Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,765 records · Page 98

Padre Island Water Resources: Monitoring Historic Shoreline Change and Suspended Sediment Patterns along Padre Island National Seashore

Land loss along Padre Island National Seashore threatens the safety of the recreational beach for the general public and endangers wildlife habitats and nesting sites. Historically, the Army Corps of Engineers has conducted dredging efforts to thwart erosion. Quantifying spatial and temporal variations of shoreline change is vital to understanding the interaction of land loss and historical dredging efforts. NASA DEVELOP collaborated with the National Park Service to use remote sensing to investigate the impact of dredging on Padre Island National Seashore’s shoreline. The team utilized high-resolution imagery from Maxar and Planet to create a time series of shoreline changes between 2011 and 2020, conduct shoreline extraction, and quantify shoreline changes. Additionally, the team monitored turbidity and sediment dynamics using Landsat 8 Operational Land Imager (OLI), Landsat 4 Thematic Mapper (TM), Landsat 5 TM, and Sentinel-2 MultiSpectral Instrument (MSI). Shoreline change results demonstrated an average change between 4.5 to 32 meters annually. Meanwhile, the dredging area directly north of the seashore’s Port Mansfield Channel experienced an areal gain of 152,000 m² between 2010 and 2021. The team also observed that turbidity values increased in areas close to the channel where dredging occurred, especially in the 2018 and 2021 dredging years. Dredging years corresponded with less shoreline change than years without dredging. These results will be used to better inform future partner-designed shoreline management projects in the face of continued erosion and sea level rise.

Lisa Tanh↗

Current and Future ESPO Supported Missions

The Earth Science Project Office (ESPO) at NASA Ames Research Center is a group of success-oriented individuals providing project management for NASA's Science Mission Directorate, Earth Science Division. We provide planning, implementation, and post-mission support for large, complex, multi-agency, domestic and international field campaigns. ESPO has led over 60 successful field campaigns, dating back to 1987. ESPO supports several of NASA's Earth Science Division’s programs, including Upper Atmosphere Research, Tropospheric Chemistry, Radiation Sciences, Weather and Atmospheric Dynamics, Ocean Biology and Biochemistry, Airborne Science, and the Earth System Science Pathfinder Program.

Erin Czech↗

The Next Generation Space Telescope: Visiting a Time When Galaxies Were Young

In the spring and summer of 1996, three independent teams studied the feasibility of a large aperture space telescope to follow the Hubble Space Telescope. The scientific goals for the new telescope had been laid out in a report by the HST & Beyond Committee, a group appointed by the Association of Universities for Research in Astronomy to consider the needs of the astronomical community after the nominal end of the HST mission in 2005. The technical capabilities and constraints on the new observatory were daunting: the telescope optics should be at least 4 meters in diameter and passively cooled to achieve optimum sensitivity in the near-infrared portion of the spectrum. Moreover, the costs should be kept within a fraction of those for the HST: approximately $500M for construction and $900M for lifetime costs, not including support for scientific data analysis. In their presentations to NASA on 19-21 August, 1996, the teams led by Lockheed Martin, TRW, and the Goddard Space Flight Center concluded that a Next Generation Space Telescope (NGST) was not only feasible and affordable, but that it could be made more powerful using recent breakthroughs in space technologies. Coming on the heels of breathtaking HST observations of distant galaxies in the process of formation, such an NGST could bridge the gap in our understanding of the earliest origins of stars, galaxies, and the elements that are the foundations of Life. This report presents the findings of the three teams and the technological roadmap which will guide us to the successful development of the NGST over the next decade. We have made liberal use of the written material, tables, and diagrams prepared by the three study teams. We have also taken advantage of the knowledge and ideas of our colleagues in government, industry and academia. In Appendix A, we list the members of the three study groups, the NGST Science Working Group and the NGST Scientific Oversight Committee. We deeply appreciate their assistance, advice, and enthusiasm. The scientific and technological goals of NGST are part of the Origins initiative in the Office of Space Science, NASA Headquarters. We are pleased to acknowledge the support and leadership of Edward Weiler, a steadfast friend of HST, Harley Thronson, a proponent of all things infrared, and Mike Kaplan, a tireless advocate of new technology. John Campbell, Project Manager for HST, initiated the NGST study at GSFC and we deeply appreciate his formative efforts and continued support. We are also grateful for the foresight of Riccardo Giacconi, Director General of the European Southern Observatory (ESO), and the efforts of his staff. We note that European Space Agency (ESA) staff at the Space Telescope Science Institute and ESO played important roles in the NGST scientific and technical studies. We look forward to future collaboration with ESA, ESO, and other international partners.

