Search NASA⌕ Search

SEARCH · Search NASA

Results for “Ground Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,765 records · Page 98

Supporting Multiple Programs and Projects at NASA's Kennedy Space Center

With the conclusion of the shuttle program in 2011, the National Aeronautics and Space Administration (NASA) had found itself at a crossroads for finding transportation of United States astronauts and experiments to space. The agency would eventually hand off the taxiing of American astronauts to the International Space Station (ISS) that orbits in Low Earth Orbit (LEO) about 210 miles above the earth under the requirements of the Commercial Crew Program (CCP). By privatizing the round trip journey from Earth to the ISS, the space agency has been given the additional time to focus funding and resources to projects that operate beyond LEO; however, adding even more stress to the agency, the premature cancellation of the program that would succeed the Shuttle Program - The Constellation Program (CxP) -it would inevitably delay the goal to travel beyond LEO for a number of years. Enter the Space Launch System (SLS) and the Orion Multipurpose Crew Vehicle (MPCV). Currently, the SLS is under development at NASA's Marshall Spaceflight Center in Huntsville, Alabama, while the Orion Capsule, built by government contractor Lockheed Martin Corporation, has been assembled and is currently under testing at the Kennedy Space Center (KSC) in Florida. In its current vision, SLS will take Orion and its crew to an asteroid that had been captured in an earlier mission in lunar orbit. Additionally, this vehicle and its configuration is NASA's transportation to Mars. Engineers at the Kennedy Space Center are currently working to test the ground systems that will facilitate the launch of Orion and the SLS within its Ground Services Development and Operations (GSDO) Program. Firing Room 1 in the Launch Control Center (LCC) has been refurbished and outfitted to support the SLS Program. In addition, the Spaceport Command and Control System (SCCS) is the underlying control system for monitoring and launching manned launch vehicles. As NASA finds itself at a junction, so does all of its associated centers across the US. KSC has found itself at the blunt end of change as the entire center has transitioned from an operations mindset to a development mentality. The author of this paper has had the fortunate privilege and opportunity to be part of a transforming NASA during the fall months of 2014. The following is a high level account of projects that he had the chance to work on including the Spaceport Command and Control System, the Advanced Ground System and Maintenance Program Project, Customer Avionics Development & Analysis (CAIDA) Lab and Swamp Works.

Advanced Ground System Maintenance↗

Multi‐fidelity digital twin structural model for a sub‐scale downwind wind turbine rotor blade

Abstract This paper presents the development of a multi‐fidelity digital twin structural model (virtual model) of an as‐built wind turbine blade. The goal is to develop and demonstrate an approach to produce an accurate and detailed model of the as‐built blade for use in verifying the performance of the operating two‐bladed, downwind rotor. The digital twin model development methodology, presented herein, involves a novel calibration process to integrate a wide range of information including design specifications, manufacturing information, and structural testing data (modal and static) to produce a multi‐fidelity digital twin structural model: a detailed high‐fidelity model (i.e., 3D finite element analysis [FEA]) and consistent beam‐type models for aeroelastic simulation. A key element is that the multi‐fidelity structural digital twin method follows the rotor from the stages of design, to manufacturing, then to the ground testing and field operation. The result of this comprehensive approach is an accurate multi‐fidelity digital twin structural model for the geometric, structural, and structural dynamic properties of the as‐built blade within a 1% match in mass properties, 3.2% in blade frequencies, and 6% in deflection. The different stages of processing this information within the methodology are discussed. The rotor examined is the SUMR‐Demonstrator (SUMR‐D), which was installed on the Controls Advanced Research Testbed (CART‐2) wind turbine at the National Wind Technology Center. The digital twin model developed here was utilized to design controllers to safely operate SUMR‐D in field tests, which are providing additional data for further evaluation and development of the multi‐fidelity digital twin structural model.

Chetan, Mayank↗

Cryocooled cold trap system for the SuperCDMS dilution refrigerator

Operating 6,800 feet underground at the SNOLAB facility in Sudbury, Ontario, Canada, the dilution refrigerator-cooled SuperCDMS SNOLAB (Super Cryogenic Dark Matter Search at the Sudbury Neutrino Observatory Laboratory) experiment has been designed for maximum cryogenic up-time and remote operations. A key element in achieving these goals is a pair cold traps in the helium circulation stream of the dilution refrigerator; the first operating near liquid nitrogen temperatures and the second operating near liquid helium temperatures. Previous experience with the CDMS experiment, located underground at the Soudan Under-ground Laboratory, has given significant operational experience with dilution refrigerator cold traps and has solidified the demand of a system of dual cold traps. Unlike the CDMS-era system, the new SuperCDMS system will feature a cryocooler powered liquid nitrogen re-liquefying system (as opposed to regular under-ground re-filling of cold trap dewars using portable nitrogen dewars) and a cryogen-free 4 K cold trap, which eliminates the need for a bath of liquid helium.

