic sensing system II (Distributed Sensing System I), it is an all optical ultrasound system. The fiber optic ultrasound generator acts as a signal generator. Fiber Bragg Grating (FBG) and Fabry-Perot (FP) sensor act as a signal receiver. In this system, there is one generator and one receiver. Aluminum plate temperature test, furnace high temperature test, and GE ISBF pilot test were performed by the fiber optic sensing system II. Fiber optic sensing system II successfully detected the temperature in all these tests. The fiber optic sensing system II successfully survived at up to 700 °C furnace environment and 320 °C GE ISBF boiler environment. For fiber optic sensing system III (Distributed Sensing System II), it is also an all optical ultrasound system. The fiber optic ultrasound generator acts as a signal generator. Multiple FP fiber sensors act as signal receivers. In this system, there is one generator and three receivers. Three GE ISBF pilot tests were performed by fiber optic sensing system III. The fiber optic sensing system III survived in the cold flow tests in GE’s ISBF pilot test facility. However, we didn’t get high temperature data by using this system since the nanosecond laser issues. During the period of the project, test trials, data simulation and algorithm optimization was performed successfully. For real time temperature field construction, the sampling rate must be fast enough to capture the field variations. The technology of Code-division multiple access (CDMA) is well studied which could allow parallel multiplexing, even if signals overlap in time or frequencies. Moreover, it has been known that extending the length of signal significantly improves SNR. For acoustic signals, these multiplexing techniques have also been widely used, mainly for sonar and acoustic communications. The CDMA modulation technique has been proposed and studied to guarantee high network throughput, low channel access delay and low energy consumption. We have studied the temperature field reconstruction using Gaussian Radial Basis Functions (GRBF)-based approximation approach. Reconstruction of 3D temperature field using Neural Networks with measured TOF and known propagation paths is feasible. 2D and 3D temperature field reconstruction simulation results are achieved. The milestone status is shown in Table 1. We finished milestone 1-8 and milestone 10. For milestone 9, we did three pilot tests by using the fiber optic sensing system III (Distributed Sensing System II) at GE Power. However, due to the failure of the ns laser, we did not get the temperature results. We conducted some additional tasks that were not originally proposed: 1) We fabricated a fiber optic sensing system I and did a pilot test based on this system. 2) In the proposal, we proposed two pilot tests at GE Power. In reality, we finished at least seven pilot tests at GE Power. GE Power has made a lot of efforts for supporting the pilot tests. 3) We got a simulation results based on CDMA. In summary, most of the tasks have been accomplished. The outcome of this project removed a few barriers that hinder the achievement of the final product of the distributed sensing systems. With the successful accomplishment of this project, a prototype of the fiber optic sensing system can be fabricated to attract more interests from companies and other funding agencies.

47 OTHER INSTRUMENTATION↗

AGR-5/6/7 Irradiation Test Final As-run Report

This document presents the as-run analysis of the Advanced Gas Reactor (AGR) 5/6/7 irradiation experiment. AGR-5/6/7 is the last of a series of experiments conducted in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) in support of the development and qualification of tri-structural isotropic (TRISO) low enriched fuel for use in high-temperature gas-cooled reactors (HTGR). The test train contained five separate capsules that were independently controlled and monitored. Each capsule contained multiple 24.91-mm-long and 12.25-mm-dimeter compacts filled with low-enriched uranium carbide/oxide tri-structural isotropic fuel particles. The objectives of the AGR 5/6/7 experiment were to: 1. Irradiate reference-design fuel particles to support fuel qualification. 2. Establish operating margins for the fuel, beyond normal operating conditions. 