H.S. Stockman↗

Advanced Technology Infusion into Spacesuit Systems

Advancement in technology drives our future. The successful implementation of a technology drives its possibilities. The National Aeronautics and Space Administration (NASA) has invested in numerous technologies that have proved to be successful. The desire is to learn from those successes. For a technology to evolve, become a reality, and infuse into NASA’s missions, a compilation of success-oriented factors must exist for the technology to reach fruition. Understanding these factors could help decrease the complexity of technology infusion and bridge the gap between technology developers and system integrators. The knowledge gained could facilitate the design, development, test, and infusion of a technology to be more effective and efficient. Successful technology infusion is complex and can be even more daunting when advanced technologies are infused into complicated systems. NASA, industry, and academia desire to understand the infusion process, along with measuring the success of infusing an advanced technology into a complex system. This paper focuses on complicated systems that necessitate successful infusion of technologies. These systems include NASA’s spacesuits used for extravehicular activity, including the Apollo Extravehicular Mobility Unit (EMU), the Shuttle/International Space Station EMU, and the Exploration EMU (xEMU) architectures. Several life support technologies will be addressed in the xEMU. Those technologies will be discussed, along with a methodology for assessing infusion pathways. The infusion pathways of these life support technologies into spacesuit architectures can form the benchmark for technology infusion into other architectures for lunar and Martian surfaces. The spacesuit system architectures as case studies can provide the foundation of technical knowledge to help NASA and industry’s project managers and system managers integrate advanced technologies more effectively and efficiently.

Cinda Chullen↗

Ideas on the NASA Senior Review and Mission Extension Process

Extended mission budgets fund a significant part of our community, particularly young scientists who in a relatively short time are exposed to a broad range of experiences and opportunities available in space science and other STEM fields. In particular, mission-funded science offers a relatively stable funding stream that enables meaningful mentoring efforts and interactions, including apprenticeships ranging from project management, to mission operations, to data processing and analysis, to hardware and software development, to STEM-related education and outreach. It moreover provides professional contacts that fuel diversity in mission leadership and in the science and technical workforce at-large. Last but not least, it sustains the scientific productivity of NASA’s missions, which constitute major national investments meriting their full exploitation. Budgets cuts, however, are exercising pressure on the science and operations of the extended mission fleet despite being only a small portion of the overall Division budget. The history of Heliophysics has demonstrated that maintaining the operation of missions beyond their prime phase invariably leads to a much deeper knowledge of the original mission science goals, together with new applications often not foreseen during their original design. Their operation as part of the Heliophysics System Observatory (HSO)---a coordinated, 1eliophysics, multipoint observing system of the heliosphere, is a prime example. Some of the first activities undertaken by the Parker Solar Probe and Solar Orbiter missions required recreating the larger context of their new observations by using the diversity of HSO mission capabilities. The marginal cost of maintaining this valuable, working science resource, in the form of both continuing high quality data access and expertise, is small compared to the cost of the original missions or of new missions to achieve similar objectives, making the operation of extended missions, the best “science per dollar” investment in Heliophysics. We argue that reducing both extended mission operations and science budgets will have a ripple effect across the community, including reducing employment and training opportunities for young scientists, to lowering the quality/impact of the Heliophysics Systems Observatory. Instead, we suggest that the proposal process for mission extension should be re-examined. We offer several ideas for reducing costs of extended missions toward maintaining science output and streamlining the management process.

