Search NASA⌕ Search

SEARCH · Search NASA

Results for “Reliability Assessment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,729 records · Page 96

Orion Multi-Purpose Crew Vehicle Solving and Mitigating the Two Main Cluster Pendulum Problem

The Orion Multi-purpose Crew Vehicle (MPCV) Orion spacecraft will return humans from beyond earth's orbit, including Mars and will be required to land 20,000 pounds of mass safely in the ocean. The parachute system nominally lands under 3 main parachutes, but the system is designed to be fault tolerant and land under 2 main parachutes. During several of the parachute development tests, it was observed that a pendulum, or swinging, motion could develop while the Crew Module (CM) was descending under two parachutes. This pendulum effect had not been previously predicted by modeling. Landing impact analysis showed that the landing loads would double in some places across the spacecraft. The CM structural design limits would be exceeded upon landing if this pendulum motion were to occur. The Orion descent and landing team was faced with potentially millions of dollars in structural modifications and a severe mass increase. A multidisciplinary team was formed to determine root cause, model the pendulum motion, study alternate canopy planforms and assess alternate operational vehicle controls & operations providing mitigation options resulting in a reliability level deemed safe for human spaceflight. The problem and solution is a balance of risk to a known solution versus a chance to improve the landing performance for the next human-rated spacecraft.

Ali, Yasmin↗

Designing ARIES-CS compact radial build and nuclear system: Neutronics, shielding, and activation

Within the ARIES-CS project, design activities have focused on developing the first compact device that enhances the attractiveness of the stellarator as a power plant. The objectives of this paper are to review the nuclear elements that received considerable attention during the design process and provide a perspective on their successful integration into the final design. Among these elements are the radial build definition, the well-optimized in-vessel components that satisfy the ARIES top-level requirements, the carefully selected nuclear and engineering parameters to produce an economic optimum, the modeling for the first time ever-of the highly complex stellarator geometry for the three-dimensional nuclear assessment, and the overarching safety and environmental constraints to deliver an attractive, reliable, and truly compact stellarator power plant.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Electronic Medical Business Operations System

Electronic Management of medical records has taken a back seat both in private industry and in the government. Record volumes continue to rise every day and management of these paper records is inefficient and very expensive. In 2005, the White House announced support for the development of electronic medical records across the federal government. In 2006, the DOE issued 10 CFR 851 requiring all medical records be electronically available by 2015. The Y-12 National Security Complex is currently investing funds to develop a comprehensive EMR to incorporate the requirements of an occupational health facility which are common across the Nuclear Weapons Complex (NWC). Scheduling, workflow, and data capture from medical surveillance, certification, and qualification examinations are core pieces of the system. The Electronic Medical Business Operations System (EMBOS) will provide a comprehensive health tool solution to 10 CFR 851 for Y-12 and can be leveraged to the Nuclear Weapon Complex (NWC); all site in the NWC must meet the requirements of 10 CFR 851 which states that all medical records must be electronically available by 2015. There is also potential to leverage EMBOS to the private4 sector. EMBOS is being developed and deployed in phases. When fully deployed the EMBOS will be a state-of-the-art web-enabled integrated electronic solution providing a complete electronic medical record (EMR). EMBOS has been deployed and provides a dynamic electronic medical history and surveillance program (e.g., Asbestos, Hearing Conservation, and Respirator Wearer) questionnaire. Table 1 below lists EMBOS capabilities and data to be tracked. Data to be tracked: Patient Demographics – Current/Historical; Physical Examination Data; Employee Medical Health History; Medical Surveillance Programs; Patient and Provider Schedules; Medical Qualification/Certifications; Laboratory Data; Standardized Abnormal Lab Notifications; Prescription Medication Tracking and Dispensing; Allergies; Non-Occupational Illness and Injury Visits; Occupational Recommendations/Restrictions; Diagnosis/Vital Signs/Blood Pressures; Immunizations; Return to Work Visits Capabilities: Targeted Health Assessments; Patient Input Capabilities for Questionnaires; Medical Health History; Surveillance Programs; Human Reliability Program; Scheduling; Automated Patient Check-in/Check-out; Provider & Patient Workflow; Laboratory Interface & Device Integration; Human Reliability Program Processing; Interoperability with SAP, IH, IS, RADCON; Coding: ICED-9/10; Desktop Integration; Interface/Storage of Digital X-Rays (PACS)

