Search NASA⌕ Search

SEARCH · Search NASA

Results for “MONITOR PROGRAM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,747 records · Page 97

Environmental Management

Another key aspect of the NNSS mission is Environmental Management program, which addresses the environmental legacy from historic nuclear weapons related activities while also ensuring the health and safety of present day workers, the public, and the environment as current and future missions are completed. The Area 5 Radioactive Waste Management site receives low-level and mixed low-level waste from some 28 different generators from across the DOE complex in support of the legacy clean-up DOE Environmental Management project. Without this capability, the DOE would not be able to complete the clean up and proper disposition of these wastes. The program includes environmental protection, compliance, and monitoring of the air, water, plants, animals, and cultural resources at the NNSS. Investigation and implementation of appropriate corrective actions to address the contaminated ground water facilities and soils resulting from historic nuclear testing activities, the demolition of abandoned nuclear facilities, as well as installation of ground water wells to identify and monitor the extent of ground water contamination.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decommissioning and Demolition of a Redundant UK Research Facility at AWE Aldermaston - 12453

The redundant two-storey brick built research facility on the AWE Site at Aldermaston, UK is in the closing stages of decommissioning and demolition. The facility was used for a variety of purposes up to 1995 predominately involving the use of alpha-emitting isotopes. The two main areas of alpha-based contamination have been decommissioned with the removal of hot -boxes and fume cupboards on the ground floor and HEPA filter units and ventilation equipment on the first floor. Many of these activities were undertaken using both airline fed suits, (supplied via a free standing mobile unit), and full face respirators. Asbestos materials were located and cleared from the first floor by specialist contractor. All sections of active drain running from the building to the site active effluent disposal system were removed early in the program using established techniques with specialist monitoring equipment used to provide confidence in the data required for disposal of the decommissioning debris. In particular a dedicated High Resolution Gamma Spectrometer (radioactive materials scanning unit) was utilized to categorise waste drums and wrapped packages. The building has been decommissioned and the monitoring and sampling of the structure was completed in November 2011 - the results demonstrating that the building was clear of contamination in accordance with UK clearance and exemption requirements. The demolition plan was developed and implemented in December with site excavation of foundations and site clearance currently ongoing in preparation for final site backfill activities and project close. A number of useful lessons have been learnt during the operations and are set out at the rear of the main text. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Virtual sensors for robust on-line monitoring (OLM) and diagnostics - 197

Unscheduled shutdown of nuclear power facilities for recalibration and replacement of faulty sensors can be expensive and disruptive to grid management. In this work, we present virtual (software) sensors that can replace a faulty physical sensor for a short duration thus allowing recalibration to be safely deferred to a later time. The virtual sensor model uses a Gaussian process model to process input data from redundant and other nearby sensors. Predicted data includes uncertainty bounds including spatial association uncertainty and measurement noise and error. Using data from an instrumented cooling water flow loop test bed, the virtual sensor model has predicted correct sensor measurements and the associated error corresponding to a faulty sensor. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

SURFACE GEOPHYSICAL EXPLORATION DEVELOPING NONINVASIVE TOOLS TO MONITOR PAST LEAKS AROUND HANFORD TANK FARMS

A characterization program has been developed at Hanford to image past leaks in and around the underground storage tank facilities. The program is based on electrical resistivity, a geophysical technique that maps the distribution of electrical properties of the subsurface. The method was shown to be immediately successful in open areas devoid of underground metallic infrastructure, due to the large contrast in material properties between the highly saline waste and the dry sandy host environment. The results in these areas, confirmed by a limited number of boreholes, demonstrate a tendency for the lateral extent of the underground waste plume to remain within the approximate footprint of the disposal facility. In infrastructure-rich areas, such as tank farms, the conventional application of electrical resistivity using small point-source surface electrodes initially presented a challenge for the resistivity method. The method was then adapted to directly use the buried infrastructure as electrodes for both transmission of electrical current and measurements of voltage. For example, steel-cased wells that surround the tanks were used as long electrodes, which helped to avoid much of the infrastructure problems. Overcoming the drawbacks of the long electrode method has been the focus of our work over the past seven years. The drawbacks include low vertical resolution and limited lateral coverage. The lateral coverage issue has been improved by supplementing the long electrodes with surface electrodes in areas devoid of infrastructure. The vertical resolution has been increased by developing borehole electrode arrays that can fit within the small-diameter drive casing of a direct push rig. The evolution of the program has led to some exceptional advances in the application of geophysical methods, including logistical deployment of the technology in hazardous areas, development of parallel processing resistivity inversion algorithms, and adapting the processing tools to accommodate electrodes of all shapes and locations. The program is accompanied by a full set of quality assurance procedures that cover the layout of sensors, measurement strategies, and software enhancements while insuring the integrity of stored data. The data have been shown to be useful in identifying previously unknown contaminant sources and defining the footprint of precipitation recharge barriers to retard the movement of existing contamination.

