Search NASA⌕ Search

SEARCH · Search NASA

Results for “Crew Performance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,765 records · Page 98

Apollo 13 Facts

Footage is seen of the Earth from the Apollo 13 spacecraft as it travels towards the Moon. The crew, James Lovell, Jr., John Swigert, Jr., and Fred Haise, Jr., are shown performing various on-orbit activities. The Lunar Module rendezvous and docking, tunnel repressurization, and S4-B separation are also seen.

Source record↗

STS-110 Flight Day 1 Highlights

The first day of the STS-110 mission begins with a live shot of the Space Shuttle Atlantis at the Kennedy Space Center. The primary objective of this flight is to rendezvous and dock with the International Space Station to attach the S (0) Truss and mobile transporter. The STS-110 crew consists of: Commander Michael J. Bloomfield, Pilot Stephen N. Frick, Mission Specialists Rex J. Walheim, Ellen Ochoa, Lee M.E. Morin, Jerry L. Ross, and Steven L. Smith. The crew is shown getting suited for their mission. Extravehicular Activity (EVA) will be performed by Jerry Ross, Lee Morin, Rex Walheim and Steven Smith. Live footage of the launch of the Space Shuttle Atlantis is also given.

Source record↗

GT-CATS: Tracking Operator Activities in Complex Systems

Human operators of complex dynamic systems can experience difficulties supervising advanced control automation. One remedy is to develop intelligent aiding systems that can provide operators with context-sensitive advice and reminders. The research reported herein proposes, implements, and evaluates a methodology for activity tracking, a form of intent inferencing that can supply the knowledge required for an intelligent aid by constructing and maintaining a representation of operator activities in real time. The methodology was implemented in the Georgia Tech Crew Activity Tracking System (GT-CATS), which predicts and interprets the actions performed by Boeing 757/767 pilots navigating using autopilot flight modes. This report first describes research on intent inferencing and complex modes of automation. It then provides a detailed description of the GT-CATS methodology, knowledge structures, and processing scheme. The results of an experimental evaluation using airline pilots are given. The results show that GT-CATS was effective in predicting and interpreting pilot actions in real time.

Callantine, Todd J.↗

Lunar precursor missions for human exploration of Mars--III: studies of system reliability and maintenance

Discussions of future human expeditions into the solar system generally focus on whether the next explorers ought to go to the Moon or to Mars. The only mission scenario developed in any detail within NASA is an expedition to Mars with a 500-day stay at the surface. The technological capabilities and the operational experience base required for such a mission do not now exist nor has any self-consistent program plan been proposed to acquire them. In particular, the lack of an Abort-to-Earth capability implies that critical mission systems must perform reliably for 3 years or must be maintainable and repairable by the crew. As has been previously argued, a well-planned program of human exploration of the Moon would provide a context within which to develop the appropriate technologies because a lunar expedition incorporates many of the operational elements of a Mars expedition. Initial lunar expeditions can be carried out at scales consistent with the current experience base but can be expanded in any or all operational phases to produce an experience base necessary to successfully and safely conduct human exploration of Mars. Published by Elsevier Ltd.

Moon↗

Multi-Megawatt Gas Turbine Power Systems for Lunar Colonies

A concept for development of second generation 10 MWe prototype lunar power plant utilizing a gas cooled fission reactor supplying heated helium working fluid to two parallel 5 MWe closed cycle gas turbines is presented. Such a power system is expected to supply the energy needs for an initial lunar colony with a crew of up to 50 persons engaged in mining and manufacturing activities. System performance and mass details were generated by an author developed code (BRMAPS). The proposed pilot power plant can be a model for future plants of the same capacity that could be tied to an evolutionary lunar power grid.