3. Provide irradiated-fuel performance data and irradiated-fuel samples for post irradiation examination and safety testing. The primary objective of the AGR-5/6 test (Capsules 1, 2, 4, and 5) was to verify the successful performance of the reference-design fuel under normal operating conditions. The AGR-7 test (Capsule 3) was designed to explore fuel performance at higher temperatures. Its primary objective is to demonstrate the capability of the fuel to withstand conditions beyond normal operating conditions, in support of plant design and licensing. AGR 5/6/7 will also provide irradiated-fuel performance data based on the fission gas release from particles during irradiation. To achieve the test objectives, the AGR-5/6/7 experiment was irradiated in the northeast (NE) flux trap of the ATR with a planned duration of 500 effective full-power days (EFPDs). The NE flux trap was selected because its larger diameter provided greater flexibility for test-train design compared to the Large B positions used for the AGR-1 and AGR-2 irradiations, significantly enhancing test capabilities for the combined irradiation campaigns. Due to delays in the ATR schedule, the AGR-5/6/7 irradiation was significantly shorter than the originally planned 13-cycle schedule. Irradiation began on February 16, 2018 and ended on July 22, 2020, spanning nine ATR cycles (162B?168A) over two and a half years. Thus, the AGR-5/6/7 fuel compacts were irradiated for a total of approximately 360.9 EFPDs. Final burnup values, on a per-compact basis, ranged from 5.66% to 15.26% fissions per initial heavy metal atom, while fast fluence values ranged from 1.62 to 5.55 × 1025 n/m2 (E >0.18 MeV). Time-averaged volume-averaged fuel temperatures on a capsule basis at the end of irradiation ranged from 756°C in Capsule 5 to 1313°C in Capsule 3 excluding days with significantly lower temperature during the two short powered axial locator mechanism cycles, 163A and 167A. By the end of irradiation, 48 out of 54 installed thermocouples (TC) had failed (the bottom three capsules lost all TCs). During the first five cycles (162B ? 165A), fission-gas isotope release-rate-to-birthrate (R/B) ratios were stable in the 10-8?10-6 range, and no in-pile particle failures were observed based on the gross gamma counts. During this time, the high exposed kernel fraction and high fuel particle temperatures in Capsule 1 led to the maximum R/B value of around 2 ? 10-6 for Kr-85m. The fission gas release in all capsules started to increase from the second half of Cycle 166A, when a large number of in-pile particle failures occurred in Capsule 1 and a gas line problem in this capsule caused fission gas leakage at various degrees into the other four capsules. This gas line problem also prevented fission gas release measurement for Capsule 1 during the last three cycles due to gas flow isolation. By the end of irradiation, it is estimated that approximately 15 particle failures in Capsule 3, which was considered possible at the start of the irradiation, since the experiment was designed to operate beyond the high-temperature gas-cooled reactor (HTGR) normal operating temperature range. A few hundred in-pile particle failures were estimated for Capsule 1 by the end of Cycle 166A, but the total number of failures is unknown due to lack of fission gas release data in the later cycles. Additionally, four potential in-pile failures were identified for Capsule 2 during the last cycle, 168A. In contrast, no in-pile failures were identified in the top two capsules (4 and 5) based on absence of the typical spikes in gross gamma counts and low failure estimates using the AGR-3/4 R/B per exposed kernel model.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

AGR-5/6/7 Irradiation Test Final As-run Report

This document presents the as-run analysis of the Advanced Gas Reactor (AGR)-5/6/7 irradiation experiment. AGR-5/6/7 is the last of a series of experiments conducted in the Advanced Test Reactor (ATR) at Idaho National Laboratory in support of the development and qualification of tri-structural isotropic low-enriched fuel for use in high-temperature gas-cooled reactors. The test train contained five separate capsules that were independently controlled and monitored. Each capsule contained multiple 24.91-mm-long and 12.25-mm-dimeter compacts filled with low-enriched uranium carbide/oxide tri-structural isotropic fuel particles. The objectives of the AGR-5/6/7 experiment were to: • Irradiate reference-design fuel particles to support fuel qualification. • Establish operating margins for the fuel, beyond normal operating conditions. • Provide irradiated-fuel performance data and irradiated-fuel samples for post-irradiation examination and safety testing. The primary objective of the AGR-5/6 test (Capsules 1, 2, 4, and 5) was to verify the successful performance of the reference-design