Cannon, D. T.↗

MODIFICATION OF THE SPAR-H METHOD TO SUPPORT HRA FOR LEVEL 2 PSA

Currently, available Human Reliability Analysis (HRA) methods were generally developed to support Level 1 Probabilistic Safety Analysis (PSA) models. There has been an increased emphasis placed on Level 2 PSA in recent years; however, the currently used HRA methods are not ideal for this application, including the SPAR-H method. Challenges that will likely be present during a severe accident such as degraded or hazardous operating conditions, shift in control from the main control room to the technical support center, unavailability of instrumentation, and others are not routinely considered for Level 1 HRA analysis. These factors combine to create a much more uncertain condition to be accounted for in the HRA analysis. While the SPAR-H shaping factors were established to support Level 1 HRA, previous studies have shown it may be used for Level 2 HRA analysis as well. The Canadian Nuclear Safety Commission (CNSC) and Idaho National Laboratory (INL) in a joint project are investigating modifications to the SPAR-H method to create more consistency in applying the performance shaping factors used in the method for Level 2 analysis.

99 GENERAL AND MISCELLANEOUS↗

Component Reliability

An overview of the National Renewable Energy Laboratories Component Reliability Project including the accomplishments for the previous year.

component reliability↗

Space Transportation Operations: Assessment of Methodologies and Models

The systems design process for future space transportation involves understanding multiple variables and their effect on lifecycle metrics. Variables such as technology readiness or potential environmental impact are qualitative, while variables such as reliability, operations costs or flight rates are quantitative. In deciding what new design concepts to fund, NASA needs a methodology that would assess the sum total of all relevant qualitative and quantitative lifecycle metrics resulting from each proposed concept. The objective of this research was to review the state of operations assessment methodologies and models used to evaluate proposed space transportation systems and to develop recommendations for improving them. It was found that, compared to the models available from other sources, the operations assessment methodology recently developed at Kennedy Space Center has the potential to produce a decision support tool that will serve as the industry standard. Towards that goal, a number of areas of improvement in the Kennedy Space Center's methodology are identified.

Joglekar, Prafulla↗

Space Transportation Operations: Assessment of Methodologies and Models

The systems design process for future space transportation involves understanding multiple variables and their effect on lifecycle metrics. Variables such as technology readiness or potential environmental impact are qualitative, while variables such as reliability, operations costs or flight rates are quantitative. In deciding what new design concepts to fund, NASA needs a methodology that would assess the sum total of all relevant qualitative and quantitative lifecycle metrics resulting from each proposed concept. The objective of this research was to review the state of operations assessment methodologies and models used to evaluate proposed space transportation systems and to develop recommendations for improving them. It was found that, compared to the models available from other sources, the operations assessment methodology recently developed at Kennedy Space Center has the potential to produce a decision support tool that will serve as the industry standard. Towards that goal, a number of areas of improvement in the Kennedy Space Center's methodology are identified.

Joglekar, Prafulla↗

Reliability and resilience of environmental flows under uncertainty: reconsidering water year types and inconsistent flow requirements in California

