Search NASA⌕ Search

SEARCH · Search NASA

Results for “WASTE PROCESSING PLANTS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,747 records · Page 97

Basement Fill Model Evaluation of Maximum Radionuclide Concentrations for Initial Suite of Radionuclides. Zion Station Restoration Project

ZionSolutions is in the process of decommissioning the Zion Nuclear Power Plant. The current decommissioning plan involves removing all above-grade structures to a depth of 3 feet below grade. The remaining underground structures will be backfilled with clean material. The final selection of fill material has not been made. The remaining backfilled structures will be the two reactor Containment Buildings, a Spent Fuel Building, an Auxiliary Building, a Turbine Building, a Crib House/Forebay Building and a Waste Water Treatment Facility (WWTF).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Background Information on ARPA-E's REUSE Program (White Paper)

Under the REUSE Topic, ARPA-E seeks to fund the development of technologies to convert high-energy materials currently going to landfills to a high-energy content liquid product capable of displacing energy imports used for fuel or chemical production. The high-energy materials include plastics (#1-7 polymers, rubber, and composites) and paper. As discussed below, we estimate 30-34 MM ton plastic, 2-6 MM ton rubber, 18 MM ton of paper, and up to 0.1 MM ton composites are potentially available annually for this purpose. These numbers may be conservative based on changes in the plastic and paper export markets. ARPA-E anticipates deployment of multiple low-cost, simple, flexible, small-scale (100-500 ton per day) regional facilities using modular plants. This scale is consistent with the sources for high-energy materials, which include ~300 Material Recovery Facilities and industrial waste sources. The assumption is that such facilities can be more economical than the paradigm of large-scale facilities making purity products, due to cost for transporting and aggregating waste and the high operating costs (OPEX) and capital cost (CAPEX) for product purification. This document gives a brief technical review for multiple potential process technologies. The review is not intended to be comprehensive or limiting, only to provide an introduction to potential Applicants.

10 SYNTHETIC FUELS↗

White Paper: Background Information on ARPA-E's Reuse Program

This document provides supplemental information for ARPA-E’s exploratory research program, “Recycle Underutilized Solids to Energy” (REUSE). The goal is to provide additional technical information to prospective Applicants. Further information is available in a blog interview and webinar at https://arpa-e.energy.gov/?q=news-item/trash-treasure-reuse-creates-feedstock-plastic-waste. Award information, submission requirements, evaluation criteria, and other applicable information is provided in Funding Opportunity Announcements DE-FOA-0001953 and DE-FOA-0001954 (SBIR/STTR). REUSE-specific requirements are provided in Topic K of those FOAs, and is available at https://arpa-e-foa.energy.gov/Default.aspx?Search=0001953&SearchType=#FoaIde8647d89-1cac-4b58-8622-1b04de8958c4. Under the REUSE Topic, ARPA-E seeks to fund the development of technologies to convert high-energy materials currently going to landfills to a high-energy content liquid product capable of displacing energy imports used for fuel or chemical production. The high-energy materials include plastics (#1-7 polymers, rubber, and composites) and paper. As discussed below, we estimate 30-34 MM ton plastic, 2-6 MM ton rubber, 18 MM ton of paper, and up to 0.1 MM ton composites are potentially available annually for this purpose. These numbers may be conservative based on changes in the plastic and paper export markets. ARPA-E anticipates deployment of multiple low-cost, simple, flexible, small-scale (100-500 ton per day) regional facilities using modular plants. This scale is consistent with the sources for high-energy materials, which include ~300 Material Recovery Facilities and industrial waste sources. The assumption is that such facilities can be more economical than the paradigm of large-scale facilities making purity products, due to cost for transporting and aggregating waste and the high operating costs (OPEX) and capital cost (CAPEX) for product purification. This document gives a brief technical review for multiple potential process technologies. The review is not intended to be comprehensive or limiting, only to provide an introduction to potential Applicants.

99 GENERAL AND MISCELLANEOUS↗

A review of recent activities in the NASA CELSS program

A CELSS (Controlled Ecological Life Support System) is a device that utilizes photosynthetic organisms and light energy to regenerate waste materials into oxygen and food for a crew in space. The results of theoretical and practical studies conducted by investigators within the CELSS program suggest that a bioregenerative life support system can be a useful and effective method of regenerating consumable materials for crew sustenance. Experimental data suggests that the operation of a CELSS in space will be practical if plants can be made to behave predictably in the space environment. Much of the work currently conducted within the CELSS program centers on the biological components of the CELSS system. The work is particularly directed at ways of achieving high efficiency and long term stability of all components of the system. Included are explorations of the conversion of nonedible cellulose to edible materials, nitrogen fixation by biological and chemical methods, and methods of waste processing. It is the intent of the presentation to provide a description of the extent to which a bioregenerative life support system can meet the constraints of the space environment, and to assess the degree to which system efficiency and stability can be increased during the next decade.

