Search NASA⌕ Search

SEARCH · Search NASA

Results for “operational controller loops”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,729 records · Page 96

DACS II - A distributed thermal/mechanical loads data acquisition and control system

A distributed data acquisition and control system has been developed for the NASA Flight Loads Research Facility. The DACS II system is composed of seven computer systems and four array processors configured as a main computer system, three satellite computer systems, and 13 analog input/output systems interconnected through three independent data networks. Up to three independent heating and loading tests can be run concurrently on different test articles or the entire system can be used on a single large test such as a full scale hypersonic aircraft. Thermal tests can include up to 512 independent adaptive closed loop control channels. The control system can apply up to 20 MW of heating to a test specimen while simultaneously applying independent mechanical loads. Each thermal control loop is capable of heating a structure at rates of up to 150 F per second over a temperature range of -300 to +2500 F. Up to 64 independent mechanical load profiles can be commanded along with thermal control. Up to 1280 analog inputs monitor temperature, load, displacement and strain on the test specimens with real time data displayed on up to 15 terminals as color plots and tabular data displays. System setup and operation is accomplished with interactive menu-driver displays with extensive facilities to assist the users in all phases of system operation.

Zamanzadeh, Behzad↗

Issues and Concerns in Robotic Drilling

Exploration of the Martian subsurface will be essential in the search for life and water, given the desiccated and highly oxidized conditions on the surface. Discovery of these, at least in non-fossil form, is unlikely without drilling or other physical access to the subsurface. Hence subsurface access will be critical for both future in-situ science and Mars sample return. Drilling applications present many new challenges for diagnosis and control technology. Traditionally, diagnosis has concentrated on determining the internal state of a system, and detecting failures of system components. In the case of drilling applications, an additional challenge is to diagnose the interactions between the drill and its environment. This is necessary because particular observations of the drilling operation may be consistent with a number of possible problems, including faults in the equipment, but also changes in the material being drilled (for example, from rock to ice). The diagnosis of a particular observation may also depend on knowledge of geological formations previously encountered during drilling, and different remedial actions may be required for each diagnosis. Current 2009 Mars mission scenarios call for no more than 33 sols to be spent drilling. Yet they also call for a baseline of two 2m-deep holes in each of three target areas, for a total of six drilling operations. Using current levels of automation, it is estimated that 15-16 sols would be required to drill each hole. As a result of this, either the drilling part of the mission plan will need to be severely downscoped to no more than two holes total, or on-board automation and robotics must be increased in order to reduce the number of sols required per hole by removing ground control from the drilling control loop. This lecture will discuss salient issues and concerns of robotic drilling automation compares with other applications, and implementation constraints.

Glass, Brian↗

Pump, and earth-testable spacecraft capillary heat transport loop using augmentation pump and check valves

A spacecraft includes heat-generating payload equipment, and a heat transport system with a cold plate thermally coupled to the equipment and a capillary-wick evaporator, for evaporating coolant liquid to cool the equipment. The coolant vapor is coupled to a condenser and in a loop back to the evaporator. A heated coolant reservoir is coupled to the loop for pressure control. If the wick is not wetted, heat transfer will not begin or continue. A pair of check valves are coupled in the loop, and the heater is cycled for augmentation pumping of coolant to and from the reservoir. This augmentation pumping, in conjunction with the check valves, wets the wick. The wick liquid storage capacity allows the augmentation pump to provide continuous pulsed liquid flow to assure continuous vapor transport and a continuously operating heat transport system. The check valves are of the ball type to assure maximum reliability. However, any type of check valve can be used, including designs which are preloaded in the closed position. The check valve may use any ball or poppet material which resists corrosion. For optimum performance during testing on Earth, the ball or poppet would have neutral buoyancy or be configured in a closed position when the heat transport system is not operating. The ball may be porous to allow passage of coolant vapor.