Abstract Environmental water allocation in California is a complex legal process involving various government agencies and stakeholders. E-flow requirements can be based on annual runoff typologies called water year types (WYTs), which dictate water volume, timing, and duration. In this study, we examined hydropower licensing documents of the major water and power projects in the Central Sierra Nevada to catalog e-flow requirements by WYT. In this study case, we identify how WYT classification systems and categories vary across and within different basins. Additionally, we assessed the impacts of climate change on hydrology, the frequency of WYTs identified, and the reliability and resilience of e-flows using future projections (2031–2060) of 10 Global Circulation Models (GCMs). We then propose a potential adaptation strategy using a 30 year moving percentiles approach to recalculate WYTs. We identified eight WYT classifications systems were identified, and their WYT distributions statistically significantly changes across all GCMs, even though most GCMs indicate no statistically significant change in hydrology. Disparities in future impacts are observed among and within hydropower projects, with some river reaches showing negative impacts on reliability and resilience. The adaptation strategy can generally boost resilience and improve reliability, but simply updating existing WYT thresholds without flexible regulatory frameworks reconsidering WYTs and e-flows thresholds, may not yield substantial improvements. Challenges in managing e-flows in California within regulatory and hydroclimatic contexts are intricate due to the lack of standardized approaches, leading to inconsistencies and potential conflicts among stakeholders, that will likely be exacerbated by climate change. Thus, we emphasize that targeted, site-specific, and adaptive management strategies are crucial, besides the need for a harmonized and consistent approach to defining and applying WYT categories and methods and/or e-flow assessments.

Environmental Sciences & Ecology↗

Simulator Data Analysis to Inform Digitalized Environment Impacts on Human Reliability

The U.S. Nuclear Regulatory Commission (NRC) has developed a human reliability analysis (HRA) method, termed the Integrated Human Event Analysis System for Event and Condition Assessment (IDHEAS-ECA), in order to estimate human error probabilities (HEPs) in risk-informed regulatory applications. To update the quantification part of IDHEAS-ECA, the NRC required human performance and error data from fully digitalized main control rooms (MCRs); therefore, it requested that Idaho National Laboratory (INL) revisit previous data collection studies and investigate how the following three factors impact human reliability: self-checking, peer-checking, and automation. The HRA data collection studies revisited were the Human Reliability Data Extraction (HuREX) project, developed by the Korea Atomic Energy Research Institute (KAERI), and the Simplified Human Error Experimental Program (SHEEP), developed by INL. HuREX is a representative HRA data collection study that collects human reliability data from full-scope simulators staffed by licensed operators. SHEEP, on the other hand, has been proposed to complement such full-scope studies by collecting data via simplified simulators staffed by non-licensed student operators. In the HuREX study, KAERI collected HRA data from fully digitalized MCRs for the Advanced Power Reactor (APR)–1400. The SHEEP data were obtained from simplified simulators that partially mimicked the features of digitalized MCRs. The present report mainly discusses how the impacts of the aforementioned three factors on human errors were derived from these two data collection studies.

99 GENERAL AND MISCELLANEOUS↗

Integrated Assessment Plan Template and Operational Demonstration for SPIDERS Phase 2: Fort Carson

This document contains the Integrated Assessment Plan (IAP) for the Phase 2 Operational Demonstration (OD) of the Smart Power Infrastructure Demonstration for Energy Reliability (SPIDERS) Joint Capability Technology Demonstration (JCTD) project. SPIDERS will be conducted over a three year period with Phase 2 being conducted at Fort Carson, Colorado. This document includes the Operational Demonstration Execution Plan (ODEP) and the Operational Assessment Execution Plan (OAEP), as approved by the Operational Manager (OM) and the Integrated Management Team (IMT). The ODEP describes the process by which the OD is conducted and the OAEP describes the process by which the data collected from the OD is processed. The execution of the OD, in accordance with the ODEP and the subsequent execution of the OAEP, will generate the necessary data for the Quick Look Report (QLR) and the Utility Assessment Report (UAR). These reports will assess the ability of the SPIDERS JCTD to meet the four critical requirements listed in the Implementation Directive (ID).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Remote Off-grid Microgrid Design Support Tool (ROMDST) - An Optimal Design Support Tool for Remote, Resilient, and Reliable Microgrids Phase II - Final Report

