Search NASA⌕ Search

SEARCH · Search NASA

Results for “System Administration”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,729 records · Page 96

Firing Room Remote Application Software Development

The Engineering and Technology Directorate (NE) at National Aeronautics and Space Administration (NASA) Kennedy Space Center (KSC) is designing a new command and control system for the checkout and launch of Space Launch System (SLS) and future rockets. The purposes of the semester long internship as a remote application software developer include the design, development, integration, and verification of the software and hardware in the firing rooms, in particular with the Mobile Launcher (ML) Launch Accessories (LACC) subsystem. In addition, a software test verification procedure document was created to verify and checkout LACC software for Launch Equipment Test Facility (LETF) testing.

Pathways↗

Large Payload Ground Transportation and Test Considerations

Many spacecraft concepts under consideration by the National Aeronautics and Space Administration’s (NASA’s) Evolvable Mars Campaign take advantage of a Space Launch System payload shroud that may be 8 to 10 meters in diameter. Large payloads can theoretically save cost by reducing the number of launches needed--but only if it is possible to build, test, and transport a large payload to the launch site in the first place. Analysis performed previously for the Altair project identified several transportation and test issues with an 8.973 meters diameter payload. Although the entire Constellation Program—including Altair—has since been canceled, these issues serve as important lessons learned for spacecraft designers and program managers considering large payloads for future programs. A transportation feasibility study found that, even broken up into an Ascent and Descent Module, the Altair spacecraft would not fit inside available aircraft. Ground transportation of such large payloads over extended distances is not generally permitted, so overland transportation alone would not be an option. Limited ground transportation to the nearest waterway may be possible, but water transportation could take as long as 67 days per production unit, depending on point of origin and acceptance test facility; transportation from the western United States would require transit through the Panama Canal to access the Kennedy Space Center launch site. Large payloads also pose acceptance test and ground processing challenges. Although propulsion, mechanical vibration, and reverberant acoustic test facilities at NASA’s Plum Brook Station have been designed to accommodate large spacecraft, special handling and test work-arounds may be necessary, which could increase cost, schedule, and technical risk. Once at the launch site, there are no facilities currently capable of accommodating the combination of large payload size and hazardous processing such as hypergolic fuels, pyrotechnic devices, and high pressure gasses. Ironically, the limiting factor to a national heavy lift strategy may not be the rocket technology needed to throw a heavy payload, but rather the terrestrial infrastructure—roads, bridges, airframes, and buildings—necessary to transport, acceptance test, and process large spacecraft. Failure to carefully consider where and how large spacecraft are manufactured, tested, and launched could result in unforeseen cost to modify existing (or develop new) infrastructure, or incur additional risk due to increased handling operations or eliminating key verifications. Although this paper focuses on the canceled Altair spacecraft as a case study, the issues identified here have wide applicability to other large payloads, including concepts under consideration for NASA’s Evolvable Mars Campaign.

Rucker, Michelle A.↗

Designing the Ares I Crew Launch Vehicle Upper Stage Element and Integrating the Stack at NASA's Marshall Space Flight Center

Fielding an integrated launch vehicle system entails many challenges, not the least of which is the fact that it has been over 30 years since the United States has developed a human-rated vehicle - the venerable Space Shuttle. Over time, whole generations of rocket scientists have passed through the aerospace community without the opportunity to perform such exacting, demanding, and rewarding work. However, with almost 50 years of experience leading the design, development, and end-to-end systems engineering and integration of complex launch vehicles, the National Aeronautics and Space Administration's (NASA's) Marshall Space Flight Center offers the in-house talent - both junior- and senior-level personnel - to shape a new national asset to meet the requirements for safe, reliable, and affordable space exploration solutions. The technical personnel are housed primarily in Marshall's Engineering Directorate and are matrixed into the programs and projects that reside at the rocket center. Fortunately, many Apollo-era and Shuttle engineers, as well as those who gained valuable hands-on experience in the 1990s by conducting technology demonstrator projects such as the Delta-Clipper Experimental Advanced, X-33, X-34, and X-37, as well as the short-lived Orbital Space Plane, work closely with industry partners to advance the nation's strategic capability for human access to space. The Ares Projects Office, resident at Marshall, is managing the design and development of America's new space fleet, including the Ares I, which will loft the Orion crew capsule for its first test flight in the 2013 timeframe, as well as the heavy-lift Ares V, which will round out the capability to leave low-Earth orbit once again, when it delivers the Altair lunar lander to orbit late next decade. This paper provides information about the approach to integrating the Ares I stack and designing the upper stage in house, using unique facilities and an expert workforce to revitalize the nation's space exploration resources.