Macelroy, R. D.↗

Remote Dismantling and Packaging of the RPV and Thermal Shield at the Obrigheim NPP - 16073

The Obrigheim Nuclear Power Plant (KWO) is located in the Federal State of Baden- Wuerttemberg in Germany and was operated by the EnKK-KWO. The Nuclear Power Plant - a light water pressurized water reactor with 357 MW of electrical power - was operated from 1968 to 2005. In June 2009 the Energiewerke Nord GmbH (EWN) was charged with the dismantling planning and dismantling of the reactor. According to the German nuclear and radiation protection law, several licenses will be required for the realisation of this task. This also applies to the disposal of the waste produced by dismantling, which must finally be stored in the German final repository for low and medium-radioactive waste (underground repository 'Konrad'). In spring 2010 EWN completed all application documents for the dismantling of the reactor pressure vessel (RPV) and the RPV internals and EnKK-KWO delivered them to the responsible Environmental Ministry of Baden-Wuerttemberg. Since then it has been worked intensively on the design, construction and manufacturing of the facilities for dismantling. With a separate notification of amendment, it was applied for the license to install and commission the facilities for the dismantling of the RPV and the RPV internals at the Environmental Ministry of Baden-Wuerttemberg in October 2010. This notification of amendment was confirmed in summer 2012. In September 2011 the work process and test plan and the technical information about the campaign for the removal of the radioactive waste resulting from the RPV with internals, peripheral components and secondary waste with the aim of final disposal in the Federal Repository 'Konrad' was submitted to the Federal Office for Radiation Protection. The evaluation and assessment of the work process and test plan was concluded in August 2013, when it was audited by TUV Nord EnSys without any further measures and indications. On September 10 the work process and test plan was released by the Federal Office for radiation protection. The dismantling of the RPV internals upper core and lower core structure started in September 2013 in the wet cutting area in room 01.106/306 and were finished in October 2014. In the presentation 'Dismantling of the Obrigheim NPP Reactor and Waste Management' held on the WM Symposia in Phoenix, 2014, an overview about the remote cutting and packaging of the upper and lower core structure was given. In today's presentation the subsequent dismantling activities will be outlined and evaluated. The presentation will start with the short description of the basic frame conditions for the nuclear licensing procedure, important procedural principles, and necessary plant-specific conditions. After the remote cutting and packing of the reactor internals of the upper and lower core structure was completed, the wet cutting area 'reactor room 01.106/306' was cleaned and the reactor room rebuilt into a cutting area for peripheral components. After the peripheral components were dismantled, all preconditions were set to lift the RPV from its mounting position and to arrange it in the upper reactor room 01.306. After these activities were completed, the lifting of the RPV was prepared and the cutting area 'Dismantling of the RPV insulation in the reactor room 01.106/306' was set up. To carry out this task, a strand jack unit with connection block was installed on the bridge of the reactor building crane. The opening created by the dismantling of the pool plate was closed with a flap door. The manipulators used for the wet cutting of the RPV internals were also used for the remote dismantling of the RPV insulation and mounted in the cutting area. The remote facilities were handled from a control centre and/or control stand. The air-technical housing which has already been used for the remote dismantling of the RPV internals was designed for the dismantling of the RPV insulation and was extended for this dismantling scope with appropriate ventilation systems. A special feature is the fixation of the RPV insulation at the RPV corpus. The RPV insulation consists of insulation wool, wire mesh and metal-sheet insulation. This 'Sandwich Construction' is detached with a steel corset at the RPV corpus and partly tightened. The insulation of the RPV bottom dome is tightened at the supporting frame. Due to the activation of the material in the core area and the resulting high ambient dose rate the RPV insulation can only be dismantled remotely. Additionally, as asbestos fibers are expected to be found in the insulation the dismantling has to be performed according to the Technical Rules for hazardous substances. The demolition, restoration or maintenance works have to be performed remotely according to the Technical Rules for hazardous substances when the RPV is located in the cutting area. But in case of dismantling of a power reactor no such experience can be found. Beginning with the explanation of the technical, radiological and substantial boundary conditions this presentation will not only impart knowledge about the dismantling of the RPV insulation but also about the remote controlled packaging of the metal sheet insulation and the manual conditioning of the RPV insulation. Subsequently, reports on the remotely controlled cutting and packaging of the RDB are given. Here is particularly interesting that cutting methods have been used and how the activity determination of the segments was carried out. On the basis of the evaluation of the realisation the subsequent dismantling activities will be lined out. In parallel to the dismantling tasks, the waste package documentation for the final repository was issued, checked and confirmed for the containers loaded with parts of the RDB internals. The most important stages are exemplified in this presentation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Greenhouse gas emissions from home composting of organic household waste