The objective of the project is to develop an advanced optimization-based design support tool for AC or DC microgrids in remote locations, where utility grids may not be accessible. The mathematical model and the interface are being developed such that multiple design objectives and criteria/constraints can be easily enabled or disabled, to deliver a flexible tool relevant to a large, diverse user base, and to facilitate future feature developments. The new tool delivered by this project leverages the team’s extensive expertise in the development, testing, deployment, and commercialization of the state-of-the-art Distributed Energy Resources Customer Adoption Model (DER-CAM) – which is the foundation for the new tool. Phase I of the project leverages the microgrid design and decision support tool DER-CAM. Key Phase I developments include the following adaption to the DER-CAM model: a) AC or DC microgrid architectures, b) multiple economic objectives (e.g. single customer vs community vs utility perspective), c) constraints on fuel availability (e.g. total fuel available during outage periods), d) active and reactive power flow constraints for normal and N-1 contingency cases, e) component part load efficiencies (e.g. power electronic devices), and f) interactive data visualization capabilities (e.g. design topology elements). A component library including components’ default technical and economical characteristics was also developed. In Phase II, the project is focused on tool testing and validation, use for real-world microgrid designs, and outreach. Fully developing this tool will have the following impacts: 1) optimal off-grid microgrid designs that replace existing back of the envelope or non-optimal calculations, reducing capital costs and risk of microgrid deployment; 2) removing barriers to microgrid assessments by lowering microgrid soft costs, as the tool is freely usable; 3) reliable and resilient designs that reduce the cost of critical load shedding due to component outages.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Remote Off-grid Microgrid Design Support Tool (ROMDST) - An Optimal Design Support Tool for Remote, Resilient, and Reliable Microgrids (Phase II, Final Report)

The objective of the project is to develop an advanced optimization-based design support tool for AC or DC microgrids in remote locations, where utility grids may not be accessible. The mathematical model and the interface are being developed such that multiple design objectives and criteria/constraints can be easily enabled or disabled, to deliver a flexible tool relevant to a large, diverse user base, and to facilitate future feature developments. The new tool delivered by this project leverages the team’s extensive expertise in the development, testing, deployment, and commercialization of the state-of-the-art Distributed Energy Resources Customer Adoption Model (DER-CAM) – which is the foundation for the new tool. Phase I of the project leverages the microgrid design and decision support tool DER-CAM. Key Phase I developments include the following adaption to the DER-CAM model: a) AC or DC microgrid architectures, b) multiple economic objectives (e.g. single customer vs community vs utility perspective), c) constraints on fuel availability (e.g. total fuel available during outage periods), d) active and reactive power flow constraints for normal and N-1 contingency cases, e) component part load efficiencies (e.g. power electronic devices), and f) interactive data visualization capabilities (e.g. design topology elements). A component library including components’ default technical and economical characteristics was also developed. In Phase II, the project is focused on tool testing and validation, use for real-world microgrid designs, and outreach. Fully developing this tool will have the following impacts: 1) optimal off-grid microgrid designs that replace existing back of the envelope or non-optimal calculations, reducing capital costs and risk of microgrid deployment; 2) removing barriers to microgrid assessments by lowering microgrid soft costs, as the tool is freely usable; 3) reliable and resilient designs that reduce the cost of critical load shedding due to component outages.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Risk Management and Risk Aversion, from Benefit to Impediment

Risk management is a critical tool for improving the probability of project success by identifying, assessing, prioritizing, and attempting to control threats to project realization. For industries that require high operational reliability due to the potential consequences of off-normal events, such as the nuclear, aerospace, and chemical sectors, a major focus of risk management is the preservation of process safety. Due to the nature of the processes or systems under consideration, the associated process safety analyses (such as risk and safety assessments) and safety features can require significant resources. These costs are typically tolerated either due to the need to satisfy regulatory requirements or based on the assumption that they generally decrease the occurrence of unwanted events and therefore improve the probability of project success. However, as the level of acceptable or tolerable risk from unwanted events decreases, the required resources necessary for ensuring and demonstrating satisfaction of these criteria can grow and in turn can become one of the dominant impediments to project success. This paper outlines a high-level theoretical framework for the consideration of dominant project risks, which includes potential project failure from both the occurrence of high consequence off-normal events and the inability to achieve project completion due to the resource needs and innovation losses associated with extreme risk aversion. Utilizing such an integrated approach permits an attempt to optimize the probability of successful project realization while also providing valuable insight into the proper level of acceptable risk. The work is presented as a first step, in hopes of spurring additional discussion and analysis regarding appropriate levels of risk tolerance and the balance of project benefits.