Otte, Neil E.↗

Developing Science Operations Concepts for the Future of Planetary Surface Exploration

Through fly-by, orbiter, rover, and even crewed missions, National Aeronautics and Space Administration (NASA) has been extremely successful in exploring planetary bodies throughout our Solar System. The focus on increasingly complex Mars orbiter and rover missions has helped us understand how Mars has evolved over time and whether life has ever existed on the red planet. However, large strategic knowledge gaps (SKGs) still exist in our understanding of the evolution of the Solar System (e.g. the Lunar Exploration Analysis Group, Small Bodies Analysis Group, and Mars Exploration Program Analysis Group). Sending humans to these bodies is a critical part of addressing these SKGs in order to transition to a new era of planetary exploration by 2050.

Young, K. E.↗

NASA's Kilopower Reactor Development and the Path to Higher Power Missions

The development of NASAs Kilopower fission reactor is taking large strides toward flight development with several successful tests completed during its technology demonstration trials. The Kilopower reactors are designed to provide 1-10 kW of electrical power to a spacecraft which could be used for additional science instruments as well as the ability to power electric propulsion systems. Power rich nuclear missions have been excluded from NASA proposals because of the lack of radioisotope fuel and the absence of a flight qualified fission system. NASA has partnered with the Department of Energy's National Nuclear Security Administration to develop the Kilopower reactor using existing facilities and infrastructure to determine if the design is ready for flight development. The 3-year Kilopower project started in 2015 with a challenging goal of building and testing a full-scale flight prototypic nuclear reactor by the end of 2017. As the date approaches, the engineering team shares information on the progress of the technology as well as the enabling capabilities it provides for science and human exploration.

Kilopower↗

NASA's Kilopower Reactor Development and the Path to Higher Power Missions

The development of NASA's Kilopower fission reactor is taking large strides toward flight development with several successful tests completed during its technology demonstration trials. The Kilopower reactors are designed to provide 1-10 kW of electrical power to a spacecraft which could be used for additional science instruments as well as the ability to power electric propulsion systems. Power rich nuclear missions have been excluded from NASA proposals because of the lack of radioisotope fuel and the absence of a flight qualified fission system. NASA has partnered with the Department of Energy's National Nuclear Security Administration to develop the Kilopower reactor using existing facilities and infrastructure to determine if the design is ready for flight development. The 3-year Kilopower project started in 2015 with a challenging goal of building and testing a full-scale flight prototypic nuclear reactor by the end of 2017. As the date approaches, the engineering team shares information on the progress of the technology as well as the enabling capabilities it provides for science and human exploration.

Kilopower↗

NASA Guidelines for Promoting Scientific and Research Integrity

The National Aeronautics and Space Administration (NASA) seeks to explore and expand human knowledge of the Earth, solar system, and universe and to enable the development of aeronautical and space exploration systems. NASA's ability to achieve these purposes depends on the integrity of the research and technology activities the agency conducts and supports. The NASA workforce - as well as all external entities who review proposals for or receive NASA funding - must maintain the highest standards of scientific integrity. These responsibilities include selecting the most meritorious research activities through open and fair competition, peer review and other appropriate merit review processes, and avoidance of actual and perceived conflicts of interest; avoiding fabrication, falsification, or plagiarism in proposing, performing, or reviewing research, or in reporting research results; openly sharing results and methods not subject to classification or privacy standards; disclosing assumptions and biases in sharing and applying scientific information and data; and acting honestly and transparently in using and serving on advisory committees and in engaging in professional development activities.