Baker, David↗

NASA's Robotic Lunar Lander Development Project

Since early 2005, NASA's Robotic Lunar Lander Development (RLLD) office at NASA MSFC, in partnership with the Applied Physics Laboratory (APL), has developed mission concepts and preformed risk-reduction activities to address planetary science and exploration objectives uniquely met with landed missions. The RLLD team developed several concepts for lunar human-exploration precursor missions to demonstrate precision landing and in-situ resource utilization, a multi-node lunar geophysical network mission, either as a stand-alone mission, or as part of the International Lunar Network (ILN), a Lunar Polar Volatiles Explorer and a Mercury lander mission for the Planetary Science decadal survey, and an asteroid rendezvous and landing mission for the Exploration Precursor Robotics Mission (xPRM) office. The RLLD team has conducted an extensive number of risk-reduction activities in areas common to all lander concepts, including thruster testing, propulsion thermal control demonstration, composite deck design and fabrication, and landing leg stability and vibration. In parallel, the team has developed two robotic lander testbeds providing closed-loop, autonomous hover and descent activities for integration and testing of flight-like components and algorithms. A compressed-air test article had its first flight in September 2009 and completed over 150 successful flights. This small test article (107 kg dry/146 kg wet) uses a central throttleable thruster to offset gravity, plus 3 descent thrusters (~37lbf ea) and 6 attitude-control thrusters (~12lbf ea) to emulate the flight system with pulsed operation over approximately 10s of flight time. The test article uses carbon composite honeycomb decks, custom avionics (COTS components assembled in-house), and custom flight and ground software. A larger (206 kg dry/322 kg wet), hydrogen peroxide-propelled vehicle began flight tests in spring 2011 and fly over 30 successful flights to a maximum altitude of 30m. The monoprop testbed also uses a central gravity-canceling thruster and 3 descent thrusters, but has 12 attitude-control thrusters and a maximum flight time of over a minute. The testbed uses aluminum ortho-grid decks, an LN200-1 IMU, Roke Manor Radar Altimeter, Illunis optical cameras, Novatel Pro-Pak GPS truth data system, Pressure transducers & thermocouples for housekeeping, "In-Control" ground system software, and the core Flight Executive (cFE) modular software environment. The peroxide lander testbed is able to accept other sensors and algorithms for testing, both from within NASA and from other customers. Through these activities, the RLLD team has significantly reduced technical risks for all small and medium class robotic landers for the Moon and other airless planetary bodies.

Cohen, Barbara A.↗

Dynamic Regulation of Sub-Atmospheric Pressure for Constant and Cyclic Gas Loads During Testing of Spacesuit Components

New iterations of the various subsystems within the spacesuit will benefit from a new sorbent technology. For example, sorbents used in the Trace Contaminant Control (TCC) and the Rapid Cycle Amine (RCA) systems within the Exploration Portable Life Support System (xPLSS), part of the Extra-Vehicular Mobility Unit (xEMU). For proper validation, the sub-atmospheric pressure needs to be maintained within a simulated 2 ft 3 spacesuit volume. The traditional approach, which involves placing the entire vent loop within a hypobaric chamber, is not practical for the widespread testing of components and prototypes, as these specialized chambers are costly and not widely available. A two-stage regulator based sub-atmospheric pressure system is presented in this work. The method regulates the pressure based on pressure differentials between the pressure regulation pump, the test system, and the ambient environment. The performance of this system is demonstrated using data collected during a 150+ hour non-regenerative TCC sorbent evaluation, several 24-hour regenerative TCC sorbent evaluations with different regeneration cycles, and an 8-hour RCA sorbent evaluation, all under xEMU operating conditions. For regulation, the inlet regulator was set to propagate a small leak to increase the stability of the system as the gas load from the testing system changes. It was also found that controlling the input flow rate that replaces the material lost during regeneration is critical for ensuring the stability of the system. This system provided excellent pressure regulation, without adjustments, for constant loads during shorter time evaluations (hours), while longer time evaluations (days) are easily obtainable with periodic regulator adjustments. A second method is under development to address longer-term stability and to automate pressure regulation. It will incorporate flow and pressure measurements to dynamically control a set of electronically controlled proportional valves for adjusting the pumping speed and air bleed supply.

