Search NASA⌕ Search

SEARCH · Search NASA

Results for “Nuclear Waste Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,765 records · Page 98

Ecological Resource Value, Remediation Options, and Impacts: Functional Remediation at Hanford Site - 17226

Governmental agencies, Tribes, regulators, resource trustees and other stakeholders are interested in understanding the risk to the environment from remediation and restoration, particularly at large DOE sites with complex remediation tasks lasting decades. While each remediation project has the usual environmental impact assessment that include risk to eco-receptors, a piece-meal approach to examining the effect of remediation does not provide an overview of remaining tasks that would aid in sequencing these tasks. The Consortium for Risk Evaluation with Stakeholder Participation (CRESP) developed a risk methodology for Hanford Site that included ecological resources between 2014 and 2015. The ecological methodology included a comparison of the value of on-site resources with the eco-region, with state and federal threatened and endangered species, and with rare and unique habitats. Potential remediation options for particular evaluation units were used in conjunction with the resource level values to determine the risk of remediation of ecological resources. The methodology developed for Hanford Site also considered functional remediation (e.g. number of trucks, personnel, heavy equipment), initiating events (e.g. earthquakes, volcanos) and future land use. These factors were combined to rate the risk to ecological resources on a scale of not-discernible to very high. In this paper seven evaluation units (waste sites requiring remediation) were evaluated to explore the efficacy of the methodology to provide useful information on the comparative risk for decommissioning and waste management sites. The evaluation of resource levels was based on prior site information, state and federal data bases, and field investigations. The final determination of a risk rating for each evaluation unit depended upon both quantitative data, field experience, and professional judgement. It provides a method that can be applied to many remediation sites within a large DOE facility such as Hanford, as well as across the DOE complex. This will provide information for sound decision-making with stakeholder participation, and will allow DOE to reassure stakeholders that they are protecting human and ecological health on the Hanford Site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Application of Robotics Technology to D and D - 17249

The Knowledge Management Information Tool (KM-IT) is a web-based system developed to maintain and preserve the deactivation and decommissioning (D and D) knowledge base across the Department of Energy (DOE) complex. The system was developed by the Applied Research Center (ARC) at Florida International University (FIU) with the support of the D and D community, including the DOE Office of Environmental Management (DOE EM), and with the active collaboration and support of the DOE's Energy Facility Contractors Group (EFCOG). The KM-IT system is a D and D community driven system tailored to serve the technical issues faced by the D and D workforce across the DOE Complex. As part of the D and D KM-IT, FIU has developed a robotics database in collaboration with DOE EM and Nuvision/Cogentus which currently contains over 500 robotics technologies along with information about the robotics technology vendors. This information is aggregated in real time and presented as a robotics technology fact sheet to the end user based on the selected technology. FIU is researching these technologies and studying their capabilities and application to D and D. As part of the research, FIU is categorizing each technology into specific application areas: characterization, decontamination, inspection, and demolition. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Chemistry and Engineering Aspects of the Application of Soluble Phosphates for Uranium Treatment in Groundwater - 17255

Treatment of uranium in groundwater is challenging because of the equilibrium partitioning of uranium between sorbed and aqueous phase complexes in mobile and immobile pore space. In situ groundwater treatment strategies for uranium hold promise because of their reliance on fundamentally altering uranium chemical speciation as well as aquifer geochemical conditions. For the last 30 years uranium in situ reductive precipitation has been the leading technology; however, there have been only a handful of large-scale applications. Recently, within the last 10 years, the application of soluble phosphates has been identified as a viable means of treating soluble uranium, while at the same time changing the balance in terms of the availability of sorbed/immobile uranium to re-mobilize. Uranium reacts with soluble phosphate to form a range of low-solubility uranium minerals; surface passivation can also result, limiting the availability of uranium for dissolution. Here we discuss the application of dissolved phosphate in a small-scale pilot test in a tailings pile. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of Nonmetallic Components in the Hanford Waste Transfer System - 17287