Guidelines↗

Manual Asset Inventory: NASA Kennedy Space Center

The National Aeronautics and Aerospace Administration (NASA) relies in the security and protection of the information and information systems to know the devices that are connected to the Agency networks whether these are business, mission, research, or engineering devices. The Agency uses different Information Technology resources in order to do this process automatically, however, there are some devices that need to be reported manually. As a result of this, every month the Agency distributes among its Information System Owners (ISOs) the Manual Asset Inventory, a document that consists of a Microsoft Excel spreadsheet with twenty field descriptions cells that has to be filled out by the ISO of every Security Plan in the Center [fifty three in total] and uploaded into the IT Security Enterprise Data Warehouse (ITSEC-EDW).

Presentation↗

TPSAS-NF1676L-35202-DND

On March 20th, 2019, the National Aeronautics and Space Administration (NASA) and the Sistema de la Integración Centroamericana (SICA, Central American Integration System) issued a joint statement sharing their mutual desire to make Earth observations and remote sensing data and products more readily available to SICA member countries to inform their decision making. Regional capacity building in the use of Earth observations was one of the many opportunities for collaboration highlighted in this joint statement. As an initial capacity building effort, NASA deployed a series of feasibility projects through the DEVELOP Program to engage emerging and transitioning professionals with SICA member state partner agencies. The initial projects in summer 2019 addressed landslides in the Dominican Republic, near-coastal flooding in Guatemala and El Salvador, and environmental challenges to the Mesoamerican Reef off the coast of Belize. Additional projects were planned for fall 2019 with the objective of impacting environmental challenges for the remaining SICA member states. This presentation will summarize the results of projects conducted to date, address the lessons learned in the process of rapid engagement with regional entities, and consider how the partnership may evolve over time.

Kenton Ross↗

Water Shelf Life for Long-Duration Rodent Research Missions

The National Aeronautics and Space Administration Rodent Research Project habitat is a highly-specialized rodent husbandry caging system that enables mice to be flown to the International Space Station for a variety of bioscience studies in the unique microgravity and radiation environment. The habitat accommodates an internal water supply box containing four water access points and two one liter flexible plastic sterile blood bags for storage. Two access points are provided on each side of the habitat, which accommodates five animals per side. Due to the nature of operations on the Space Station – including limited fluid handling – water cannot be changed out weekly as in ground-based vivariums. Water is added to the system a maximum of eighteen months prior to being provided to rodents. The dependable provision of high-quality drinking water is essential for both the welfare of rodents and the scientific integrity of the studies in which they are involved. The robust, multi-stage water preparation process involves the autoclave sterilization of deionized water, the addition of iodine to minimize biofilms, and filtration through a sterile filter to ensure removal of bacteria and other contaminants. The water is then loaded into the sterile blood bags as part of the automated delivery system. A water storage test determined that the shelf life of this water in the habitat could be increased up to four years from a previous eighteen months. This facilitates the ability to pre-position habitats on Station as well as demonstrates that the habitat’s water system can be utilized on future long-duration and deep space missions involving rodents.