fuel under normal operating conditions. The AGR-7 test (Capsule 3) was designed to explore fuel performance at higher temperatures. Its primary objective was to demonstrate the capability of the fuel to withstand conditions beyond normal operating conditions, in support of plant design and licensing. AGR-5/6/7 will also provide irradiated-fuel performance data based on the fission gas release from particles during irradiation. To achieve the test objectives, the AGR-5/6/7 experiment was irradiated in the northeast flux trap of the ATR with a planned duration of 500 effective full-power days. The northeast flux trap was selected because its larger diameter provided greater flexibility for test-train design compared to the Large B positions used for the AGR-1 and AGR-2 irradiations, significantly enhancing test capabilities for the combined irradiation campaigns. Due to delays in the ATR schedule, the AGR-5/6/7 irradiation was significantly shorter than the originally planned 13-cycle schedule. Irradiation began on February 16, 2018 and ended on July 22, 2020, spanning nine ATR cycles (162B–168A) over two and a half years. Thus, the AGR-5/6/7 fuel compacts were irradiated for a total of approximately 360.9 effective full-power days. Final burnup values, on a per-compact basis, ranged from 5.66 to 15.26% fissions per initial heavy metal atom, while fast fluence values ranged from 1.62 to 5.55 × 1025 n/m2 (E >0.18 MeV). Time-averaged volume-averaged fuel temperatures on a capsule basis at the end of irradiation ranged from 756°C in Capsule 5 to 1313°C in Capsule 3 excluding days with significantly lower temperature during the two short powered axial locator mechanism cycles, 163A and 167A. By the end of irradiation, 48 out of 54 installed thermocouples had failed (the bottom three capsules lost all thermocouples). During the first five cycles (162B – 165A), the fission-gas isotope release-rate-to-birthrate (R/B) ratios were stable in the 10-8–10-6 range, and no in-pile particle failures were observed based on the gross gamma counts. During this time, the high exposed kernel fraction and high fuel particle temperatures in Capsule 1 led to a maximum R/B value of around 2 ? 10-6 for Kr-85m. The fission gas release in all capsules started to increase from the second half of Cycle 166A, when a large number of in-pile particle failures occurred in Capsule 1 and a gas line problem in this capsule caused fission gas leakage at various degrees into the other four capsules. This gas line problem also prevented a fission gas release measurement for Capsule 1 during the last three cycles due to gas flow isolation. By the end of irradiation, it is estimated that approximately 15 particles failed in Capsule 3, which was considered possible because the experiment was designed to operate beyond the high-temperature gas-cooled reactor normal operating temperature range. A few hundred in-pile particle failures were estimated for Capsule 1 by the end of Cycle 166A, but the total number of failures is unknown due to the lack of fission gas release data in the later cycles. Additionally, four potential in-pile failures were identified for Capsule 2 during the last cycle, Cycle 168A. In contrast, no in-pile failures were identified in the top two capsules (4 and 5) based on the absence of the typical spikes in gross gamma counts and low failure estimates using the AGR-3/4 R/B per exposed kernel model.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Application of Ensemble Sensitivity Analysis to Observation Targeting for Short-term Wind Speed Forecasting

The operators of electrical grids, sometimes referred to as Balancing Authorities (BA), typically make critical decisions on how to most reliably and economically balance electrical load and generation in time frames ranging from a few minutes to six hours ahead. At higher levels of wind power generation, there is an increasing need to improve the accuracy of 0- to 6-hour ahead wind power forecasts. Forecasts on this time scale have typically been strongly dependent on short-term trends indicated by the time series of power production and meteorological data from a wind farm. Additional input information is often available from the output of Numerical Weather Prediction (NWP) models and occasionally from off-site meteorological towers in the region surrounding the wind generation facility. A widely proposed approach to improve short-term forecasts is the deployment of off-site meteorological towers at locations upstream from the wind generation facility in order to sense approaching wind