Search NASA⌕ Search

SEARCH · Search NASA

Results for “Data Management Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,765 records · Page 98

Flight project data book, 1991

The Office of Space Science and Applications (OSSA) is responsible for planning, directing, executing, and evaluating that part of the overall NASA program that has as its goal the use of the unique characteristics of the space environment to conduct a scientific study of the universe, to solve practical problems on Earth, and to provide the scientific research foundation for expanding human presence beyond Earth into the solar system. OSSA manages the development of NASA's flight instrumentation for space science and applications including free flying spacecraft, Shuttle and Space Station payloads, and the suborbital sounding rockets, balloons, and aircraft programs. A summary is provided of future flight missions, including those approved and currently under development and those which appear in the OSSA strategic plan.

Source record↗

A framework for monitoring-based commissioning: Identifying variables that act as barriers and enablers to the process

The practice of monitoring-based commissioning (MBCx) using energy management and information systems (EMIS) has been shown to enable and help sustain up to 20% energy savings in buildings. Despite research that has quantified the costs, benefits, and energy savings of MBCx, the process remains under-utilized. To understand why MBCx is not more frequently adopted and how to encourage its use, this research synthesizes qualitative data from over 40 organizations, currently engaging in MBCx. The outcome of this research is a framework containing variables that emerged from the qualitative data, marked as barriers or enablers, organized by phases of the MBCx process. The framework is comprised of 51 emergent variables that fall within 13 different categories. The variables that most frequently act as barriers are data configuration, measurement & verification (M&V), developing specifications for EMIS, and data architecture. Although some variables that act as barriers for one organization were identified as enablers for another. For example, payback/ROI was considered a barrier 7 times and an enabler 3 times. One organization had difficulty making the business case for the initial investment for MBCx due to lack of cost information, while another was able to justify large investments with documented savings of previously implemented measures identified through MBCx. The framework formally validates barriers found in previous research, and can be used by practitioners to better understand common experiences with MBCx. This research also highlights the need for a similar collective data set to validate common enablers to MBCx and also the need for empirical research to determine relationships between variables.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Learning-based demand-supply-coupled charging station location problem for electric vehicle demand management

We present a learning-based, demand-supply-coupled optimization model for the charging station location problem (CSLP), aiming to integrate the concept of electric vehicle (EV) charging demand management into the planning of charging infrastructures. In stage one, a gradient boosting-based learning model is developed to predict the charging demand of a charging station based on 15 defined features. Next, in stage two, a demand–supply-coupled CSLP model is developed to optimize the total charging usage rates of both existing and newly selected charging stations. We design a gradient-based stochastic spatial search algorithm to solve the proposed model. A case study with 6-year charging event data from Kansas City Missouri is performed. Results show that the proposed method can generate satisfactory charging demand predictions, and can increase charging usage rates by 14%, outperforming two benchmark approaches. Furthermore, the results of this research are poised to guide agencies in identifying optimal locations for new charging stations.

33 ADVANCED PROPULSION SYSTEMS↗

An intelligent Data Delivery Service for and beyond the ATLAS experiment

The intelligent Data Delivery Service (iDDS) has been developed to cope with the huge increase of computing and storage resource usage in the coming LHC data taking. iDDS has been designed to intelligently orchestrate workflow and data management systems, decoupling data pre-processing, delivery, and main processing in various workflows. It is an experiment-agnostic service around a workflow-oriented structure to work with existing and emerging use cases in ATLAS and other experiments. Here we will present the motivation for iDDS, its design schema and architecture, use cases and current status, and plans for the future.