Grabaskas, David↗

Comparing three novel endpoints for developmental osteotoxicity in the embryonic stem cell test

Birth defects belong to the most serious side effects of pharmaceutical compounds or environmental chemicals. In vivo, teratogens most often affect the normal development of bones, causing growth retardation, limb defects or craniofacial malformations. The embryonic stem cell test (EST) is one of the most promising models that allow the in vitro prediction of embryotoxicity, with one of its endpoints being bone tissue development. The present study was designed to describe three novel inexpensive endpoints to assess developmental osteotoxicity using the model compounds penicillin G (non-teratogenic), 5-fluorouracil (strong teratogen) and all-trans retinoic acid (bone teratogen). These three endpoints were: quantification of matrix incorporated calcium by (1) morphometric analysis and (2) measurement of calcium levels as well as (3) activity of alkaline phosphatase, an enzyme involved in matrix calcification. To evaluate our data, we have compared the concentration curves and resulting ID{sub 50}s of the new endpoints with mRNA expression for osteocalcin. Osteocalcin is an exclusive marker found only in mineralized tissues, is regulated upon compound treatment and reliably predicts the potential of a chemical entity acting as a bone teratogen. By comparing the new endpoints to quantitative expression of osteocalcin, which we previously identified as suitable to detect developmental osteotoxicity, we were ultimately able to illustrate IMAGE analysis and Ca{sup 2+} deposition assays as two reliable novel endpoints for the EST. This is of particular importance for routine industrial assessment of novel compounds as these two new endpoints may substitute previously used molecular read-out methods, which are often costly and time-consuming.

60 APPLIED LIFE SCIENCES↗

Extreme Scale Computing to Secure the Nation

Since the dawn of modern electronic computing in the mid 1940's, U.S. national security programs have been dominant users of every new generation of high-performance computer. Indeed, the first general-purpose electronic computer, ENIAC (the Electronic Numerical Integrator and Computer), was used to calculate the expected explosive yield of early thermonuclear weapons designs. Even the U. S. numerical weather prediction program, another early application for high-performance computing, was initially funded jointly by sponsors that included the U.S. Air Force and Navy, agencies interested in accurate weather predictions to support U.S. military operations. For the decades of the cold war, national security requirements continued to drive the development of high performance computing (HPC), including advancement of the computing hardware and development of sophisticated simulation codes to support weapons and military aircraft design, numerical weather prediction as well as data-intensive applications such as cryptography and cybersecurity U.S. national security concerns continue to drive the development of high-performance computers and software in the U.S. and in fact, events following the end of the cold war have driven an increase in the growth rate of computer performance at the high-end of the market. This mainly derives from our nation's observance of a moratorium on underground nuclear testing beginning in 1992, followed by our voluntary adherence to the Comprehensive Test Ban Treaty (CTBT) beginning in 1995. The CTBT prohibits further underground nuclear tests, which in the past had been a key component of the nation's science-based program for assuring the reliability, performance and safety of U.S. nuclear weapons. In response to this change, the U.S. Department of Energy (DOE) initiated the Science-Based Stockpile Stewardship (SBSS) program in response to the Fiscal Year 1994 National Defense Authorization Act, which requires, 'in the absence of nuclear testing, a progam to: (1) Support a focused, multifaceted program to increase the understanding of the enduring stockpile; (2) Predict, detect, and evaluate potential problems of the aging of the stockpile; (3) Refurbish and re-manufacture weapons and components, as required; and (4) Maintain the science and engineering institutions needed to support the nation's nuclear deterrent, now and in the future'. This program continues to fulfill its national security mission by adding significant new capabilities for producing scientific results through large-scale computational simulation coupled with careful experimentation, including sub-critical nuclear experiments permitted under the CTBT. To develop the computational science and the computational horsepower needed to support its mission, SBSS initiated the Accelerated Strategic Computing Initiative, later renamed the Advanced Simulation & Computing (ASC) program (sidebar: 'History of ASC Computing Program Computing Capability'). The modern 3D computational simulation capability of the ASC program supports the assessment and certification of the current nuclear stockpile through calibration with past underground test (UGT) data. While an impressive accomplishment, continued evolution of national security mission requirements will demand computing resources at a significantly greater scale than we have today. In particular, continued observance and potential Senate confirmation of the Comprehensive Test Ban Treaty (CTBT) together with the U.S administration's promise for a significant reduction in the size of the stockpile and the inexorable aging and consequent refurbishment of the stockpile all demand increasing refinement of our computational simulation capabilities. Assessment of the present and future stockpile with increased confidence of the safety and reliability without reliance upon calibration with past or future test data is a long-term goal of the ASC program. This will be accomplished through significant increases in the scientific bases that underlie the computational tools. Computer codes must be developed that replace phenomenology with increased levels of scientific understanding together with an accompanying quantification of uncertainty. These advanced codes will place significantly higher demands on the computing infrastructure than do the current 3D ASC codes. This article discusses not only the need for a future computing capability at the exascale for the SBSS program, but also considers high performance computing requirements for broader national security questions. For example, the increasing concern over potential nuclear terrorist threats demands a capability to assess threats and potential disablement technologies as well as a rapid forensic capability for determining a nuclear weapons design from post-detonation evidence (nuclear counterterrorism).

