Search NASA⌕ Search

SEARCH · Search NASA

Results for “sequestration”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,729 records · Page 96

Life Cycle Greenhouse Gas Analysis of Advanced Jet Propulsion Fuels: F-T Based SPK-1 Case Study (Report)

In response to the Energy Independence and Security Act (EISA), NETL conducted an LCA (LCA) of 10 fuel production pathways using Fischer-Tropsch synthesis. These pathways use varying combinations of coal and swithgrass feedstocks and two options for carbon management (sequestration or enhanced oil recovery). Only greenhouse gas (GHG) emissions are inventoried. Comparative analysis of the results demonstrate that higher percentages of biomass result in lower life cycle GHG emissions when using switchgrass. The choice of carbon management strategy has an effect on the results.

09 BIOMASS FUELS↗

Hydrogen Energy California (Final Scientific and Technical Report)

Hydrogen Energy California ("HECA") is an Integrated Gasification Combined-Cycle (IGCC) “polygeneration” project. The Project gasifies a 75 percent coal and 25 percent petroleum coke (petcoke) fuel blend to produce synthesis gas (syngas). Syngas produced via gasification is purified to hydrogen-rich fuel, which is used to generate low-carbon baseload electricity in a Combined Cycle Power Block, low-carbon nitrogen-based products in an integrated manufacturing Complex, and carbon dioxide (CO 2 ) for use in enhanced oil recovery (EOR). The power and products produced by HECA have a lower carbon footprint compared to power and products produced from more traditional fossil fuel facilities. This low-carbon footprint is achieved by capturing more than 90 percent of the CO 2 in the production of the hydrogen fuel and transporting it for use in EOR, which results in simultaneous sequestration (storage) of the CO 2 in a secure geologic formation in the adjacent Elk Hills Oil Field (EHOF), a hydrocarbon producing area. Highlights of HECA as conceived during the execution of FEED are as follows: The Project is designed to operate on a fuel blend consisting of 75 percent western subbituminous coal and 25 percent California petcoke based on thermal input to the gasifier on a higher heating value (HHV) basis; The feedstocks are gasified to produce syngas that is further processed and cleaned to produce hydrogen-rich fuel; More than 90 percent of the carbon in the raw syngas is captured in a high-purity CO 2 stream during steady-state operation; High purity CO 2 is compressed and transported by pipeline to the EHOF for injection into deep underground hydrocarbon reservoirs for CO 2 EOR; The Combined Cycle Power Block produces over 420 megawatts (MW) of gross power, which yields during periods of maximum power production over 270 MW of low-carbon baseload electricity to the grid; An integrated Manufacturing Complex produces approximately 1 million tons per year of low-carbon nitrogen-based products, including urea, urea ammonium nitrate (UAN), and anhydrous ammonia, to be used in agricultural, transportation, and industrial applications.

01 COAL, LIGNITE, AND PEAT↗

Carbon Dioxide Plume Evolution Following Injection into a Depleted Natural Gas Reservoir: Modeling of Conformance Uncertainty Reduction Over Time

The uncertainty in the long-term fate of CO 2 injected for geologic carbon sequestration (GCS) is a significant barrier to the adoption of GCS as a greenhouse gas emission mitigation approach for industry and regulatory agencies alike. Here we present a modeling study that demonstrates that the uncertainty in forecasts of GCS site performance decreases over time as monitoring data are used to inform and update operational models. The approach we take is to consider a case study consisting of a depleted natural gas reservoir that is used for GCS with CO 2 injection occurring over 20 years, with a 50-year post-injection site care (PISC) period. We constructed a detailed model of the system and ran this model out to 200 years to generate the actual site data. A series of simpler operational models based on limited data and assumptions about how an actual operator would model such a site are then run and compared against the actual model output at various specific monitoring points after one year, two years, etc. The operational model is then updated and improved using the observations (synthetic data from the actual model) at the same time intervals. We found that both model parameter values and model features needed to be added over time to improve matches to the actual system. These kinds of model adjustments are expected to be a normal part of reservoir engineering and site management at GCS sites. We found that the uncertainty in two key measures related to site performance at various locations decreases with time. This overall conclusion should help allay the concerns of industry and regulators about the uncertainty in GCS operations.