97 MATHEMATICS AND COMPUTING↗

An Overview of the Risk Assessment Information System

This technical memorandum (TM) presents an overview of the Risk Assessment Information System (RAIS), a collection of web-based tools designed to assist with the environmental risk assessment process. The objective of the RAIS is to be a single resource for the risk assessment process, providing guidance when planning and performing the steps: data assessment, exposure assessment, toxicity assessment, and risk characterization. The RAIS evolved as a result of the initial remediation efforts at various United States (U.S.) Department of Energy (DOE) facilities. The goal was to increase the efficiency and transparency of the human health and ecological assessments being performed by DOE’s Office of Environmental Management, Oak Ridge Operations (ORO) office by providing a repository for toxicity information, physicochemical data, risk assessment procedures, standardized risk calculation methods, and web-based tools. Since the initial launch in 1996, the RAIS has expanded its user base outside of the federal government and now has users from over 100 countries, universities, states, and local governments. What sets the RAIS apart from other risk assessment sites are the publicly available, searchable toxicity and physicochemical databases and the wide range of chemical and radionuclide risk calculation tools. The purpose of this TM is to present the RAIS tools in order of the website menus and explain how they fit in the risk assessment process. In addition, this TM describes differences between the chemical and radionuclide tools of the RAIS. Screening level equations, chronic daily intake equations, and default exposure factors used in the chemical and radionuclide calculators are included in the appendices of this TM. This TM is not intended to be a detailed guide to risk assessment or the RAIS tools. The tools on the RAIS can be used to comply with procedures from multiple agencies, including but not limited to DOE, U.S. Environmental Protection Agency (EPA), U.S. Department of Defense (DoD), and many state governments. Further information on the RAIS tools can be found in the user guides and tutorials available on the webpage.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

ERISTAR: Earth Resources Information Storage, Transformation, Analysis, and Retrieval

The National Aeronautics and Space Administration (NASA) and the American Society for Engineering Education (ASEE) have sponsored faculty fellowship programs in systems engineering design for the past several years. During the summer of 1972 four such programs were conducted by NASA, with Auburn University cooperating with Marshall Space Flight Center (MSFC). The subject for the Auburn-MSFC design group was ERISTAR, an acronym for Earth Resources Information Storage, Transformation, Analysis and Retrieval, which represents an earth resources information management network of state information centers administered by the respective states and linked to federally administered regional centers and a national center. The considerations for serving the users and the considerations that must be given to processing data from a variety of sources are described. The combination of these elements into a national network is discussed and an implementation plan is proposed for a prototype state information center. The compatibility of the proposed plan with the Department of Interior plan, RALI, is indicated.

Source record↗

Space Station Furnace Facility. Volume 2: Summary of technical reports

The Space Station Furnace Facility (SSFF) is a modular facility for materials research in the microgravity environment of the Space Station Freedom (SSF). The SSFF is designed for crystal growth and solidification research in the fields of electronic and photonic materials, metals and alloys, and glasses and ceramics, and will allow for experimental determination of the role of gravitational forces in the solidification process. The facility will provide a capability for basic scientific research and will evaluate the commercial viability of low-gravity processing of selected technologically important materials. In order to accommodate the furnace modules with the resources required to operate, SSFF developed a design that meets the needs of the wide range of furnaces that are planned for the SSFF. The system design is divided into subsystems which provide the functions of interfacing to the SSF services, conditioning and control for furnace module use, providing the controlled services to the furnace modules, and interfacing to and acquiring data from the furnace modules. The subsystems, described in detail, are as follows: Power Conditioning and Distribution Subsystem; Data Management Subsystem; Software; Gas Distribution Subsystem; Thermal Control Subsystem; and Mechanical Structures Subsystem.

Source record↗

Earth Observing System (EOS)/Advanced Microwave Sounding Unit-A (AMSU-A): Calibration management plan

This is the Calibration Management Plan for the Earth Observing System/Advanced Microwave Sounding Unit-A (AMSU-A). The plan defines calibration requirements, calibration equipment, and calibration methods for the AMSU-A, a 15 channel passive microwave radiometer that will be used for measuring global atmospheric temperature profiles from the EOS polar orbiting observatory. The AMSU-A system will also provide data to verify and augment that of the Atmospheric Infrared Sounder.