A. Vourlidas↗

Explore Earth Commercial Smallsat Data Acquisition (CSDA) Program

The European Space Agency (ESA), our international partner in the ESA-NASA Earth Science & Observation Joint Program Planning Group (JPPG), is hosting the VH-RODA (Very High-resolution Radar and Optical Data Assessment Workshop) at ESA/ European Space Research Institute (ERSIN) in Frascati, Italy from November 7-10, 2022. The objective of the VH-RODA workshop is to provide an open forum (for the new space, commercial and institutional space sectors) for presenting and discussing about the current status and future developments related to Earth Observation (EO) data quality, calibration and validation of space-borne very high-resolution Synthetic Aperture Radar (SAR) and Optical sensors and data products, with a dedicated focus on commercial EO data providers and related Calibration/Validation activities, synergies between optical and SAR communities, presentation of standards and best practices for data quality. Additionally, the ESA-NASA Joint Program Planning Group (JPPG) Third Party Mission component will meet to further develop non-binding practices on evaluation, identify common guard rails for comparison of data, and coordinate future schedules to leverage shared knowledge. I serve as the Project Manager for the NASA’s Commercial Smallsat Data Acquisition (CSDA) Program and will participate in the VHRODA workshop on behalf of the program.

Commercial Remote Sensing↗

NASA Small Spacecraft Technology Program

This presentation provides an overview of the technology demonstration missions, Tipping Point, and Announcement of Collaboration Opportunity projects managed by the Small Spacecraft Technology program. It also provides brief mentions of major NASA missions and programs.

Roger C. Hunter↗

Mission Planning for Trident: Discovery proposal to Neptune’s moon, Triton

Trident was one of the four Discovery-class Step-1 mission proposals selected by NASA in 2020 for further development and study; however, in 2021, the Step-2 proposal was not down-selected to transition into the next phase of mission development, i.e., a mission for flight.Neptune’s largest moon, Triton, was the primary focus of study for Trident. Triton’s physical and orbital characteristics make it a unique planetary target for scientific exploration, providing opportunities for investigations in a wide variety of scientific fields, including geomorphological, atmospheric, geophysical, magnetospheric, and ionospheric studies. The science objectives of the Trident mission encompassed an in-depth interior-to-exterior set of objectives, focused on multiple outstanding questions resulting from the 1989 encounter of Voyager 2, and subsequent analysis.Ball Aerospace Corp. was tasked with building the Trident spacecraft, with JPL responsible for providing Engineering Support (Mission Design & Navigation, Mission Planning, Flight Operations, Ground Data Systems, Systems Engineering) and leading Project Management. The observatory would carry a wide-ranging suite of scientific instruments onboard, including an Infrared Spectrometer (IRS) and Narrow Angle Camera (NAC) to be provided by Ball Aerospace Corp., a Wide Angle Camera (WAC) from JPL, a Magnetometer from UCLA, a contributed Plasma Science Suite from IRF (Sweden), and a contributed Radio Science instrument from ASI (Italy). All of these instruments would be used to collect unique datasets during the Triton encounter. Trident would have taken advantage of an ~13-yr, nearly-ballistic trajectory to Triton, utilizing a timely Jupiter Gravity Assist, to execute a 10-day long encounter in the Neptunian system. Launch was planned for October 2025, with Triton arrival scheduled for December 2038. The timeline for this mission would have been sub-divided into seven major phases: Launch, Commissioning, Inner Planet Cruise, Outer Planet Cruise, Approach, Encounter, and Science Data Return. Multiple planetary flybys were planned to be performed during the cruise, including three Earth flybys and one Venus flyby in the Inner Planet Cruise phase, and one Jupiter flyby in the Outer Planet Cruise phase. Along with conventional (Range and Doppler) tracking data, Delta-DOR and Optical Navigation data were also to be acquired to assist with spacecraft navigation during the Approach and Encounter phases. A 3 meter X-Band High Gain Antenna would allow playback of all science data at 1 kbps within 1 year after the Triton Encounter. The Mission Planning element on Trident encompassed and informed multiple aspects of this proposal, ranging from science observation planning during the Triton Encounter phase, to generation of activity timelines for all mission phases; performing ground coverage analysis for science observations to be acquired by all instruments and tracing them to science requirements; evaluation of spacecraft resources including data volume stored onboard, power/energy consumption, telecom (commanding/telemetry) requirements, and overall, working at the interface of science and engineering teams on the mission. All of these functions that were performed by the Mission Planning team on this proposal are discussed in this paper.