The emission of greenhouse gases (GHGs) is a potential environmental disadvantage of home composting. Because of a lack of reliable GHG emission data, a comprehensive experimental home composting system was set up. The system consisted of six composting units, and a static flux chamber method was used to measure and quantify the GHG emissions for one year composting of organic household waste (OHW). The average OHW input in the six composting units was 2.6-3.5 kg week{sup -1} and the temperature inside the composting units was in all cases only a few degrees (2-10 {sup o}C) higher than the ambient temperature. The emissions of methane (CH{sub 4}) and nitrous oxide (N{sub 2}O) were quantified as 0.4-4.2 kg CH{sub 4} Mg{sup -1} input wet waste (ww) and 0.30-0.55 kg N{sub 2}O Mg{sup -1} ww, depending on the mixing frequency. This corresponds to emission factors (EFs) (including only CH{sub 4} and N{sub 2}O emissions) of 100-239 kg CO{sub 2}-eq. Mg{sup -1} ww. Composting units exposed to weekly mixing had the highest EFs, whereas the units with no mixing during the entire year had the lowest emissions. In addition to the higher emission from the frequently mixed units, there was also an instant release of CH{sub 4} during mixing which was estimated to 8-12% of the total CH{sub 4} emissions. Experiments with higher loads of OHW (up to 20 kg every fortnight) entailed a higher emission and significantly increased overall EFs (in kg substance per Mg{sup -1} ww). However, the temperature development did not change significantly. The GHG emissions (in kg CO{sub 2}-eq. Mg{sup -1} ww) from home composting of OHW were found to be in the same order of magnitude as for centralised composting plants.

54 ENVIRONMENTAL SCIENCES↗

Jose Cabrera dismantling and decommissioning project

The Jose Cabrera Nuclear Power Plant (NPP) was the first commercial power reactor (Westinghouse 1 loop PWR 510 MWth, 160 MWe) commissioned in Spain and provided the base for future development and training. The reactor construction started in 1963 and it was officially on-line by 1969. The NPP operated from 1969 until 2006 when it became the first reactor to be shut down after completing its operational period. The containment is reinforced concrete with a stainless steel head. In 2010 responsibility for D and D was transferred to Enresa to achieve IAEA level 3 (a green field site available for unrestricted re-uses) by 2017. Of the total of more than 104,000 tons of materials that will be generated during dismantling, it is estimated that only ∼4,000 tons will be radioactive waste, some of which, 40 t are considered as intermediate level long-lived wastes and the rest (3,960 t) will be categorized as VLLW and ILLW. The Project is divided into five phases: Phase 0 - Removal of fuel and preliminary work.. Phase 1 - Preparatory Activities for D and D. complete. Phase 2 - Dismantling of Major Components. Phase 3 - Removal of Auxiliary Installations, Decontamination and Demolition. Phase 4 - Environmental Restoration. Phase 2, is currently ongoing (50% completed). To manage the diverse aspects of decommissioning operations, Enresa uses an internally developed computerized project management tool. The tool, based on knowledge gathered from other Enresa projects, can process operations management, maintenance operations, materials, waste, storage areas, procedures, work permits, operator dose management and records. Enresa considers that communication is important for both internal and external stakeholder relations and can be used to inform, to neutralize negative opinions and attitudes, to remove false expectations and for training. Enresa has created a new multi-purpose area (exhibition/visitor centre) and encourages visits from the public, local schools, local and national politicians and technical groups. Greenfield is the final end state objective. The total cost of this project, including a 20% contingency as estimated in 2003 is 135 Meuros. This figure does not include the management of the plant spent fuel, which has constituted an independent project that has been completed in 2009 (35 Meuros). Enresa, with 15 staff on site are managing a team of ∼250 workers, 40 of whom belong to the previous operator. The spent fuel is On-Site prior to the final destination in the future Spain Centralized Spent Fuel Installation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Management on Hazardous Materials During Decommissioning - 18310