43 PARTICLE ACCELERATORS↗

XML Flight/Ground Data Dictionary Management

A computer program generates Extensible Markup Language (XML) files that effect coupling between the command- and telemetry-handling software running aboard a spacecraft and the corresponding software running in ground support systems. The XML files are produced by use of information from the flight software and from flight-system engineering. The XML files are converted to legacy ground-system data formats for command and telemetry, transformed into Web-based and printed documentation, and used in developing new ground-system data-handling software. Previously, the information about telemetry and command was scattered in various paper documents that were not synchronized. The process of searching and reading the documents was time-consuming and introduced errors. In contrast, the XML files contain all of the information in one place. XML structures can evolve in such a manner as to enable the addition, to the XML files, of the metadata necessary to track the changes and the associated documentation. The use of this software has reduced the extent of manual operations in developing a ground data system, thereby saving considerable time and removing errors that previously arose in the translation and transcription of software information from the flight to the ground system.

Wright, Jesse↗

An End-to-End Architecture for Science Goal Driven Observing

New observatories will have greater on-board storage capacity and on-board processing capabilities. The new bottleneck will be download capacity. The cost of downlink time and limitations of bandwidth will end the era where all exposure data is downloaded and all data processing is performed on the ground. In addition, observing campaigns involving inherently variable targets will need scheduling flexibility to focus observing time and data download on exposures that are scientifically interesting. The ability to quickly recognize and react to such events by re-prioritizing the observing schedule will be an essential characteristic for maximizing scientific returns. It will also be a step towards increasing spacecraft autonomy, a major goal of NASA's strategic plan. The science goal monitoring (SGM) system is a proof-of-concept effort to address these challenges. We are developing an interactive distributed system that will use on-board processing and storage combined with event-driven interfaces with ground-based processing and operations, to enable fast re-prioritization of observing schedules, and to minimize time spent on non-optimized observations. SGM is initially aimed towards time-tagged observing modes used frequently in spectroscopic studies of varying targets. In particular, the SGM is collaborating with the proposed MIDEX-class mission Kronos team. The variable targets that Kronos seeks to study make an adaptive system such as SGM particularly valuable for achieving mission goals. However, the architecture and interfaces will also be designed for easy adaptability to other observing platforms, including ground-based systems and to work with different scheduling and pipeline processing systems. This talk will focus on our strategy for developing SGM and the technical challenges that we have encountered. We will discuss the SGM architecture as it applies to the Kronos mission and explain how it is scalable to other missions.

Jones, Jeremy↗

Terrestrial Proving Ground Capabilities Needed for Lunar In Situ Resource Utilization (ISRU) & Construction Concepts of Operation

Incorporating any new technology or system into a human exploration mission or architecture requires development well in advance of the mission to eliminate technology, cost, and schedule risk concerns. It is often stated that technologies need to be at a Technology Readiness Level (TRL) of 6, i.e. ‘system/subsystem model or prototype demonstration in a relevant environment (ground or space)’, by Authority To Proceed (ATP) or by the Preliminary Design Review (PDR) for the mission at the latest. There are two game changing capabilities for sustained human exploration of space that can have a significant effect on the overall exploration architecture and the technologies and systems included in the architecture. The first game changing capability, known as In Situ Resource Utilization (ISRU), involves the search for, acquisition, and processing of resources on the Moon and Mars into mission consumables and usable products, and the second is the ability to utilize space resources in the construction of roads, structures, and surface infrastructure. ISRU and surface construction capabilities have the potential to greatly reduce the cost and risk of human exploration while enabling sustained lunar surface and commercial operations. However, ISRU and surface construction systems are complex and must operate in extremely harsh environments, with abrasive regolith and pervasive dust, for long-periods of time, with potentially limited opportunities for maintenance and repair by humans. The complexity of these capabilities and operations also means that there are a limited number of companies that can design, build, and operate end-to-end systems on their own. The majority of the technologies being developed for these systems are by small companies and at the component or subsystem level. With the overarching strategy of the United States National Aeronautics and Space Administration (NASA) Space Technology Mission Directorate (STMD) to enable industry to implement ISRU and surface infrastructure for Artemis and space commercialization, it is therefore important to establish processes and capabilities to promote and foster collaborations among large and small companies involved in ISRU and surface infrastructure development. For ISRU and infrastructure systems and capabilities to be used in Artemis missions and future commercial lunar surface operations, a coordinated framework with virtual/physical integration and testing locations, or ‘Proving Grounds’, needs to be established and operated on a regular basis and open to all. This paper will discuss the ISRU and surface construction near and long-term concepts of operations, and review operations and lessons-learned from the previous ISRU analog field tests. From this information, requirements and capabilities will be proposed to support and enable the integration and testing of ISRU and construction systems with industry, academia, and international agencies, as well as what facilities and organizations could help establish these Proving Grounds.