99 GENERAL AND MISCELLANEOUS↗

An assessment of particle velocimetry potential in hypersonic flow

Future progress in the computation of hypersonic flow fields is restricted by the need for a reliable turbulence modeling data base which could be used for the development of empirical models for use in numerical codes. Currently, there are few compressible flow measurements which could be used for this purpose. Procedures for hot wire measurements in hypersonic flows are presently outlined, and assessments are made of the potential for hot wire and laser velocimeter measurements of turbulent fluctuations in hypersonic flow fields. The results of recent experiments conducted in two hypersonic wind tunnels will be presented and comparisons made with previous hot wire turbulence measurements.

Owen, F. K.↗

Fatigue analysis of the Spallation Neutron Source 2 MW target design

Upgrades to the Spallation Neutron Source (SNS) at Oak Ridge National Laboratory are under way with two major projects. The first project is the Proton Power Upgrade (PPU), which will double the power capacity of the SNS accelerator system to enable the operation of a future second neutron source target station—the second project. PPU also will increase power to the SNS first target station – which currently operates at 1.4 MW with 1.0 GeV protons – to 2 MW with 1.3 GeV protons. Final design of the PPU 2 MW target module is finished, including all necessary design and analysis calculations. The fatigue evaluation described herein is an assessment of the fitness of the PPU 2 MW target mercury vessel to resist failure from cyclic loading from the pulsed 60 Hz proton beam and thermal changes from disrupted operation. In addition to the reliability predictions, the method, detail, and depth of this fatigue evaluation are superior to those of past target design assessments. Furthermore, the thermal fatigue life is predicted to exceed 3125 thermal cycles per 1250 h of operation for all load cases. The design also meets the (relative) fatigue design goal for combined thermal and pulse loading of greater than 0.5 times the minimum fatigue life calculated for a jet-flow target design operating at 1.4 MW—the most robust design to date in terms of resistance to fatigue failure. From the onset of the PPU, it has been known that pulse loading requires effective application of helium gas injection into the target mercury to reduce beam pressure loading. For the PPU 2 MW target, none of the pulse load cases requires a maximum strain reduction from gas injection of more than 50% (for base material) to meet the fatigue design goal. This level of reduction is achievable from gas injection, according to historical strain measurements from 1.4 MW target operation. Overall, the PPU 2 MW target design is predicted to have superior resistance to fatigue failure compared with past target designs.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