Juhasz, Albert J.↗

Summary of the Science performed onboard the International Space Station during Increments 12 and 13

By September of 2007, continuous human presence on the International Space Station will reach a milestone of eighty months. The many astronauts and cosmonauts, who live onboard the station during the last fourteen Increments over that time span, spend their time building the station as well as performing science on a daily basis. Over those eighty months, the U.S astronauts crew members logged over 2954 hours of research time. Far more research time has been accumulated by experiments controlled by investigators on the ground. The U.S astronauts conducted over one hundred and twenty six (126) science investigations. From these hundred and twenty six science investigations, many were operated across multiple Increments. The crew also installed, activated and operated nine (9) science racks that supported six science disciplines ranging from material sciences to life science. By the end of Increment 14, a total of 5083 kg of research rack mass were ferried to the station as well as 5021 kg of research mass. The objectives of this paper are three-fold. (1) To briefly review the science conducted on the International Space Station during the previous eleven Increments; (2) to discuss in detail the science investigations that were conducted on the station during Increments 12 and 13. The discussion will focus mainly on the primary objectives of each investigation and their associated hypotheses that were investigated during these two Increments. Also, some preliminary science results will be discussed for each of the investigation as science results availability permit. (3) The paper will briefly touch on what the science complement planning was and what was actually accomplished due to real time science implementation and challenges during these two Increments in question to illustrate the challenges of daily science activity while the science platform is under construction. Finally, the paper will briefly discuss the science research complements for the other two Increments, Increments 14 and 15, to preview how much science might be accomplished during these two Increments.

Jules, Kenol↗

NASA's Decadal Planning Team Mars Mission Analysis Summary

In June 1999 the NASA Administrator chartered an internal NASA task force, termed the Decadal Planning Team, to create new integrated vision and strategy for space exploration. The efforts of the Decadal Planning Team evolved into the Agency-wide team known as the NASA Exploration Team (NEXT). This team was also instructed to identify technology roadmaps to enable the science-driven exploration vision, established a cross-Enterprise, cross-Center systems engineering team with emphasis focused on revolutionary not evolutionary approaches. The strategy of the DPT and NEXT teams was to "Go Anywhere, Anytime" by conquering key exploration hurdles of space transportation, crew health and safety, human/robotic partnerships, affordable abundant power, and advanced space systems performance. Early emphasis was placed on revolutionary exploration concepts such as rail gun and electromagnetic launchers, propellant depots, retrograde trajectories, nano structures, and gas core nuclear rockets to name a few. Many of these revolutionary concepts turned out to be either not feasible for human exploration missions or well beyond expected technology readiness for near-term implementation. During the DPT and NEXT study cycles, several architectures were analyzed including missions to the Earth-Sun Libration Point (L2), the Earth-Moon Gateway and L1, the lunar surface, Mars (both short and long stays), one-year round trip Mars, and near-Earth asteroids. Common emphasis of these studies included utilization of the Earth-Moon Libration Point (L1) as a staging point for exploration activities, current (Shuttle) and near-term launch capabilities (EELV), advanced propulsion, and robust space power. Although there was much emphasis placed on utilization of existing launch capabilities, the team concluded that missions in near-Earth space are only marginally feasible and human missions to Mars were not feasible without a heavy lift launch capability. In addition, the team concluded that missions in Earth s neighborhood, such as to the Moon, can serve as stepping-stones toward further deep-space missions in terms of proving systems, technologies, and operational concepts. The material contained in this presentation was compiled to capture the work performed by the Mars Sub-Team of the DPT NEXT efforts in the late 1999-2001 timeframe.

Drake, Bret G.↗

Measurement of CPAS Main Parachute Rate of Descent

The Crew Exploration Vehicle Parachute Assembly System (CPAS) is being designed to land the Orion Crew Module (CM) at a safe rate of descent at splashdown. Flight test performance must be measured to a high degree of accuracy to ensure this requirement is met with the most efficient design possible. Although the design includes three CPAS Main parachutes, the requirement is that the system must not exceed 33 ft/s under two Main parachutes, should one of the Main parachutes fail. Therefore, several tests were conducted with clusters of two Mains. All of the steady-state rate of descent data are normalized to standard sea level conditions and checked against the limit. As the Orion design gains weight, the system is approaching this limit to within measurement precision. Parachute "breathing," cluster interactions, and atmospheric anomalies can cause the rate of descent to vary widely and lead to challenges in characterizing parachute terminal performance. An early test had contradictory rate of descent results from optical trajectory and Differential Global Positioning Systems (DGPS). A thorough analysis of the data sources and error propagation was conducted to determine the uncertainty in the trajectory. It was discovered that the Time Space Position Information (TSPI) from the optical tracking provided accurate position data. However, the velocity from TPSI must be computed via numerical differentiation, which is prone to large error. DGPS obtains position through pseudo-range calculations from multiple satellites and velocity through Doppler shift of the carrier frequency. Because the velocity from DGPS is a direct measurement, it is more accurate than TSPI velocity. To remedy the situation, a commercial off-the-shelf product that combines GPS and an Inertial Measurement Unit (IMU) was purchased to significantly improve rate of descent measurements. This had the added benefit of solving GPS dropouts during aircraft extraction. Statistical probability distributions for CPAS Main parachute rate of descent and drag coefficient were computed and plotted. Using test data, a terminal rate of descent at splashdown can be estimated as a function of canopy loading.