99 GENERAL AND MISCELLANEOUS↗

RXTE Observations of Selected Blazars

The work completed includes the analysis of observations obtained during Cycles 4 and 5 of the Rossi X-ray Timing Explorer (RXTE). The project is part of a longer-term, continuing program to study the X-ray emission process in blazars in cooperation with Dr. Ian McHardy (U. of Southampton, UK). The goals of the program are to study the X-ray emission mechanism in blazars and the relation of the X-ray emission to changes in the relativistic jet. The program includes contemporaneous brightness and linear polarization monitoring at radio and optical wavelengths, total and polarized intensity imaging at 43 GHz with a resolution of 0.1 milliarcseconds with the Very Long Baseline Array (VLBA), and well-sampled X-ray light curves obtained from a series of approved RXTE programs.

Aller, Margo F.↗

Groundwater Protection Program Management Plan For The U.S. Department Of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

This document presents the Groundwater Protection Program (GWPP) management plan for the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12). The Y-12 GWPP functions as the primary point-of-contact for groundwater-related issues at Y-12, provides stewardship of the extensive network of groundwater monitoring wells at Y-12, and serves as a resource for technical expertise, support, and historical data for groundwater-related activities at Y-12. These organizational functions each serve the primary programmatic purpose of the GWPP, which is to ensure that groundwater monitoring activities within areas under Y-12 administrative control provide representative data in compliance with the multiple purposes of applicable state and federal regulations, DOE orders, and the corporate policies of Babcock & Wilcox Technical Services Y-12 LLC (hereafter referenced as B&W Y-12), the Y-12 management and operations (M&O) contractor for DOE. B&W Y-12 is a new corporate name, assumed in January 2007, for the company formerly known as BWXT Y-12, L.L.C., hereafter referenced as BWXT. This GWPP management plan addresses the requirements of DOE Order 450.1A Environmental Protection Program (hereafter referenced as DOE O 450.1A), which emphasize a site-wide approach for groundwater protection at each DOE facility through implementation of groundwater surveillance monitoring. Additionally, this plan addresses the relevant and applicable GWPP elements and goals described in the DOE O 450.1A technical guidance documents issued in June 2004 (DOE 2004) and May 2005 (DOE 2005). This GWPP management plan is a 'living' document that is reviewed annually, revised and reissued every three years, and is formatted to provide for updating individual sections independent of the rest of the document. Section 2 includes a short description of the groundwater system at Y-12, the history of groundwater monitoring at Y-12 and the corresponding evolution of the GWPP, and an overview of ongoing Y-12 groundwater monitoring activities. Section 3 describes the key elements of the GWPP management strategy. Organizational roles and responsibilities of GWPP personnel are outlined in Section 4. Section 5 presents an overview of the GWPP project plans for applicable programmatic elements. Section 6 lists the reports, plans, and documents that are referenced for technical and administrative details.

54 ENVIRONMENTAL SCIENCES↗

Demonstration (DEMO) of Radio Frequency Identification (RFID) system for tracking and monitoring of nuclear materials.

