Search NASA⌕ Search

SEARCH · Search NASA

Results for “program verification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,747 records · Page 97

Developing Formal Correctness Properties from Natural Language Requirements

This viewgraph presentation reviews the rationale of the program to transform natural language specifications into formal notation.Specifically, automate generation of Linear Temporal Logic (LTL)correctness properties from natural language temporal specifications. There are several reasons for this approach (1) Model-based techniques becoming more widely accepted, (2) Analytical verification techniques (e.g., model checking, theorem proving) significantly more effective at detecting types of specification design errors (e.g., race conditions, deadlock) than manual inspection, (3) Many requirements still written in natural language, which results in a high learning curve for specification languages, associated tools and increased schedule and budget pressure on projects reduce training opportunities for engineers, and (4) Formulation of correctness properties for system models can be a difficult problem. This has relevance to NASA in that it would simplify development of formal correctness properties, lead to more widespread use of model-based specification, design techniques, assist in earlier identification of defects and reduce residual defect content for space mission software systems. The presentation also discusses: potential applications, accomplishments and/or technological transfer potential and the next steps.

requirements engineering↗

International Space Station Payload Operations Integration Center (POIC) Overview

Objectives and Goals: Maintain and operate the POIC and support integrated Space Station command and control functions. Provide software and hardware systems to support ISS payloads and Shuttle for the POIF cadre, Payload Developers and International Partners. Provide design, development, independent verification &validation, configuration, operational product/system deliveries and maintenance of those systems for telemetry, commanding, database and planning. Provide Backup Control Center for MCC-H in case of shutdown. Provide certified personnel and systems to support 24x7 facility operations per ISS Program. Payloads CoFR Implementation Plan (SSP 52054) and MSFC Payload Operations CoFR Implementation Plan (POIF-1006).

Ijames, Gayleen N.↗

Managing Complexity in the MSL/Curiosity Entry, Descent, and Landing Flight Software and Avionics Verification and Validation Campaign

The complexity of the Mars Science Laboratory (MSL) mission presented the Entry, Descent, and Landing systems engineering team with many challenges in its Verification and Validation (V&V) campaign. This paper describes some of the logistical hurdles related to managing a complex set of requirements, test venues, test objectives, and analysis products in the implementation of a specific portion of the overall V&V program to test the interaction of flight software with the MSL avionics suite. Application-specific solutions to these problems are presented herein, which can be generalized to other space missions and to similar formidable systems engineering problems.

Stehura, Aaron↗

NGSI: IAEA Verification of UF6 Cylinders

The International Atomic Energy Agency (IAEA) is often ignorant of the location of declared, uranium hexafluoride (UF6) cylinders following verification, because cylinders are not typically tracked onsite or off. This paper will assess various methods the IAEA uses to verify cylinder gross defects, and how the task could be ameliorated through the use of improved identification and monitoring. The assessment will be restricted to current verification methods together with one that has been applied on a trial basis—short-notice random inspections coupled with mailbox declarations. This paper is part of the NNSA Office of Nonproliferation and International Security’s Next Generation Safeguards Initiative (NGSI) program to investigate the concept of a global monitoring scheme that uniquely identifies and tracks UF6 cylinders.

cylinder monitoring tracking IAEA↗

Patient-Specific Quality Assurance for the Delivery of {sup 60}Co Intensity Modulated Radiation Therapy Subject to a 0.35-T Lateral Magnetic Field