Nonmetallic materials are currently being used in the United States Department of Energy's Hanford Site Tank Farm waste transfer system. These materials include the inner primary hoses in the hose-in-hose transfer lines (HIHTLs), Garlock{sup R} gaskets, ethylene propylene diene monomer (EPDM) O-rings. These materials are exposed to a number of stressors and the synergistic effects are not well understood. Florida International University (FIU) engineers have developed an experimental test loop to determine how the nonmetallic materials react to both individual and simultaneous stressors. The initial phase of testing includes exposure of coupons and components to caustic material at various temperatures for varying lengths of time. The coupons are manufactured from EPDM and Garlock{sup R} sheets and will be used to evaluate changes in material data from baseline data. Components (inner hoses, O-rings and gaskets) will also be used to determine the effects from an environment similar to its operational environment. The test loop utilizes a 25% NAOH solution as the fluid and can accommodate eighteen component assemblies, each consisting of one EPDM HIHTL, EPDM O-ring and Garlock{sup R} gasket. There are three assembly aging sets, one for each temperature (37.78 deg. C, 54.44 deg. C and 79.44 deg. C) and each set contains six assemblies; three for each of the two time periods (6 months and 1 year). Prior to aging, a sample set of the components had baseline mechanical properties tested and a sample set of the coupons had baseline material properties determined as per ASTM standards. After the aging is completed the mechanical and material properties of the aged samples will be measured and compared with the bass-line data to obtain an understanding of the synergistic effects of the two stressors. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

National contribution to the organization and carrying out monitoring activities on assessment of radiation and ecological situation in uranium tailings of SE 'Vostokredmet' - 15068

In this paper, the legislation governing radiation safety and radioactive waste management in Tajikistan is described. The role and responsibilities of both the regulator and the user as they apply to the remediation of legacy sites are presented, as is the infrastructure for the monitoring of legacy sites. The challenges presented by radiological contamination in Tajikistan and Central Asia are discussed. National and regional commitments with respect to legacy sites remediation in Tajikistan are described. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Contingencies in Decommissioning Cost Evaluations - Panel Session 24

Contingency costs apply to unforeseen, uncertain and unpredictable conditions, typically encountered during the decommissioning activities (known unknowns). Outside spent fuel management, the dismantling activities in the controlled area constitute the largest contributor to project risk and decommissioning cost. Using data from previous proven experience on site help minimize the contingencies and provide more accurate cost estimates. Technology improvement leads to cost and contingency reduction.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Benefits of a Full Waste Cost Recovery Program - 16322

A full waste cost recovery program has been established at the INL in order to fund disposition of all newly-generated hazardous, radioactive, and mixed waste at the INL. Significant improvements have resulted from implementation of this program at the INL, and it is anticipated that others could benefit from using a similar approach. The INL Waste Management Program (WMP) administers two site-wide service centers that collect revenue from programs and projects in order to pay waste disposition costs. These service centers are administered separately due to their unique scope and functions. The combination of these service centers provides the INL with a fully functional cost recovery program for all newly generated waste. This cost recovery program ensures that funding is available for disposition of all waste types and that waste costs are paid for by the generating programs or facilities. The implementation of these service centers in Fiscal Year 2014 has resulting in several significant improvements in waste disposition, including a substantial increase in awareness and emphasis on waste minimization and segregation. The service centers have virtually eliminated funding shortfalls from projects that end and have not budgeted for dispositioning waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The UK's National Policy and Programme for the Management of Spent Fuel and Radioactive Waste - 16574

This paper provides a broad overview of the United Kingdom's (UK's) national policies and national programme for the management of spent fuel and radioactive waste. The aim of the paper is to ensure a clear understanding of the approach taken in the UK so that opportunities for learning lessons and joint working, where they exist, can be identified and to ensure a general understanding of the interdependencies between the various approaches taken in the UK. With a legacy that dates back to the late 1940's/early 1950's the UK have a range of complex and difficult issues to resolve that have evolved over time. What was considered to be acceptable in the past is not thought of in the same way today. We therefore need to be forward thinking, innovative and above all ready to adapt our practices and policies to address previously unknown issues and complications. Due to the wide range of types of radioactive wastes and materials to be managed in the UK we have needed to establish a set of high level principles to cover all radioactive waste types while at the same time ensure that specific approaches for specific issues are developed within that framework. In the UK we have also had to consider the issue of integration to ensure that an approach that addresses one issue does not inadvertently cause a problem elsewhere - for example: in disposing of the high volumes of very low level waste we needed an approach to ensure that other low level waste has a disposal route. Financing of decommissioning and future waste management is clearly one of the biggest challenges to be addressed. As mentioned above ensuring that the legacy left for future generation is not one of a burden - we need to ensure that measures are in place to fund and manage long lived radioactive wastes. Finally, it is clear that not all radioactive wastes are the same and therefore different approaches are needed for managing the different types of material. This requires a proportionate and prioritised approach so while the same ultimate goal is applied (i.e.: the safe and responsible management of radioactive waste) some radioactive wastes are more equal than others and need to be treated accordingly. In the UK we believe that we have a broad programme in place that allows the right balance to be struck in managing all our radioactive waste and spent fuel in a proportionate, safe and responsible manner.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Collaborative Management for Complex Closure Teams - 19246