Source record↗

GeoSAR: A Radar Terrain Mapping System for the New Millennium

GeoSAR Geographic Synthetic Aperture Radar) is a new 3 year effort to build a unique, dual-frequency, airborne Interferometric SAR for mapping of terrain. This is being pursued via a Consortium of the Jet Propulsion Laboratory (JPL), Calgis, Inc., and the California Department of Conservation. The airborne portion of this system will operate on a Calgis Gulfstream-II aircraft outfitted with P- and X-band Interferometric SARs. The ground portions of this system will be a suite of Flight Planning Software, an IFSAR Processor and a Radar-GIS Workstation. The airborne P-band and X-band radars will be constructed by JPL with the goal of obtaining foliage penetration at the longer P-band wavelengths. The P-band and X-band radar will operate at frequencies of 350 Mhz and 9.71 Ghz with bandwidths of either 80 or 160 Mhz. The airborne radars will be complemented with airborne laser system for measuring antenna positions. Aircraft flight lines and radar operating instructions will be computed with the Flight Planning Software The ground processing will be a two-step step process. First, the raw radar data will be processed into radar images and interferometer derived Digital Elevation Models (DEMs). Second, these radar images and DEMs will be processed with a Radar GIS Workstation which performs processes such as Projection Transformations, Registration, Geometric Adjustment, Mosaicking, Merging and Database Management. JPL will construct the IFSAR Processor and Calgis, Inc. will construct the Radar GIS Workstation. The GeoSAR Project was underway in November 1996 with a goal of having the radars and laser systems fully integrated onto the Calgis Gulfstream-II aircraft in early 1999. Then, Engineering Checkout and Calibration-Characterization Flights will be conducted through November 1999. The system will be completed at the end of 1999 and ready for routine operations in the year 2000.

Thompson, Thomas↗

Towards a Standard for Provenance and Context for Preservation of Data for Earth System Science

Long-term data sets with data from many missions are needed to study trends and validate model results that are typical in Earth System Science research. Data and derived products originate from multiple missions (spaceborne, airborne and/or in situ) and from multiple organizations. During the missions as well as well past their termination, it is essential to preserve the data and products to support future studies. Key aspects of preservation are: preserving bits and ensuring data are uncorrupted, preserving understandability with appropriate documentation, and preserving reproducibility of science with appropriate documentation and other artifacts. Computer technology provides adequate standards to ensure that, with proper engineering, bits are preserved as hardware evolves. However, to ensure understandability and reproducibility, it is essential to plan ahead to preserve all the relevant data and information. There are currently no standards to identify the content that needs to be preserved, leading to non-uniformity in content and users not being sure of whether preserved content is comprehensive. Each project, program or agency can specify the items to be preserved as a part of its data management requirements. However, broader community consensus that cuts across organizational or national boundaries would be needed to ensure comprehensiveness, uniformity and long-term utility of archived data. The Federation of Earth Science Information Partners (ESIP), a diverse network of scientists, data stewards and technology developers, has a forum for ESIP members to collaborate on data preservation issues. During early 2011, members discussed the importance of developing a Provenance and Context Content Standard (PCCS) and developed an initial list of content items. This list is based on the outcome of a NASA and NOAA meeting held in 1998 under the auspices of the USGCRP, documentation requirements from NOAA and our experience with some of the NASA Earth science missions. The items are categorized into the following 8 high level categories: Preflight/Pre-Operations, Products (Data), Product Documentation, Mission Calibration, Product Software, Algorithm Input, Validation, Software Tools.

Ramaprian, Hampapuram K.↗

Enterprise level fuel inventory management simulation and optimization.

