Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,783 records · Page 99

Romania: Brand-New Engineering Solutions

The HEU spent nuclear fuel transport from Romania was a pilot project in the framework of the Russian Research Reactor Fuel Return Program (RRRFR), being the first fully certified spent nuclear fuel shipment by air. The successful implementation of the Romanian shipment also brought various new technology in the program, further used by other participating countries. Until 2009, the RRRFR program repatriated to the Russian Federation HEU spent nuclear fuel of Russian origin from many countries, like Uzbekistan, Czech Republic, Latvia, Hungary, Kazakhstan and Bulgaria. The means of transport used were various; from specialized TK-5 train for the carriage of Russian TUK-19 transport casks, to platform trains for 20 ft freight ISO containers carrying Czech Skoda VPVR/M casks; from river barge on the Danube, to vessel on the Mediterranean Sea and Atlantic Ocean. Initially, in 2005, the transport plan of the HEU spent nuclear fuel from the National Institute for R&D in Nuclear Physics and Nuclear Engineering 'Horia Hulubei' in Magurele, Romania considered a similar scheme, using the specialized TK-5 train transiting Ukraine to the destination point in the Russian Federation, or, as an alternative, using the means and route of the spent nuclear fuel periodically shipped from the Bulgarian nuclear power plant Kosloduy (by barge on the Danube, and by train through Ukraine to the Russian Federation). Due to impossibility to reach an agreement in due time with the transit country, in February 2007 the US, Russian and Romanian project partners decided to adopt the air shipment of the spent nuclear fuel as prime option, eliminating the need for agreements with any transit countries. By this time the spent nuclear fuel inspections were completed, proving the compliance of the burn-up parameters with the international requirements for air shipments of radioactive materials. The short air route avoiding overflying of any other countries except the country of origin and the country of destination also contributed to the decision making in this issue. The efficient project management and cooperation between the three countries (Russia, Romania and USA) made possible, after two and a half years of preparation work, for the first fully certified spent nuclear fuel air shipment to take place on 29th of June 2009, from Romanian airport 'Henri Coanda' to the Russian airport 'Koltsovo' near Yekaterinburg. One day before that, after a record period of 3 weeks of preparation, another HEU cargo was shipped by air from Romanian Institute for Nuclear Research in Pitesti to Russia, containing fresh pellets and therefore making Romania the third HEU-free country in the RRRFR program.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

ADVANCES IN HEXAVALENT CHROMIUM REMOVAL AT HANFORD

At the Hanford Site, chromium was used as a corrosion inhibitor in the reactor cooling water and was introduced into the groundwater as a result of planned and unplanned discharges from reactors during plutonium production since 1944. Beginning in 1995, groundwater treatment methods were evaluated leading to the use of pump and treat facilities with ion exchange using Dowex 21 K, a regenerable strong base anion exchange resin. This required regeneration of the resin, which is currently performed offsite. Resin was installed in a 4 vessel train, with resin removal required from the lead vessel approximately once a month. In 2007, there were 8 trains (32 vessels) in operation. In 2008, DOE recognized that regulatory agreements would require significant expansion in the groundwater chromium treatment capacity. Previous experience from one of the DOE project managers led to identification of a possible alternative resin, and the contractor was requested to evaluate alternative resins for both cost and programmatic risk reductions. Testing was performed onsite in 2009 and 2010, using a variety of potential resins in two separate facilities with groundwater from specific remediation sites to demonstrate resin performance in the specific groundwater chemistry at each site. The testing demonstrated that a weak base anion single-use resin, ResinTech SIR-700, was effective at removing chromium, had a significantly higher capacity, could be disposed of efficiently on site, and would eliminate the complexities and programmatic risks from sampling, packaging, transportation and return of resin for regeneration. This resin was installed in Hanford's newest groundwater treatment facility, called 100-DX, which began operations in November, 2010, and used in a sister facility, 100-HX, which started up in September of 2011. This increased chromium treatment capacity to 25 trains (100 vessels). The resin is also being tested in existing facilities that utilize Dowex 21 K for conversion to the new resin. This paper will describe the results of the testing, performance in the facilities, continued optimization in the pump and treat facilities, and the estimated savings and non-tangible benefits of the conversion.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