Nicholas F Materer↗

Task Load Management in Earth Independent Medical Operations

BACKGROUND: Medical care in spaceflight carries a high task load and can easily overwhelm a small crew. Present day operations in low Earth orbit (LEO) offload most medical tasks to ground teams in mission control. This team includes dozens of flight surgeons, specialists, and engineers and supports the on-orbit crew in monitoring environmental systems, tracking medications, guiding procedures, providing expert advice, and many other tasks. However, the physical limitations of the speed of light and technical limitations of bandwidth, channel capacity, and signal processing mean that missions beyond LEO cannot rely on this level of telemedical support. The further we travel from Earth the more these tasks will fall on the shoulders of the crew and the greater the risk of task saturation to the wellbeing of the crew and the success of the mission. Exploration class space crews will need progressively more robust systems for managing task load as they progress further out in space. OVERVIEW: Medical task management systems will need to assist with two broad categories of tasks; cognitively intensive tasks and procedure execution tasks. In both cases the goal is for the systems to operate in the background with minimal human-in-the-loop intervention. To accomplish this such systems will need to be designed with careful consideration for human factors and human systems integration to maximize efficiency, minimize alarm fatigue, and avoid inadvertently increasing task loads. Finally, the key domains of space medicine tasking can be used to map present day and near future technologies to the areas where they are best suited to support and identify gaps which can be targeted for research and development. DISCUSSION: Task load is a major challenge for Earth Independent Medical Operations to overcome. It will require careful coordination between experts in a variety of fields paying attention to human factors and human systems integration as well as technical and medical expertise. If done well medical task management systems can handle many of the tasks currently run by humans in mission control and enable human crews to maintain terrestrial standards of care in the extraterrestrial environment.

Dana Levin↗

Experimental validation of advanced regulations for superconducting magnet cooling undergoing periodic heat loads

Superconducting magnets used in tokamaks undergo periodic heat load caused by cycling plasma operations inducing AC losses, neutrons fluxes and eddy currents in magnet structures. In the cryogenic system of JT60-SA tokamak, the Auxiliary Cold Box (ACB) distributes helium from the refrigerator to the cryogenic users and in particular to the superconducting magnets. ACB comprises a saturated helium bath with immersed heat exchangers, extracting heat from independent cooling loops. The supercritical helium flow in each cooling loop is driven by a cold circulator. In order to safely operate the refrigerator during plasma pulses, the interface between the ACB and the refrigerator shall be as stable as possible, with well-balanced bath inlet and outlet mass flows during cycling operation. The solution presented in this paper relies on a combination of regulations to smooth pulsed heat loads and to keep a constant refrigeration power during all the cycle. Two smoothing strategies are presented, both regulating the outlet mass flow of the bath: the first one using the bath as a thermal buffer and the second one storing energy in the loop by varying the cold circulator speed. The bath outlet mass flow is also controlled by an immersed resistive heater which enables a constant evaporation rate in the bath when power coming from the loops is decreasing. The refrigeration power is controlled so that the compensating power remains within an acceptable margin. Experimental validation is achieved using the HELIOS facility. This facility running at CEA Grenoble since 2010 is a scaled down model of the ACB bath and Central Solenoid magnet cooling loop of the JT60-SA tokamak. Test results show performances and robustness of the regulations.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Isochronous Architecture-Based Voltage-Active Power Droop for Multi-Inverter Systems

This article proposes an isochronous architecture for parallel inverters with only voltage-active power droop (VP-D) control for improving active power sharing as well as plug-and-play of multi-inverter-based distributed energy resources (DERs). The isochronous framework obviates the need for an explicit regulation of the frequency while allowing for sharing of reactive power. The article shows that the detrimental effects of circulating currents between inverters can be addressed in the framework developed. The isochronous architecture is implemented by employing a GPS to disseminate clock timing signals that enable the microgrid to maintain the nominal system frequency. Small signal eigenvalue analysis of a Multi-inverter Microgrid system near the steady-state operating point is presented to evaluate the system stability. Moreover, unlike traditional droop-based methods, the isochronous strategy lends itself to analytical guarantees which are developed in the article. Furthermore, the effect of delays in receiving GPS clock signals by an inverter is experimentally characterized and an inverter isolation mechanism is proposed that disconnects inverters facing large GPS communication delays. Hardware experiments on an 1.2 kVA-prototype and controller-hardware-in-the-loop validation on the CIGRE distribution network are conducted to demonstrate the effectiveness of the proposed architecture towards active and reactive power sharing between inverters with load scenarios.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electric Power Infrastructure Reliability and Security (EPIRS) Reseach and Development Initiative