Non-radiological contaminants in site systems, on structures, and in site media (soil, groundwater, sediment, and surface water) often become a significant driver to cost and schedule in nuclear power plant decommissioning. This is borne out by historical experience in decommissioning projects. Management of non-radiological issues in site decommissioning is complicated by the site-specific nature of non-radiological contaminants in systems, structures and media; the variety of regulatory programs potentially applicable to compliance management; how these issues impact planning and execution of decommissioning elements; and interface with the management of site radiological issues in the decommissioning process. To address the importance of management of non-radiological hazards during decommissioning, EPRI recently issued the report Guidance for Management of Hazardous Materials during Decommissioning (EPRI 3002010592) [1]. The report provides an experience-based framework for identifying nonradiological issues at plants early in the decommissioning process, planning for regulatory compliance, options for remedial management, and considerations for integration into the plant decommissioning process. This paper summarizes the content of the EPRI report, including description of a framework for identifying non-radiological issues early in the decommissioning planning process such that site-specific issues can be optimally addressed, and funding to manage those issues can be established. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preliminary Preclosure Accident Consequence Analysis for the APM Conceptual Design - 18090

The Nuclear Waste Management Organization (NWMO) is implementing Adaptive Phased Management (APM), Canada's plan for the long-term management of used nuclear fuel. The APM approach encompasses centralized containment and isolation of the used fuel in a Deep Geological Repository (DGR) in a suitable rock formation, such as crystalline rock or sedimentary rock, in an informed and willing host. This paper describes a preliminary analysis of the potential dose consequences to the public under accident conditions associated with the operation of a DGR and related surface processing facilities. These results are for a generic site and considers exposure to a person standing at a potential fenceline location under conservative atmospheric conditions. Radiological dose consequences to the public were calculated for accidents identified in the preliminary hazard identification. The presence or absence of ventilation system HEPA filters was also considered in combination with specific accident scenarios. A Gaussian dispersion model considering the most stable atmospheric condition (Pasquill stability category F) was used to estimate the exposure of a member of the public in the direct plume path at the location of maximum airborne radionuclide concentrations. The public dose was calculated via the inhalation, air immersion and ground exposure pathways. For all accidents considered, the calculated public dose was low, up to about 0.8 mSv for a fall of an UFTP with container breach. The total dose to the public was also calculated at various distances from the Used Fuel Packaging Plant, Ventilation Shaft, and Main Shaft. For all accidents considered, the calculated dose to the public was low, below 1 mSv even at the minimum 100 m distance evaluated. Sensitivity cases were also carried out to determine the effect of stack release height, the effluent exit velocity, and the release orientation on the calculated minimum site boundary distance. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Joint US/Russian Studies of Population Exposures Resulting from Nuclear Production Activities in the Southern Urals

Beginning in 1948, the Soviet Union initiated a program for production of nuclear materials for a weapons program. The first facility for production of plutonium was constructed in the central portion of the country east of the southern Ural Mountains, about halfway between the major industrial cities of Ekaterinburg and Chelyabinsk. The facility now known as the Mayak Production Association and its associated town, now known as Ozersk, were built to irradiate uranium in reactors, separate the resulting plutonium in reprocessing plants, and prepare plutonium metal. The rush to production, coupled with inexperience in handling radioactive materials, lead to large radiation exposures, not only to the workers in the facilities, but also to the surrounding public. Fuel processing started with no controls on releases, and fuel dissolution and accidents in reactors resulted in release of about 37 PBq (1015 Bq) of 131I between 1948 and 1967. Designed disposals of low- and intermediate-level liquid radioactive wastes, and accidental releases via cooling water from tank farms of high-level liquid radioactive wastes, into the small Techa River caused significant contamination and exposures to residents of numerous small riverside villages downstream of the site. Discovery of the magnitude of the aquatic contamination in late 1951 caused revisions to the waste handling regimes, but not before over 200 PBq of radionuclides (with large contributions of 90Sr and 137Cs) were released. Liquid wastes were diverted to tiny Lake Karachay (which today holds over 4 EBq); cooling water was stopped in the tank farms. In 1957, one of the tanks in the tank farm overheated and exploded; over 70 PBq, disproportionately 90Sr, was blown over a large area to the northeast of the site; a large area was contaminated and many villages evacuated. This area today is known as the East Urals Radioactive Trace (EURT). Each of these releases was significant; together they have created a group of cohorts unrivaled in the world for their chronic, low-dose-rate radiation exposure. The 26,000 workers at Mayak were highly exposed to external gamma and inhaled plutonium. A cohort of individuals raised as children in Ozersk is under evaluation for their exposures to radioiodine. The Techa River Cohort consists of over 30,000 people who were born before the start of exposure in 1949 and lived along the Techa River. The Techa River Offspring Cohort consists of about 21,000 persons born to one or more exposed parents of this group - many of whom also lived along the contaminated river. The EURT Cohort consists of about 18,000 people who were evacuated from the EURT soon after the 1957 explosion and another 8000 who remained. These groups together are the focus of dose reconstruction and epidemiological studies funded by the US, Russia, and the European Union to address the question “Are doses delivered at low dose rates as effective in producing health effects as the same doses delivered at high dose rates?”

