Search NASA⌕ Search

SEARCH · Search NASA

Results for “Permitting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,783 records · Page 99

Confirming the Strength of Residential Roof Structures for Solar Installations

The rooftop solar PV permitting process involves a number of steps and varies greatly, even between neighboring cities. Jurisdictions follow state or national codes, but each may interpret the codes in their own way and insert additional requirements. In some locations, a rooftop structural analysis conducted by a professional engineer is required before a rooftop solar permit is issued. The extra step is not universally applied across states or municipalities, and can alter scheduling logistics and add hundreds of dollars to the cost of the system.

14 SOLAR ENERGY↗

Turbine component and methods of making and cooling a turbine component

A turbine component includes a root and an airfoil extending from the root to a tip opposite the root. The airfoil forms a leading edge and a trailing edge portion extending to a trailing edge. A plurality of axial cooling channels in the trailing edge portion of the airfoil are arranged to permit axial flow of a cooling fluid from an interior of the turbine component at the trailing edge portion to an exterior of the turbine component at the trailing edge portion. A method of making a turbine component includes forming an airfoil having a trailing edge portion with axial cooling channels. The axial cooling channels are arranged to permit axial flow of a cooling fluid from an interior to an exterior of the turbine component at the trailing edge portion. A method of cooling a turbine component is also disclosed.

33 ADVANCED PROPULSION SYSTEMS↗

Monitor for measuring mercury emissions

A mercury emissions monitor includes a mercury sensor tape configured to be fed in a reel-to-reel manner between first and second tape reels, wherein the mercury sensor tape includes a thin metallic film configured to form an amalgam with detected mercury. A mercury collection unit is configured to receive into a chamber a sample of a gas containing mercury, wherein the mercury collection unit is further configured to permit passage of portions of the mercury sensor tape through the chamber containing the gas sample so that the amalgam is formed with the thin metallic film. A mercury analysis unit includes a total reflection x-ray fluorescence (“TXRF”) system configured to perform a TXRF analysis of the amalgam, wherein the mercury analysis unit is configured to permit passage of the mercury sensor tape within a proximity of an XRF detector of the TXRF system. The mercury collection unit and the mercury analysis unit are positioned between the first and second tape reels so that the mercury sensor tape can move in a continuous manner from the first tape reel through the chamber of the mercury collection unit, then within sufficient proximity to the XRF detector, to be then taken up onto the second tape reel.

Kumar, Nalin↗

Turbine component and methods of making and cooling a turbine component

A turbine component includes a root and an airfoil extending from the root to a tip opposite the root. The airfoil forms a leading edge and a trailing edge portion extending to a trailing edge. A plurality of axial cooling channels in the trailing edge portion of the airfoil are arranged to permit axial flow of a cooling fluid from an interior of the turbine component at the trailing edge portion to an exterior of the turbine component at the trailing edge portion. A method of making a turbine component includes forming an airfoil having a trailing edge portion with axial cooling channels. The axial cooling channels are arranged to permit axial flow of a cooling fluid from an interior to an exterior of the turbine component at the trailing edge portion. A method of cooling a turbine component is also disclosed.

Dutta, Sandip↗

The Classical Equations of Motion of Quantized Gauge Theories, Part I: General Relativity

In this and a companion paper, we show that quantum field theories with gauge symmetries permit a broader class of classical dynamics than typically assumed. In this article, we show that the dynamics extracted from the path integral or Hamiltonian formulation of general relativity allows for classical states that do not satisfy the full set of Einstein's equations. This amounts to loosening the Hamiltonian and momentum constraints that are imposed on the initial state. Nevertheless, the quantum theory permits gauge invariant time evolution of these states. The time evolution of these states is such that at the classical level the full set of Einstein's equations would appear to hold, with the physical effects of these states being attributable to an auxiliary, covariantly conserved energy-momentum tensor with no internal degrees of freedom. We derive the generalized Einstein equations for these states and show that a homogeneous and isotropic initial background state contributes to expansion identical to cold dark matter. The inhomogeneous components of this state could source curvature perturbations that grow linearly at linear order. This auxiliary contribution to Einstein's equations could have either sign and thus provide a trivial way to violate the null energy condition, enabling novel gravitational dynamics such as cosmic bounces and wormholes.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Mooring latch for marine structures