Ray, Eric S.↗

Simulation Based Training Improves Airway Management for Helicopter EMS Teams

The use of paralytic medications in the performance of RSI intubation is a high risk intervention used by many HEMS crews. There is no margin for error in RSI intubation as the results can be fatal. Operating room access for airway management training has become more difficult, and is not representative of the environment in which HEMS crews typically function. LifeEvac of Virginia designed and implemented an SST airway management program to provide a realistic, consistent training platform. The dynamic program incorporates standardized scenarios, and real life challenging cases that this and other programs have encountered. SST is done in a variety of settings including the helicopter, back of ambulances, staged car crashes and simulation centers. The result has been the indoctrination of a well defined, consistent approach to every airway management intervention. The SST program facillitates enhancement of technical skills. as well as team dynamics and communication.

Dhindsa, Harinder S.↗

Operation Evaluation of the VEGGIE Food Production System in the Habitat Demonstration Unit

The 2010 Desert Research and Technology Studies (DRATS) of the VEGGIE Food Production System in the Habitat Demonstration Unit (HDU) Pressurized Excursion Module (PEM) was the first operational evaluation of salad crop production technology in a NASA analog test. A systematic evaluation of rooting media and nutrient delivery systems were evaluated for three lettuce cultivars that have shown promise as candidates for a surface based food production system. The VEGGIE nutrient delivery system worked well, was able to be maintained by multiple operators with a minimum of training, and supported excellent lettuce growth for the duration of the test. A Hazard Analysis and Critical Control Point (HACCP) evaluation was performed using ProSantm as sanitation agent prior to consumption was approved, and the crew was allowed to consume the lettuce grown using the VEGGIE light cap and gravity based nutrient delivery system at the completion of the 14-day DRAT field test. The DRAT field test validated the crew operations; Growth of all lettuce cultivars was excellent. The operational DRAT field testing in the HDU identified light quality issues related to morphology and pigment development that will need to be addressed through additional testing. Feedback from the crew, ground support personnel, and human factors leads was uniformly positive on the psychological value of having the crop production system in the excursion module. A number of areas have been identified for future work, to minimize the "footprint" of the Food Production system through creative use of unused wall and floor space in the unit.

Stutte, Gary W.↗

Mass Analyzers Facilitate Research on Addiction

The famous go/no go command for Space Shuttle launches comes from a place called the Firing Room. Located at Kennedy Space Center in the Launch Control Center (LCC), there are actually four Firing Rooms that take up most of the third floor of the LCC. These rooms comprise the nerve center for Space Shuttle launch and processing. Test engineers in the Firing Rooms operate the Launch Processing System (LPS), which is a highly automated, computer-controlled system for assembly, checkout, and launch of the Space Shuttle. LPS monitors thousands of measurements on the Space Shuttle and its ground support equipment, compares them to predefined tolerance levels, and then displays values that are out of tolerance. Firing Room operators view the data and send commands about everything from propellant levels inside the external tank to temperatures inside the crew compartment. In many cases, LPS will automatically react to abnormal conditions and perform related functions without test engineer intervention; however, firing room engineers continue to look at each and every happening to ensure a safe launch. Some of the systems monitored during launch operations include electrical, cooling, communications, and computers. One of the thousands of measurements derived from these systems is the amount of hydrogen and oxygen inside the shuttle during launch.