ISRU↗

NASA's Unsteady Pressure-Sensitive Paint Research and Operational Capability Developments

In the last three years, several advancements have been made to produce a new state-of-the-art capability in the field of Aerosciences. NASA’s Aerosciences Evaluations and Test Capabilities (AETC) Portfolio Office has funded a multi-year project to produce the unsteady Pressure-Sensitive Paint (uPSP) technology as an operational capability in key ground test facilities at NASA. The research and development has primarily been conducted at NASA Ames Research Center’s (ARC) Unitary Plan Wind Tunnel (UPWT) 11-by 11-ft Transonic Wind Tunnel (TWT). The NASA ARC UPWT is one of the ground test facilities under NASA AETC’s Portfolio Office. AETC’s goals are to provide the tools to deliver the technology innovations and breakthroughs necessary to address increasingly complex research and development challenges. AETC’s integrated approach will consider the complimentary high-end compute capabilities necessary to advance analysis in conjunction with ground experimental capabilities. The uPSP Capability Challenge Project is a demonstration of several different technologies: 1) the unsteady Pressure-Sensitive Paint (uPSP) technology, and 2) Project: Red Rover, establishing a secure, reliable, fast connection between experimental and computation facilities, leveraging NASA’s computational resources within the High-End Compute Capability (HECC) Project for processing, storing, and sharing data efficiently. This project demonstrates the technical diversity and technical inclusion need to advance the field of Aerosciences. The approach to combine subject matter experts in experimental methods, optical methods, production wind tunnel testing, network engineering, high-end computing, signal processing, grid generation, and visualization while establishing the required infrastructure for subject matter experts to have access to the data while the wind tunnel test is being conducted. The most recent advancements for the uPSP technology have focused on three key areas: development of data products, robust processing pipeline, operational efficiencies and uncertainty quantification.

buffet↗

Cyber Threat Assessment of Uplink and Commanding System for Mission Operation

Most of today's Mission Operations Systems (MOS) rely on Ground Data System (GDS) segment to mitigate cyber security risks. Unfortunately, IT security design is done separately from the design of GDS' mission operational capabilities. This incoherent practice leaves many security vulnerabilities in the system without any notice. This paper describes a new way to system engineering MOS, to include cyber threat risk assessments throughout the MOS development cycle, without this, it is impossible to design a dependable and reliable MOS to meet today's rapid changing cyber threat environment.

ground data↗

Evaluation of advanced airship concepts

A historical overview of the airship, technical and operational characteristics of conventional and hybrid concepts, and the results of a parametric design analysis and evaluation are presented. The lift capabilities of certain buoyant fluids for a hypothetical 16 million cu.ft. volume airship are compared. The potential advanced airship concepts are surveyed, followed by a discussion of the six configurations: conventional nonrigid, conventional rigid, Deltoid (Dynairship), Guppoid (Megalifter), Helipsoid, and Heli-Stat. It is suggested that a partially buoyant Helipsoid concept of the optimum buoyancy ratio has the potential to solve the problems facing future airship development, such as Ballast and Ballast Recovery System, Full Low-Speed Controllability, Susceptibility to Wind/Gusting, Weather/Icing Constraints, Ground Handling/Hangaring, and Direct/Indirect Operating Costs.

Joner, B. A.↗

Environmentally Preferable Coatings for Structural Steel Project

The Ground Systems Development and Operations (GSDO) Program at NASA John F. Kennedy Space Center (KSC) has the primary objective of modernizing and transforming the launch and range complex at KSC to benefit current and future NASA programs along with other emerging users. Described a the "launch support and infrastructure modernization program" in the NASA Authorization Act of 2010, the GSDO Program will develop and implement shared infrastructure and process improvements to provide more flexible, affordable, and responsive capabilities to a multi-user community. In support of the GSDO Program, the objective of this project is to determine the feasibility of environmentally friendly corrosion resistant coatings for launch facilities and ground support equipment. The focus of the project is corrosion resistance and survivability with the goal to reduce the amount of maintenance required to preserve the performance of launch facilities while reducing mission risk. Number of facilities/structures with metallic structural and non-structural components in a highly corrosive environment. Metals require periodic maintenance activity to guard against the insidious effects of corrosion and thus ensure that structures meet or exceed design or performance life. The standard practice for protecting metallic substrates in atmospheric environments is the application of corrosion protective coating system.