A mooring latch includes a passive foundation portion and a latching portion. The latching portion includes a mechanism, a conical surface shaped to mate with a conical surface of the passive portion, a connector for connection to a mooring structure and permitting rotation about a horizontal axis. The mechanism has a latched configuration that mates the conical surfaces and permits rotations about a shared vertical axis of the conical surfaces. A mooring line threaded through the passive and latching portions and equipped with one or more stops may be used to guide the latching portion to or from the passive portion and to actuate latching or unlatching or the mooring latch.

Siegel, Stefan G.↗

Results of FY 2023 Alloy 617 and Alloy 709 High-Temperature Crack-Growth Testing

This report summarizes the work performed at Idaho National Laboratory under the “Creep, fatigue and creep-fatigue crack growth tests” task of the “Long-Term VHTR Material Qualification – INL” work package. Work was performed this year to validate the crack growth monitoring setup used with the test frames against both continuous crack length monitoring using an optical camera, as well as post-mortem analysis of marker bands on the fracture surface. Delays prevented the use of a gauge to measure load-line displacement for early tests, and so the creep-fatigue crack growth setup was evaluated using the actuator displacement for a load-line displacement setup. While not ideal, this allowed examination of the shortcomings with the current software setup that was originally designed for performing stress corrosion crack growth rate studies. The method for data collection was modified to link the crack growth monitoring software with Instron’s Wave Matrix software. Once the load-line displacement gauge arrived, the crack growth equipment was successfully modified to permit continuous monitoring of both load-line displacement and crack length. This is critical for creep-fatigue and creep crack growth rate studies for ductile material, as it permits the C* and Ct analyses. Test results are shown for Alloy 617 fatigue and creep-fatigue (without the gauge for load-line displacement measurements), as well as creep-fatigue of Alloy 709, which was performed with the completed test setup, allowing for crack length and load-line displacement monitoring.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Performance Assessment Program for the Savannah River Site Liquid Waste Facilities - 13610

The Liquid Waste facilities at the U.S. Department of Energy's (DOE) Savannah River Site (SRS) are operated by Liquid Waste Operations contractor Savannah River Remediation LLC (SRR). A separate Performance Assessment (PA) is prepared to support disposal operations at the Saltstone Disposal Facility and closure evaluations for the two liquid waste tank farm facilities at SRS, F-Tank Farm and H-Tank Farm. A PA provides the technical basis and results to be used in subsequent documents to demonstrate compliance with the pertinent requirements identified in operations and closure regulatory guidance. The Saltstone Disposal Facility is subject to a State of South Carolina industrial solid waste landfill permit and the tank farms are subject to a state industrial waste water permit. The three Liquid Waste facilities are also subject to a Federal Facility Agreement approved by the State, DOE and the Environmental Protection Agency (EPA). Due to the regulatory structure, a PA is a key technical document reviewed by the DOE, the State of South Carolina and the EPA. As the waste material disposed of in the Saltstone Disposal Facility and the residual material in the closed tank farms is also subject to reclassification prior to closure via a waste determination pursuant to Section 3116 of the Ronald W. Reagan National Defense Authorization Act of Fiscal Year 2005, the U.S. Nuclear Regulatory Commission (NRC) is also a reviewing agency for the PAs. Pursuant to the Act, the NRC also has a continuing role to monitor disposal actions to assess compliance with stated performance objectives. The Liquid Waste PA program at SRS represents a continual process over the life of the disposal and closure operations. When the need for a PA or PA revision is identified, the first step is to develop a conceptual model to best represent the facility conditions. The conceptual model will include physical dimensions of the closed system, both the engineered and natural system, and modeling input parameters associated with the modeled features, both initial values (at the time of facility closure) and degradation rates/values. During the development of the PA, evaluations are conducted to reflect not only the results associated with the best available information at the time but also to evaluate potential uncertainties and sensitivities associated with the modeled system. While the PA will reflect the modeled system results from the best available information, it will also identify areas for future work to reduce overall PA uncertainties moving forward. DOE requires a PA Maintenance Program such that work continues to reduce model uncertainties, thus bolstering confidence in PA results that support regulatory decisions. This maintenance work may include new Research and Development activities or modeling as informed by previous PA results and other new information that becomes available. As new information becomes available, it is evaluated against previous PAs and appropriate actions are taken to ensure continued confidence in the regulatory decisions. Therefore, the PA program is a continual process that is not just the development of a PA but seeks to incorporate new information to reduce overall model uncertainty and provide continuing confidence in regulatory decisions. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sodium Components Maintenance Shop (SCMS) Carbonation Vessel – Partial HWMA/RCRA Closure Certification Report