Power systems have become increasingly complex and face unprecedented challenges posed by population growth, climate change, national security issues, foreign energy dependence and an aging power infrastructure. Increased demand combined with increased economic and environmental constraints is forcing state, regional and national power grids to expand supply without the large safety and stability margins in generation and transmission capacity that have been the rule in the past. Deregulation, distributed generation, natural and man-made catastrophes and other causes serve to further challenge and complicate management of the electric power grid. To meet the challenges of the 21st century while also maintaining system reliability, the electric power grid must effectively integrate new and advanced technologies both in the actual equipment for energy conversion, transfer and use, and in the command, control, and communication systems by which effective and efficient operation of the system is orchestrated - in essence, the 'smart grid'. This evolution calls for advances in development, integration, analysis, and deployment approaches that ultimately seek to take into account, every step of the way, the dynamic behavior of the system, capturing critical effects due to interdependencies and interaction. This approach is necessary to better mitigate the risk of blackouts and other disruptions and to improve the flexibility and capacity of the grid. Building on prior Navy and Department of Energy investments in infrastructure and resources for electric power systems research, testing, modeling, and simulation at the Florida State University (FSU) Center for Advanced Power Systems (CAPS), this project has continued an initiative aimed at assuring reliable and secure grid operation through a more complete understanding and characterization of some of the key technologies that will be important in a modern electric system, while also fulfilling an education and outreach mission to provide future energy workforce talent and support the electric system stakeholder community. Building upon and extending portions of that research effort, this project has been focused in the following areas: (1) Building high-fidelity integrated power and controls hardware-in-the-loop research and development testbed capabilities (Figure 1). (2) Distributed Energy Resources Integration - (a) Testing Requirements and Methods for Fault Current Limiters, (b) Contributions to the Development of IEEE 1547.7, (c) Analysis of a STATCOM Application for Wind Resource Integration, (d) Development of a Grid-Interactive Inverter with Energy Storage Elements, (e) Simulation-Assisted Advancement of Microgrid Understanding and Applications; (3) Availability of High-Fidelity Dynamic Simulation Tools for Grid Disturbance Investigations; (4) HTS Material Characterization - (a) AC Loss Studies on High Temperature Superconductors, (b) Local Identification of Current-Limiting Mechanisms in Coated Conductors; (5) Cryogenic Dielectric Research; and (6) Workshops, education, and outreach.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Application of a novel multi-stage signal parameter estimator to high dynamic GPS receivers

The performance of a novel multistage estimator when applied to the estimation of the position, velocity, and acceleration of high dynamic Global Positioning System (GPS) receivers is discussed. For the present application, a two-stage specialization of the more general estimation scheme is considered, wherein the first-stage algorithm is selected to be a modified least-squares algorithm operating upon the differential signal model and referred to as differential least-squares (DLS) and the second stage is simply an extended Kalman filter (EKF). In terms of the threshold on received carrier power-to-noise power spectral density ratio (CNR), when compared to the single-stage EKF algorithm, the DLS-EKF algorithm is about 1.5-2.0 dB better in terms of threshold and outperforms the crossproduct AFC (automatic frequency control) loop by 2-5 dB. For the case when data modulation is present, the proposed scheme provides an improvement of about 6 dB in terms of CNR compared to an earlier approximate MLE (maximum likelihood estimation) scheme. There are also very significant improvements in terms of other performance measures.

Kumar, R.↗

An Investigation of the Effects of the Time Lag Due to Long Transmission Distances upon Remote Control: Tracking Experiments - Phase 1

A series of pursuit tracking tasks were performed incorporating a transport lag in the control loop. The target was a mixture of four sine waves, the fastest having a frequency of 16 cycles per minute at full speed. An attempt was made to design the experiments so that they would provide data applicable to remote control of a ground vehicle over long transmission distances. Three programs were run. In each the time lag was placed between the control and the display. In the first program a velocity control was used and the operator was told that his knob controlled a vehicle, the problem represented a road 9 and he was to drive his vehicle along the road 9 using the delayed vehicle position as feedback for whatever means he desired. The objective was not to match the display traces. In the second program a velocity control was used, and the operator was told that the problem trace represented a road and the delayed trace represented a vehicle and he was to keep them together. The objective was to match display traces. The third program was identical with the first, except that an acceleration control was used rather than a velocity control. Target speeds used were full speed, 1/2 speed, 1/4 speed, 1/8 speed, and 1/16 speed. Time lags were 1/4 second, l/2 second, 1 second, 1-1/2 second, 2 second, 3 second, and 6 seconds. The experimental results are presented in the last section of this report.