perturbations. While conceptually appealing, it turns out that, in practice, it is often very difficult to derive significant benefit in forecast performance from this approach. The difficulty is rooted in the fact that the type, scale, and amplitude of the processes controlling wind variability at a site change from day to day if not from hour to hour. Thus, a location that provides some useful forecast information for one time may not be a useful predictor a few hours later. Indeed, some processes that cause significant changes in wind power production operate predominantly in the vertical direction and thus cannot be monitored by employing a network of sensors at off-site locations. Hence, it is very challenging to determine the type of sensors and deployment locations to get the most benefit for a specific short-term forecast application. Two tools recently developed in the meteorological research community have the potential to help determine the locations and parameters to measure in order to get the maximum positive impact on forecast performance for a particular site and short-term look-ahead period. Both tools rely on the use of NWP models to assess the sensitivity of a forecast for a particular location to measurements made at a prior time (i.e. the look-ahead period) at points surrounding the target location. The fundamental hypothesis is that points and variables with high sensitivity are good candidates for measurements since information at those points are likely to have the most impact on the forecast for the desired parameter, location and look-ahead period. One approach is called the adjoint method (Errico and Vukicevic, 1992; Errico, 1997) and the other newer approach is known as Ensemble Sensitivity Analysis (ESA; Ancell and Hakim 2007; Torn and Hakim 2008). Both approaches have been tested on large-scale atmospheric prediction problems (e.g. forecasting pressure or precipitation over a relatively large region 24 hours ahead) but neither has been applied to mesoscale space-time scales of winds or any other variables near the surface of the earth. A number of factors suggest that ESA is better suited for short-term wind forecasting applications. One of the most significant advantages of this approach is that it is not necessary to linearize the mathematical representation of the processes in the underlying atmospheric model as required by the adjoint approach. Such a linearization may be especially problematic for the application of short-term forecasting of boundary layer winds in complex terrain since non-linear shifts in the structure of boundary layer due to atmospheric stability changes are a critical part of the wind power production forecast problem. The specific objective of work described in this paper is to test the ESA as a tool to identify measurement locations and variables that have the greatest positive impact on the accuracy of wind forecasts in the 0- to 6-hour look-ahead periods for the wind generation area of California's Tehachapi Pass during the warm (high generation) season. The paper is organized as follows. Section 2 highlights the methodology, Section 3 presents results, and Section 4 concludes with a summary and brief discussion of future work.

17 WIND ENERGY↗

High concentrations of ice: Investigations using polarimetric radar observations combined with in situ measurements and cloud modeling (Final Report)

This DOE-funded joint project had the over-arching goal of understanding the reasons for observed size distributions of ice particles in cold clouds. Its approach involves the use of cloud models and field observations by radar and aircraft of real storms. The project addresses three major research objectives: (1) Utilize a novel polarimetric radar technique to retrieve size distributions and amounts of ice from radar data collected during the previous DOE ARM field campaigns; (2) Evaluate the results of ice microphysical retrievals using available in situ aircraft measurements and other remote sensors (e.g., vertically pointing cloud radars and wind profilers); (3) Improve the treatment of microphysical processes leading to cloud glaciation and ice multiplication in numerical cloud models. The study was performed by three research organizations: University of Oklahoma, The Hebrew University of Jerusalem, Israel, and Lund University, Sweden. The Israel and Swedish partners were funded by the sub-awards from the University of Oklahoma. Cloud modeling studies have been performed by the research teams at The Hebrew University of Jerusalem (HUJ) and Lund University to identify