This report documents the Hazardous Waste Management Act (HWMA)/ Resource Conservation and Recovery Act (RCRA) Partial Closure Certification of the Sodium Components Maintenance Shop (SCMS) Carbonation Vessel. The HWMA/RCRA Closure followed the multi step review and evaluation closure process identified in the Idaho National Laboratory (INL) Materials and Fuels Complex (MFC) HWMA/RCRA Partial Permit Closure Plan, October 1, 2015. This closure certification report documents that the SCMS Carbonation Vessel was removed from the SCMS, packaged as hazardous waste and stored for future treatment and disposal, and therefore has met the closure performance standards in accordance with the Department of Energy Idaho National Laboratory Materials and Fuels Complex HWMA/RCRA Partial Permit Closure Plan (EPA No. ID4890008952, October 1, 2015).

99 GENERAL AND MISCELLANEOUS↗

Demonstration Testing of a Thermal Desorption Unit to Receive and Treat Waste with Unlimited Concentration of PCBs - 13437

For the last nine years, EnergySolutions and TD*X Associates LP have teamed up to provide the most comprehensive organic removal treatment process in the radioactive waste industry. The high performance thermal desorption unit (HP-TDU) located at the EnergySolutions Clive facility in Utah has successfully processed over 1,850 tons of organically contaminated radioactive mixed waste. Products from the HP-TDU system include a radioactively contaminated dry solid material that can be disposed in the on-site landfill and an organic condensate with high thermal energy content that is generally below background radiation and capable of free-release to a non-radioactive incinerator. Over the years, Permits and approvals have been obtained through the state of Utah, United States Environmental Protection Agency (USEPA) Region 8, and USEPA headquarters that enable the treatment of several waste categories including volatile and semi-volatile organic compounds, combustion-coded (CMBST) compounds, volatile metals, and polychlorinated biphenyls (PCBs). The unit has recently successfully completed Demonstration Testing for PCB concentrations up to 660,000 ppm (parts per million). Solid processed material from this Demonstration Testing was less than two ppm PCBs in three separate treatment runs; reprocessing or additional treatment was not needed to meet this limit. Through post-demonstration permitting, the system is unlimited in scope as approval has been given to receive and solidify up to pure PCBs down to this processing limit concentration to complete treatment of mixed waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The LLWR's 2011 Environmental Safety Case - 12143

The Low Level Waste Repository (LLWR) is the United Kingdom's principal facility for the disposal of LLW. The LLWR recently submitted an Environmental Safety Case (ESC), which will support applications to regulatory and government authorities to dispose of LLW and to start to install final closure engineering. The ESC is a major submission, with important implications for the future of the LLWR and the United Kingdom's management of LLW. The paper describes the context of the ESC, the ESC, its results and conclusions, and its implementation. The description shows that our ESC is a modern safety case developed as a range of safety arguments concerning our management, scientific and technical understanding, optimisation of the facility, as well as assessment calculations. The LLWR's 2011 ESC is a major submission, with important implications for the future of the LLWR and the United Kingdom's management of LLW. The description given of the scope of the ESC shows that it is a modern safety case developed as a range of safety arguments concerning our management, scientific and technical understanding, optimisation of the facility, as well as assessment calculations. A number of key advances have been made since the previous submission. In particular, the 2011 ESC addresses the criticisms made by the regulator on the previous submission in 2002, including those relating to lack of demonstration of optimisation, high calculated doses and risks compared with guidance levels, treatment of coastal erosion, and treatment of uncertainty. The ESC is being reviewed by the environmental regulator and it is hoped that a new permit for disposal of LLW and installation of closure engineering, along with the appropriate planning permission, will be obtained during 2013. The ESC, including its proposed waste acceptance arrangements, is already being implemented by the LLWR where consistent with our current Permit. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Full Focus Needed on Finishing Hanford's Waste Treatment Plant - 12196