Purpose: This work describes a patient-specific dosimetry quality assurance (QA) program for intensity modulated radiation therapy (IMRT) using ViewRay, the first commercial magnetic resonance imaging-guided RT device. Methods and Materials: The program consisted of: (1) a 1-dimensional multipoint ionization chamber measurement using a customized 15-cm{sup 3} cube-shaped phantom; (2) 2-dimensional (2D) radiographic film measurement using a 30- × 30- × 20-cm{sup 3} phantom with multiple inserted ionization chambers; (3) quasi-3D diode array (ArcCHECK) measurement with a centrally inserted ionization chamber; (4) 2D fluence verification using machine delivery log files; and (5) 3D Monte Carlo (MC) dose reconstruction with machine delivery files and phantom CT. Results: Ionization chamber measurements agreed well with treatment planning system (TPS)-computed doses in all phantom geometries where the mean ± SD difference was 0.0% ± 1.3% (n=102; range, −3.0%-2.9%). Film measurements also showed excellent agreement with the TPS-computed 2D dose distributions where the mean passing rate using 3% relative/3 mm gamma criteria was 94.6% ± 3.4% (n=30; range, 87.4%-100%). For ArcCHECK measurements, the mean ± SD passing rate using 3% relative/3 mm gamma criteria was 98.9% ± 1.1% (n=34; range, 95.8%-100%). 2D fluence maps with a resolution of 1 × 1 mm{sup 2} showed 100% passing rates for all plan deliveries (n=34). The MC reconstructed doses to the phantom agreed well with planned 3D doses where the mean passing rate using 3% absolute/3 mm gamma criteria was 99.0% ± 1.0% (n=18; range, 97.0%-100%), demonstrating the feasibility of evaluating the QA results in the patient geometry. Conclusions: We developed a dosimetry program for ViewRay's patient-specific IMRT QA. The methodology will be useful for other ViewRay users. The QA results presented here can assist the RT community to establish appropriate tolerance and action limits for ViewRay's IMRT QA.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

SU-E-T-75: A Simple Technique for Proton Beam Range Verification

Purpose: To develop a measurement-based technique to verify the range of proton beams for quality assurance (QA). Methods: We developed a simple technique to verify the proton beam range with in-house fabricated devices. Two separate devices were fabricated; a clear acrylic rectangular cuboid and a solid polyvinyl chloride (PVC) step wedge. For efficiency in our clinic, we used the rectangular cuboid for double scattering (DS) beams and the step wedge for pencil beam scanning (PBS) beams. These devices were added to our QA phantom to measure dose points along the distal fall-off region (between 80% and 20%) in addition to dose at mid-SOBP (spread out Bragg peak) using a two-dimensional parallel plate chamber array (MatriXX™, IBA Dosimetry, Schwarzenbruck, Germany). This method relies on the fact that the slope of the distal fall-off is linear and does not vary with small changes in energy. Using a multi-layer ionization chamber (Zebra™, IBA Dosimetry), percent depth dose (PDD) curves were measured for our standard daily QA beams. The range (energy) for each beam was then varied (i.e. ±2mm and ±5mm) and additional PDD curves were measured. The distal fall-off of all PDD curves was fit to a linear equation. The distal fall-off measured dose for a particular beam was used in our linear equation to determine the beam range. Results: The linear fit of the fall-off region for the PDD curves, when varying the range by a few millimeters for a specific QA beam, yielded identical slopes. The calculated range based on measured point dose(s) in the fall-off region using the slope resulted in agreement of ±1mm of the expected beam range. Conclusion: We developed a simple technique for accurately verifying the beam range for proton therapy QA programs.

60 APPLIED LIFE SCIENCES↗

Systems, methods and apparatus for generation and verification of policies in autonomic computing systems

Described herein is a method that produces fully (mathematically) tractable development of policies for autonomic systems from requirements through to code generation. This method is illustrated through an example showing how user formulated policies can be translated into a formal mode which can then be converted to code. The requirements-based programming method described provides faster, higher quality development and maintenance of autonomic systems based on user formulation of policies.Further, the systems, methods and apparatus described herein provide a way of analyzing policies for autonomic systems and facilities the generation of provably correct implementations automatically, which in turn provides reduced development time, reduced testing requirements, guarantees of correctness of the implementation with respect to the policies specified at the outset, and provides a higher degree of confidence that the policies are both complete and reasonable. The ability to specify the policy for the management of a system and then automatically generate an equivalent implementation greatly improves the quality of software, the survivability of future missions, in particular when the system will operate untended in very remote environments, and greatly reduces development lead times and costs.