Technology Portfolio System↗

Environmentally-Preferable Launch Coatings

The Ground Systems Development and Operations (GSDO) Program at NASA Kennedy Space Center (KSC), Florida, has the primary objective of modernizing and transforming the launch and range complex at KSC to benefit current and future NASA programs along with other emerging users. Described as the launch support and infrastructure modernization program in the NASA Authorization Act of 2010, the GSDO Program will develop and implement shared infrastructure and process improvements to provide more flexible, affordable, and responsive capabilities to a multi-user community. In support of NASA and the GSDO Program, the objective of this project is to determine the feasibility of environmentally friendly corrosion protecting coatings for launch facilities and ground support equipment (GSE). The focus of the project is corrosion resistance and survivability with the goal to reduce the amount of maintenance required to preserve the performance of launch facilities while reducing mission risk. The project compares coating performance of the selected alternatives to existing coating systems or standards.

ground support equipment↗

Proven Innovations and New Initiatives in Ground System Development: Reducing Costs in the Ground System

The state-of-the-practice for engineering and development of Ground Systems has evolved significantly over the past half decade. Missions that challenge ground system developers with significantly reduced budgets in spite of requirements for greater and previously unimagined functionality are now the norm. Making the right trades early in the mission lifecycle is one of the key factors to minimizing ground system costs. The Mission Operations Strategic Leadership Team at the Jet Propulsion Laboratory has spent the last year collecting and working through successes and failures in ground systems for application to future missions.

costs↗

Lessons Learned In Developing Multiple Distributed Planning Systems for the International Space Station

The planning processes for the International Space Station (ISS) Program are quite complex. Detailed mission planning for ISS on-orbit operations is a distributed function. Pieces of the on-orbit plan are developed by multiple planning organizations, located around the world, based on their respective expertise and responsibilities. The "pieces" are then integrated to yield the final detailed plan that will be executed onboard the ISS. Previous space programs have not distributed the planning and scheduling functions to this extent. Major ISS planning organizations are currently located in the United States (at both the NASA Johnson Space Center (JSC) and NASA Marshall Space Flight Center (MSFC)), in Russia, in Europe, and in Japan. Software systems have been developed by each of these planning organizations to support their assigned planning and scheduling functions. Although there is some cooperative development and sharing of key software components, each planning system has been tailored to meet the unique requirements and operational environment of the facility in which it operates. However, all the systems must operate in a coordinated fashion in order to effectively and efficiently produce a single integrated plan of ISS operations, in accordance with the established planning processes. This paper addresses lessons learned during the development of these multiple distributed planning systems, from the perspective of the developer of one of the software systems. The lessons focus on the coordination required to allow the multiple systems to operate together, rather than on the problems associated with the development of any particular system. Included in the paper is a discussion of typical problems faced during the development and coordination process, such as incompatible development schedules, difficulties in defining system interfaces, technical coordination and funding for shared tools, continually evolving planning concepts/requirements, programmatic and budget issues, and external influences. Techniques that mitigated some of these problems will also be addressed, along with recommendations for any future programs involving the development of multiple planning and scheduling systems. Many of these lessons learned are not unique to the area of planning and scheduling systems, so may be applied to other distributed ground systems that must operate in concert to successfully support space mission operations.

Maxwell, Theresa G.↗

Lessons Learned in Developing Multiple Distributed Planning Systems for the International Space Station

The planning processes for the International Space Station (ISS) Program are quite complex. Detailed mission planning for ISS on-orbit operations is a distributed function. Pieces of the on-orbit plan are developed by multiple planning organizations, located around the world, based on their respective expertise and responsibilities. The pieces are then integrated to yield the final detailed plan that will be executed onboard the ISS. Previous space programs have not distributed the planning and scheduling functions to this extent. Major ISS planning organizations are currently located in the United States (at both the NASA Johnson Space Center (JSC) and NASA Marshall Space Flight Center (MSFC)), in Russia, in Europe, and in Japan. Software systems have been developed by each of these planning organizations to support their assigned planning and scheduling functions. Although there is some cooperative development and sharing of key software components, each planning system has been tailored to meet the unique requirements and operational environment of the facility in which it operates. However, all the systems must operate in a coordinated fashion in order to effectively and efficiently produce a single integrated plan of ISS operations, in accordance with the established planning processes. This paper addresses lessons learned during the development of these multiple distributed planning systems, from the perspective of the developer of one of the software systems. The lessons focus on the coordination required to allow the multiple systems to operate together, rather than on the problems associated with the development of any particular system. Included in the paper is a discussion of typical problems faced during the development and coordination process, such as incompatible development schedules, difficulties in defining system interfaces, technical coordination and funding for shared tools, continually evolving planning concepts/requirements, programmatic and budget issues, and external influences. Techniques that mitigated some of these problems will also be addressed, along with recommendations for any future programs involving the development of multiple planning and scheduling systems. Many of these lessons learned are not unique to the area of planning and scheduling systems, so may be applied to other distributed ground systems that must operate in concert to successfully support space mission operations.

