Search NASA⌕ Search

SEARCH · Search NASA

Results for “loading”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,729 records · Page 96

Assessing Fatigue and Ultimate Load Uncertainty in Floating Offshore Wind Turbines Due to Varying Simulation Length

With the push towards siting wind turbines farther offshore due to higher wind quality and less visibility, floating offshore wind turbines, which can be located in deep water, are becoming an economically attractive option. The International Electrotechnical Commission's (IEC) 61400-3 design standard covers fixed-bottom offshore wind turbines, but there are a number of new research questions that need to be answered to modify these standards so that they are applicable to floating wind turbines. One issue is the appropriate simulation length needed for floating turbines. This paper will discuss the results from a study assessing the impact of simulation length on the ultimate and fatigue loads of the structure, and will address uncertainties associated with changing the simulation length for the analyzed floating platform. Recommendations of required simulation length based on load uncertainty will be made and compared to current simulation length requirements.

17 WIND ENERGY↗

Loads Bias Genetic and Signaling Switches in Synthetic and Natural Systems

Biological protein interactions networks such as signal transduction or gene transcription networks are often treated as modular, allowing motifs to be analyzed in isolation from the rest of the network. Modularity is also a key assumption in synthetic biology, where it is similarly expected that when network motifs are combined together, they do not lose their essential characteristics. However, the interactions that a network module has with downstream elements change the dynamical equations describing the upstream module and thus may change the dynamic and static properties of the upstream circuit even without explicit feedback. In this work we analyze the behavior of a ubiquitous motif in gene transcription and signal transduction circuits: the switch. We show that adding an additional downstream component to the simple genetic toggle switch changes its dynamical properties by changing the underlying potential energy landscape, and skewing it in favor of the unloaded side, and in some situations adding loads to the genetic switch can also abrogate bistable behavior. We find that an additional positive feedback motif found in naturally occurring toggle switches could tune the potential energy landscape in a desirable manner. We also analyze autocatalytic signal transduction switches and show that a ubiquitous positive feedback switch can lose its switch-like properties when connected to a downstream load. Our analysis underscores the necessity of incorporating the effects of downstream components when understanding the physics of biochemical network motifs, and raises the question as to how these effects are managed in real biological systems. This analysis is particularly important when scaling synthetic networks to more complex organisms.

59 BASIC BIOLOGICAL SCIENCES↗

UNH TDP - Load Cell Raw Data and Processing Scripts - Fall 2021

This submission contains raw Load Cell data and processing scripts associated with MHKDR submission 394 (UNH TDP - Concurrent Measurements of Inflow, Power Performance, and Loads for a Grid-Synchronized Vertical Axis Cross-Flow Turbine Operating in a Tidal Estuary, DOI: 10.15473/1973860) from the University of New Hampshire and Atlantic Marine Energy Center (AMEC) turbine deployment platform. The user is directed to the MHKDR submission 394 for relevant context and detail of this deployment; see link below. The 394_READ_ME file here provides the description from that submission for quick reference. The READ_ME file for this specific instrument from the 394 submission is also available here. This submission contains a zipped folder structure containing raw data in its original format and MATLAB (2019a) processing scripts used to process and manipulate the data into its final form. The final data products are submitted in the 394 submission.

16 TIDAL AND WAVE POWER↗

National Dataset of EV Charging Stations With Estimates of Load and Vehicle Throughput

Current data from the AFDC provide locations and many details about EV charging stations, but not estimates of their peak loads or the number of vehicles they can accommodate. This dataset will augment the AFDC charging station locations with estimates of transmission load and vehicle throughput based on engineering specifications of the chargers, charging patterns based on vehicle types, battery capacities, and user behavior.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

GSE Yearly Load Profiles for Each Airport Under Six Charging Scenarios

This dataset contains GSE yearly load profiles for each airport under six charging scenarios: (1) charging when the battery state of charge is insufficient for the next service using 40-kW chargers (S1); (2) charging when the battery state of charge is insufficient for the next service using 20-kW chargers (S2); (3) charging starts immediately after each GSE completes a service task using 40-kW chargers (S3); (4) charging starts immediately after each GSE completes a service task using 20-kW chargers (S4); (5) charging during off-peak hours using 40-kW chargers (S5); and (6) charging during off-peak hours using 20-kW chargers (S6). ![image](gse_load_profile_sample_day.png) GSE load profile of a sample day across different airport categories under charging scenario 1.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Assessing and Reducing Plug and Process Loads in Retail Buildings (Brochure)