Adams, James L.↗

Measuring Image Navigation and Registration Performance at the 3-Sigma Level Using Platinum Quality Landmarks

Geostationary Operational Environmental Satellite (GOES) Image Navigation and Registration (INR) performance is specified at the 3- level, meaning that 99.7% of a collection of individual measurements must comply with specification thresholds. Landmarks are measured by the Replacement Product Monitor (RPM), part of the operational GOES ground system, to assess INR performance and to close the INR loop. The RPM automatically discriminates between valid and invalid measurements enabling it to run without human supervision. In general, this screening is reliable, but a small population of invalid measurements will be falsely identified as valid. Even a small population of invalid measurements can create problems when assessing performance at the 3-sigma level. This paper describes an additional layer of quality control whereby landmarks of the highest quality ("platinum") are identified by their self-consistency. The platinum screening criteria are not simple statistical outlier tests against sigma values in populations of INR errors. In-orbit INR performance metrics for GOES-12 and GOES-13 are presented using the platinum landmark methodology.

Carr, James L.↗

Portable Health Algorithms Test System

A document discusses the Portable Health Algorithms Test (PHALT) System, which has been designed as a means for evolving the maturity and credibility of algorithms developed to assess the health of aerospace systems. Comprising an integrated hardware-software environment, the PHALT system allows systems health management algorithms to be developed in a graphical programming environment, to be tested and refined using system simulation or test data playback, and to be evaluated in a real-time hardware-in-the-loop mode with a live test article. The integrated hardware and software development environment provides a seamless transition from algorithm development to real-time implementation. The portability of the hardware makes it quick and easy to transport between test facilities. This hard ware/software architecture is flexible enough to support a variety of diagnostic applications and test hardware, and the GUI-based rapid prototyping capability is sufficient to support development execution, and testing of custom diagnostic algorithms. The PHALT operating system supports execution of diagnostic algorithms under real-time constraints. PHALT can perform real-time capture and playback of test rig data with the ability to augment/ modify the data stream (e.g. inject simulated faults). It performs algorithm testing using a variety of data input sources, including real-time data acquisition, test data playback, and system simulations, and also provides system feedback to evaluate closed-loop diagnostic response and mitigation control.

Melcher, Kevin J.↗

NASA Small Spacecraft Technology (SST) Program - Recent and Upcoming Technology Demonstrations and Development Efforts

The Small Spacecraft Technology (SST) program within NASA’s Space Technology Mission Directorate, expands the ability to execute unique missions through rapid development and demonstration of capabilities for small spacecraft applicable to exploration, science and the commercial space sector. Through targeted development and frequent in space testing, the program: • Enables execution of missions at much lower cost than previously possible • Substantially reduces the time required for development of spacecraft • Enables new mission architectures through the use of small spacecraft • Expands the reach of small spacecraft to new destinations and challenging new environments • Enables the augmentation of existing assets and future missions with supporting small spacecraft. The program achieves its objectives through: • Identification and investment in the development of new subsystem technologies to enhance or expand the capabilities of small spacecraft • Sponsorship of flight demonstrations of new technologies, capabilities and applications for small spacecraft • Promotion of the use of small spacecraft as platforms for testing and demonstrating technologies and capabilities that might have more general applications in larger-scale spacecraft and systems Technologies funded by the program that are key to advancing the utility and capability of small spacecraft were demonstrated in 2022 and 2023. Notable on-orbit demonstrations include the following. • The Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment’s (CAPSTONE) navigation technology that was demonstrated for the first time in 2023 could provide autonomous onboard navigation information for future lunar missions, minimizing or eliminating human-in-the-loop mission operations. • The optical communications technology also demonstrated in 2023 by the TeraByte InfraRed Delivery (TBIRD) payload that launched on Pathfinder Technology Demonstrator-3, achieved 200 gigabit per second (Gbps) throughput on a space-to-ground optical link between a satellite in orbit and Earth, the highest data rate ever achieved by optical communications technology. • The precision laser pointing performance of NASA’s CubeSat Infrared CrossLink A (CLICK) spacecraft’s fine steering mirror control system was successfully demonstrated. This element of the laser communications system will be used to demonstrate two-way crosslink communication in low-Earth orbit by CLICK B/C anticipated to launch in late 2024. Investments in subsystem technology development through funding to university, industry, and other government partners in a number of areas will be discussed. Among others, topic areas include propulsion, autonomous swarm technology, edge computing, and thermal control. Additionally, the status of the CubeSat-alternative platform, DiskSat, strategies for accelerating the demonstration of technology payloads via the Realizing Rapid, Reduced-cost high-Risk Research (R5) project, and the status of recently completed and upcoming on-orbit demonstrations will also be presented.