Tyler Marsh↗

Hydrogen Fuel Cell Electric Bus (FCEB) Evaluations in US Public Transit Service

The National Renewable Energy Laboratory (NREL) is a Department of Energy (DOE) national laboratory focused on renewable energy and energy efficiency. NREL has evaluated alternative fuel and advanced propulsion transit buses for DOE and the U.S. Department of Transportation's Federal Transit Administration (FTA). These evaluations are focused on determining the status of fuel cell systems and the corresponding infrastructure in transit applications to help DOE and FTA assess the progress toward technology readiness. For the last 19 years NREL has evaluated FCEBs in service around the United States and in Canada. The results of these evaluations have been published in numerous reports that compare FCEB performance to conventional technology as well as document the implementation experience and lessons learned by the transit agencies and their demonstration teams. Currently, 70 fuel cell buses are in active service in the US and 66 FCEBs are in development. NREL is evaluating a subset of the active FCEBs that includes three transit agencies demonstrating 25 fuel cell electric buses in California. One bus has exceeded 35,000 hours in service and 12 have exceeded 25,000 hours. Fuel economy for the current generation of FCEBs has improved 35% over the previous generation and is double that of conventional buses. Maintenance cost for FCEBs is equivalent to diesel and BEBs. The most up-to-date performance results will be presented, including fuel economy, availability, reliability, and operational costs.

bus↗

Permanent Magnetic Synchronous Motor (PMSM) Model Development

The Advanced Air Transport Technology (AATT) Project seeks to enhance the capabilities of fixed-wing subsonic transport through improved energy efficiency and environmental compatibility. One element of this effort is the use of high efficiency PMSM systems. Understanding the behavior and limitations of the se motors allows the National Aeronautics and Space Administration (NASA) to collaborate with and inform its partners worldwide. PMSM modeling is achieved using MATLAB®-Simulink® (The Math Works, Inc., Natick, Massachusetts). Through the analysis of an existing high-fidelity NASA Electrical Aircraft Testbed (NEAT) model, simplified models of varying fidelity can be developed with the goal of building a PMSM model capable of running in real-time for use in a piloted simulation environment. By utilizing system identification methods, it has been demonstrated that internal electrical components like the inverter can be represented by a simple variable gain thus greatly reducing the required simulation step size and subsequently decreasing model run-time by multiple orders of magnitude

motor controls↗

Integrated System Test Approaches for the NASA Ares I Crew Launch Vehicle

The Ares I Crew Launch Vehicle (CLV) is being developed by the U.S. National Aeronautics and Space Administration (NASA) to provide crew access to the International Space Station (ISS) and, together with the Ares V Cargo Launch Vehicle (CaLV), serves as one component of a future launch capability for human exploration of the Moon. During the system requirements definition process and early design cycles, NASA defined and began implementing plans for integrated ground and flight testing necessary to achieve the first human launch of Ares I. The individual Ares I flight hardware elements: the first stage five segment booster (FSB), upper stage, and J-2X upper stage engine, will undergo extensive development, qualification, and certification testing prior to flight. Key integrated system tests include the Main Propulsion Test Article (MPTA), acceptance tests of the integrated upper stage and upper stage engine assembly, a full-scale integrated vehicle dynamic test (IVDT), aerodynamic testing to characterize vehicle performance, and integrated testing of the avionics and software components. The Ares I-X development flight test will provide flight data to validate engineering models for aerodynamic performance, stage separation, structural dynamic performance, and control system functionality. The Ares I-Y flight test will validate ascent performance of the first stage, stage separation functionality, and a highaltitude actuation of the launch abort system (LAS) following separation. The Orion-1 flight test will be conducted as a full, un-crewed, operational flight test through the entire ascent flight profile prior to the first crewed launch.

Cockrell, Charles E., Jr.↗

Exploration Mission Particulate Matter Filtration Technology Performance Testing in a Simulated Spacecraft Cabin Ventilation System

Human deep space exploration missions will require advances in long-life, low maintenance airborne particulate matter filtration technology. As one of the National Aeronautics and Space Administrations (NASA) developments in this area, a prototype of a new regenerable, multi-stage particulate matter filtration technology was tested in an International Space Station (ISS) module simulation facility. As previously reported, the key features of the filter system include inertial and media filtration with regeneration and in-place media replacement techniques. The testing facility can simulate aspects of the cabin environment aboard the ISS and contains flight-like cabin ventilation system components. The filtration technology test article was installed at the inlet of the central ventilation system duct and instrumented to provide performance data under nominal flow conditions. In-place regeneration operations were also evaluated. The real-time data included pressure drop across the filter stages, process air flow rate, ambient pressure, humidity and temperature. In addition, two video cameras positioned at the filtration technology test articles inlet and outlet were used to capture the mechanical performance of the filter media indexing operation under varying air flow rates. Recent test results are presented and future design recommendations are discussed.