63 RADIATION, THERMAL, AND OTHER ENVIRON. POLLUTAN↗

Salt Heater Test (FY19)

This report discusses the fiscal year 2019 (FY19) design, implementation, and preliminary data interpretation plan for a set of borehole heater tests call the brine availability tests in salt (BATS), which is funded by the DOE Office of Nuclear Energy (DOE-NE) at the Waste Isolation Pilot Plant (WIPP). The organization of BATS is outlined in Project Plan: Salt In-Situ Heater Test. An early design of the field test is laid out in Kuhlman et al., including extensive references to previous field tests, which illustrates aspects of the present test. The previous test plan by Stauffer et al., places BATS in the context of a multi-year testing strategy, which involves tests of multiple scales and processes, possibly culminating in a drift-scale disposal demonstration.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Development of three-dimensional models for WIPP performance assessment using PFLOTRAN - 15073

The Waste Isolation Pilot Plant (WIPP), located in southeastern New Mexico, has been developed by the U.S. Department of Energy (DOE) for the deep geologic disposal of transuranic (TRU) waste. WIPP performance assessment (PA) calculations estimate the probability and consequence of potential radionuclide releases from the repository to the accessible environment for a regulatory period of 10,000 years after facility closure. To date, WIPP PA calculations have employed multiple 2D numerical models requiring simplification of the mesh and processes. Introducing 3D numerical models within WIPP PA enables increasingly realistic representations of the WIPP subsurface domain and improved flexibility for incorporating relevant features. Furthermore, the increased computing capacity afforded by modern hardware architectures enables this 3D modeling. Modeling in 3D will be more flexible because less homogenization is required and better accuracy of the results can be obtained by making fewer assumptions and/or simplifications. The use of PFLOTRAN, a state-of-art massively parallel subsurface flow and reactive transport code, will enable this 3D modeling, and eliminate the need for multiple related, but decoupled 2D models. However, there are capabilities that PFLOTRAN must be demonstrated in order to fulfill requirements for WIPP PA. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of Remote Cutting Tools for use at ATR - 20438

As a result of years of operations of the Advanced Test Reactor (ATR) at the Idaho National Lab (INL), the ATR canal has become congested due to the storage of materials including waste consisting of highly irradiated remote handled (RH) metals. In order to support its continuing nuclear mission the ATR requires canal space to support fuel storage and future core internal change out (CIC) components. INL staff determined that the canal must be cleaned out and waste removed to efficiently utilize the valuable canal floor space. It was determined that a methodology for processing, packaging, characterizing, and removing current and future irradiated hardware from the ATR canal is needed. Orano Federal Services (OFS) and its subcontractor Babcock Services Inc. (BSI) were selected to provide remote tooling in order to safely and efficiently size reduce the material currently stored in the ATR canal. INL developed detailed requirements that established the design and performance requirements for the tooling. Orano TN and BSI had recently successfully completed similar tasks in clearing highly activated materials from spent fuel pools and canals at commercial nuclear plants. That experience directly translated into a proven approach that could be used at the ATR thereby saving time and money and lowering risks. Based on BSI's demonstrated proficiency in the design and deployment of remote size reduction specialty tooling at comparable commercial facilities, Orano Federal Services was confident that a solution to INL's requirements could be delivered. The tooling had to be designed to be compatible with the operational requirements of the ATR canal as well as the functionality needed by the facility operators that will use the equipment. Some of the major design requirements and functions of the equipment included remote operations, capability to shear highly irradiated sections of aluminum and steel tubing, pipe, and components ranging in size from 0.6 cm to 16.5 cm diameter into 1.5 m -1.8 m lengths, utilizing buoyancy compensation to assist with underwater operations, and use commercially available existing technology and components as much as practical. The design team evaluated and selected commercially available equipment that could be modified to meet the design and performance specifications. In addition, a waste sizing table (WST) was designed and fabricated to further ensure the size reduction equipment would perform as expected and give the facility operators a stable and usable remote, underwater work platform. After successful development of the tooling, a mock up test and operator training was conducted to ensure the tooling performed as expected and met the requirements of INL. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Iron Phosphate Glass for Vitrifying Hanford AZ102 LAW in Joule Heated and Cold Crucible Induction Melters - 12240