03 NATURAL GAS↗

NRAP-Open-IAM Multisegmented Wellbore Reduced-Order Model

Geologic carbon storage is one of the promising strategies to mitigate climate change by reducing the emission of carbon dioxide to the atmosphere. As part of the National Risk Assessment Partnership (NRAP), a systems-level stochastic analysis tool called the open source integrated assessment model, NRAP-Open-IAM, has been developed to estimate and manage the risk of containment loss at a geological carbon sequestration site. NRAP-Open-IAM contains several wellbore leakage model components that estimate the fluid leak rate that may occur through compromised legacy wells due to the increase in pressure resulting from CO 2 injection activities. Coupled to a reservoir component model, these components estimate the leakage of CO 2 and/or brine from a storage reservoir to overlying aquifer layers and the atmosphere through legacy wells. This report presents the theoretical framework and quality testing of the multisegmented wellbore reduced-order model. The model allows for segmenting of the legacy wells passing through the overlying stratigraphy into several intervals to simulate a site’s specific stratigraphic and hydrogeologic properties. For quality assurance, the analytical model is validated against numerical reservoir flow simulations for single and multiple aquifer(s) models. The results indicate that the model accurately predicts the transport of two-phase fluids (brine and injected CO 2 ) through the well over time. A detailed description of the model helps users to understand the model and provides a basis for future improvements.

58 GEOSCIENCES↗

NRAP-Open-IAM Analytical Reservoir Model: Development and Testing

Geological carbon sequestration (GCS) is a key technology for reducing global carbon dioxide (CO 2 ) emissions. Over the last decade, the U.S. Department of Energy has invested in understanding the science base, developing practical implementation methods, and demonstrating secure GCS technologies to mitigate the environmental impacts associated with the atmospheric release of CO 2 . As part of the National Risk Assessment Partnership, a systems-level risk assessment tool, called the NRAP-Open-IAM, has been developed to conduct risk assessment and enable safe operations at a GCS site. The current NRAP-Open-IAM contains a simple reservoir model component that calculates the evolution of CO 2 saturation and fluid pressure in a storage reservoir during CO 2 injection operations. This report presents the development and testing of a new analytical reservoir reduced-order model (ROM), which is extended from an existing semi-analytical model for estimation of CO 2 and brine leakage along legacy wells, and enhances the capability of the NRAP-Open-IAM to simulate more types of reservoir conditions. The developed model is validated against three reference studies, and the results indicate that the new ROM predicts the behavior of the two-phase fluids (brine and injected CO 2 ) well and is applicable to different reservoir simulation boundary conditions (i.e., constant pressure boundary and infinite-acting boundary) without a priori user specification of the boundary type. Sensitivity analysis for a set of model parameters is performed using 4,000 synthetic cases prepared via a fully automated process and using machine-learning-based feature selection. The stochastic analysis identifies gravitational number (i.e., ratio of gravitational forces to viscous force) and distance between the injection well and observation location as the most impactful parameters for matching the pressure and CO 2 saturation, respectively, between the numerical simulations and the ROM. This report details the possible ROM uncertainties and serves as a guide for users to understand the use and limitations of this ROM. The code implementation of the model will be released as a module within the NRAP-Open-IAM.

54 ENVIRONMENTAL SCIENCES↗

Plains CO 2 Reduction (PCOR) Partnership Phase III (Annual Assessment Report)

The Plains CO 2 Reduction (PCOR) Partnership is one of seven Regional Carbon Sequestration Partnerships (RCSPs) competitively awarded by the U.S. Department of Energy National Energy Technology Laboratory in 2003 as part of a national plan to mitigate greenhouse gas emissions. The PCOR Partnership is led by the Energy & Environmental Research Center (EERC) at the University of North Dakota in Grand Forks, North Dakota, and includes over 90 stakeholders from the public and private sector in Phase III. The PCOR Partnership region includes all or part of nine U.S. states and four Canadian provinces.

02 PETROLEUM↗

Special Issue of IJGGC: Nexus of Water and Carbon Capture and Storage

The mission of the Regional Carbon Sequestration Partnership (RCSP) Water Working Group (WWG) is to address stakeholder concerns regarding emerging carbon capture and storage (CCS) technology and potential interactions with local and regional water resources. As part of that mission, the WWG has been working with the International Journal of Greenhouse Gas Control (IJGGC) to develop a Special Issue dedicated to the nexus of water and CCS. Research papers were solicited, edited, and subsequently published in IJGGC. These articles were then submitted to IJGGC on December, 29, 2016, to be published online in a virtual special issue. The articles published in the virtual special issue build upon the research that has been published in IJGGC over the previous 4 years to complete a more comprehensive understanding of water issues associated with CCS.