Hinchey, Michael G.↗

Progress in the Verification and Validation Efforts for START: A Spent Fuel Routing Tool

The U.S. Department of Energy’s (DOE) Office of Nuclear Energy (DOE-NE) is planning for an integrated waste management approach to transport, store, and dispose of spent nuclear fuel (SNF) and other high-level radioactive waste (HLW) as part of the Integrated Waste Management (IWM) program [1]. In support of this effort, the Stakeholder Tool for Assessing Radioactive Transportation (START) is being developed within the IWM program [2, 3]. This is a web-based decision support tool that can be used to analyze geospatial data related to the transportation of SNF and HLW. START is designed as a web-based application using an ArcGIS server through which the user can select the origin and destination of the route [4]. This is followed by selection of the mode of transportation of choice based on user preference. Some of the modes available to the user include rail, heavy haul truck, and barge. The option of utilizing more than one mode of transportation (intermodal transportation) is also implemented in START. A few examples of intermodal transportation include barge to rail, and heavy haul truck to rail. It must be noted that some routes might not have access to all modes of transportation, depending on the infrastructure availability at the origin and destination sites. Users can also select any stops or barriers they would like to introduce in the routes. This is followed by selection of the routing criteria of interest. Three primary routing options available to the user include minimum population, minimum distance, and minimum time. Apart from that, a few other options include accounting for a weighted average of the three aforementioned routing options. The next step involves the selection of the buffer distance of interest which includes the two choices available of 800 m and 2500 m, respectively. Finally, an option to select any prohibited rail carriers that the user does not wish to use is available. After making these selections, a route is ready to be created.

Gadey, Harish Reddy↗

A Scalable Analysis Toolkit

The Scalable Analysis Toolkit (SAT) project aimed to demonstrate that it is feasible and useful to statically detect software bugs in very large systems. The technical focus of the project was on a relatively new class of constraint-based techniques for analysis software, where the desired facts about programs (e.g., the presence of a particular bug) are phrased as constraint problems to be solved. At the beginning of this project, the most successful forms of formal software analysis were limited forms of automatic theorem proving (as exemplified by the analyses used in language type systems and optimizing compilers), semi-automatic theorem proving for full verification, and model checking. With a few notable exceptions these approaches had not been demonstrated to scale to software systems of even 50,000 lines of code. Realistic approaches to large-scale software analysis cannot hope to make every conceivable formal method scale. Thus, the SAT approach is to mix different methods in one application by using coarse and fast but still adequate methods at the largest scales, and reserving the use of more precise but also more expensive methods at smaller scales for critical aspects (that is, aspects critical to the analysis problem under consideration) of a software system. The principled method proposed for combining a heterogeneous collection of formal systems with different scalability characteristics is mixed constraints. This idea had been used previously in small-scale applications with encouraging results: using mostly coarse methods and narrowly targeted precise methods, useful information (meaning the discovery of bugs in real programs) was obtained with excellent scalability.

Aiken, Alexander↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY 2024

Energy Savings Performance Contracts (ESPCs)are a contractual mechanism that allow a federal agency to procure energy savings and facility improvements without upfront capital costs to reduce costs and resiliency. ESPCs are covered under FAR Part 23.2, and 42 USC § 8287. Section 8287(a)(2)(A) of Title 42 of the U.S. Code requires that each energy savings performance contract (ESPC) undergo an annual energy audit, resulting in a separate audit report for every project. The objective of the present report is to compile and analyze all annual ESPC audit reports issued between October 1, 2023, and September 30, 2024, for projects awarded under Generations 1, 2, and 3 of DOE’s ESPC IDIQ contracts. During this period, 205 measurement and verification (M&V) reports were produced for 200 projects; the total number of reports exceeds the number of projects because some projects generated more than one report(for example, a few projects measure savings twice per year and produce two audit reports annually, each covering a different six-month period). By aggregating the results from these individual audits, the report determines the portfolio-wide realization rate of energy and cost savings for all active ESPC projects awarded under DOE’s IDIQ program. For all 205audit reports, sufficient information was available to compare project-level estimated, reported, and guaranteed cost savings. Reported cost savings accounted for ESCO verified savings per each project’s M&V plan. The total reported cost savings for the period addressed were $\$$647.8million,compared with the total guaranteed cost savings of $\$$601.6million. On average across the reported projects: •ESPC contractors guaranteed 92.8% of the estimated cost savings• projects reported achieving 100.0% of the estimated cost savings• projects reported achieving 107.7% of the guaranteed cost savings. The M&V performed for the period indicated adjustments for government operations and maintenance impacts to savings amount to$\$$43.9millionandcould be restored with the original operational parameters for impacted projects. Accounting for this potential cost savings impact, these projects still realized 100.4% of the guaranteed cost savings. The information on estimated and reported energy savings was collected and compared for all 205of the reports examined. Based on site energy, estimated savings totaled 14.88million MMBtu, and reported savings were 15.33million MMBtu; 3.1% greater than the estimated energy savings. All of the reports examined contained sufficient information to calculate source energy savings. Based on site-adjusted source energy, total estimated energy savings were 20.90 million MMBtu, and reported savings were 21.22million MMBtu, 101.5% of the estimated energy savings. For water savings, the estimated savings were 11,539,055 kGal and the reported savings were 13,315,930 kGal. This means 1,776,875 kGal more water was saved than estimated, which is about 15% higher than the estimate. These results indicate that, overall, the reported energy savings slightly exceeded the estimated values, while estimated water savings significantly exceeded estimated values, suggesting that the projects achieved greater cost savings than originally projected. The total annual expense for the ESCOs to perform annual M&V audits and reporting was $\$$10.02million. Through this effort, $\$$647.8 million in annual cost savings was verified. The M&V results indicated that $\$$43.9 million of these verified savings reflected adjustments due to government operations A-6and maintenance impacts, which could be restored under the original operational parameters for the affected projects. These findings show the value of M&V that only costs 1.7%of the guaranteed cost savings to ensure guarantees are met.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Gateway Program Development Progress