An iron phosphate composition for vitrifying a high sulfate (∼17 wt%) and high alkali (∼80 wt%) Hanford low activity waste (LAW), known as AZ-102 LAW, has been developed for processing in a Joule Heated Melter (JHM) or a Cold Crucible Induction Melter (CCIM). This composition produced a glass waste form, designated as MS26AZ102F-2, with a waste loading of 26 wt% of the AZ-102 which corresponded to a total alkali and sulfate (represented as SO{sub 3}) content of 21 and 4.4 wt%, respectively. A slurry (7 M Na{sup +}) of MS26AZ102F-2 simulant was melted continuously at temperatures between 1030 and 1090 deg. C for 10 days in a small JHM at PNNL and for 70 hours in a CCIM at INL. The as-cast glasses produced in both melters and in trial laboratory experiments along with their canister centerline cooled (CCC) counterparts met the requirements for the Product Consistency Test (PCT) and the Vapor Hydration Test (VHT) responses in the Hanford Tank Waste Treatment and Immobilization Plant (WTP) Contract. These glass waste forms retained up to 77 % of the SO{sub 3} (3.3 wt%), 100% of the Cesium, and 33 to 44% of the rhenium (used as a surrogate for Tc) all of which either exceeded or were comparable to the retention limit for these species in borosilicate glass nuclear waste form. Analyses of commercial K-3 refractory lining and the Inconel 693 metal electrodes used in JHM indicated only minimum corrosion of these components by the iron phosphate glass. This is the first time that an iron phosphate composition was melted continuously in a slurry fed JHM and in the US, thereby, demonstrating that iron phosphate glasses can be used as alternative hosts for vitrifying nuclear waste. The following conclusions are drawn from the results of the present work. (1) An iron phosphate composition, designated as MS26AZ102F-2, containing 26 wt% of the simulated high sulfate (17 wt%), high alkali (80 wt%) Hanford AZ-102 LAW meets all the criteria for processing in a JHM and CCIM. This composition produces a homogeneous glass with a density of 2.80 ± 0.04 g/cm{sup 3} after melting between 1000 and 1050 deg. C for 3 to 5 h. (2) This is the first time that an iron phosphate glass was melted in the JHM continuously for 10 days achieving a specific melting rate of 1010 kg/m2/day and in the CCIM for 70 hrs with a melting rate of 664 kg/m{sup 2}/day. (3) The analyzed (ICP-AES) compositions for all the glasses prepared under several melting conditions are in excellent agreement with the target composition. The variation of melting conditions include: (i) use of small scale/short melting time to large scale/long melting time (300 g to 80 kg, 4 h to 10 days) operations including melting in the JHM and CCIM, (ii) use of dry or wet (slurry) melter feed, (iii) addition of reductant (sugar) in the batch, and (iv) bubbling the melt with air. (4) The chemical durability as measured by PCT and VHT for the quenched and CCC-treated waste forms prepared from laboratory, JHM or CCIM melting exceeds the DOE requirements for LAW. (5) Depending upon the melting time (4 h to 10 days), the average concentration of SO{sub 3} in the MS26AZ102F-2 iron phosphate glass waste form varies from about 1.78 (RSM) to 3.74 (laboratory melt) wt% which corresponds to an SO{sub 3} retention of 41 to 86% when melted between 1030 at 1050 deg. C in air. (6) The retention of SO{sub 3} in the glass was reduced when a reductant (sugar) was added to the slurry. (7) The retention of other problem components like Cesium and Rhenium/Tc-99 is also high; from 92 to 100% for Cs{sub 2}O under different melting conditions, and from 66 to 33% for Re{sub 2}O{sub 7} for melts processed from 3 to 5 hours and up to 10 days. (8) Corrosion tests on Inconel 693 and K-3 refractory at temperatures between 1000 and 1050 deg. C indicate that both materials should be suitable for melting iron phosphate glasses. (9) The viscosity and electrical conductivity of the MS26AZ102F-2 melt are within the acceptable limits for RSM and CCIM processing. (10)This work has shown that iron phosphate compositions are a potential alternative to borosilicate glasses for vitrifying problematic wastes such as Hanford AZ-102 LAW that contains high amounts sulfate and alkali oxides, and that iron phosphate melts such as MS26AZ102F-2 can be processed in the JHM or CCIM. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Belgian regulatory framework for decontamination and decommissioning - lessons learned and new initiatives