US ITER Moving Forward

US ITER Project Manager Ned Sauthoff, joined by Wayne Reiersen, Team Leader Magnet Systems, and Jan Berry, Team Leader Tokamak Cooling System, discuss the U.S.'s role in the ITER international collaboration.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Embedding Agile Practices within a Plan-Driven Hierarchical Project Life Cycle

Organizations use structured, plan-driven approaches to provide continuity, direction, and control to large, multi-year programs. Projects within these programs vary greatly in size, complexity, level of maturity, technical risk, and clarity of the development objectives. Organizations that perform exploratory research, evolutionary development, and other R&D activities can obtain the benefits of Agile practices without losing the benefits of their program’s overarching plan-driven structure. This paper describes application of Agile development methods on a large plan-driven sensor integration program. While the client employed plan-driven, requirements flow-down methodologies, tight project schedules and complex interfaces called for frequent end-to-end demonstrations to provide feedback during system development. The development process maintained the many benefits of plan-driven project execution with the rapid prototyping, integration, demonstration, and client feedback possible through Agile development methods. This paper also describes some of the tools and implementing mechanisms used to transition between and take advantage of each methodology, and presents lessons learned from the project management, system engineering, and developer’s perspectives.

Agile Development↗

Program Direction FY 2017 Budget At-A-Glance

Program Direction enables EERE to maintain and support a world-class federal workforce to accomplish its mission of creating and sustaining American leadership in the sustainable transportation, renewable power, and energy efficiency sectors. The FY 2017 Program Direction budget request provides resources for program and project management, administrative support, contract administration, human capital management, headquarters and field site non-laboratory facilities and infrastructure, and contractor support.

Budget, Finance, FY 2017, Direction, Program↗

JCESR Scientific Sprints – Better Polymers for Better Batteries

Argonne National Laboratory leads the Joint Center for Energy Storage Research (JCESR), a major collaborative research partnership with the goal of developing next-generation energy storage technologies. JCESR supplements its traditional project management approach with scientific “Sprints.” The Sprint described in this video involved a multidisciplinary team from Argonne, the University of Illinois at Urbana-Champaign, Massachusetts Institute of Technology, and the University of Michigan. As they studied how polymers in solution can react electrochemically to store energy, the team solved a crucial battery problem: “crossover,” which is caused by molecules mixing together when they should not, resulting in reduced performance. Many possible materials were tested, and a set of candidate polymers were chosen that are stable, cheap to make, and suitable for conditions required in batteries. The collaboration allowed timely development that would have taken much longer had the groups been working independently.

25 ENERGY STORAGE↗

Campus Challenge, Part 1: Benefits and Challenges of BACnet

Here, the BACnet protocol was designed to achieve interoperability among building automation vendors and evolve over time to include new functionality as well as support new communication technologies such as the Ethernet and IP protocols as they became prevalent and economical in the market place. For large multi-building, multi-vendor campus environments, standardizing on the BACnet protocol as an implementation strategy can be a key component in meeting the challenge of an interoperable, flexible, and scalable building automation system. The interoperability of BACnet is especially important when large campuses with legacy equipment have DDC upgrades to facilities performed over different time frames and use different contractors that install equipment from different vendors under the guidance of different campus HVAC project managers. In these circumstances, BACnet can serve as a common foundation for interoperability when potential variability exists in approaches to the design-build process by numerous parties over time. Likewise, BACnet support for a range of networking protocols and technologies can be a key strategy for achieving flexible and scalable automation systems as campuses and enterprises expand networking infrastructures using standard interoperable protocols like IP and Ethernet.

42 ENGINEERING↗

Eastern Renewable Generation Integration Study: Redefining What’s Possible for Renewable Energy

NREL project manager Aaron Bloom introduces NREL’s Eastern Renewable Generation Integration Study (ERGIS) and high-performance computing capabilities and new methodologies that allowed NREL to model operations of the Eastern Interconnection at unprecedented fidelity. ERGIS shows that the Eastern Interconnection can balance the variability and uncertainty of wind and solar photovoltaics at a 5-minute level, for one simulated year.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Integration of National Laboratory and Low-Activity Waste Pre-Treatment System Technology Service Providers - 16435

The National Laboratories are a critical partner and provide expertise in numerous aspects of the successful execution of the Direct-Feed Low Activity Waste Program. The National Laboratories are maturing the technologies of the Low-Activity Waste Pre-Treatment System (LAWPS) consistent with DOE Order 413.3B “Program and Project Management for the Acquisition of Capital Assets” expectations. The National Laboratories continue to mature waste forms, i.e. glass and secondary waste grout, for formulations and predictions of long-term performance as inputs to performance assessments. The working processes with the National Laboratories have been developed in procurements, communications, and reporting to support the necessary delivery-based technology support. The relationship continues to evolve from planning and technology development to support of ongoing operations and integration of multiple highly coordinated facilities.