54 ENVIRONMENTAL SCIENCES↗

Best Practice for the Commercial Deployment of Carbon Dioxide Geologic Storage: Adaptive Management Approach

The Plains CO 2 Reduction (PCOR) Partnership is one of seven regional partnerships formed as part of the U.S. Department of Energy’s National Energy Technology Laboratory Regional Carbon Sequestration Partnerships (RCSP) Initiative. The RCSP Initiative is focused on the safe and long-term storage of CO 2 to support the commercial deployment of carbon capture and storage (CCS). To that end, the PCOR Partnership has spent over 10 years developing, testing, and validating the best methods and technologies to conduct the geologic storage of CO 2 (hereafter referred to as CO 2 storage). Through this effort, the PCOR Partnership has formalized an adaptive management approach (AMA) for the commercial development of CO 2 storage projects. The use of this approach, which draws upon the collective experience and lessons learned from the PCOR Partnership, represents best practice for advancing CO 2 storage projects toward commercial deployment. At the heart of the AMA are four technical elements necessary for any successful CO 2 storage project: 1) site characterization; 2) modeling and simulation; 3) risk assessment; and 4) monitoring, verification, and accounting (MVA). Each of these elements plays a key role in gathering and assessing site-specific data that provide a fundamental understanding of the storage complex and its performance. While each of the four technical elements can provide useful data independently, integrating them through the AMA yields a streamlined, fit-for-purpose strategy for the commercial deployment of CO 2 storage. Key to this integration and resulting best practice are feedback loops that allow the results of each element to serve as inputs to the others. Each iteration of the AMA creates an improved understanding of the storage complex and thus more targeted and efficient applications of the technical elements. For the purpose of establishing an adaptive management framework, hard lines have been drawn between the technical elements of the AMA. However, in practice, the rapid and seamless interaction between the elements can blur these lines. For example, to aid in the analysis and interpretation of site characterization data, a static geocellular model is often required. While this model development is part of the technical element, modeling and simulation, it is an integral part of the site characterization effort. Likewise, much of the monitoring data collected as part of the MVA technical element can be used to inform site characterization. This back-and-forth flow of data and use of models between the technical elements continues throughout the project.

54 ENVIRONMENTAL SCIENCES↗

Plains CO 2 Reduction (PCOR) Partnership Phase III (Annual Assessment Report)

This report presents an update of Phase III PCOR Partnership activities from October 1, 2011, through September 30, 2012 (PY5), and planned activities for the following year. The Plains CO 2 Reduction (PCOR) Partnership is one of seven Regional Carbon Sequestration Partnerships (RCSPs) competitively awarded by the U.S. Department of Energy National Energy Technology Laboratory in 2003 as part of a national plan to mitigate greenhouse gas emissions. The PCOR Partnership is led by the Energy & Environmental Research Center (EERC) at the University of North Dakota in Grand Forks, North Dakota, and includes over 90 stakeholders from the public and private sector in Phase III. The PCOR Partnership region includes all or part of nine U.S. states and four Canadian provinces.

02 PETROLEUM↗

Plains CO 2 Reduction (PCOR) Partnership Phase III (Annual Assessment Report)

This report presents an update of Phase III PCOR Partnership activities from October 1, 2008, through September 30, 2009, and planned activities for the following year. The Plains CO 2 Reduction (PCOR) Partnership is one of seven Regional Carbon Sequestration Partnerships (RCSPs) competitively awarded by the U.S. Department of Energy National Energy Technology Laboratory in 2003 as part of a national plan to mitigate greenhouse gas emissions. The PCOR Partnership is led by the Energy & Environmental Research Center (EERC) at the University of North Dakota in Grand Forks, North Dakota, and includes more than 80 stakeholders from the public and private sector in Phases II and III. The PCOR Partnership region includes all or part of nine U.S. states and four Canadian provinces.

02 PETROLEUM↗

Plains CO 2 Reduction (PCOR) Partnership Phase III (Annual Assessment Report)

This report presents an update of Phase III PCOR Partnership activities from October 1, 2014, through September 30, 2015 (PY8) and planned activities for the following year. The Plains CO 2 Reduction (PCOR) Partnership is one of seven Regional Carbon Sequestration Partnerships (RCSPs) competitively awarded by the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL) in 2003 as part of a national plan to mitigate greenhouse gas emissions. The PCOR Partnership is led and managed by the Energy & Environmental Research Center (EERC) at the University of North Dakota in Grand Forks, North Dakota, and includes almost 100 stakeholders from the public and private sector in Phase III. The PCOR Partnership region includes all or part of nine U.S. states and four Canadian provinces.