The closure documentation for government waste management sites requires a multidisciplinary approach to achieve success. This approach is necessary and similar to approaches utilized across remediation projects in the private and public sectors [1]. Closure documentation for government projects can range from tens of pages to upwards of thousands of pages. They normally take more than six months to put together - although, in many cases, it takes years - with multiple revisions. These documents, while all unique, share common themes with regards to communication and conflict with the other waste management projects. This paper explores the challenges in management and leadership approaches for generating technical documents, such as those found in the closure missions at government hazardous waste management sites. These matrixed teams are composed of many different members with varying expertise and experience, each with different stakeholder backgrounds. These teams experience challenges not only from using a matrixed approach - where the majority of the members are only partially engaged in the project - but also from integrating each of their respective stakeholder group's cultural individualities [2]. The Project Leads, who head up these highly matrixed projects, operate in environments comprised of virtual project teams- or more specifically in this context, intensive virtual project teams. Most of the participants are within the same city, but all of the document project teams operate with some level of organizational dispersion. Moreover, the larger a project becomes the more dispersed the team becomes. The frequent addition of sub-contracting resources by Project Leads further disperses the group and dilutes communication. The difficulties in communication derive from complications in the goal setting stages of a project and can manifest across the project team in the form of motivational issues, disengagement, quality expectations, and a loss of understanding. This puts a considerable amount of importance on a Project Lead to establish goals through the appropriate tools and methodology. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 16: Hot Topics and Emerging Issues in US Commercial LLRW Management and Disposal

This panel focused on emerging issues in commercial LLW management in the US from the perspective of active members of the Low-Level Radioactive Waste Forum, Inc. State, compact, federal and industry officials will share their views on a variety of timely and significant topics related to low-level radioactive waste management, disposal and related issues. Presentations proposed include: 1 - Overview of NRC Activities and Initiatives (John Tappert, US NRC (USA)); 2 - Advocates for Responsible Disposal in Texas (Edward Selig, Advocates for Responsible Disposal in Texas (ARDT) (USA)); 3 - Hot Topics and Emerging Issues in U.S. Commercial LLW Management and Disposal (Joe Weismann, US Ecology (USA)); 4 - DOE/NNSA Office of Radiological Security (ORS) Sealed Source Management and Disposal (David Martin, Energetics Incorporated (USA), Temeka Taplin, US DOE NNSA (USA))

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 105: US DOE LLW On-Site Disposal: LLW Disposal Facility Federal Review Group Review Process

This panel focuses on risk-informed provision for waste management of US DOE radioactive wastes. Detailed information on the high-level radioactive waste interpretation Federal Register Notice will be discussed to better educate the audience in understanding that interpretation. The Co-Chairs and panelists each introduced themselves. Presentations proposed include: 1 - Overview of Public Comments on the Proposed High-Level Radioactive Waste Interpretation (Theresa Kliczewski, US DOE EM (USA)); 2 - ECA Presentation on Implementation Approaches and Expectations for Radwaste Management; DOE Order 435.1 (Kara Colton, Energy Communities Alliance (USA)); 3 - 2019 Grassroots Efforts to Clarify HLW Definition (Rick McLeod, Savannah River Site Community Reuse Organization - SRSCRO (USA))

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Evolution of DOE/Stakeholder Relationships at the Fernald Preserve, Ohio, Site - 19559

The Fernald Preserve, Ohio, Site is managed by the US Department of Energy (DOE) Office of Legacy Management. It is approximately 29 km (18 miles) northwest of Cincinnati, Ohio, on the site of a former uranium-processing plant established by the US Atomic Energy Commission in 1951. The production mission officially ended in 1991 when it was replaced by a remediation mission. Extensive environmental remediation was subsequently conducted under the Superfund program by the DOE Office of Environmental Management. After most of the remediation was concluded in 2006, the site was transferred to the DOE Office of Legacy Management, which continued comprehensive ecological restoration and is responsible for an ongoing aquifer remediation operation. The site was renamed the Fernald Preserve and opened to the public in 2008 as an undeveloped park, encompassing a diversity of natural habitats native to the area. The site now serves as a community asset, offering a Visitors Center with exhibits that tell the site story, hiking trails, wildlife observation opportunities, meeting spaces for community groups, educational program opportunities, and Interpretive Services personnel to engage the public. There was a long history of community mistrust about government operations at the site, beginning in the 1950's when land for the site was acquired by eminent domain, and continuing when contamination and hazardous waste management concerns were revealed in the 1980's. Resulting media coverage on possible contamination and cover-up concerns was extensive. In 1986, sitewide studies to determine the nature and extent of contamination and to consider cleanup options were instigated. In 1989, the site was placed on the National Priorities List of the Superfund program. Because of the longstanding mistrust held by many stakeholders, DOE faced a very serious challenge in achieving consensus among stakeholder groups about the cleanup levels, waste disposition, and the future uses of the site. Starting in the late 1980's, DOE, the regulators, site contractors and the community took a number of steps over many years to increase trust and achieve consensus among the many stakeholder groups. These steps included establishing a single cleanup mission, involving the community early and often as a critically important stakeholder, creating a citizens taskforce and community envoys, and providing extensive educational outreach. As a result, DOE, regulators, contractors, and community members moved from a position of very little trust to one of increased trust and collaboration among all concerned parties. The lessons learned from the Fernald site can be invaluable in the resolution of difficult environmental issues and should be considered as DOE seeks increased collaboration and consensus with stakeholders to solve other environmental remediation challenges. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 94: US DOE Procurement Opportunities and End-State Contracting Model Status