Low-Activity Waste↗

RESolution

RESolution provides simple, one-stop, streamlined access to multiple enterprise business systems. Users may access information, track progress, and complete tasks through either their desktops or mobile devices. Features include: Display items waiting user's action from enterprise applications; Alerts users for important events approaching; Track items that may be of interest to users; Provides user with both a quick glance and details of active and pending procurement related items; Provides site access information for guests and foreign national employees hosted by the user; Search for people and enterprise systems directly from within RESolution; Impersonation allows a user to view RESolution as another user (impersonators must have access privileges to view information); Contains internal integration to the RESolution Project Management Tool and RESolution Publication Management Tool.

Rowe, Andrew↗

INL ART TDO AGR-5/6/7 PIE at Oak Ridge National Laboratory

The Idaho National Laboratory (INL) Advanced Reactor Technologies (ART) Technology Development Office (TDO) is currently supporting a tristructural isotropic (TRISO) fuel development and qualification program, which includes fuel fabrication, test irradiations, and post-irradiation examination (PIE) and safety testing to assess fuel performance during normal irradiation and under accident conditions. PIE work on fuel from the last in the series of test irradiations, Advanced Gas Reactor (AGR)-5/6/7, will begin at Idaho National Laboratory (INL) in approximately September 2020, but because of the complexity of the experiment preparations for the PIE are going to begin in FY2016. The work scope in this memorandum purchase order (MPO) includes Oak Ridge National Laboratory (ORNL) providing project management and technical support to PIE-related activities, providing technical input to the moisture furnace design, providing technical support for development of equipment and techniques for planned PIE evolutions, and contributing general expertise to this effort.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Materials for Advanced Ultra-Supercritical (AUSC) Steam Turbines – AUSC Component Demonstration