Belgium can rely on significant experience in the field of decontamination and decommissioning of nuclear facilities. Several projects are ongoing and include research reactors (BR3, Thetis), uranium and MOX fuel fabrication plants (FBFC International, Belgonucleaire), fuel reprocessing facilities (Eurochemic) and radwaste processing facilities (Belgoprocess). Additional projects are expected in the coming years with the planned final shutdown of the oldest nuclear power reactor units. Two national authorities are involved in the decontamination and decommissioning process of nuclear facilities. The FANC (together with its subsidiary Bel V) is concerned for all matters related to nuclear safety and radiation protection, while NIRAS/ONDRAF is concerned for all matters related to radioactive waste and fuel management and financial provisions. These attributions ensure that all safety and material concerns are addressed and that both the licensees and the national authorities bear their own responsibilities. They rely on an existing regulatory framework covering both the procedural and the technical aspects of the decontamination and decommissioning activities. However, opportunities for regulatory improvement were raised after some recent events in Belgium, among which the bankruptcy of a nuclear company producing radioisotopes, involving numerous additional interested parties in a complex judiciary context. Amendments in the current regulations are considered to increase the prerogatives of the authorities regarding the management of radioactive waste by a licensee, the transfer of an operating license from an operator to another, and the general decommissioning strategy of a facility. Furthermore, a dedicated 'waste and decommissioning' working group within WENRA defined new reference levels applying to the decontamination and decommissioning of nuclear facilities. Belgium committed to include these requirements explicitly in its national legislation, even though most of them were already included in the existing decommissioning authorizations. Amendments will cover the safety provisions inherent to the decontamination and decommissioning phase, such as the decommissioning strategy, the qualification of techniques, the experience feedback valorization, the periodic safety reviews, the radioactive waste management, or the final characterization of the sites. Additionally, requirements regarding the authorization process will be detailed, such as the content of the licensee's application file or the structure of the safety report covering the decontamination and decommissioning phase. These changes will contribute to a more secure regulatory framework for all interested parties. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Informed Critical Mineral Recovery from Fossil Energy Waste Feedstocks

Critical minerals (CM), such as rare earth elements (REE), cobalt, nickel, and lithium, have important uses in modern energy and technologies, yet are vulnerable to potential supply chain disruptions. One potential domestic CM source is fossil energy wastes, such as coal combustion ash, acid mine drainage (AMD) and treatment solids (AMD solids), and Oil and Gas (O&G) drilling wastes (drill cuttings and produced waters). CM recovery from these feedstocks is promising due to their abundant quantity and fast availability as waste products. To develop informed and effective CM recovery, DOE’s National Energy Technology Laboratory (NETL) have collected and analyzed CM data for aforementioned fossil energy wastes, and utilized advanced geochemical characterization (e.g., synchrotron microprobe, sequential extraction and geochemical modeling) to identify the CM speciation and binding environments. Novel methods that recover multiple CMs while co-producing other valuable byproducts from these feedstocks have been developed. Successful examples include: (1) the discovery of easily mobile REE phases in Ca-rich coal combustion ash resulted in a patented REE recovery process from the ash feedstock while producing zeolite sorbents from the extraction wastes; (2) the successful identification of REE/Co/Ni/Zn hosting phases in acid mine drainage treatment solids (AMD solids) has informed the sequential CM recovery from AMD solids and has inspired lithium sorbent development from the extraction wastes; (3) the recovery potential of Li and other CMs in O&G produced waters and drill cuttings has been explored while the extraction residuals have been demonstrated to support plant growth as soil supplements. The innovations driven by characterization information have the potential to maximize CM recovery revenue, offset the cost of waste management and wastewater treatments while reducing the cost and environmental footprint of CM extraction.

characterization and extraction of rare earth elem↗

Gasification of Coal and Biomass: The Route to Net-Negative-Carbon Power and Hydrogen