the origins of high concentrations of cloud ice in areas of high ice water content (HIWC). The Hebrew University Cloud Model (HUCM) with full spectral bin microphysics and the Lund University aerosol-cloud (AC) model with a hybrid bin / bulk microphysics scheme complementing HUCM were utilized for simulations. Both research teams had particular focus on secondary ice production (SIP) as one of the possible sources of enhanced ice concentration. The HUJ group suggested a novel concept of ice multiplication during droplet freezing. It is assumed that splintering and droplet fragmentation during droplet freezing takes place because of dendritic growth within a supercooled drop. The resulting simulations of SIP generated small ice in concentrations exceeding hundreds per liter similar to what was observed in the HIWC regions of the tropical storms. The Lund team explored the SIP mechanisms such as breakup of ice particles due to ice-ice collisions and ice sublimation that are expected to dominate the continental storms. They also quantified the impact of homogeneous nucleation of cloud droplets on the total number concentration of ice at very low temperatures near the tops of the clouds. Additionally, the Lund AC model is able to simulate the effect of aerosols of various types (including biological) on the cloud life cycle and the corresponding ice production. The HUCM / AC model was used to simulate one of the “golden” cases of the DOE MC3E campaign on 20 May 2011. The model output was converted into the fields of polarimetric radar variables using the polarimetric radar forward operator developed at the University of Oklahoma and compared with radar observations and in situ microphysical measurements onboard research aircraft. It was demonstrated that specific differential phase KDP is the best radar parameter to identify the HIWC areas and quantify the corresponding ice parameters. For the first time, the shape of the vertical profile of KDP was realistically reproduced by the cloud model with the KDP maximum in the dendritic growth layer (DGL) centered at the -15°C isotherm. The University of Oklahoma team has developed a methodology for polarimetric radar retrievals of such microphysical parameters of ice as ice water content (IWC), mean volume diameter (Dm), and total number concentration (Nt) of ice particles. These retrievals have been validated using in situ aircraft measurements during 6 field campaigns and proved to be quite robust and reliable. This allowed to build the first climatology of the vertical profiles of polarimetric radar variables and retrieved microphysical parameters for the three types of weather systems: continental MCSs, maritime MCSs, and tropical cyclones / hurricanes (Hu and Ryzhkov 2022). The data were collected by a multitude of the WSR-88D radars in 13 continental and 10 maritime MCSs and 11 landfalling hurricanes. The HIWC areas were identified within the examined storms and the corresponding “HIWC statistics” was compared with the “background” one without HIWC. An overarching conclusion of the study is that maritime tropical storms (MCSs and hurricanes) are characterized by smaller size ice in higher concentration compared to the continental MCSs. High ice water content in the HIWC areas is primarily caused by a strong jump in a number concentration of ice particles rather than the increase of their size compared to the “background” environment. This may point to the homogeneous nucleation of excessive amounts of supercooled droplets and / or secondary ice production as the possible origins of HIWC. Such a climatology provides a good observational reference for the modelers to evaluate the performance of their models. As an example, the in-depth analysis of the 20 May 2011 MC3E case shows that the advanced cloud models developed in the course of this study still tend to underestimate the number concentration of ice in the HIWC areas although they succeed in reproducing realistically looking vertical profiles of IWC and Nt. The results of the project research are summarized in 13 journal papers.

54 ENVIRONMENTAL SCIENCES↗

Development of Thermoacoustic Sensors for Sodium-cooled Fast Reactors