The objective is to find the optimal fuel inventory management strategy roadmap for each supplier along the fuel delivery supply chain. SoSAT (System of Systems Analysis Toolset) Enterprise is a suite of software tools: State Model tool; Stochastic simulation tool; Advanced data visualization tools; and Optimization tools. Initially designed to provide DoDand supporting organizations the capability to analyze a System-of-Systems (SoS) and its various platforms: (1) Supporting multiple US Army Program Executive Office Integration (PEO-I) trade studies; (2) Supporting US Army Program Executive Office of Ground Combat Systems (PEO GCS) for Fleet Management and Modernization Planning initiative; and (3) Participating in formal Verification, Validation & Accreditation effort with Army Organizations (AMSAA and ATEC).

99 GENERAL AND MISCELLANEOUS↗

A snapshot in time - the new TRUplanner database - 10400

A new database was developed to augment transuranic (TRU) waste inventory information already captured within the Comprehensive Inventory Database (CID). This new database, known as the TRUplanner, includes information focused on site capability for TRU waste certification and availability to ship to either the Waste Isolation Pilot Plant (WIPP) or Idaho National Laboratory for final characterization and certification before coming to WIPP. Waste stream specific data is imported from the CID to the TRUplanner, and additional data is collected and entered as a result of interviews and site visits. This data is continuously updated as sites are visited. TRU waste information such as facility, equipment, and container information for waste streams, has been captured within the TRUplanner, and supports the Department of Energy, Carlsbad Field Office (CBFO) decision making and strategic planning activities. This infonnation is delivered via three built-in TRUplanner reports that are provided to CBFO management, Acceptable Knowledge (AK) Experts and the TRU Waste Inventory Team.

99 GENERAL AND MISCELLANEOUS↗

Deactivation and Decommissioning Planning and Analysis with Geographic Information Systems

From the mid-1950's through the 1980's, the U.S. Department of Energy's Savannah River Site produced nuclear materials for the weapons stockpile, for medical and industrial applications, and for space exploration. Although SRS has a continuing defense-related mission, the overall site mission is now oriented toward environmental restoration and management of legacy chemical and nuclear waste. With the change in mission, SRS no longer has a need for much of the infrastructure developed to support the weapons program. This excess infrastructure, which includes over 1000 facilities, will be decommissioned and demolished over the forthcoming years. Dis-positioning facilities for decommissioning and deactivation requires significant resources to determine hazards, structure type, and a rough-order-of-magnitude estimate for the decommissioning and demolition cost. Geographic information systems (GIS) technology was used to help manage the process of dis-positioning infrastructure and for reporting the future status of impacted facilities. Several thousand facilities of various ages and conditions are present at SRS. Many of these facilities, built to support previous defense-related missions, now represent a potential hazard and cost for maintenance and surveillance. To reduce costs and the hazards associated with this excess infrastructure, SRS has developed an ambitious plan to decommission and demolish unneeded facilities in a systematic fashion. GIS technology was used to assist development of this plan by: providing locational information for remote facilities, identifying the location of known waste units adjacent to buildings slated for demolition, and for providing a powerful visual representation of the impact of the overall plan. Several steps were required for the development of the infrastructure GIS model. The first step involved creating an accurate and current GIS representation of the infrastructure data. This data is maintained in a Computer Aided Design (CAD) system and had to be imported into a GIS framework. Since the data is maintained in a different format in CAD, import into GIS involved several spatial processing steps to convert various geometric shapes present in the CAD data to self-closing polygons. The polygons represent facility footprints in plan or map view. Once these were successfully imported and converted, building identifier attributes from the CAD had to be associated with the appropriate polygons in GIS. Attributes are stored as graphical information in a CAD system and are not 'attached' to a building in a relational sense. In GIS, attributes such as building names, building area, hazards, or other descriptive information, must be associated or related to the spatial polygon representing a particular building. This spatial relationship between building polygons and the descriptive attribute information is very similar to relating tables of information in a relational database in which each table record has a unique identifier that can be used to join or relate that table to other tables of information present in the database. The CAD building identifiers were imported into the GIS and several spatial processing steps were used to associate building polygons with the correct identifiers. These spatial steps involved determining the intersection of and nearest identifiers with each building polygon in the GIS. Automating this process in GIS saved a significant amount of time. Once a current and geographically correct representation of the infrastructure data had been created in GIS, field-engineering teams collected information for each facility. This information included the building area, radiological hazards and the associated area, industrial hazards such as asbestos or mercury, structure type (e.g. hardened, industrial, nuclear), annual surveillance and monitoring cost, and other engineering data. The facility engineering data was used in a simple model to determine the rough-order-of-magnitude cost for decontaminating and demolishing each facility. Finally, the engineering and cost data was linked to the GIS model so that this data could be rapidly displayed and analyzed in its geographic context. Once the GIS representing SRS infrastructure and associated descriptive attribute information was developed, detailed maps depicting the future status of all site facilities were created. These maps display the relationship between known waste units and buildings that will be decommissioned and demolished. Cost and hazard information was also depicted illustrating areas and facilities that could present a particular demolition challenge. Although the GIS was quite helpful as an engineering and planning tool, its real power was evident in communicating the impact of the facilities disposition plan to senior management and other stakeholders.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transportation and System Analysis Collaborations in Support of a Federal Consolidated Interim Storage Facility