One promising process that is a candidate for meeting the goals of the US Department of Energy’s 21st Century Power Plant initiative is to gasify a mixture of coal and biomass to yield a syngas, which can have CO2 removed and then be used to produce hydrogen as well as an off-gas that can be used to flexibly produce power. This concept would overall be carbon net-negative and readily meet the 21st Century Power Plant initiative targets of smaller scale MW generation, high ramp rates and turndown, feedstock flexibility, and high efficiency—at a reasonable cost. Moreover, adding the large-scale production of “ultra-green” hydrogen yields a system tailored for the coming hydrogen economy, providing long-term energy storage and an attractive co-product for sale. The objective of the work being led by the Electric Power Research Institute, Inc. (EPRI), with support by Bechtel Corporation (Bechtel), Gas Technology Institute (GTI), Hamilton Mauer International, Inc. (HMI), Nebraska Public Power District (NPPD), NexantECA, Inc. (Nexant), and Wärtsilä, is to perform a front-end design and engineering (FEED) study on an oxygen-blown gasification system coupled with water-gas shift, pre-combustion CO2 capture, and pressure-swing adsorption working off a coal/biomass mix to yield high-purity hydrogen and a fuel off-gas that can generate power. Several designs are being considered that will be capable of producing 50 MW net from a flexible generator, over 8500 kg/hr of hydrogen, and net-negative CO2 emissions, at an efficiency of 50% net HHV. The plant would be hosted at an NPPD site, where opportunities for enhanced oil recovery and sequestration have been investigated and the need for low-carbon power and hydrogen is imminent. The principal biomass to be used is corn stover—prevalent in Nebraska where the plant will be located—mixed with Powder River Basin (PRB) coal, necessitating a gasifier that can use this feedstock and be flexible to allow other types. Waste plastics will also be reviewed for use. Two oxygen-blown gasifiers have been identified as candidates that have done testing with biomass including corn stover: the GTI gasifier—a high-pressure, fluidized-bed type—and HMI’s, a lower pressure moving-bed type. Both have relative advantages that were investigated in the Phase I design study, with a resultant down select of one system for which the FEED will be performed in Phase II. The technical tasks for the project are: • Design Development: Completion of design activities necessary to provide inputs for the FEED study. Multiple design cases will be assessed with the selection of the optimal one for the FEED. • Investment Case Preparation: Development of the draft investment case for the proposed process with business cases performed for the proposed host site and two other locations. • Host Site Selection: Evaluation of the two potential host sites within NPPD’s portfolio to select the preferred candidate based on technical, economic, and environmental considerations. • Environmental Information Volume (EIV) Development: Completion of the EIV for the host site. • FEED Study: Completion of a FEED study based on the design selected in Phase I. A Greenhouse Gas Life Cycle Analysis will also be performed for the process. • Update Investment Case: Finalization of the investment case based on findings from the FEED. The advantages of the proposed project are significant. Having an engaged U.S. power utility willing to provide a host site that will produce energy from coal plus a deep and experienced team is critical; the process meets all the goals of DOE’s 21st Century Power Plant initiative at an estimated total plant cost of ~$880M and a production cost of hydrogen of ~$2/kg-H2 while producing net-negative carbon power. If developed, this process has real commercial potential in the United States—supported by EPRI’s initial review of the considerable interest from selected U.S. utilities—and elsewhere around the globe. The process has fewer environmental hurdles compared to other concepts, lowering regulatory and protest risks—providing a pathway to preserving the viability of a critical indigenous energy source by transforming its use to match a changing world. This presentation outlines the motivation for the effort, summarizes project plans, work completed to date, results of the Phase I effort and, and detailed work scope for the remainder of the project in the Phase II FEED effort.

01 COAL, LIGNITE, AND PEAT↗

Friction Stir Cutting for Decommissioning - 16130

Safe and cost effective decommissioning of redundant nuclear plant is a primary consideration to countries and companies with aging nuclear facilities. The wider media coverage of nuclear issues and strong public feeling is ensuring decommissioning options are also considered prior to development of new nuclear facilities. A project has been undertaken to demonstrate the feasibility of applying friction stir cutting, a non-fusion, non-machining, method of separating materials for size reduction of redundant metallic nuclear plant, specifically as a flexible low cost tool for plant dismantling. The research program was designed to provide a fast and effective approach to the assessment of process feasibility in stainless steels. Friction stir cutting may begin by traversing the rotating tool into the edge of the plate, or alternatively, by piercing the plate with a suitably profiled rotating friction stir cutting tool. Plate piercing trials were conducted to determine the down-force required to pierce the plate and to identify the appropriate tool tip profile for efficient piercing. The friction stir cutting process has been successfully demonstrated in 3 mm and 6 mm thick stainless steel plate. Provided sufficient torque is available, the friction stir cutting process is suitable for robotic application. The process is suitable for submerged applications such as the removal of pond furniture. Special attention was given towards any fume generation or particulate emissions during cutting. Friction stir cutting of bare steel plate does not generate fume, results in a relatively smooth edge profile and produces minimal loose debris. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