This Final Report refers to the project “Development of Thermoacoustic Sensors for Sodium-cooled Fast Reactor Systems”, which was led by Westinghouse Electric Company (Westinghouse) and carried out in collaboration with Argonne National Laboratory (ANL) and University of Pittsburgh. Thermo-acoustic Power Sensors (TAPS) are self-powered, wireless sensors envisioned for measuring key parameters, such as local temperature and neutron flux, in a nuclear reactor core. This project was intended to specifically investigate their applicability to Sodium-cooled Fast Reactors (SFR). TAPS are non-invasive (wireless) and passive (self-powered) devices. The passivity derives from their ability to use conditions that “naturally” exist in a nuclear reactor, such as gamma and neutron flux, as power sources. They generate oscillating pressure waves (i.e., sound waves) which, with a frequency and amplitude dependent upon these conditions, can travel through the core and associated structures, and reach the outside of the reactor vessel where a properly designed network of receivers can detect and interpret them. These receivers require a very small amount of power which, during loss of power events, can be provided for example by harvesting gamma radiation energy, thus resulting in a monitoring system that can function both during normal operation and during loss of power events. The project aimed at TAPS development through a series of tasks which are listed and briefly discussed as follows. TASK 1 – Sensor hardware design Subtask 1a: Assessment of sensor applications to SFRs Subtask 1b: Development of sensor functional requirements Subtask 1c: Definition of sensor hardware design specifications Task description: TAPS design was informed by considerations on their application (Subtask 1a), both the ultimate one in an SFR and the actual one in the ANL testing facilities that was intended to be used in support of the project. Considerations were made to identify optimum sensor design features that optimize the sensor size, materials, and output signal, for installation inside an SFR core. These considerations led to the development of Functional Requirements (Subtask 1b) and Design Requirements (Subtask 1c). TASK 2 – Sensor Hardware Manufacture Subtask 2a: Sensor hardware construction drawing development Subtask 2b: Sensor manufacture and assembly Task description: TAPS technical drawings were developed (Subtask 2a) using the Design Requirements established under Task 1. Subsequently, in spite of some problems which ultimately caused the program to be delayed, TAPS manufacturing was completed based on drawings (Subtask 2b). TASK 3 – Development of TAPS Signal Measurement System and TAPS Testing in Water Subtask 3a: Design, assembly and testing of signal measurement system, and TAPS testing in water Subtask 3b: Signal prediction-correction methodology development Task description: An assessment was performed on the techniques that can potentially be used to detect the signals emitted by the TAPS, e.g. a fiber-optic based acoustic signal measurement system, a laser vibrometer system, or an accelerometer-based system. The most suited technology, i.e. the accelerometer-based system, was developed further, and tested in water (Subtask 3a). Moreover, efforts were made to develop the methodology required to determine the actual system temperature and neutron flux distribution using differences between the measured and predicted TAPS responses (Subtask 3b). TASK 4 – Sensor System Testing in Sodium Subtask 4a: Test plan development Subtask 4b: Design, assembly and testing in small-scale sodium facility Subtask 4c: Design, assembly and testing in large-scale sodium and structures facility Task description: Upon proper test plan development (Subtask 4a), the fabricated TAPS was planned to be tested in sodium, by using two sodium facilities at ANL having different size and different purpose. The Under Sodium Viewing (USV) small-scale facility was intended to be used to investigate the effect of sodium on the sensor and its performance (Subtask 4b). The Mechanism Engineering Test Loop (METL) large-scale facility was instead intended to be used to assess the additional effect of prototypical SFR structures, such as fuel assembly mockup or parts of the core restrain structure, on sensor performance (Subtask 4c). As discussed in Section 3.2.2.7, unexpected issues during the TAPS manufacturing process resulted in some activities being delayed, with the TAPS and USV facility developed to the point to be ready for testing in sodium, however without the possibility to actually perform such testing (including the testing in METL) due to the end of the program’s performance period. Overall, through the development and testing (in water only) of two TAPS devices (a First-Generation TAPS followed by an optimized Second-Generation TAPS), the project confirmed the capability of this technology to generate acoustic signals proportional to temperature, which can