particulate matter filtration↗

Nuclear Lunar Logistics Study

This document has been prepared to incorporate all presentation aid material, together with some explanatory text, used during an oral briefing on the Nuclear Lunar Logistics System given at the George C. Marshall Space Flight Center, National Aeronautics and Space Administration, on 18 July 1963. The briefing and this document are intended to present the general status of the NERVA (Nuclear Engine for Rocket Vehicle Application) nuclear rocket development, the characteristics of certain operational NERVA-class engines, and appropriate technical and schedule information. Some of the information presented herein is preliminary in nature and will be subject to further verification, checking and analysis during the remainder of the study program. In addition, more detailed information will be prepared in many areas for inclusion in a final summary report. This work has been performed by REON, a division of Aerojet-General Corporation under Subcontract 74-10039 from the Lockheed Missiles and Space Company. The presentation and this document have been prepared in partial fulfillment of the provisions of the subcontract. From the inception of the NERVA program in July 1961, the stated emphasis has centered around the demonstration of the ability of a nuclear rocket to perform safely and reliably in the space environment, with the understanding that the assignment of a mission (or missions) would place undue emphasis on performance and operational flexibility. However, all were aware that the ultimate justification for the development program must lie in the application of the nuclear propulsion system to the national space objectives.

Source record↗

Conducting Safe and Efficient Airport Surface Operations in a NextGen Environment

The Next Generation Air Transportation System (NextGen) vision proposes many revolutionary operational concepts, such as surface trajectory-based operations (STBO) and technologies, including display of traffic information and movements, airport moving maps (AMM), and proactive alerts of runway incursions and surface traffic conflicts, to deliver an overall increase in system capacity and safety. A piloted simulation study was conducted at the National Aeronautics and Space Administration (NASA) Langley Research Center to evaluate the ability of a flight crew to conduct safe and efficient airport surface operations while utilizing an AMM. Position accuracy of traffic was varied, and the effect of traffic position accuracy on airport conflict detection and resolution (CD&R) capability was measured. Another goal was to evaluate the crew's ability to safely conduct STBO by assessing the impact of providing traffic intent information, CD&R system capability, and the display of STBO guidance to the flight crew on both head-down and head-up displays (HUD). Nominal scenarios and off-nominal conflict scenarios were conducted using 12 airline crews operating in a simulated Memphis International Airport terminal environment. The data suggest that all traffic should be shown on the airport moving map, whether qualified or unqualified, and conflict detection and resolution technologies provide significant safety benefits. Despite the presence of traffic information on the map, collisions or near-collisions still occurred; when indications or alerts were generated in these same scenarios, the incidents were averted. During the STBO testing, the flight crews met their required time-of-arrival at route end within 10 seconds on 98 percent of the trials, well within the acceptable performance bounds of 15 seconds. Traffic intent information was found to be useful in determining the intent of conflicting traffic, with graphical presentation preferred. The CD&R system was only minimally effective during STBO because the prevailing visibility was sufficient for visual detection of conflicting traffic. Overall, the pilots indicated STBO increased general situation awareness but also negatively impacted workload, reduced the ability to watch for other traffic, and increased head-down time.