Prockter, Louise↗

What You Need to Know about Planetary Protection Categorization for Your Mission

Planetary protection mission categorization helps to define the risk posture for requirements definition and implementation practices on space flight projects with planetary protection considerations. NASA has recently updated it’s planetary protection policy (NPR 8715.24), and with the update comes a major change in how the planetary protection categorization process is performed for NASA missions. Previously, projects would request the NASA Planetary Protection Officer (PPO) provide a categorization letter documenting the planetary protection category assigned to the proposed mission. Under the new policy the project manager (PM) proposes the planetary protection category for their mission. Depending on the level of the category, the PPO either concurs or recommends concurrence to the Chief of Safety and Mission Assurance (SMA) before forwarding to the Mission Directorate Associate Administrator (MDAA) for final approval prior to the system requirements review (SRR). But what topics must be considered for categorization? This presentation will provide key considerations for planetary protection mission categorization including the target solar system body to be explored, the trajectory to get to the target body, and the operations to be performed at the target body. Additional unique scenarios such as secondary and auxiliary payloads, encountering other solar system bodies on the way to the target body, and sample return missions will also be discussed to share lessons learned from missions that have been through the new categorization process.

Elaine Seasly↗

The Knowledge-based Digital Platform Concept for Advanced Air Mobility Research and Development

National Aeronautics and Space Administration (NASA) Langley Research Center (LaRC) is spearheading an innovative digital engineering approach to integrate, communicate, and facilitate the research of multi-modal transportation systems. The Knowledge-based Digital Platform (KbDP) is a concept being developed that ties the workflows of Project Managers (PM), Principal Investigators (PI), and System Engineers (SE) together across organizational boundaries. The overarching vision for the KbDP Concept for AAM R&D is a substantial undertaking. The initial concept and implementation will focus on UAM operations to tractably learn and adjust the concept with a manageable database. Lessons learned and best practices with a smaller scope will enable successful scalability to AAM R&D or even to the entire modes of transportation and logistics. The UAM vision is one in which advanced technologies and new operational procedures enable practical and cost-effective air transport as an integrated mode of movement of people and goods throughout metropolitan areas. Initial implementation of three KbDP concepts of use shows promising benefits to NASA’s Air Traffic Management-Exploration (ATM-X) UAM Airspace Subproject. It is envisioned that the KbDP will manage an information database defined by mathematical, data science, and system engineering principles. AIML algorithms play a vital role in this KbDP concept by extracting meaningful knowledge from the information database, which the human user leverages to improve the efficiency and effectiveness of their research greatly.

ATM↗

NASA CARA Prelaunch Analysis and Process

NASA implemented an official Procedural Requirement (NPR) 8079.1 in June 2023, establishing the minimum collision avoidance requirements and associated operational protocols for NASA space flight programs, projects, and spacecraft to protect the space environment by reducing the risk of collision to an acceptable level. Part of the requirement employs a two-fold approach to analyze the satellite design process with conjunction assessment and risk mitigation in mind, during the pre-launch process, led by the Conjunction Assessment Risk Analysis (CARA) Program for non-Human Space Flight (HSF) Missions. This presentation outlines CARA coordination with missions, informed by the NPR, that spans early mission development to operations. CARA is an Agency-level resource that provides support to all NASA non-HSF missions. CARA protects the orbital environment from collision between NASA non-HSF missions and other tracked on-orbit objects. During the pre-formulation and formulation phases, NASA missions undergo a series of conjunction assessment analyses captured in the Orbital Collision Avoidance Plan (OCAP) prior to transitioning to the implementation phase (typically at the Preliminary Design Review (PDR) or equivalent). The OCAP analyses consist of a thorough review of the spacecraft(s) orbit selection and placement, deployment, cataloguing performance, trackability, ephemeris generation, conjunction mitigation options, autonomous maneuvering, and risk assessment parameters which are performed by a dedicated CARA Analysis Team. The results of these analyses, CARA’s formal recommendations, and the mission’s methods for implementing them, are documented in the OCAP. The intent of engaging in this process so early in the mission design phase, is to ensure that conjunction assessment is considered from the outset, thus mitigating costly design changes and operational risks down the road. NASA missions are also required to coordinate their operational processes and conjunction mitigation procedures with CARA in a Conjunction Assessment Operations Implementation Agreement (CAOIA). The aim of this process is to document the conjunction assessment screening process, conjunction risk assessment parameters, conjunction mitigation steps, flight dynamics operations concepts and maneuvers, and the communication and coordination process between the mission’s project manager and CARA. The intent of the CAOIA document is for it to be completed iteratively, and as missions update these elements, corresponding changes are made in the CAOIA. With this process in place, the engagement and coordination between the missions and CARA from early in the design process into mission operations, helps to ensure that missions not only have a robust conjunction assessment concept of operations to reduce conjunction risk for space sustainability, but are also able to achieve their science goals and have a successful mission.