This paper provides an overview and status of Gateway, humanity’s first space station to orbit the Moon providing vital support for a sustained, long-term human return to the lunar surface and a steppingstone to Mars as part of the Artemis missions. As a lunar outpost, Gateway is a destination for deep space crew expeditions and science investigations, a port for deep space transportation, including landers transiting to the lunar surface or spacecraft embarking to deep space destinations beyond the Earth-Moon system. The National Aeronautics and Space Administration (NASA) leads the Program and is the integrator of the spaceflight capabilities and contributions of U.S. commercial partners and international partners to develop Gateway. This paper will provide an overview of Gateway’s major components in various stages of development. The entire Gateway spacecraft is at preliminary design level of maturity, with some components at or near critical design review. Gateway’s major components are the Power and Propulsion Element; the Habitation and Logistics Outpost; Deep Space Logistics; the International Habitation module; Gateway External Robotics System; European System Providing Refueling, Infrastructure and Telecommunications; and an Airlock. This paper will also provide an update on the status of the integration activities necessary to fly and operate this complex, next-generation integrated spacecraft for a minimum 15 year design life, including systems engineering integrated analysis cycles, the autonomous Vehicle System Manager software, verification and validation labs, and common vehicle equipment. Expanding on the successful partnership that has provided over 20 years of continuous crew operations in low-Earth orbit on the International Space Station, Gateway is an evolution of this extraordinary partnership leveraging the capabilities of each contributor to expand humankind’s sustained exploration deeper into the cosmos. Highlighting the international program with participation from multiple space agencies, this paper will also provide a status of Gateway multilateral governance structure and international agreements.

Sean M Fuller↗

Gateway Program Development Progress

This paper provides an overview and status of Gateway, humanity’s first space station to orbit the Moon providing vital support for a sustained, long-term human return to the lunar surface and a steppingstone to Mars as part of the Artemis missions. As a lunar outpost, Gateway is a destination for deep space crew expeditions and science investigations, a port for deep space transportation, including landers transiting to the lunar surface or spacecraft embarking to deep space destinations beyond the Earth-Moon system. The National Aeronautics and Space Administration (NASA) leads the Program and is the integrator of the spaceflight capabilities and contributions of U.S. commercial partners and international partners to develop Gateway. This paper will provide an overview of Gateway’s major components in various stages of development. The entire Gateway spacecraft is at preliminary design level of maturity, with some components at or near critical design review. Gateway’s major components are the Power and Propulsion Element; the Habitation and Logistics Outpost; Deep Space Logistics; the International Habitation module; Gateway External Robotics System; European System Providing Refueling, Infrastructure and Telecommunications; and an Airlock. This paper will also provide an update on the status of the integration activities necessary to fly and operate this complex, next-generation integrated spacecraft for a minimum 15-year design life, including systems engineering integrated analysis cycles, the autonomous Vehicle System Manager software, verification and validation labs, and common vehicle equipment. Expanding on the successful partnership that has provided over 20 years of continuous crew operations in low-Earth orbit on the International Space Station, Gateway is an evolution of this extraordinary partnership leveraging the capabilities of each contributor to expand humankind’s sustained exploration deeper into the cosmos. Highlighting the international program with participation from multiple space agencies, this paper will also provide a status of Gateway multilateral governance structure and international agreements.