The U.S. Department of Energy’s Integrated Waste Management (IWM) program under the Office of Nuclear Energy is planning for the future transportation, storage, and eventual disposal of spent nuclear fuel (SNF) and high-level radioactive waste (HLW) from nuclear power plant and waste custodian sites across the United States. To better enable informed decision-making regarding the back end of the nuclear fuel cycle, the IWM program has been sponsoring the development and application of system analysis tools capable of analyzing various options for managing SNF and HLW. With these tools, integrated waste management system (IWMS) architecture analyses are being conducted to support the future deployment of a comprehensive nuclear waste management system that considers all major back-end aspects of the nuclear fuel cycle (i.e., transportation, storage, and disposal). System analyses and assessments typically use these modeling and simulation tools to investigate implications of changes in various assumptions and parameters such as acceptance rates, receipt logic, facility capacities and capabilities, use of standardized canisters, start and stop dates of facilities, etc. The Next Generation System Analysis Model (NGSAM) is an agent-based simulation toolkit that is used for a system-level simulation and analysis focused on SNF management in the United States. NGSAM’s primary purpose is to provide a system analyst with capabilities to model the IWMS and gain insights into SNF and HLW management alternatives including the impact of system choices, associated cost estimates, and development of integrated yet flexible approaches. An analyst using NGSAM can define several factors like the number of storage facilities, capacity at each facility, transportation schedules, shipment rates, and other conditions. IWM is also developing the Stakeholder Tool for Assessing Radioactive Transportation (START). START is a web-based geospatial tool developed to provide the visualization and initial evaluation of transportation options associated with future SNF and HLW shipment planning and operations. This includes characterizing safety, economic, and environmental conditions at and in proximity to shipment origins as well as along prospective transportation routes. Information from the START tool can be presented/shared as maps, graphics, geospatial files, and tabular form to enable easy data representation and export functionality. The system analysis, NGSAM, and START teams have been working closely for several years before formalizing this collaboration. START provides the SNF transportation routing information for use in NGSAM. System analysts use the NGSAM tool to generate results (schedule, costs, infrastructure acquisitions, shipment rates, etc.). Subject-matter experts and system analysts work together to inform how NGSAM should model the waste management system. Specifically, this paper discusses the collaborations between the system analysis, NGSAM, and START teams and their accomplishments over the past year. Some examples of these efforts include calibrating and adding data to the START output files to meet NGSAM needs, gaining a better understanding of START data used in NGSAM as well as how updates in START data could result in an improved NGSAM analysis. Detailed examples of various tasks that have been performed by the team will be discussed in the full paper. Continued efforts in this direction are expected in the coming years.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A portable application framework for energy management and information systems (EMIS) solutions using Brick semantic schema