Source record↗

HAVOC: High Altitude Venus Operational Concept - An Exploration Strategy for Venus

The atmosphere of Venus is an exciting destination for both further scientific study and future human exploration. A lighter-than-air vehicle can carry either a host of instruments and probes, or a habitat and ascent vehicle for a crew of two astronauts to explore Venus for up to a month. The mission requires less time to complete than a crewed Mars mission, and the environment at 50 km is relatively benign, with similar pressure, density, gravity, and radiation protection to the surface of Earth. A recent internal NASA study of a High Altitude Venus Operational Concept (HAVOC) led to the development of an evolutionary program for the exploration of Venus, with focus on the mission architecture and vehicle concept for a 30 day crewed mission into Venus's atmosphere. Key technical challenges for the mission include performing the aerocapture maneuvers at Venus and Earth, inserting and inflating the airship at Venus, and protecting the solar panels and structure from the sulfuric acid in the atmosphere. With advances in technology and further refinement of the concept, missions to the Venusian atmosphere can expand humanity's future in space.

Arney, Dale↗

Remote Imaging of Exploration Flight Test-1 (EFT-1) Entry Heating Risk Reduction

A Measure of Performance (MOP) identified with an Exploration Flight Test-1 (EFT-1) Multi- Purpose Crew Vehicle (MPCV) Program Flight Test Objective (FTO) (OFT1.091) specified an observation during reentry though external ground-based or airborne assets with thermal detection capabilities. The objective of this FTO was to be met with onboard Developmental Flight Instrumentation (DFI), but the MOP for external observation was intended to provide complementary quantitative data and serve as a risk reduction in the event of anomalous DFI behavior (or failure). Mr. Gavin Mendeck, the Entry, Descent, and Landing (EDL) Phase Engineer for the MPCV Program (Vehicle Integration Office/Systems & Mission Integration) requested a risk-reduction assessment from the NASA Engineering and Safety Center (NESC) to determine whether quantitative imagery could be obtained from remote aerial assets to support the external observation MOP. If so, then a viable path forward was to be determined, risks identified, and an observation pursued. If not, then the MOP for external observation was to be eliminated.

Schuster, David M.↗

Upgrades to the International Space Station Urine Processor Assembly

The ISS Urine Processor Assembly (UPA) began operations in November 2008. Though the UPA has successfully generated distillate from crew urine, several modifications and upgrades have been implemented to improve overall system performance throughout the years. Current and future upgrades to the UPA will continue to focus on improved system performance and reliability, focusing primarily on the Distillation Assembly and upgrades to the UPA vacuum pump. Work towards a flight demonstration experiment of a vacuum pump utilizing scroll pump technologies has also continued forward. The following paper discusses progress on these various concepts, including the implementation of a more reliable drive belt, improved methods for managing condensate in the stationary bowl of the Distillation Assembly, installation of improved centrifuge bearings, implementation of a liquid level sensor, and upgrades to the UPA vacuum pump.

Williamson, Jill P.↗

Status of the Advanced Oxygen Generation Assembly Design

Future Exploration missions will require an Oxygen Generation Assembly (OGA) to electrolyze water to supply oxygen for crew metabolic consumption. The system design will be based on the international Space Station (ISS) OGA but with added improvements based on lessons learned during ISS operations and technological advances since the original OGA was designed and built. The goal of these improvements will be to reduce system mass, crew maintenance time and spares mass while increasing reliability. The design team has performed trade studies, tests and analyses to inform the redesign. Upgrades being considered include: redesign of the electrolysis cell stack, redesign of the hydrogen dome, replacement of the hydrogen sensors, redesign of the recirculation loop deionizing bed and redesign of the cell stack Power Supply Module. The ISS OGA will be upgraded to an Advanced OGA (AOGA) configuration and its operation demonstrated in a flight environment.