This panel focused on DoE's procurement implementation strategy and planned activities for its first-tier contractors (Tier 1 procurements). This panel also focused on the implementation status of DoE's End State Contracting Model, which uses a single-award ID/IQ approach to give DOE flexibility to better define discrete scopes of work for site closure or end states. The panelists provided their prospective on progress toward the implementation of this new approach, lessons learned and the path forward for upcoming opportunities utilizing this contracting model. Panelists with presentations: EFCOG (Billy Morrison); DOE Procurement Opportunities - 4 Ways for Small Business Participation (Anne Marie Bird); US DOE Procurement and Contracting Opportunities (Aaron Deckard)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Session 097C - Panel: Reuse of Federal Land on the Oak Ridge Reservation, TN (3/4) (R.16c)

This panel was to focus on what is being done to enable federal reuse across the DOE's Oak Ridge Reservation, including how the Community Reuse Organization of East Tennessee (CROET) plays a critical role, how the community is benefiting, and the experience of the private sector companies now occupying the site. The Panelists were to discuss how resources from the East Tennessee Technology Park (ETTP) are being transitioned to support cleanup efforts that enable critical NNSA and Office of Science missions. This session integrated with panel sessions 97A, 97B, and 97D. Panelists with presentations: Community Reuse Organization of East Tennessee (CROET) (Ryan Overton); Community Perspective (Ron Woody); ETTP Tenant Point of View (Bradley Spears); Enabling NNSA and Office of Science Missions (Stephen Phillips); Enabling Federal Land Reuse (David Adler)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Developing Decommissioning Cost Estimating Relationships and the Decommissioning Estimate Analysis Library Estimating System - 20423

DOE-EM's Consolidated Business Center (EM-CBC) Office of Cost Estimating has developed a system of Decommissioning Cost Estimating Relationships (CERs) and Models to improve the reliability and efficiency of its estimates. The development builds on the multi-year process of collecting and organizing historical cost data from DOEEMs decommissioning projects and estimate model development to support project and program-level decommissioning estimates. The latest work has extended these models down to project scope element and component building area levels, allowing the actual costs of work for these estimate components to be assembled into estimates that reflect specific projects. The CERs have been incorporated into two estimator-friendly products - as cost libraries in the MII estimating program and as an MS Excel-based model, and are available for DOE federal staff use. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

IMPLEMENTATION OF THE WIPP PERMIT MODIFICATION AT THE HANFORD TRANSURANIC (TRU) PROGRAM

Hanford is one of the Department of Energy's sites that ships transuranic (TRU) waste to the Waste Isolation Pilot Plant (WIPP). WIPP's revised Hazardous Waste Facility Permit, granted by the State of New Mexico, required Hanford's TRU Program to make substantial changes to its process for certifying and shipping waste. This paper presents the extent of the changes to WIPP's permit and describes the way Hanford addressed the new requirements.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

TECHNOLOGY NEEDS AND STATUS ON CLOSURE OF DOE RADIOACTIVE WASTE TANK ANCILLARY SYSTEMS

This paper summarizes the current state of art of sampling, characterizing, retrieving, transferring and treating the incidental waste and stabilizing the void space in tank ancillary systems and the needs involved with closure of these systems. The overall effort for closing tank and ancillary systems is very large and is in the initial stages of being addressed in a systematic manner. It was recognized in doing this effort, that gaps in both technology and material application for characterization and removal of residual waste and closure of ancillary systems would be identified. Great efficiencies are to be gained by defining the technology need areas early in the closure process and providing recommendations for technical programs to improve the closure strategies. Therefore, this paper will not only summarize the state of closure of ancillary systems but also provide recommendations to address the technology gaps identified in this assessment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