Plug and process loads (PPLs) in commercial buildings account for almost 5% of U.S. primary energy consumption. Minimizing these loads is a primary challenge in the design and operation of an energy-efficient building. PPLs are not related to general lighting, heating, ventilation, cooling, and water heating, and typically do not provide comfort to the occupants. They use an increasingly largefraction of the building energy use pie because the number and variety of electrical devices have increased along with building system efficiency. Reducing PPLs is difficult because energy efficiency opportunities and the equipment needed to address PPL energy use in retail spaces are poorly understood.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Assessing and Reducing Plug and Process Loads in Office Buildings (Brochure)

Plug and process loads (PPLs) in commercial buildings account for almost 5% of U.S. primary energy consumption. Minimizing these loads is a primary challenge in the design and operation of an energy-efficient building. PPLs are not related to general lighting, heating, ventilation, cooling, and water heating, and typically do not provide comfort to the occupants. They use an increasingly largefraction of the building energy use pie because the number and variety of electrical devices have increased along with building system efficiency. Reducing PPLs is difficult because energy efficiency opportunities and the equipment needed to address PPL energy use in office spaces are poorly understood.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Literature review on maximum loading of radionuclides on crystalline silicotitanate

Plans are underway to use small column ion exchange (SCIX) units installed in high-level waste tanks to remove Cs-137 from highly alkaline salt solutions at Savannah River Site. The ion exchange material slated for the SCIX project is engineered or granular crystalline silicotitanate (CST). Information on the maximum loading of radionuclides on CST is needed by Savannah River Remediation for safety evaluations. A literature review has been conducted that culminated in the estimation of the maximum loading of all but one of the radionuclides of interest (Cs-137, Sr-90, Ba-137m, Pu-238, Pu-239, Pu-240, Pu-241, Am-241, and Cm-244). No data was found for Cm-244.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Retail Buildings: Assessing and Reducing Plug and Process Loads in Retail Buildings (Fact Sheet)

Plug and process loads (PPLs) in commercial buildings account for almost 5% of U.S. primary energy consumption. Minimizing these loads is a primary challenge in the design and operation of an energy-efficient building. PPLs are not related to general lighting, heating, ventilation, cooling, and water heating, and typically do not provide comfort to the occupants. They use an increasingly largefraction of the building energy use pie because the number and variety of electrical devices have increased along with building system efficiency. Reducing PPLs is difficult because energy efficiency opportunities and the equipment needed to address PPL energy use in retail spaces are poorly understood.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Office Buildings: Assessing and Reducing Plug and Process Loads in Office Buildings (Fact Sheet)

Plug and process loads (PPLs) in commercial buildings account for almost 5% of U.S. primary energy consumption. Minimizing these loads is a primary challenge in the design and operation of an energy-efficient building. PPLs are not related to general lighting, heating, ventilation, cooling, and water heating, and typically do not provide comfort to the occupants. They use an increasingly largefraction of the building energy use pie because the number and variety of electrical devices have increased along with building system efficiency. Reducing PPLs is difficult because energy efficiency opportunities and the equipment needed to address PPL energy use in office spaces are poorly understood.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Cone Penetrometer Load Cell Temperature and Radiation Testing Results

This report summarizes testing activities performed at the Pacific Northwest National Laboratory to verify the cone penetrometer load cell can withstand the tank conditions present in 241-AN-101 and 241-AN-106. The tests demonstrated the load cell device will operate under the elevated temperature and radiation levels expected to be encountered during tank farm deployment of the device.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Mechanical Loads Test Report for the U.S. Department of Energy 1.5-Megawatt Wind Turbine

The objective of the test was to obtain a baseline characterization of the mechanical loads of the DOE 1.5 wind turbine located at NREL. The test was conducted in accordance with the International Electrotechnical Commission (IEC) Technical Specification, IEC 61400-13 Wind Turbine Generator Systems – Part 13: Measurement of mechanical loads; First Edition 2001-06 [1]. The National Wind Technology Center (NWTC) at NREL conducted this test in accordance with its quality system procedures so that the final test report meets the full requirements of its accreditation by the American Association for Laboratory Accreditation (A2LA). NREL’s quality system requires that all applicable requirements specified by A2LA and International Standards Organization/IEC 17025 be met or to note any exceptions in the test report.