The United States Department of Energy's (US DOE's) Hanford Nuclear Site has 177 underground waste storage tanks located 19 to 24 km (12 to 15 miles) from the Columbia River in south-central Washington State. Hanford's tanks now hold about 212,000 cu m (56 million gallons) of highly radioactive and chemically hazardous waste. Sixty-seven tanks have leaked an estimated 3,785 cu m (1 million gallons) of this waste into the surrounding soil. Further releases to soil, groundwater, and the Columbia River are the inevitable result of the tanks continuing to age. The risk from this waste is recognized as a threat to the Northwest by both State and Federal governments. US DOE and Bechtel National, Inc., are building the Waste Treatment and Immobilization Plant (WTP) to treat and vitrify (immobilize in glass) the waste from Hanford's tanks. As is usual for any groundbreaking project, problems have arisen that must be resolved as they occur if treatment is to take place as specified in the court-enforceable Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) and the Consent Decree, entered into by US DOE, the U.S. Environmental Protection Agency, and the Washington State Department of Ecology (Ecology). At times, US DOE's approach to solving these critical issues seems to have caused undue wastes of time, energy, and, ultimately, public funds. Upon reviewing the history of Hanford's tank waste treatment project, Ecology hopes that constructive criticism of past failures and praise of successes will inspire US DOE to consider changing practices, be more transparent with regulatory agencies and the public, and take a 'lean production' approach to successfully completing this project. All three Tri-Party Agreement agencies share the goal of completing WTP on time, ensuring it is operational and in compliance with safety standards. To do this, Ecology believes US DOE should: - Maintain focus on the primary goal of completing the five major facilities of WTP. - Construct a supplemental low-activity waste (LAW) vitrification facility for the two-thirds balance of LAW that will not be treated by the vitrification facility under construction. - Prepare infrastructure for waste feed from the tanks and facilities to handle the WTP waste streams. To support this project track, Ecology expedites dangerous waste permitting by using a design-build approach to integrate WTP into the Resource Conservation and Recovery Act permit for Hanford. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Russian-Norwegian Cooperation In Regulation of the Public Radiation Protection in the Northwest Russia - 12440