conjunction assessment↗

2024 Nasa Lunabotics University Competition: Site Preparation With Bulk Regolith

Lunabotics provides accredited in-stitutions of higher learning students (vocational-technical, college, university) an opportunity to apply the NASA systems engineering process to design and build a prototype robot. This robot would be capable of performing the proposed operations on the Lunar sur-face in support of future Artemis mission goals. Lunabotics features a systems engineering design challenge to engage students in the next phase of hu-man space exploration supporting the Artemis missions. This two-semester event encourages students to design and build an autonomous or telerobotic robot designed to traverse the simulated Lunar surface and complete the assigned construction tasks. The number of teams accepted into this challenge is not predetermined but is based on the scores and overall quality of the Project Management Plans received and other factors.

Lunabotics↗

Design, Analysis, Testing, and Flight Activities for A Green Propulsion Dual Mode (Gpdm) Technology Demonstration Mission

NASA’s Strategic Plan (2022) outlines specific technology development objectives which direct the Agency to “innovate and advance transformational space technologies.” An example of these potentially high-impact space technologies is the low-toxicity or “green” rocket propellant known as ASCENT (or Advanced Spacecraft Energetic Non-Toxic Propellant). Developed in the 2010’s by the Air Force Research Lab (AFRL), ASCENT (formerly AF-315E) has shown improved specific impulse density (50% higher) vs. hydrazine in addition to its favorable in-space storability and ease of handling capability. The chemical propulsion capability of ASCENT has been demonstrated on several missions including the Green Propulsion Infusion Mission (GPIM) in 2019 and most recently, the Lunar Flashlight mission. ASCENT is an ionic liquid, which lends itself as both a chemical and an electrospray propellant. The capability to use the same propellants in multiple modes using the same propellant tank and feed system has yet to be demonstrated in orbit. This capability, if proven successful has the potential to reduce system weight and complexity, while taking advantage of both high thrust and high propellant efficiency in electrospray mode. The GPDM Project, managed by the Marshall Space Flight Center is seeking to develop a dual-mode propulsion system as the payload on a small spacecraft (6U CubeSat) and subsequent in-space demonstration. This paper will summarize the concept, ground testing as well as mission operations plan for demonstrating green “dual-mode” propulsion.