1.5 MW↗

Multipactor Physics, Acceleration, and Breakdown in Dielectric-Loaded Accelerating Structures

The objective of this 3-year program is to study the physics issues associated with rf acceleration in dielectric-loaded accelerating (DLA) structures, with a focus on the key issue of multipactor loading, which has been found to cause very significant rf power loss in DLA structures whenever the rf pulsewidth exceeds the multipactor risetime (~10 ns). The experiments are carried out in the X-band magnicon laboratory at the Naval Research Laboratory (NRL) in collaboration with Argonne National Laboratory (ANL) and Euclid Techlabs LLC, who develop the test structures with support from the DoE SBIR program. There are two main elements in the research program: (1) high-power tests of DLA structures using the magnicon output (20 MW @11.4 GHz), and (2) tests of electron acceleration in DLA structures using relativistic electrons from a compact X-band accelerator. The work during this period has focused on a study of the use of an axial magnetic field to suppress multipactor in DLA structures, with several new high power tests carried out at NRL, and on preparation of the accelerator for the electron acceleration experiments.

11.4 GHz↗

Predictive Solar-Integrated Commercial Building Load Control

This report is the final technical report for the Department of Energy SunShot award number EE0007180 to EdgePower Inc., for the project entitled “Predictive Solar-Integrated Commercial Building Load Control.” The goal of this project was to successfully prove that the integration of solar forecasting and building load control can reduce demand charge costs for commercial building owners with solar PV. This proof of concept Tier 0 project demonstrated its value through a pilot project at a commercial building. This final report contains a summary of the work completed through he duration of the project. Clean Power Research was a sub-recipient on the award.

14 SOLAR ENERGY↗

WGRID-49 GMLC Project Report: Understanding the Role of Short-Term Energy Storage and Large Motor Loads for Active Power Controls by Wind Power

The GMLC project is built upon the results of pioneering research funded by the U.S. Department of Energy (DOE) and conducted by the National Renewable Energy Laboratory (NREL)—in collaboration with the Electric Power Research Institute and the University of Colorado—on active power controls (APC) by wind power during 2013–2016. The studies detailed in the first APC by wind power project have shown tremendous promise for the potential for wind power plants to provide APC. The goal of this project was to continue the previous work and develop and validate coordinated controls of APC by wind generation, short-term energy storage, and large industrial motor drives for providing various types of ancillary services to the grid and minimizing loading impacts on wind turbines (e.g., drivetrains), thereby reducing operation-and-maintenance (O&M) costs and subsequently reducing the cost of energy generated by wind power. This work used the $30 million, multiyear DOE investments and the unique characteristics of NREL’s existing National Wind Technology Center test site, including a combination of multimegawatt utility-scale wind turbine generators, a 1-MW/1-MWh battery energy storage system (BESS), industrial variable-frequency motor drives, a 1-MW solar photovoltaic (PV) array, and a 7-MVA controllable grid interface. This combination of technologies allows for the optimization, testing, and demonstration of various types of APC by wind power in coordination with other generation sources (including regenerative loads) and energy storage to allow for enhancing or, in some cases, substituting the APC services by wind power and reducing impacts on wind turbine component life and thus increasing the availability and reliability of the power supply from wind

17 WIND ENERGY↗

Load Forecasting for the Moroccan Electricity Sector

The Moroccan electricity sector is undergoing rapid transformation as it seeks to increase its utilization of renewable energy from its abundant domestic supply. Key to implementing variable renewable energy is understanding current electricity demand and forecasting this demand on the long, medium, and short timescales. This report leverages existing Moroccan electricity sector data to build basic load forecasts on these timescales. Taking these forecasts, the report recommends next steps in terms of additional algorithms, mathematical models, data collection, and scenarios (such as vehicle electrification or high levels of distributed generation) that should be examined for advanced load forecasts.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Simulants for Testing the Blend Can Loading System

Eleven simulants have been provided to the Savannah River National Laboratory (SRNL) Mechanical Systems & Custom Equipment Development (MSCED) organization to further test the capabilities of the Blend Can Loading System (BCLS). The basis for the materials used in these simulants are based on SRNL-STI-2020-00503, “Simulant Recommendation for the Blend Can Loading System” (Ref. i). The 11 different simulants provided to MSCED are summarized in Table ES-1. This table provides a basis of why they were selected and what properties were specifically targeted, given the composition of the procured materials.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