ECLSS↗

Upgrades to the International Space Station Urine Processor Assembly

The ISS Urine Processor Assembly (UPA) began operations in November 2008. Though the UPA has successfully generated distillate from crew urine, several modifications and upgrades have been implemented to improve overall system performance throughout the years. Current and future upgrades to the UPA will continue to focus on improved system performance and reliability, focusing next on a flight demonstration experiment of a vacuum pump utilizing scroll pump technologies. The upgraded Distillation Assembly, described in further detail in previous publications, will also be available for on-orbit integration within the year. The following paper discusses progress on the Purge Pump and Separator Assembly (PPSA), and concept considerations for future UPA upgrades.

Jill P Williamson↗

Rise and Shine: Using Light as a Countermeasure to Sleep Inertia

INTRODUCTION: Sleep inertia describes the phenomenon of sleepiness and poor performance experienced after waking from sleep. This period of impaired alertness and performance is of significant concern to workers who nap on shift, or work on-call and are required to perform safety-critical tasks soon after waking (e.g., emergency services, healthcare, military). Light has been shown to acutely improve alertness during sleep deprivation and circadian misalignment. In this study, we assessed the efficacy of blue-enriched light to improve alertness and mood immediately after waking from SWS, i.e., during the sleep inertia period. METHODS: Twelve participants kept a sleep schedule of 8.5 h for 5 nights and 5 h for one night prior to the overnight laboratory visit (confirmed by actigraphy). Participants went to bed at their scheduled habitual bedtime in the laboratory and were monitored by standard polysomnography. After at least 5 min of SWS, participants were awoken and exposed to either red ambient light (control) or blue-enriched light (light) for 1 h. During this time, participants completed a subjective scale of alertness (Karolinska Sleepiness Scale, KSS) and visual analogue scales (VAS) of mood at 2 min, 17 min, 32 min, and 47 min after waking. Following this sleep inertia measurement period, all lights were turned off and participants were allowed to return to sleep. They were then awoken again from their subsequent SWS period and exposed to the opposite condition (control or light). A linear mixed-effects model with fixed effects of condition, time, and condition*time and a random effect of participant was used to determine the impact of light across the testing period. An average of baseline responses (pre-sleep) was included as a covariate. RESULTS: Compared to the control condition, participants exposed to blue-enriched light reported feeling more alert (KSS: F1,77=4.955, p=.029; VASalert: F1,77=8.226, p=.005), more cheerful (VAScheerful: F1,77=8.615, p=.004), less depressed (VASdepressed: F1,77=4.649, p=.034), and less lethargic (VASlethargic: F1,77=5.652, p=.020). DISCUSSION: Exposure to blue-enriched light immediately after waking from SWS may help to improve subjective alertness and mood. Future analyses will explore whether these findings extend to effects on cognitive performance. This countermeasure to sleep inertia may be suitable for implementation to alert crew members during mid-sleep emergencies but requires further testing in field settings.

alertness↗

Artemis Lunar Mission Availability & Design

The National Aeronautics and Space Administration’s (NASA) Artemis Program is leading international spaceexploration in a return to human lunar missions. The mission design underpinning this program is a critical aspect inthe integration of the multiple vehicles, processes, and capabilities to execute the most demanding human spaceflightmissions to date. Frequently mission design is characterized solely by its trajectory and the associated delta-velocityto achieve the end-to-end mission on a single day of flight. However, in practical terms for spaceflight missions,actual performance must characterize the translation delta-velocity demand, integrated power and thermal, crew dayoperations, commodities limitations, launch vehicle opportunities, and numerous additional factors across numerouslaunch day dependent variables. These factors together provide a unified set of mission design constraints that mustall be met in order to execute a fully integrated mission. The frequency of achieving all of the mission designconstraints is thus characterized as mission availability. The mission availability reflects the number of opportunitiesin any given period (month, year, etc.) for which an end-to-end mission could be launched. Ensuring adequatemission availability for the Artemis Program is necessary to support long term viability and sustainability of humanlunar exploration. This paper will characterize the driving factors in the Artemis mission availability includingvehicle specific effects from the Space Launch System (SLS), Orion Multi-Purpose Crew Vehicle, Gateway, HumanLanding System (HLS) and other contributing projects. This analysis will also summarize the relevant factors thatfuture vehicles and projects should consider for the integration and expansion of exploration capabilities with theArtemis Program.

Nujoud Fahoum Merancy↗