Roger C Hunter↗

Tore Supra LH transmitter upgrade, a new RF driver for the power spectrum

New real time tools have been developed for testing new 700kW/3.7GHz/CW klystrons and for the operations on very long plasma shots. After the commissioning of the 18 series tubes on the high power test bed facility, the installation of the first 8 klystrons in the Tore Supra transmitter and the adjustment tests on load, this upgrade work has been materialized during the last 2010 campaign by a successful operation on the Full Active Multijunction (FAM) C3 antenna, with new performances: 3.5MW/40s on plasma. The RF output power control in amplitude and phase has been improved for a better control of the wave spectrum launched into the plasma. The new klystrons have no modulating anode and the high cathode voltage must be adjusted with the RF input power in order to optimize the RF output power with a minimization of the thermal power losses in the collector. A new phase correction, depending on the 3 RF output power ranges used, has been introduced. The improvements made in 2009 and 2010 on the generic phase loop and the procedures used during the real time tests of the RF transfer functions in amplitude and phase are detailed below. All RF measurements systems, RF safety systems and the RF calibration procedures have been revised in order to have the best consistency, reproducibility and with a measurement error against the calorimetry measurement lower than 10%.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Radiological Survey of Contaminated Installations of Research Reactor before Dismantling in High Dose Conditions with Complex for Remote Measurements of Radioactivity - 12069

Decontamination and decommissioning of the research reactors MR (Testing Reactor) and RFT (Reactor of Physics and Technology) has recently been initiated in the National Research Center (NRC) 'Kurchatov institute', Moscow. These research reactors have a long history and many installations - nine loop facilities for experiments with different kinds of fuel. When decommissioning nuclear facilities it is necessary to measure the distribution of radioactive contamination in the rooms and at the equipment at high levels of background radiation. At 'Kurchatov Institute' some special remote control measuring systems were developed and they are applied during dismantling of the reactors MR and RFT. For a survey of high-level objects a radiometric system mounted on the robotic Brokk vehicle is used. This system has two (4π and collimated) dose meters and a high resolution video camera. Maximum measured dose rate for this system is ∼8.5 Sv/h. To determine the composition of contaminants, a portable spectrometric system is used. It is a remotely controlled, collimated detector for scanning the distribution of radioactive contamination. To obtain a detailed distribution of contamination a remote-controlled gamma camera is applied. For work at highly contaminated premises with non-uniform background radiation, another camera is equipped with rotating coded mask (coded aperture imaging). As a result, a new system of instruments for remote radioactivity measurements with wide range of sensitivity and angular resolution was developed. The experience and results of measurements in different areas of the reactor and at its loop installations, with emphasis on the radioactive survey of highly-contaminated samples, are presented. These activities are conducted under the Federal Program for Nuclear and Radiation Safety of Russia. Adaptation of complex remote measurements of radioactivity and survey of contaminated installations of research reactor before dismantling in high dose conditions has proven successful. The radioactivity measuring devices for operation at high, non-uniform dose background were tested in the field and a new data of measurement of contamination distribution in the premises and installations were obtained. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Open Source Scanning Probe Microscopy Control Software package GXSM

GXSM is a full featured and modern scanning probe microscopy (SPM) software. It can be used for powerful multidimensional image/data processing, analysis, and visualization. Connected to an instrument, it is operating many different flavors of SPM, e.g., scanning tunneling microscopy and atomic force microscopy or, in general, two-dimensional multichannel data acquisition instruments. The GXSM core can handle different data types, e.g., integer and floating point numbers. An easily extendable plug-in architecture provides many image analysis and manipulation functions. A digital signal processor subsystem runs the feedback loop, generates the scanning signals, and acquires the data during SPM measurements. The programmable GXSM vector probe engine performs virtually any thinkable spectroscopy and manipulation task, such as scanning tunneling spectroscopy or tip formation. The GXSM software is released under the GNU general public license and can be obtained via the internet.

77 NANOSCIENCE AND NANOTECHNOLOGY↗

Regenerable Air Purification System for Gas-Phase Contaminant Control

Tests of a pre-prototype regenerable air purification system (RAPS) that uses water vapor to displace adsorbed contaminants from an adsorbent column have been performed at NASA Ames Research Center. A unit based on this design can be used for removing trace gas-phase contaminants from spacecraft cabin air or from polluted process streams including incinerator exhaust. During the normal operation mode, contaminants are removed from the air on the column. Regeneration of the column is performed on-line. During regeneration, contaminants are displaced and destroyed inside the closed oxidation loop. In this presentation we discuss initial experimental results for the performance of RAPS in the removal and treatment of several important spacecraft contaminant species from air.

Constantinescu, Ileana C.↗