Gateway↗

Book Review: Monitoring compliance with the comprehensive Nuclear-Test-Ban Treaty (CTBT). Contributions by the German national data centre edited by Christoph Pilger, Lars Ceranna and Christian Bönnemann

For decades, the nuclear weapons capability of different countries was tracked in part via the interpretation of signals from more than 2000 nuclear test explosions that were conducted in programs of weapons development. The first such explosion took place in July 1945 (in New Mexico, USA, prior to the use of nuclear weapons in World War 2 against Japan). The last nuclear test, prior to the Comprehensive Nuclear-Test-Ban Treaty (CTBT) becoming open for signature in September 1996, was in July 1996 (in China). This treaty, which took nearly forty years to negotiate, has been signed by 184 states as of December 2018, but a few key additional signatures and ratifications are still needed before nuclear tests are banned under international law. The evidence that a nuclear test explosion has occurred can come from electromagnetic, seismic, hydroacoustic, and infrasonic waves; and from unusual radionuclides— which can be present in particulate matter and/or as noble gases. Of course there is a vast infrastructure associated with military programs of nuclear weapons development in a limited number of countries. Less well-known, is the existence of a large infrastructure involving national and international efforts to monitor for the possible occurrence of nuclear test explosions, and thus to support CTBT verification. This book does a very good job of explaining much of that work, as it is conducted in practice by a western nation with sophisticated facilities.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Advanced High-Temperature Reactor Dynamic System Model Development: April 2012 Status

The Advanced High-Temperature Reactor (AHTR) is a large-output fluoride-salt-cooled high-temperature reactor (FHR). An early-phase preconceptual design of a 1500 MW(e) power plant was developed in 2011 [Refs. 1 and 2]. An updated version of this plant is shown as Fig. 1. FHRs feature low-pressure liquid fluoride salt cooling, coated-particle fuel, a high-temperature power cycle, and fully passive decay heat rejection. The AHTR is designed to be a “walk away” reactor that requires no action to prevent large off-site releases following even severe reactor accidents. This report describes the development of dynamic system models used to further the AHTR design toward that goal. These models predict system response during warmup, startup, normal operation, and limited off-normal operating conditions. Severe accidents that include a loss-of-fluid inventory are not currently modeled. The scope of the models is limited to the plant power system, including the reactor, the primary and intermediate heat transport systems, the power conversion system, and safety-related or auxiliary heat removal systems. The primary coolant system, the intermediate heat transport system and the reactor building structure surrounding them are shown in Fig. 2. These systems are modeled in the most detail because the passive interaction of the primary system with the surrounding structure and heat removal systems, and ultimately the environment, protects the reactor fuel and the vessel from damage during severe reactor transients. The reactor silo also plays an important role during system warmup. The dynamic system modeling tools predict system performance and response. The goal is to accurately predict temperatures and pressures within the primary, intermediate, and power conversion systems and to study the impacts of design changes on those responses. The models are design tools and are not intended to be used in reactor qualification. The important details to capture in the primary system relate to flows within the reactor vessel during severe events and the resulting temperature profiles (temperature and duration) for major components. Critical components include the fuel, reactor vessel, primary piping, and the primary-to-intermediate heat exchangers (P-IHXs). The major AHTR power system loops are shown in Fig. 3. The intermediate heat transfer system is a group of three pumped salt loops that transports the energy produced in the primary system to the power conversion system. Two dynamic system models are used to analyze the AHTR. A Matlab/Simulink-based model initiated in 2011 has been updated to reflect the evolving design parameters related to the heat flows associated with the reactor vessel. The Matlab model utilizes simplified flow assumptions within the vessel and incorporates an empirical representation of the Direct Reactor Auxiliary Cooling System (DRACS). A Dymola/Modelica model incorporates a more sophisticated representation of primary coolant flow and a physics-based representation of the three-loop DRACS thermal hydraulics. This model is not currently operating in a fully integrated mode. The Matlab model serves as a prototype and provides verification for the Dymola model, and its use will be phased out as the Dymola model nears completion. The heat exchangers in the system are sized using spreadsheet-based, steady-state calculations. The detail features of the heat exchangers are programmed into the dynamic models, and the overall dimensions are used to generate realistic plant designs. For the modeling cases where the emphasis is on understanding responses within the intermediate and primary systems, the power conversion system may be modeled as a simple boundary condition at the intermediate-to-power conversion system heat exchangers.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Office of Nuclear Verification FY 2023 Quarterly Report TSVT Q1