The work by the United States Department of Energy (U.S. DOE)/Ohio Coal Development Office (OCDO) Advanced Ultra-Supercritical (AUSC) Steam Boiler and Turbine Materials Consortia from 2001 through September 2015 was primarily focused on lab scale and pilot scale materials testing. The field testing included air-cooled probes and steam-cooled “loops” that were installed into existing utility boilers to gain exposure of these materials to realistic conditions of high temperature and corrosion due to the constituents in the coal ash. Successful research and development resulted in identification of metallic alloy materials and fabrication processes suited for power generation applications with metal temperatures up to approximately 1472°F (800°C). These materials or alloys have shown, in extensive laboratory tests and shop fabrication studies, to have excellent applicability for high-efficiency low CO2 transformational power generation technologies. However, as valuable as these material field tests have been for obtaining information, their scale is significantly below that required to minimize the risk associated with a power company building a multi-billion-dollar AUSC power plant. To decrease the identified risk barriers to full-scale implementation of these advanced materials, the U.S. DOE/OCDO AUSC Steam Boiler and Turbine Materials Consortia identified the key areas of the technology that need to be tested at a larger scale. Based upon the recommendations and outcome of a Consortia-sponsored workshop with the U.S.’s leading utilities, a Component Test (ComTest) Program for AUSC was proposed. The AUSC ComTest program would define materials performance requirements, plan for overall advanced system integration, design critical component tests, fabricate components for testing from advanced materials, and carry out the tests. A Pre-FEED evaluation of the test facility including the evaluation of three potential sites has been completed and previously reported. This report describes the Front-End Engineering Design (FEED), Detailed Engineering and the Environmental Assessment of the ComTest project. A significant amount of work was accomplished during Phase 1 to identity the components, as well as the component size, that would be manufactured from advanced alloys such as INCONEL 740H or HAYNES 282 alloys. Pathways to supply these components for ComTest have been identified as well as any further development that would be required. Every project of this nature has challenges and this project was no exception. The greatest challenge has been the project cost. Largely due to the infrastructure and balance of plant equipment upgrades required for Youngstown Thermal, the estimated project cost for the “base case” project was greater than originally budgeted. The project team spent a significant amount of time exploring opportunities for reducing the project cost. These options included: • Youngstown Thermal was exploring building a Combined Heat and Power (CHP) unit at their facility. The Youngstown Thermal staff, supported by Thermal Engineering Group, worked with the project team to determine whether it was economically desirable to supply ComTest with steam and other utilities, which would be supplied by the CHP project. • The project team also evaluated opportunities to optimize the project scope to reduce cost, such as reducing project scope by eliminating the Superheater Outlet Header test. • Southern Company had offered two sites as possible host locations for ComTest. Both sites had infrastructure in place such as steam from an existing unit, natural gas, cooling water and ample electrical power that would be required to be added at the Youngstown Thermal site. Utilizing this existing infrastructure could reduce the project cost. An additional project challenge was the departure of Babcock and Wilcox from the project in September 2016. This project setback was overcome by GE Power’s willingness to assume the design of the ComTest superheater. Since the project could not proceed without the superheater, this was a very positive project development. The merger of the GE Power and Alstom Power steam turbine divisions created synergies leading to the conclusion that instead of building a small-scale turbine, a more practical and useful endeavor would be to validate the manufacturing technology and supplier readiness for fabricating and machining full scale steam turbine components. Consequently, in March 2017, GE Power decided that a steam turbine test would not be necessary as part of the ComTest demonstration. Removing the operational testing of the steam turbine from ComTest further reduced the total project cost. Additionally, there was an opportunity to move ComTest from Youngstown Thermal to one of the Southern Company sites and operate ComTest at supercritical steam conditions and test the steam turbine main stop/control valve at a temperature and pressure that would be representative of the conditions of a high pressure steam turbine inlet valve. The steam could also possibly be returned to the host boiler so there would be no economic penalty of using this steam for ComTest. Relocating the project could further reduce the project cost due to the infrastructure already in place, including high pressure natural gas and cooling water, and the potential for heat integration, allowing a reduction of operating costs. Due to these potential cost reductions, it was decided to move the project away from Youngstown Thermal in March 2017. As integrating ComTest at the Southern Company site was explored, an issue was raised regarding the integration of the ComTest cycle with the plant steam cycle. Steam would be supplied to ComTest at nominally ~3865 psia and 775°F. The steam would be heated with natural gas to 1400°F for the valve test and then cooled to 1000°F so that the steam would be returned to the host boiler at the same conditions as their high pressure steam turbine inlet. However, there were concerns raised that the addition of the energy (natural gas) to the steam could trigger a New Source Review on the unit. Southern Company did not want ComTest to cause this review, so condensing all of the steam exiting ComTest and returning it to the host steam cycle as condensate was explored to insure there would be no implication that ComTest was adding energy to the host plant’s steam cycle. Ultimately, Southern Company decided that they wanted to “decouple” ComTest from the operating unit, making ComTest self-supporting, similar to the Youngstown Thermal “base case.” Without the steam turbine, the project team reached a consensus that operating the ComTest Superheater and steam turbine valves at the typical pressure of a package boiler (~1000 psig) would not generate enough useful technical information to justify the cost of the test. Therefore, it was decided in the December 2017 project quarterly meeting to cancel the operational phase of ComTest. Throughout the engineering phase of ComTest, manufacturing and supply chain challenges were identified. When GE Power recommended dropping the steam turbine test from ComTest, they identified many important manufacturing issues that should be evaluated and demonstrated. Other challenges had been raised by the GE Power group designing the superheater as well as those engineering components such as pressure relief and steam turbine bypass valves. In the December 2017 meeting, the project team decided that it was more beneficial to the AUSC technology to pursue these manufacturing and supply chain issues as Phase 2 of the ComTest project. This report is organized in the following manner: • Section 2 discusses the ComTest project background and organization. • Section 3 discussed project management. • Section 4 discusses the design of the ComTest AUSC components – the Superheater, steam turbine and Superheater Outlet Header. • Section 5 discusses the implementation of ComTest at Youngstown Thermal and the Southern Company site. • Section 6 discusses the development of the AUSC Supply Chain • Section 7 discusses the recommended plan for Phase 2 of ComTest

01 COAL, LIGNITE, AND PEAT↗

Performance Assurance Planning: Continuous Design-Level Performance of Each Energy Conservation Measure in a Utility Energy Service Contract is Fundamental to Achieving Projected Results