In 1960's, the large technical bases of the Northern Fleet were arranged on the Kola Peninsula. These bases were involved in support of nuclear submarines performing acceptance and storage of radioactive waste (RW) and spent nuclear fuel (SNF). Since 1985, the waste acceptance has been stopped and the technical bases changed their functions to serve as sites of temporary storage (STS). According to the RF Government Directive of 09 February 2000 No 220-r, the STS were put under Rosatom responsibility in order to conduct operations dealing with the SNF and RW management being accumulated during the naval activity and originated from dismantlement of nuclear submarines and surface ships equipped with nuclear powered installations, as well as to carry out environmental remediation of radiation hazardous facilities in this region. The international collaborative assistance is very important to increase effectiveness of such works. This paper includes the findings of cooperation between the Federal Medical Biological Agency (FMBA) and Norwegian Radiation Protection Authority (NRPA) in radiation protection of the public in the course of the STS remediation. Since 2004, the following works has been carried out in this direction: - radiation threat assessment and identification of the priority directions of radiation and hygienic studies; - radiation situation inspections on-site and within the coastal offshore waters at different stage of remediation; - development of the documents including the criteria for the STS remediation and guidelines for radiation monitoring to control the mentioned criteria compliance; - development of the radio-ecological geo-information system. The developed criteria consider four basic options of the STS remediation - renovation, conversion, conservation and liquidation. The main (dose) and derived remediation levels have been determined for each option. The resulted from monitoring radiation parameters - including contents of {sup 137}Cs, {sup 90}Sr and {sup 60}Co in samples of soil, vegetation, seawater, seaweeds, bottom sediments, invertebrates and vertebrates, gamma dose rate values - are integrated in the database, which is the component of the geo-information system. The developed regulative and methodical documents and the geo-information system have been introduced in Regional Management-120 under FMBA of Russia, which is responsible for the radiation safety supervision, Centre of Hygiene and Epidemiology-120 under FMBA of Russia, which carries out regulatory radiation control, and in the operating organization involved in the STS remediation and responsible for radiation protection of workers and public. The works completed have permitted to solve the majority of problems in enhancement of radiation and hygienic supervision of SevRAO operation. However, some relevant questions in this area need additional efforts. In particular, in the course of specification of the design solutions, obtaining additional data on the radiation situation parameters and clarification of the prognostic assessments, the necessity will certainly arise to amend the regulatory documents taking the adopted design solutions into account. We are on the way to real results. Much has been done for the first time, and although it is difficult to foresee all future problems and challenges, our knowledge, experience and close cooperation permit to assess the prospects confidently. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress in the development of the neutron flux monitoring system of the French GEN-IV SFR: simulations and experimental validations [ANIMMA--2015-IO-392]

France has a long experience of about 50 years in designing, building and operating sodium-cooled fast reactors (SFR) such as RAPSODIE, PHENIX and SUPER PHENIX. Fast reactors feature the double capability of reducing nuclear waste and saving nuclear energy resources by burning actinides. Since this reactor type is one of those selected by the Generation IV International Forum, the French government asked, in the year 2006, CEA, namely the French Alternative Energies and Atomic Energy Commission, to lead the development of an innovative GEN-IV nuclear- fission power demonstrator. The major objective is to improve the safety and availability of an SFR. The neutron flux monitoring (NFM) system of any reactor must, in any situation, permit both reactivity control and power level monitoring from startup to full power. It also has to monitor possible changes in neutron flux distribution within the core region in order to prevent any local melting accident. The neutron detectors will have to be installed inside the reactor vessel because locations outside the vessel will suffer from severe disadvantages; radially the neutron shield that is also contained in the reactor vessel will cause unacceptable losses in neutron flux; below the core the presence of a core-catcher prevents from inserting neutron guides; and above the core the distance is too large to obtain decent neutron signals outside the vessel. Another important point is to limit the number of detectors placed in the vessel in order to alleviate their installation into the vessel. In this paper, we show that the architecture of the NFM system will rely on high-temperature fission chambers (HTFC) featuring wide-range flux monitoring capability. The definition of such a system is presented and the justifications of technological options are brought with the use of simulation and experimental results. Firstly, neutron-transport calculations allow us to propose two in-vessel regions, namely the above-core and under-core structures. We verify that they comply with the main objective, that is the neutron power and flux distribution monitoring. HTFC placed in these two regions can detect an inadvertent control rod withdrawal that is a postulated initiating event for safety demonstration. Secondly, we show that the HTFC reliability is enhanced thanks to a more robust physical design and the fact that it has been justified that the mineral insulation is insensitive to any increase in temperature. Indeed, the HTFC insulation is subject to partial discharges at high temperature when the electric field between their electrodes is greater than about 200 V/mm or so. These discharges give rise to signals similar to the neutron pulses generated by a fission chamber itself, which may bias the HTFC count rate at start-up only. However, as displayed in Figure 1, we have experimentally verified that one can discriminate neutron pulses from partial discharges using online estimation of pulse width. Thirdly, we propose to estimate the count rate of a HTFC using the third order cumulant of its signal that is described by a filtered Poisson process. For such a statistic process, it is known that any cumulant, also called cumulative moment, is proportional to the process intensity that is here the count rate of a fission chamber. One recalls that the so-called Campbelling mode of such a detector is actually based on the signal variance, which is the second-order cumulant as well. The use of this extended Campbelling mode based on the third-order cumulant will permit to ensure the HTFC response linearity over the entire neutron flux range using a signal processing technique that is simple enough to satisfy design constraints on electric devices important for nuclear safety. We also show that this technique, named high order Campbelling method (HOC), is significantly more robust than another technique based on the change in the HTFC filling gas, which consists in adding a few percent of nitrogen. Finally, we also present an experimental campaign devoted to the required calibration process of the so-called HOC method. The Campbelling results show a good agreement with the simple pulse counting estimation at low count rates. It is also shown that the HOC technique provides a linear estimation of the count rates at higher power levels as well.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Risks of Hazardous Substances in Radioactive Waste for the Konrad Repository in Germany - 17522