02 PETROLEUM↗

PCOR Partnership Best Practices Manual for Subsurface Technical Risk Assessment of Geologic CO 2 Storage Projects

In 2003, the U.S. Department of Energy established the Regional Carbon Sequestration Partnerships (RCSP) Initiative to help develop technology, infrastructure, and regulations needed to facilitate large-scale carbon dioxide (CO 2 ) geologic storage (herein “storage”) and support deployment of commercial carbon capture and storage projects. The Plains CO 2 Reduction (PCOR) Partnership, led by the Energy & Environmental Research Center (EERC), is one of seven partnerships created by this program. The PCOR Partnership is publishing a series of best practices manuals for each of the four PCOR Partnership-defined primary technical elements of a storage site: site characterization; modeling and simulation; risk assessment; and monitoring, verification, and accounting. This document describes the risk assessment process for evaluating subsurface technical risks associated with a CO 2 storage project. This best practices manual identifies the key elements comprising a risk assessment for a CO 2 storage complex and defines important risk management terminology and technical factors that are unique to the geologic storage of CO 2 . It also provides best practices for implementing a risk assessment based on lessons learned from conducting risk assessments for storage complexes within the PCOR Partnership region. Case studies of these real-world examples, which highlight key aspects of applying the risk assessment process to storage projects, are provided to support the proposed best practices. The development of a best practice requires the execution of multiple projects where the knowledge gained and lessons learned are accumulated over time and integrated to yield a best practice. This development progression is an adaptive management process whereby best practices constantly evolve over time in response to knowledge gained and lessons learned. This document encompasses the current body-of-knowledge and best practices for applying a standardized risk assessment approach within risk management for storage projects. Application of these best practices will provide reliable and consistent standards for identifying project-related risks, analyzing the probabilities and potential impacts of these risks, evaluating which risks require treatment, and determining priority for treatment implementation. These best practices will continue to evolve and be refined over time as commercialization of the CO 2 storage industry proceeds.

54 ENVIRONMENTAL SCIENCES↗

Plains CO 2 Reduction (PCOR) Partnership Phase III (Annual Assessment Report)

This report presents an update of Phase III PCOR Partnership activities from October 1, 2009, through September 30, 2010, and planned activities for the following year. The Plains CO 2 Reduction (PCOR) Partnership is one of seven Regional Carbon Sequestration Partnerships (RCSPs) competitively awarded by the U.S. Department of Energy National Energy Technology Laboratory in 2003 as part of a national plan to mitigate greenhouse gas emissions. The PCOR Partnership is led by the Energy & Environmental Research Center (EERC) at the University of North Dakota in Grand Forks, North Dakota, and includes nearly 90 stakeholders from the public and private sector in Phase III. The PCOR Partnership region includes all or part of nine U.S. states and four Canadian provinces.

02 PETROLEUM↗

Plains CO 2 Reduction (PCOR) Partnership Phase III (Annual Assessment Report)

This report presents an update of Phase III PCOR Partnership activities from October 1, 2013, through September 30, 2014 (PY7) and planned activities for the following year. The Plains CO 2 Reduction (PCOR) Partnership is one of seven Regional Carbon Sequestration Partnerships (RCSPs) competitively awarded by the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL) in 2003 as part of a national plan to mitigate greenhouse gas emissions. The PCOR Partnership is led by the Energy & Environmental Research Center (EERC) at the University of North Dakota in Grand Forks, North Dakota, and includes over 90 stakeholders from the public and private sector in Phase III. The PCOR Partnership region includes all or part of nine U.S. states and four Canadian provinces.

02 PETROLEUM↗

Plains CO 2 Reduction (PCOR) Partnership Phase III (Annual Assessment Report)

This report presents an update of Phase III PCOR Partnership activities from October 1, 2015, through September 30, 2016 (PY9) and planned activities for the following year. The Plains CO 2 Reduction (PCOR) Partnership is one of seven Regional Carbon Sequestration Partnerships (RCSPs) competitively awarded by the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL) in 2003 as part of a national plan to mitigate greenhouse gas emissions. The PCOR Partnership is led and managed by the Energy & Environmental Research Center (EERC) at the University of North Dakota in Grand Forks, North Dakota, and includes over 100 stakeholders from the public and private sector in Phase III. The PCOR Partnership region includes all or part of nine U.S. states and four Canadian provinces.