Maxwell, Theresa G.↗

Science Goal Driven Observing and Spacecraft Autonomy

Spacecraft autonomy will be an integral part of mission operations in the coming decade. While recent missions have made great strides in the ability to autonomously monitor and react to changing health and physical status of spacecraft, little progress has been made in responding quickly to science driven events. For observations of inherently variable targets and targets of opportunity, the ability to recognize early if an observation will meet the science goals of a program, and react accordingly, can have a major positive impact on the overall scientific returns of an observatory and on its operational costs. If the onboard software can reprioritize the schedule to focus on alternate targets, discard uninteresting observations prior to downloading, or download a subset of observations at a reduced resolution, the spacecraft's overall efficiency will be dramatically increased. The science goal monitoring (SGM) system is a proof-of-concept effort to address the above challenge. The SGM will have an interface to help capture higher level science goals from the scientists and translate them into a flexible observing strategy that SGM can execute and monitor. We are developing an interactive distributed system that will use on-board processing and storage combined with event-driven interfaces with ground-based processing and operations, to enable fast re-prioritization of observing schedules, and to minimize time spent on non-optimized observations.

Koratkar, Amuradha↗

Candidate functions for advanced technology implementation in the Columbus mission planning environment

The Columbus Project is the European Space Agency's contribution to the International Space Station program. Columbus is planned to consist of three elements (a laboratory module attached to the Space Station base, a man-tended freeflyer orbiting with the Space Station base, and a platform in polar orbit). System definition and requirements analysis for Columbus are underway, scheduled for completion in mid-1990. An overview of the Columbus mission planning environment and operations concept as currently defined is given, and some of the challenges presented to software maintainers and ground segment personnel during mission operators are identified. The use of advanced technologies in system implementation is being explored. Both advantages of such solutions and potential problems they present are discussed, and the next steps to be taken by Columbus before targeting any functions for advanced technology implementation are summarized. Several functions in the mission planning process were identified as candidates for advanced technology implementation. These range from expert interaction with Columbus' data bases through activity scheduling and near-real-time response to departures from the planned timeline. Each function is described, and its potential for advanced technology implementation briefly assessed.

Loomis, Audrey↗

TOPEX/Poseidon orbit acquisition maneuver design

The current baseline injection orbit for the jointly sponsored NASA/CNES TOPEX/Poseidon mission is near-circular, approximately 30 km below the desired operational orbit altitude and at the operational orbit inclination. A baseline maneuver sequence to retarget from this injection orbit to the desired operational orbit has been designed based upon the expected worst-case 3-sigma injection and maneuver execution errors. The sequence requires seven maneuvers, including an initial calibration burn, and achieves the operational orbit with the desired ground track pattern in 30 days. A delay sensitivity analysis has been conducted to estimate the allowable operational delay for each maneuver without increasing the total orbit acquisition period. The baseline sequence provides back-ups for a one-revolution delay for each maneuver and one-day delay for most maneuvers. It is also shown that a higher injection orbit allows the maneuver sequence to achieve the operational orbit in 26 days under a worst-case scenario.

Bhat, Ramachandra S.↗

Airport surface operations requirements analysis

This report documents the results of the Airport Surface Operations Requirements Analysis (ASORA) study. This study was conducted in response to task 24 of NASA Contract NAS1-18027. This study is part of NASA LaRC's Low Visibility Surface Operations program, which is designed to eliminate the constraints on all-weather arrival/departure operations due to the airport/aircraft ground system. The goal of this program is to provide the capability for safe and efficient aircraft operations on the airport surface during low visibility conditions down to zero. The ASORA study objectives were to (1) develop requirements for operation on the airport surface in visibilities down to zero; (2) survey and evaluate likely technologies; (3) develop candidate concepts to meet the requirements; and (4) select the most suitable concept based on cost/benefit factors.

Groce, John L.↗