When disposing of radioactive waste with negligible heat generation, the activity of the radionuclides is limited. However, the waste including radioactive material comprises a certain proportion of non-radioactive material. The risk of hazardous contamination of the groundwater by non-radioactive substances must be taken into account. It must be ascertained that the non-radioactive material cannot affect near-surface groundwater, which is a resource for drinking water supply. To achieve this, limit values on the amount of hazardous substances in the total waste volume shall be determined. In 2002 a regulatory approval was granted to the 'Konrad' final storage facility for radioactive waste with negligible heat generation according to the German Water Resources Act. This approval is embedded in the license (plan-approval decision) based on the German Atomic Energy Act. The approval is based on the model of a possible discharge of contaminants from the final storage facility. In a long-term simulation spanning 300,000 years, contact of the waste with the groundwater in the surrounding rock formations over the postoperational phase was conservatively assumed. The maximum amount of allowable disposal of substances - such that no concern of affecting the near-surface groundwater arises - can be derived from the solubility of the respective substances. Implementing the permit according to the Water Resources Act requires: - classification of the waste through delivery declaration obligations - monitoring the substance inspection in the waste to assess its suitability for the disposal, and - stock keeping procedures for the disposal waste by the operator. While the repository is operated by the Federal Office for Radiation Protection (BfS) (http://www.bfs.de./EN/home/home{sub n}ode;), reporting to the Federal Environment Ministry, the statutory water permit is issued and applied by the State of Lower Saxony as responsible state authority. A waste package/container list supplements a comprehensive list of substances. From this - depending on the respectively conditioned waste - material vectors can be derived. For this purpose, BfS provides a database with a substances and container list to the waste owners. In the meantime, first experiences have been collected in applying the approval. More than 540 waste containers with a total mass of almost 6,000 Mg have been controlled and are ready for disposal. In our presentation we will show the recent development in supervising the preparation for the disposal of mixed waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preliminary performance assessment for the Waste Management Area C at the Hanford site in southeast Washington - 15331

A performance assessment of Single-Shell Tank Waste Management Area C located at the U.S. Department of Energy's Hanford Site in southeastern Washington is being conducted to satisfy the requirements of the Hanford Federal Facility Agreement and Consent Order, as well as other Federal requirements and State-approved closure plans and permits. The Waste Management Area C performance assessment assesses the fate, transport, and impacts of radionuclides and hazardous chemicals within residual wastes left in tanks and ancillary equipment and facilities in their assumed closed configuration and the subsequent risks to humans into the far future. The part of the performance assessment focused on radiological impacts is being developed to meet the requirements for a closure authorization under U.S. Department of Energy Order 435.1 that include a waste incidental to reprocessing determination for residual wastes remaining in tanks, ancillary equipment, and facilities. An additional part of the performance assessment will evaluate human health and environmental impacts from hazardous chemical inventories in residual wastes remaining in Waste Management Area C tanks, ancillary equipment, and facilities needed to meet the requirements for permitted closure under the Resource Conservation and Recovery Act of 1976. Preliminary results of the performance assessment are evaluating the groundwater and air pathways to determine radiation exposure once radionuclides are released to the environment due to degradation of the engineered barriers. Per DOE Order 435.1, results of the preliminary analyses are being compared to the performance objectives during the 1,000-year post-closure period of compliance. Per the Order, performance assessment results are also being compared to the performance measures related to acute and chronic inadvertent intruder analyses and groundwater protection. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