be detected through a network of accelerometers identified as the best-suited type of receivers for acoustic signal detection. Moreover, the project also developed a computational model to predict the characteristics of the acoustic signals being generated, which combines thermal analysis of the TAPS with Finite Element Modeling (FEM)-aided acoustic characterization of the system. This model was benchmarked against experimental data collected during the project and, although general agreement was obtained, some limitations of the modeling methods were identified, which require additional development. Additional testing is needed in order to assess the effect, on TAPS operation and performance, of environmental changes resulting from the transition from water to liquid sodium. Such testing, which is suggested to be performed in the future, should look specifically at 1) both the effect resulting from the different thermoacoustic behavior of sodium (relative to water) and the effects of higher temperature on TAPS performance, and 2) the performance of the sensor-receiver system when multiple TAPS are used simultaneously and prototypical reactor structures are positioned in the testing environment. The latter testing is needed to assess the effects that potential signal attenuation/ distortion phenomena, as well as potential interference between signals emitted simultaneously, have on the performance of the technology for ultimate application in a nuclear reactor.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Size-resolved ice nucleating particle (INP) concentrations from the MOSAiC campaign

Sample collection: Ground-based immersion mode ice nucleation measurements were conducted on samples collected at the U.S. DOE ARM AMF2 onboard the R/V Polarstern P-deck during MOSAiC from 23 Oct 2019 to 01 Oct 2020. Samples were collected using a Davis Rotating-drum Unit for Monitoring (DRUM; DRUMAir, LLC) cascading impactor in 4 stages (i.e., size bins). Instrument information on the model used, the DA400, can be found at the DRUMAir website (http://www.drumair.com/). Stages A, B, C, and D had particle size cuts at 2.96, 1.21, 0.34, and 0.15 &micro;m in particle diameter, respectively. Strips of sample substrate (PFA, perfluoroalkoxy; McMaster) were adhered to each disc in each stage and coated with petrolatum to enable particles to stick on impact. The discs move slowly over time, such that aerosol loading is streaked onto the PFA. Every 24 hours, a blank is created on the PFA to separate daily samples. During MOSAiC, the pump typically pulled 20 &ndash; 35 lpm (average of 32 lpm) at the inlet with all the discs in place in each stage. Daily samples were collected for each of the four stages, equaling 28,800 &ndash; 50,400 total L of air (average of 46,080 L total L of air) per sample. Discs rotated for approximately 24 days before the sampling per strip was complete and changed to a new disc. Discs were stored frozen after collection. Sample preparation for analysis: Following collection and transport from MOSAiC to the Kreidenweis/DeMott laboratory, care of PI Creamean, in Fort Collins, CO, strips were removed from the discs and cut up to separate daily samples. Each daily portion of the strip was stored in separate sterile 15-mL centrifuge tubes and stored in a standard commercial freezer until analysis (approximately 4 &ndash; 12 months after collection). Sample analysis: Drop freezing assays (DFAs) were conducted on one daily sample set every 3 &ndash; 4 days of the study for all four stages using the Colorado State University (CSU) cold plate (CP). Sample set days were chosen to cover the entire year of MOSAiC and avoiding days where the AOS purge system was activated. Immediately after removal from the freezer, 2 mL of 0.1-&micro;m filtered deionized water was added with a single-use sterile syringe directly to the tubes, then mixed using a vortex mixer for at least 30 minutes at 500 rpm to resuspend particles from the PFA into the deionized water. Following sample preparation, another single-use syringe was used to create 100 aliquots on a 3-inch diameter copper plate, then covered with a transparent plastic dome. The drops were approximately the same volume (2.5 &micro;L each), though careful inspection. The plate was cooled at approximately 3 &ndash; 10 K min-1 from room temperature until all drops froze on the plate. Temperature was measured by an Omega thermocouple probes and meter. Drop freezing was visually detected but recorded through monitoring software to provide the time frozen, channel of the meter