02 PETROLEUM↗

Technical Assessment of Geologic Carbon Dioxide (CO 2 ) Storage: Best Practices Derived from Phase III of the Plains CO 2 Reduction (PCOR) Partnership Program, 2007-2018

The Plains CO 2 Reduction (PCOR) Partnership, led by the Energy & Environmental Research Center (EERC), was formed as part of the U.S. Department of Energy (DOE) Regional Carbon Sequestration Partnerships (RCSP) Initiative in 2003. The RCSP Program supports deployment of carbon capture, utilization, and storage (CCUS) technologies—with primary focus on carbon utilization and geologic storage of carbon dioxide (CO 2 ) (hereafter referred to as storage)—as an essential means of reducing the carbon intensity of electricity generation and other CO 2 -emitting industrial processes. The PCOR Partnership has a growing membership, which has included over 120 industry, government, and research organizations, and over a decade of experience developing, testing, and validating methods and technologies for conducting CO 2 storage projects. Nine U.S. states and four Canadian provinces comprise the PCOR Partnership region, covering an area of 1.4 million square miles in the northern Great Plains.

02 PETROLEUM↗

Plains CO 2 Reduction (PCOR) Partnership Phase III (Annual Assessment Report)

This report presents an update of Phase III PCOR Partnership activities from October 1, 2010, through September 30, 2011 (PY4), and planned activities for the following year. The Plains CO 2 Reduction (PCOR) Partnership is one of seven Regional Carbon Sequestration Partnerships (RCSPs) competitively awarded by the U.S. Department of Energy National Energy Technology Laboratory in 2003 as part of a national plan to mitigate greenhouse gas emissions. The PCOR Partnership is led by the Energy & Environmental Research Center (EERC) at the University of North Dakota in Grand Forks, North Dakota, and includes over 90 stakeholders from the public and private sector in Phase III. The PCOR Partnership region includes all or part of nine U.S. states and four Canadian provinces.

02 PETROLEUM↗

FutureGen 2.0 Monitoring Systems Design Basis and Technology Selection: Geohydrologic, Geochemical and Geophysical Considerations

Advances in carbon capture and storage (CCS) technology show promise for addressing carbon dioxide (CO 2 ) emissions and global climate change concerns related to coal-fueled energy. The FutureGen 2.0 Project is intended to demonstrate 1) the technical feasibility of oxy-combustion technology as an approach for implementing carbon capture at new and existing coal-fueled energy facilities, and 2) utility-scale integration of transport and permanent storage of captured CO 2 in a deep geologic formation. Development of the FutureGen 2.0 CO 2 storage site is part of a larger project to design, build, and operate a commercial-scale CCS system capable of capturing, treating, and storing the CO 2 off-gas from a 168-MW(e) gross capacity oxy-combustion coal-fueled power plant located in Meredosia, Illinois—a first-of-its-kind, near-zero emissions coal-fueled power plant with CCS. In cooperation with the U.S. Department of Energy, the FutureGen 2.0 project partners will repower a previously retired oil-fired power plant with oxy-combustion technology to capture approximately 1.1 million metric tons of CO 2 each year—more than 90 percent of the plant’s carbon emissions. Emissions such as sulfur oxides, nitrogen oxides, and mercury will be reduced to near-zero levels. Safe and proven pipeline technology will be used to transport the CO 2 to the storage site and inject it deep into the subsurface through a network of deep-injection wells for long-term storage through geologic sequestration. An evaluation that considered pertinent hydrologic, geochemical, and geophysical processes was performed during development of the testing and monitoring program for the FutureGen 2.0 project. This evaluation informed the technology screening process and, in conjunction with project- and regulation-driven monitoring objectives, was the basis for monitoring technology selection. A summary of the overall monitoring approach adopted by the FutureGen 2.0 project, and a detailed description of the testing and monitoring activities that the FutureGen Industrial Alliance, Inc. will undertake at the FutureGen 2.0 storage site near Jacksonville, Illinois, are documented in a project-maintained testing and monitoring plan. All testing and monitoring activities will be performed in accordance with Title 40 of the Code of Federal Regulations (CFR) Sections 146.89, 146.90, and 146.91 (40 CFR §146.89, 146.90, and 146.91) to verify that the storage site is operating as permitted and is not endangering any underground sources of drinking water (USDWs).

54 ENVIRONMENTAL SCIENCES↗