Nehemiah J. Williams↗

NASA CARA Prelaunch Analysis and Process

NASA implemented an official Procedural Requirement (NPR) 8079.1 in June 2023, establishing the minimum collision avoidance requirements and associated operational protocols for NASA space flight programs, projects, and spacecraft to protect the space environment by reducing the risk of collision to an acceptable level. Part of the requirement employs a two-fold approach to analyze the satellite design process with conjunction assessment and risk mitigation in mind, during the pre-launch process, led by the Conjunction Assessment Risk Analysis (CARA) Program for non-Human Space Flight (HSF) Missions. This presentation outlines CARA coordination with missions, informed by the NPR, that spans early mission development to operations. CARA is an Agency-level resource that provides support to all NASA non-HSF missions. CARA protects the orbital environment from collision between NASA non-HSF missions and other tracked on-orbit objects. During the pre-formulation and formulation phases, NASA missions undergo a series of conjunction assessment analyses captured in the Orbital Collision Avoidance Plan (OCAP) prior to transitioning to the implementation phase (typically at the Preliminary Design Review (PDR) or equivalent). The OCAP analyses consist of a thorough review of the spacecraft(s) orbit selection and placement, deployment, cataloguing performance, trackability, ephemeris generation, conjunction mitigation options, autonomous maneuvering, and risk assessment parameters which are performed by a dedicated CARA Analysis Team. The results of these analyses, CARA’s formal recommendations, and the mission’s methods for implementing them, are documented in the OCAP. The intent of engaging in this process so early in the mission design phase, is to ensure that conjunction assessment is considered from the outset, thus mitigating costly design changes and operational risks down the road. NASA missions are also required to coordinate their operational processes and conjunction mitigation procedures with CARA in a Conjunction Assessment Operations Implementation Agreement (CAOIA). The aim of this process is to document the conjunction assessment screening process, conjunction risk assessment parameters, conjunction mitigation steps, flight dynamics operations concepts and maneuvers, and the communication and coordination process between the mission’s project manager and CARA. The intent of the CAOIA document is for it to be completed iteratively, and as missions update these elements, corresponding changes are made in the CAOIA. With this process in place, the engagement and coordination between the missions and CARA from early in the design process into mission operations, helps to ensure that missions not only have a robust conjunction assessment concept of operations to reduce conjunction risk for space sustainability, but are also able to achieve their science goals and have a successful mission.

conjunction assessment↗

Developing Concepts of Operations Using Multi-Step Tool Techniques With Large Language Models

The National Aeronautics and Space Administration (NASA) Air Mobility Pathfinders (AMP) project is developing and evaluating concepts of operations (ConOps) for safe, secure, and scalable Urban Air Mobility (UAM) operations. The AMP project’s Operational Concepts, Architecture, and Requirements Integration (OCARI) Team is using a Model Based System Engineering (MBSE) approach for integration, interoperability, and traceability of Advanced Air Mobility (AAM) ecosystems centered around urban air taxi services. The team’s goal is to define structures and behaviors needed for system feasibility, readiness, and interoperability, establish a UAM knowledge base, and trace and validate assumptions and requirements relevant to AAM. NASA Langley Research Center (LaRC) is spearheading an innovative digital engineering approach to integrate, communicate, and facilitate the research of multi-modal transportation systems. The Knowledge-based Digital Platform (KbDP) is a concept being developed that ties the workflows of Project Managers (PM), Principal Investigators (PI), and System Engineers together across organizational boundaries. It does so through the management of an information database defined by mathematical, data science, and system engineering principles. Machine Learning (ML) algorithms play a key role in this concept by extracting meaningful knowledge from relational and graph databases, document repositories, and system artifacts, which the human user leverages to greatly improve the efficiency and effectiveness of their research. Recent advancements in the field of Large Language Models (LLMs), specifically models trained for tool use, such as Command-R , now allow for the reliable implementation of single-step and multi-step tool-centric systems. These techniques provide the LLM with a set of tools, in our case Python functions, that can be called on to answer a much wider range of questions compared to LLMs implemented using a traditional single-source or Retrieval Augmented Generation (RAG) approach. Through this method, the LLM can pull information from multiple data sources, such as relational or graph databases, document repositories, application programming interfaces (APIs), and SysML artifacts depending on the user’s question. The LLM can also output the information in a variety of different formats, using output generation tools, such as CSV, UML, or SysML artifacts. Additionally, tools can be assigned roles and can work together to provide answers to queries in an “agent” like approach, similar to that implemented by Microsoft’s AutoGen framework where different agents can converse with each other to accomplish tasks. Previously, our team developed a chatbot system with “agent like” functionality in the form of different “modes” the user could select from a user interface (UI), this architecture can be seen on the left in figure 1. Three different modes were implemented, the first mode allowed the LLM to utilize the structures and algorithms within a graph database to trace UAM requirements. The second mode gave the LLM access to a vector search capable of providing relevant information from thousands of document pages related to UAM ConOps and requirements. The third mode served as a general assistant where users could enter open-ended questions and custom prompts to utilize the LLM for different use-cases. This system improved the process surrounding generating and analyzing information related to UAM requirements, however, the implementation provided a clunky user experience. Users were required to know what mode to select within the UI in advance before entering their question to the selected tool. Moreover, the different tools were isolated from each other, they lacked bidirectional links that would allow for tools to collaborate to generate better responses. Our team is working on a new architecture, seen on the right in the below figure, with the goal to address many of the UX shortcomings of our original system while improving the accuracy and depth of responses from the LLM. This new system will automatically select the appropriate tool to use based off the user’s question. Each tool will be capable of calling on any of the other tools available to the LLM, resulting in a collaborative pipeline where tools can pass data between other tools until enough data is received to generate an answer to the user’s question. Using a locally deployed, open-source, LLM, the NASA OCARI team, in collaboration with Collins Aerospace, will implement a prototype application that will bridge knowledge across multiple sources to assist System Engineers (SEs) with requirements discovery and tracing, research question and use case identification, and assumption validation. Such a system will also allow SEs to more easily, and intuitively, explore the AAM ecosystem, ultimately improving the efficiency and effectiveness of the SE's research and decision-making processes surrounding ConOps development and validation. In this session, our team will provide a video demonstration of our new prototype architecture in action. We will also present an overview of our prototype system architecture and talk about its advantages over traditional LLM deployments along with how those advantages can provide additional value to the field of System Engineering.