used, temperature, and cooling rate for each drop. Not all 100 drops were always detected; the total number of rows in each data file equals the number of drops recorded, which typically was > 80 %. Each sample was tested three times (i.e., a new set of 100 drops was created for each test). Data provided are files containing these parameters. From the freezing temperatures recorded, the fraction frozen was and INP concentrations were calculated per L of air using the equation from Vali (1971): [INPs] = &minus;(ln(f)/Valiquot)*(Vsuspension/Vair) where f is the proportion of droplets not frozen, Valiquot is the volume of each aliquot (i.e., 2.5e-6 L), Vsuspension is the volume of the suspension (i.e., 0.002 L), and Vair is the volume of air per sample (i.e., 36000 L). Data usage guidance: There are three files included with this dataset: (1) dumcp_inp_concentrations.csv which includes cumulative INP concentrations binned every 0.5 &deg;C from 0 to &ndash;30 &deg;C for all samples and size ranges (i.e., DRUM stages) processed via DFA using the CSU CP; (2) dumcp_inp_standard_deviation.csv which includes the standard deviations for all samples and temperatures in dumcp_inp_concentrations.csv; and (3) dumcp_blank_concentrations_standard_deviation.csv which includes the INP concentrations and standard deviations for the deionized water and PFA blanks binned every 0.5 &deg;C from 0 to &ndash;30 &deg;C. The first column in each file represents the freezing temperature in &deg;C binned every 0.5 &deg;C from 0 to &ndash;30 &deg;C (first cell in this column = header = &ldquo;temp&rdquo;). The second column in each file represents the standard deviation of each temperature bin in &deg;C (first cell in this column = header = &ldquo;temperr&rdquo;). For file (1) dumcp_inp_concentrations.csv, the remaining columns indicate the INP concentrations per L of air for each temperature bin. For each sample column, the header in the first row indicates the stage (i.e., size bin as &ldquo;A_&rdquo;, &ldquo;B_&rdquo;, &ldquo;C_&rdquo;, or &ldquo;D_&rdquo;) and date (&ldquo;_yyyymmdd) of collection. For file (2) dumcp_inp_standard_deviation.csv, the remaining columns indicate the INP concentration standard deviation per L of air for each temperature bin. For each sample column, the header in the first row indicates the stage (i.e., size bin as &ldquo;A_&rdquo;, &ldquo;B_&rdquo;, &ldquo;C_&rdquo;, or &ldquo;D_&rdquo;) and date (&ldquo;_yyyymmdd) of collection. For file (3) dumcp_blank_concentrations_standard_deviation.csv, the remaining columns indicate the INP concentrations and standard deviations for the deionized water blank (&ldquo;di_0.1&rdquo; and &ldquo;di_0.1sd&rdquo; for the concentrations and standard deviations, respectively) and PFA blank (&ldquo;pfa&rdquo; and &ldquo;pfasd&rdquo; for the concentrations and standard deviations, respectively). Please see Creamean et al. (2019a; 2018a; 2018b; 2019b) for additional details on DRUM sample collection and offline processing. For questions or help with data interpretation, contact Dr. Jessie Creamean (jessie.creamean@colostate.edu). References: Creamean, J. M., Mignani, C., Bukowiecki, N., and Conen, F.: Using spectra characteristics to identify ice nucleating particle populations during winter storms in the Alps, Atmos. Chem. Phys., 19, 8123&ndash;8140, 2019a. Creamean, J. M., Kirpes, R. M., Pratt, K. A., Spada, N. S., Maahn, M., de Boer, G., Schnell, R. C., and China, S.: Marine and terrestrial influences on ice nucleating particles during continuous springtime measurements in an Arctic oilfield location, Atmospheric Chemistry and Physics, 18, 18023-18042, 10.5194/acp-18-18023-2018, 2018a. Creamean, J. M., Primm, K. M., Tolbert, M. A., Hall, E. G., Wendell, J., Jordan, A., Sheridan, P. J., Smith, J., and Schnell, R. C.: HOVERCAT: A novel aerial system for evaluation of aerosol-cloud interactions, Atmospheric Measurement Techniques, 11, 3969-3985, 10.5194/amt-11-3969-2018, 2018b. Creamean, J. M., Cross, J. N., Pickart, R., McRaven, L., Lin, P., Pacini, A., Hanlon, R., Schmale, D. G., Ceniceros, J., Aydell, T., Colombi, N., Bolger, E., and DeMott, P. J.: Ice nucleating particles carried from below a phytoplankton bloom to the Arctic atmosphere, Geophys. Res. Lett., 46, 8572-8581, https://doi.org/10.1029/2019GL083039, 2019b. Vali, G.: Quantitative Evaluation of Experimental Results an the Heterogeneous Freezing Nucleation of Supercooled Liquids, Journal of the Atmospheric Sciences, 28, 402-409, 10.1175/1520-0469(1971)028<0402:qeoera>2.0.co;2, 1971.

4-stage DRUM aerosol collector (DA400),Ice nuclei,↗