The US Department of Energy (DOE) [Environmental Management (EM), Office of Packaging and Transportation (EM-45)] Packaging Certification Program (PCP) has developed a radiofrequency identification (RFID) tracking and monitoring system for the management of nuclear materials packages during storage and transportation. The system, developed by the PCP team at Argonne National Laboratory, involves hardware modification, application software development, secured database and web server development, and irradiation experiments. In April 2008, Argonne tested key features of the RFID tracking and monitoring system in a weeklong, 1700 mile (2736 km) demonstration employing 14 empty type B fissile material drums of three designs (models 9975, 9977 and ES-3100) that have been certified for shipment by the DOE and the US Nuclear Regulatory Commission. The demonstration successfully integrated global positioning system (GPS) technology for vehicle tracking, satellite/cellular (general packet radio service, or GPRS) technologies for wireless communication, and active RFID tags with multiple sensors (seal integrity, shock, temperature, humidity and battery status) on drums. In addition, the demonstration integrated geographic information system (GIS) technology with automatic alarm notifications of incidents and generated buffer zone reports for emergency response and management of staged incidents. The demonstration was sponsored by EM and the US National Nuclear Security Administration, with the participation of Argonne, Savannah River and Oak Ridge National Laboratories. Over 50 authorised stakeholders across the country observed the demonstration via secured Internet access. The DOE PCP and national laboratories are working on several RFID system implementation projects at selected DOE sites, as well as continuing device and systems development and widening applications beyond DOE sites and possibly beyond nuclear materials to include other radioactive materials.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Air Monitoring Stations Preliminary Real Estate Plan

LANL is required to utilize an air monitoring system at the LANL boundaries to ensure the safety of the public. This system constitutes the LANL Airnet Program compliance network and is a collection of air monitoring stations positioned in specific locations per Environmental Protection Agency (EPA) regulatory requirements. A number of these Airnet stations reside on property outside the LANL boundaries. For example, existing stations exist on Los Alamos County (County) property, Los Alamos Public School (LAPS) property, a local business and on private property. This Preliminary Real Estate Plan is required for the renewal of existing agreements to the County, the LAPS a local business and to a private property land owner for access to and operation of Airnet stations and associated infrastructure located on their property.

54 ENVIRONMENTAL SCIENCES↗

Safeguards Envelope

The Safeguards Envelope is a strategy to determine a set of specific operating parameters within which nuclear facilities may operate to maximize safeguards effectiveness without sacrificing safety or plant efficiency. This paper details advanced statistical techniques that will be applied to real plant process monitoring (PM) data from the Idaho Chemical Processing Plant (ICPP). In a simulation based on this data, multi-tank and multi-attribute correlations were tested against synthetic diversion scenarios. Kernel regression smoothing was used to fit a curve to the historical data, and multivariable, residual analysis and cumulative sum techniques set parameters for operating conditions. Diversion scenarios were created and tested, showing improved results when compared with a previous study utilizing only one-variable Z-testing. A brief analysis of the impact of the safeguard's optimization on the rest of plant efficiency, criticality concerns, and overall requirements is presented.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Data Automata in Scala

The field of runtime verification has during the last decade seen a multitude of systems for monitoring event sequences (traces) emitted by a running system. The objective is to ensure correctness of a system by checking its execution traces against formal specifications representing requirements. A special challenge is data parameterized events, where monitors have to keep track of the combination of control states as well as data constraints, relating events and the data they carry across time points. This poses a challenge wrt. efficiency of monitors, as well as expressiveness of logics. Data automata is a form of automata where states are parameterized with data, supporting monitoring of data parameterized events. We describe the full details of a very simple API in the Scala programming language, an internal DSL (Domain-Specific Language), implementing data automata. The small implementation suggests a design pattern. Data automata allow transition conditions to refer to other states than the source state, and allow target states of transitions to be inlined, offering a temporal logic flavored notation. An embedding of a logic in a high-level language like Scala in addition allows monitors to be programmed using all of Scala's language constructs, offering the full flexibility of a programming language. The framework is demonstrated on an XML processing scenario previously addressed in related work.

runtime verification↗

Initial comparison of SSPM ground test results and flight data to NASCAP simulations

The satellite surface potential monitor (SSPM) has been developed for the P78-2 SCATHA (Spacecraft Charging At The High Altitudes) satellite to determine the response of selected spacecraft materials to charged-particle environmental fluxes. Since the monitor infers total surface voltages from a single point on the interior side of insulators, a ground simulation program was undertaken to develop analytical techniques to model the monitors and to obtain an experimental calibration of the relationship between the flight measurement techniques and actual measurements. The experimental testing was conducted using monoenergetic electron beams irradiating samples in the dark. An analytical computer model was developed in the NASCAP (NASA Charging Analyzer Program) code. The analytical model material properties for Kapton that controlled backscatter and secondary yield were adjusted to obtain a single set of values that produced reasonable fits for both voltages and currents. The analytical techniques developed in the ground technology investigation have been applied to space flight conditions. Predictions were compared with limited flight data. The agreement is very good indicating that the technique, and NASCAP, can be used to predict spacecraft material charging behavior. Details of the testing, the analytical modelling technique and flight data comparisons are presented.