MS4 - Municipal Separate Storm Sewer System

Stormwater refers to the rainwater or melted snow that flows over land surfaces - including streets, rooftops, and parking lots - that does not infiltrate into the ground. It is collected by storm drains and conveyed through a network of pipes and channels, eventually discharging into streams, rivers, lakes, or oceans. The storm sewer systems on NREL's South Table Mountain (STM) campus, distinct from the sanitary sewer systems, is known as a Municipal Separate Storm Sewer System (MS4).The Environmental Protection Agency (EPA) issued NREL an MS4 Permit for the STM campus to regulate stormwater operations within the boundaries of the STM campus. The STM campus is the only NREL campus to have an MS4 Permit.

ENERGY PLANNING, POLICY, AND ECONOMY↗

Remote-Controlled Removal of Bricks from a Reactor Shaft: An Unconventional Approach - 16406

The first German prototype Fast Breeder Nuclear Reactor (KNK) is currently being dismantled after being the only operating Fast Breeder-type reactor in Germany. The complete dismantling is based on 10 decommissioning permits. Package 3 of the 9. decommissioning permit, which is currently under preparation, comprises the dismantling of the biological shield. Package 2 comprised the dismantling of the Primary Shield. In preparation to lift the 14 primary shield segments on height of the reactor core, these were milled at 16 positions and equipped with a total of 26 holes. As a result of the milling and drilling process, an estimated amount of 500-600 kg cast iron swarfs accumulated at the bottom of the 12 m deep reactor shaft. The cobalt in the cast iron was activated to cobalt-60 during operation. This results in a measurable dose-rate of 30-35 mSv/h. At the conical bottom of the reactor shaft were still the remaining parts of the thermal insulation consisting of a lining with brick stones, covered with loose remnants of the thermal insulation, loose metallic residues and cut-off wheels of the angel grinder. For the next dismantling step, the removal of the activated part of the biological shield, it is necessary that the cast iron swarfs must be removed as well as the remains of the thermal insulation. Firstly, this is necessary to reduce the dose rate inside the shaft for subsequent breakthrough operations and, secondly to have a statically resilient surface for the installation of a necessary working platform for next dismantling tools. There was no access for personnel. A manual removal was also not possible due to the existing dose rate. The cast iron swarfs supposed to be removed by a remote controlled suction unit, which was installed on top of a drum and mounted in a special rack. The complete system was lowered into the reactor shaft by using a crane. After removing the major amount of swarfs, the remaining swarfs as well as the sheet metal liner should be collected with a magnetic grabber. The solution for the metal removal was easy to realize, but there was no idea how to remove the remaining bricks remote controlled out of the reactor shaft. Another boundary was that only existing facilities were supposed to be used in addition to the new suction system, i.e. the existing cranes, gripper, as well as the double lid lock of the encasing for the handling of the vacuum cleaner, the transport of the drum and the lock procedure. The design essentially consists of a suction unit and a collecting unit. Both units are connected hooked by the three single suspension chains on the rack on the traverse and connection of the suction tube. Subsequently the entire unit was drained in the 12 m deep reactor shaft. The entire unit has been lifted out of the reactor shaft and placed on a defined set-down position. At this position, now both of the units could be separated by using the Master-Slave-Manipulator in the encasing (A100). By using different suction pipes the reactor shaft bottom could be exempted from the cast iron swarfs within a few days. The suction unit worked in such a positive way that it was decided to remove the loose refractory bricks, metallic residues, cut off wheels, etc., too. Metal parts remaining on the ground were removed by a magnet. This pragmatic approach avoided additional complex design works and the need of constructing special solutions and thus, massively saved time, cost and dose rate. The duration of planning, permission including implementation amounted to approximately 3 to 4 months. The additional work could be performed directly after the actual dismantling step.

07 ISOTOPE AND RADIATION SOURCES↗