This paper introduces a portable framework for developing, scaling and maintaining energy management and information systems (EMIS) applications using an ontology-based approach. Key contributions include an interoperable layer based on Brick schema, the formalization of application constraints pertaining metadata and data requirements, and a field demonstration. The framework allows for querying metadata models, fetching data, preprocessing, and analyzing data, thereby offering a modular and flexible workflow for application development. Its effectiveness is demonstrated through a case study involving the development and implementation of a data-driven anomaly detection tool for the photovoltaic systems installed at the Politecnico di Torino, Italy. During eight months of testing, the framework was used to tackle practical challenges including: (i) developing a machine learning-based anomaly detection pipeline, (ii) replacing data-driven models during operation, (iii) optimizing model deployment and retraining, (iv) handling critical changes in variable naming conventions and sensor availability (v) extending the pipeline from one system to additional ones.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

OECD MCCI Project 2-D Core Concrete Interaction (CCI) Tests. CCI-5 Test Plan. Rev. 1, Final

Ex-vessel debris coolability is an important light water reactor (LWR) safety issue. For existing plants, resolution of this issue will confirm the technical basis for severe accident management guidelines (SAMGs). For new reactors, understanding this issue will help confirm the effectiveness of the design and implementation of new accident mitigation features and severe accident management design alternatives (SAMDAs). The first OECD-MCCI program conducted reactor material experiments focused on achieving the following technical objectives: (i) provide confirmatory evidence for various cooling mechanisms through separate effect tests and data for severe accident code model development, and (ii) provide longer-term two-dimensional core-concrete interaction data for code assessment and improvement. Debris cooling mechanisms investigated as part of the first MCCI program included: (i) water ingression through cracks/fissures in the core debris, (ii) melt eruption caused by gas sparging (volcanic-type event), and (iii) large-scale crust mechanical failure leading to renewed bulk cooling. The results of this testing and associated analysis provided an envelope (principally determined by melt depth) for debris coolability. However, this envelope does not encompass the full range of melt depths that are calculated for all plant accident sequences. Cooling augmentation by additional means may be needed at the late stage to assure coolability for new reactor designs as well as for various accident sequences for existing reactors. In addition, the results of the CCI tests showed that lateral/axial power split is a function of concrete type. However, the first program produced limited data sets for code assessment. In light of significant differences in ablation behavior for different concrete types, additional data will be useful in reducing uncertainties and gaining confidence in code predictions. The objective of this test plan is to document the final CCI-5 test design in sufficient detail so that pretest analyses may be conducted by member organizations.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

ERTS-1 Role in land management and planning in Minnesota

Research on applications of ERTS-1 imagery to land use has focused on evaluating the ability of ERTS-1 imagery to update and refine the detail of land use information in the Minnesota Land Management Information System. Work has been directed toward defining the capabilities of the ERTS-1 system to provide information about surface cover by identifying forest, water, and wetland resources; urban and agricultural development: and testing and evaluating data input and output procedures. As capabilities were developed, meetings were held with administrators and resource information users from various agencies of government to identify their information needs. A full scale systems test for several selected pilot areas in the state is nearly complete. Users have been identified for each test area and they have been instrumental in identifying data requirements and analysis needs for administrative purposes. Users have both rural and urban orientations and provide a basis for evaluation of the results.

Sizer, J. E.↗

Advance Distribution Management System (ADMS)

This presentation explores the transition from traditional distribution management systems to Advanced Distribution Management Systems (ADMS) as a foundation for smart grid development. It highlights the key benefits of ADMS, including enhanced reliability, improved operational efficiency, and increased situational awareness. The presentation also addresses common implementation challenges such as system integration, data management, and organizational readiness. It concludes with a forward-looking perspective on the evolving role of ADMS and essential takeaways for utilities and stakeholders.

24 POWER TRANSMISSION AND DISTRIBUTION↗