Stevens, N. J.↗

OPAD through 1991 - Status report no. 2

The Optical Plume Anomaly Detection (OPAD) experimental program has attempted to develop a rocket engine health monitor for the detection, and if possible the quantification, of anomalous atomic and molecular species in exhaust plumes. The test program has formulated instrument designs allowing both wide spectral range and high spectral resolution. Attention is presently given to OPAD data collected for the SSME at NASA-Marshall's technology test stand, with a view to spectral emissions at startup and variations in baseline plume emissions due to changes in rated power level.

Powers, W. T.↗

Lessons Learned During Implementation and Early Operations of the DS1 Beacon Monitor Experiment

A new approach to mission operations will be flight validated on NASA's New Millennium Program Deep Space One (DS1) mission which launched in October 1998. The Beacon Monitor Operations Technology is aimed at decreasing the total volume of downlinked engineering telemetry by reducing the frequency of downlink and the volume of data received per pass. Cost savings are achieved by reducing the amount of routine telemetry processing and analysis performed by ground staff. The technology is required for upcoming NASA missions to Pluto, Europa, and possibly some other missions. With beacon monitoring, the spacecraft will assess its own health and will transmit one of four beacon messages each representing a unique frequency tone to inform the ground how urgent it is to track the spacecraft for telemetry. If all conditions are nominal, the tone provides periodic assurance to ground personnel that the mission is proceeding as planned without having to receive and analyze downlinked telemetry. If there is a problem, the tone will indicate that tracking is required and the resulting telemetry will contain a concise summary of what has occurred since the last telemetry pass. The primary components of the technology are a tone monitoring technology, AI-based software for onboard engineering data summarization, and a ground response system. In addition, there is a ground visualization system for telemetry summaries. This paper includes a description of the Beacon monitor concept, the trade-offs with adapting that concept as a technology experiment, the current state of the resulting implementation on DS1, and our lessons learned during the initial checkout phase of the mission. Applicability to future missions is also included.

Sherwood, Rob↗

Innovative Strategies for Long-Term Monitoring of Complex Groundwater Plumes at DOE’s Legacy Sites (Workshop Report)

Most remaining Department of Energy (DOE) sites will require extended periods of institutional control, especially at complex groundwater sites where attenuation-based strategies have been implemented to facilitate closure. The current practice of monitoring—obtaining and analyzing contaminant concentration in groundwater samples at numerous wells—will account for a large portion of the projected life-cycle at these DOE sites unless a new approach is adopted. State-of-the-art technologies are being developed, including in situ sensors, geophysics, radiation mapping, numerical modeling and AI/ML. These technologies can optimize monitoring strategies in space and time, provide spatially extensive information at vulnerable regions and/or provide more continuous monitoring at lower cost. As part of DOE’s Office of Environmental Management (DOE-EM’s) efforts to advance long-term monitoring systems, an in-person/virtual hybrid workshop was hosted by Savannah River National Laboratory (SRNL) on January 24 and 25, 2023, in Augusta, Georgia. Because DOE-EM’s complex sites will eventually be transferred to DOE’s Office of Legacy Management (DOE-LM), representatives of DOE-LM were important participants in the workshop. The purpose of the workshop was to identify challenges and opportunities for deploying advanced technologies for long-term monitoring at DOE sites. The key questions during the workshop were: 1) the regulatory acceptance of replacing a process that traditionally has used laboratory sampling and analysis of groundwater samples, and 2) the application of this strategy to the southwestern arid sites that include many of the remaining DOE-EM and DOE-LM complex groundwater plumes. Characteristics common to most arid sites present both limitations and opportunities for advanced technologies. DOE-EM has funded a National Laboratory team from SRNL, Lawrence Berkeley National Laboratory (LBNL), and Pacific Northwest National Laboratory (PNNL) to establish the overarching framework of long-term monitoring by systematically combining advanced hardware and software technologies. This project is titled “Advanced Long-Term Environmental Monitoring Systems (ALTEMIS)” and is sponsored by the DOE-EM Technology Development Program. The multi-laboratory team is currently developing and testing innovative monitoring strategies, including the use of in situ groundwater sensors, geophysics, drone/satellite-based remote sensing, reactive transport modeling, and artificial intelligence/machine learning (AI/ML). The project’s demonstration testbed is at the Savannah River Site (SRS) F-Area Seepage Basins, where a well-characterized complex groundwater plume composed of uranium and other radionuclides is in the latter stages of remediation. The workshop included more than 70 participants, presentations, a field visit to F-Area, breakout working groups, and large group discussion. Participants developed recommendations on five topics: in situ sensors, spatially integrative tools, challenges to regulatory acceptance, AI/ML strategies, and transitioning sites to DOE-LM.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Status of NASA's Earth-to-Orbit Propulsion Technology program