This project encompasses the continued development and training of a U.S. operational team, the Test Site Verification Team (TSVT), supporting verification of nuclear testing activities. TSVT builds on decades of U.S. nuclear testing history and nuclear explosion monitoring experience. The Team maintains readiness to deploy internationally on short notice to provide field-based support of verification of declared or undeclared nuclear testing and associated activities, as well as follow-on activities including monitoring and capability disablement and dismantlement, as established by negotiated agreement or treaty. The roles and structure of the TSVT are integrated with other NA-243 deployable verification teams and the interagency. FY23 TSVT activities focus on continued capability buildup within the team, including Team trainings and exercises with a focus on missions in confined spaces (e.g., tunnels, mines, other underground facilities), increased familiarity with foreign nuclear weapons testing programs, demonstration of Team capacity to deploy, train, and practice sustained OPSEC in non-western locations, establishment of sustainable storage and maintenance of equipment, specification and procurement of additional equipment to support field observations, further evolution of concepts of operation documents (CONOPs), and mission coordination with Headquarters and associated Stakeholders. Activities will culminate with a full-scale domestic team exercise at the end of FY23 focusing on underground activities signatures/observations and safety including advanced outdoor safety and familiarity in working around explosive test environments. In addition, we will be further articulating approaches and capacity relevant to the identification of nuclear tests, as well as monitoring of nuclear testing activities and/or dismantlement of nuclear test sites and anticipate developing additional equipment requests in support of this evolution. The TSVT Team Leads will also coordinate with its Senior Advisor, the TSVT Logistics and Readiness (L&R) Training Lead, and NNSA Headquarters to draft a five-year TSVT training and exercise plan, that strategically and incrementally builds capacity and expertise in key areas of significance for the continuum of nuclear and nuclear-related testing activities that fall within the team’s mission space.

42 ENGINEERING↗

Digital Twin + AI: Control Room of the Future [Slides]

The control room functions as the central brain of the grid, essential for balancing supply and demand and ensuring moment-to-moment grid reliability. Like the human brain, which processes sensory data to make decisions, control room operators analyze operational data from power generation, transmission, and distribution to make informed decisions. Currently, decision-making primarily rests with operators due to hardware and software limitations. However, with technological advancements, Digital Twins and AI are becoming high interest points in the control room's decision-making pilot programs. NREL is developing a comprehensive decision-making platform that integrates Digital Twins, AI, and advanced visualization techniques. As this integration progresses, the role of Digital Twins will evolve from conducting automated simulations to serving as a Trustworthy AI enabler, offering verification and validation of AI-generated response for power systems or providing physics-aware synthetic data of AI pre-training.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Combination of an electrolytic pretreatment unit with secondary water reclamation processes

The design and fabrication of a flight concept prototype electrolytic pretreatment unit (EPU) and of a contractor-furnished air evaporation unit (AEU) are described. The integrated EPU and AEU potable water recovery system is referred to as the Electrovap and is capable of processing the urine and flush water of a six-man crew. Results of a five-day performance verification test of the Electrovap system are presented and plans are included for the extended testing of the Electrovap to produce data applicable to the combination of electrolytic pretreatment with most final potable water recovery systems. Plans are also presented for a program to define the design requirements for combining the electrolytic pretreatment unit with a reverse osmosis final processing unit.

Wells, G. W.↗