systems engineering↗

State-of-the-Art Small Spacecraft Technology

The objective of this report is to assess and provide an overview of the state of the art in small spacecraft technologies for use by mission designers, project managers, technologists, and students, connecting current small spacecraft missions to available technologies. This report focuses on the spacecraft system in its entirety, provides current best practices for integration and key considerations for the reader where possible, and presents devices from publicly available sources for each specific spacecraft subsystem. This report is a survey of small spacecraft technologies sourced from open literature; it is not an original source. In addition, this report only considers literature in the public domain. Information presented in this report is limited to SmallSat technology that is publicly available as of September 30, 2024. It does not include information on instrumentation, science payloads, or advances or developments that have not been publicly disclosed. Commonly used sources for data include manufacturer data sheets, press releases, conference papers, journal papers, public filings with government agencies, news articles, presentations, the compendium of databases accessed via NASA’s Small Spacecraft Systems Virtual Institute (S3VI) Information Search, and engagement with companies. Data not appropriate for public dissemination, such as proprietary, export controlled, or otherwise restricted data, are not considered. We encourage the SmallSat community to publish mission outcomes and technology development milestones in publicly available conference papers, press releases, or company websites so they can be reflected in future editions of this report. This report is funded by NASA’s Space Technology Mission Directorate (STMD). It was first commissioned by the Small Spacecraft Technology (SST) program within NASA’s STMD in mid2012 in response to the rapid growth in interest in using small spacecraft for low-Earth orbit, lowcost missions. The report was subsequently updated in 2015, 2018, 2020, 2021, 2022, and 2023 to capture SmallSat technology growth and maturation. In addition to reporting currently available state-of-the-art technologies that have achieved Technology Readiness Level (TRL) 5 or above, a prognosis is provided describing technologies as "on the horizon" if they are being considered for future application.

Sasha V Weston↗

NASA Agile Community of Practice 2024-2026 Report

This 2024-2026 report provides a summary of the products and activities executed by the NASA Agile Community of Practice (CoP) during its second and third years. Building on the foundation established in its inaugural year, the CoP continued to advance Agile values and principles across NASA centers. The report highlights key initiatives, including specialized framework training, AI integration in Agile toolkits, and active participation in agency-wide project management and systems engineering workshops.

Agile↗

Enhanced Chemical Cleaning

Renee Spires, Project Manager at Savannah River Remediation, opens Session 3 (Accelerated Waste Retrieval and Closure: Key Technologies) at the 2010 EM Waste Processing Technical Exchange with a talk on enhanced chemical cleaning.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