Earth-to-Orbit Propulsion Technology program is considered. The program's three major technical areas include combustion devices, turbomachinery, and controls and monitoring. Directed toward reducing acquisition and operations risk and cost the ETO program is conducted in two serially-performed categories: technology acquisition and technology validation. The former is constituted of studies, tool building, and bench-scale experimentation. The latter involves next-step verification of the acquisition results and findings, usually leading to a test-bed validated technology 'product'.

Escher, W. J. D.↗

NASA DEVELOP’s Approach to Building Individual and Institutional Capacity to Use Earth Observations for Atmospheric Monitoring and Decision Making

NASA DEVELOP, an Applied Sciences’ Capacity Building program, introduces individuals and institutions to the applications of NASA Earth observation data in an effort to help inform decision making. The program employs early career professionals to conduct rapid feasibility studies tailored specific to partner needs. Each year, DEVELOP conducts 50-60 feasibility studies that highlight the capabilities of Earth observations for measuring and monitoring a wide range of environmental phenomena. For this presentation, example projects will be highlighted that focus on monitoring air quality and pollution, wildfire emissions, and greenhouse gasses such as methane. An overview of example projects, the user communities involved, satellite data used, and lessons learned will be shared.

Capacity Building↗

A low-cost centralized HVAC control system solution for energy savings, load shedding, and improved maintenance

University campuses rely on centralized controls for managing and optimizing complex HVAC systems in larger buildings. However, most campuses also have many smaller buildings with packaged HVAC systems controlled by a stand-alone thermostat. Even when these distributed and often overlooked systems have modern programmable thermostats, they cannot be centrally monitored or controlled, and they are typically not programmed adequately. This paper describes the implementation of a low-cost centralized control solution for these systems serving smaller campus buildings, mostly under 5,000 sf and representative of light commercial spaces. Thanks to advances in technology spurred by residential and commercial IoT developments, simple networked thermostat solutions exist that can easily replace original thermostats, and, connect these systems to a web-based portal for monitoring and control. We show that, with small customizations, these platforms can be integrated into facility management workflows. Beyond the energy savings potential from improved scheduling and closer management of these systems, there are significant advantages for maintenance crews since these systems can now be monitored on smart phones or tablets. A grid-responsive load-shedding program has also been implemented for additional cost savings. The networked thermostats can also be connected to additional systems such as economizer controls for improved ventilation management and energy savings. With data from these systems integrated centrally, it can also be used for improved analytics and fault detection. A toolkit has been developed to share the program with other campuses, whether for energy savings, improved management of ventilation, or a more proactive maintenance approach.

Fauchier-Magnan, Nicolas↗

Monitoring Object Library Usage and Changes

The NASA Ames Numerical Aerodynamic Simulation program Aeronautics Consolidated Supercomputing Facility (NAS/ACSF) supercomputing center services over 1600 users, and has numerous analysts with root access. Several tools have been developed to monitor object library usage and changes. Some of the tools do "noninvasive" monitoring and other tools implement run-time logging even for object-only libraries. The run-time logging identifies who, when, and what is being used. The benefits are that real usage can be measured, unused libraries can be discontinued, training and optimization efforts can be focused at those numerical methods that are actually used. An overview of the tools will be given and the results will be discussed.

Owen, R. K.↗