Jones, Denise R.↗

Modeling Ionizing Radiation for Spaceflight Dynamic Radioisotope Power Systems

This paper presents methods, simulations, and analyses for spaceflight ionizing radiation exposures to three dynamic radioisotope power systems(DRPSs). The specific systems being investigated are part of an open solicitation by the National Aeronautics and Space Administration (NASA) and the US Department of Energy (DOE)to develop DRPS convertor technologies. The analyses include ionizing radiation sources from PuO2andgalactic cosmic rays (GCRs) over notional 20-year mission architectures with optional 10-year exposures from Jovian radiation environments. Total integrated doses to various components are calculated and compared to known material degradation thresholds in the open literature. Based on the findings, certain material trades are recommended for Jovian and non-Jovian mission architectures based solely on ionizing radiation. However, consideration is given to known and unknown synergistic degradation effects(i.e., radiation in combination with heat, pressure, or outgassing)that may be relevant to these systems and are not captured in these analyses.

Models↗

Corrective Action Decision Document/ Closure Report for Corrective Action Unit 556: Dry Wells and Surface Release Points, Nevada Test Site, Nevada with Errata Sheet and ROTC 1

This Corrective Action Decision Document (CADD)/Closure Report (CR) has been prepared for Corrective Action Unit 556, Dry Wells and Surface Release Points, located at the Nevada Test Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order (FFACO, 1996; as amended February 2008). Corrective Action Unit (CAU) 556 is comprised of four corrective action sites (CASs): • 06-20-04, National Cementers Dry Well • 06-99-09, Birdwell Test Hole • 25-60-03, E-MAD Stormwater Discharge and Piping • 25-64-01, Vehicle Washdown and Drainage Pit The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure of CAU 556 with no further corrective action. To achieve this, corrective action investigation (CAI) activities began on February 7 and were completed on June 19, 2008, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 556: Dry Wells and Surface Release Points, Nevada Test Site, Nevada (NNSA/NSO, 2007). The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective (DQO) process: • Determine whether contaminants of concern (COCs) are present. • If COCs are present, determine their nature and extent. • Provide sufficient information and data to complete appropriate corrective actions. The CAU 556 data were evaluated based on the data quality assessment process, which demonstrated the quality and acceptability of the data for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against appropriate final action levels (FALs) to identify the COCs for each CAS. The results of the CAI identified COCs at one of the four CASs in CAU 556 that required the completion of a corrective action. Assessment of the data generated from investigation activities conducted at CAU 556 revealed the following: • Corrective Action Sites 06-20-04, 06-99-09, and 25-64-01 do not contain contamination at concentrations exceeding the FALs. • Polychlorinated biphenyl (PCB) contamination above the FAL was identified in the surface and/or shallow subsurface soils at the outfall and around Catch Basin 2, and in soils contained within the catch basins and the manhole at CAS 25-60-03. A corrective action of close in place with a soil removal action and use restriction (UR) was completed at CAS 25-60-03. The PCB-contaminated soils were removed from the outfall area and around Catch Basin 2, and disposed of at a Nevada Test Site landfill as part of a removal action. The catch basins and the manhole were sealed shut by filling them with grout. The end of the outfall pipe was plugged using grout, covered with soil, and the area was regraded. A UR was applied to the entire stormwater system at CAS 25-60-03, which includes the three catch basins, manhole, and associated piping. No further action is the corrective action for CASs 06-20-04, 06-99-09, and 25-64-01. The liquids in the test holes at CAS 06-99-09 were removed for disposal and the features were filled with grout as a best management practice. The drainage pipe between the vehicle washdown pad and the drainage pit at CAS 25-64-01 was sealed at each end as a best management practice. The corrective actions were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. They were judged to meet all requirements for the technical components evaluated. The corrective actions meet all applicable federal and state regulations for closure of the site and will reduce potential exposure pathways to the contaminated media to an acceptable level at CAU 556. Therefore, the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office provides the following recommendations: • Maintain a UR for the entire stormwater drainage system (i.e., three catch basins, one manhole, and associated piping) at CAS 25-60-03. • No further corrective action for CAU 556. • A Notice of Completion to the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office is requested from the Nevada Division of Environmental Protection for closure of CAU 556. • Corrective Action Unit 556 should be moved from Appendix III to Appendix IV of the Federal Facility Agreement and Consent Order.

54 ENVIRONMENTAL SCIENCES↗