Design-level performance of each energy conservation measure (ECM) in an awarded utility energy service contract (UESC) is fundamental to achieving the projected results through the term of the contract and over the life of the measure. Because the authority for a UESC does not require contractual guarantees of energy, water, or cost savings, FEMP developed a protocol for emphasizing sustained performance to help ensure projected savings are realized. The information and templates offered within this paper reflect responsible project management and oversight, align with UESC best practices, and satisfy the conditions for annual scoring provided by the Office of Management and Budget (OMB). OMB memorandum M-12-21 requires, 'energy savings performance assurances,' 'measurement and verification (M&V) of savings through commissioning and retrocommissioing,' and 'competition or an alternatives analysis as part of the selection process.'

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

SAFETY ANALYSIS REPORT FOR PACKAGING SHIELDING & NUCLEAR CRITICALITY SAFETY COURSES DEVELOPED AND CONDUCTED BY OAK RIDGE NATIONAL LABORATORY

The US Department of Energy (DOE) Packaging Certification Program, Office of Packaging and Transportation, is offering Safety Analysis Report for Packaging (SARP) Shielding and Nuclear Criticality Safety (NCS) courses for SARP generalists and analysts. The SARP generalist course is designed for project managers, supervisors, NCS/shielding subject matter experts (SME), and SMEs in non-NCS/shielding technical areas (e.g., structural, thermal, package design) who need to improve their understanding of how NCS/shielding analyses fit into the broader spectrum of SARP documentation. The generalist course provides an overview of the regulations and guidelines for the criticality and shielding analyses included in a SARP, and it illustrates how the NCS/shielding chapters integrate with the other parts of the SARP. After course material is presented, students in the generalist course will review an actual SARP document to examine key elements of the shielding and criticality analyses. The analyst course provides detailed instructions on the radioactive material package shielding analyses and NCS evaluation fundamentals needed by analysts/practitioners, including safety analysts and/or technical reviewers, to prepare and/or review technical analyses for SARP documentation. The analyst course also provides an overview of regulations and guidelines, in addition to detailed in-class exercises associated with package shielding and NCS analyses. Analysis teams will be faced with staged SARP examples in which several important decision processes in the generation of a SARP will be demonstrated and discussed. Both courses are offered at Oak Ridge National Laboratory, and for interested students, the analyst course is offered for one hour of graduate credit (course ME-690) from the University of Nevada at Reno. An overview of the course will be provided to ensure that the NCS community is aware of the course and its intent to support the shielding and NCS aspects of packaging and transportation analyses for SARP activities.

Bowen, Douglas G.↗

INL ART AGR-5/6/7 PIE at Oak Ridge National Laboratory

Idaho National Laboratory (INL) Advanced Reactor Technologies (ART) is currently supporting a tristructural isotropic (TRISO) fuel development and qualification program, which includes fuel fabrication, test irradiations, and post-irradiation examination (PIE) and safety testing to assess fuel performance during normal irradiation and under potential accident conditions. PIE fuel work from the final test irradiation (Advanced Gas Reactor [AGR]-5/6/7) is expected to commence at INL in early 2021, but the PIE preparations work began in FY2016. The work scope in this statement of work includes Oak Ridge National Laboratory (ORNL) providing project management and technical support to PIE-related activities; technical input to the moisture/air-ingress furnace design, fabrication, and equipment qualification; and technical support for development of equipment and techniques for planned PIE evolutions.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

INL ART AGR-5/6/7 PIE at Oak Ridge National Laboratory

The Idaho National Laboratory (INL) Advanced Reactor Technologies (ART) is currently supporting a tristructural isotropic (TRISO) fuel development and qualification program, which includes fuel fabrication, test irradiations, and post-irradiation examination (PIE) and safety testing to assess fuel performance during normal irradiation and under accident conditions. PIE work on fuel from the last in the series of test irradiations, Advanced Gas Reactor (AGR)-5/6/7, will begin at Idaho National Laboratory (INL) in approximately September 2020, but because of the complexity of the experiment preparations for the PIE are going to begin in FY2016. The work scope in this memorandum purchase order (MPO) includes Oak Ridge National Laboratory (ORNL) providing project management and technical support to PIE-related activities, providing technical input to the moisture furnace design, providing technical support for development of equipment and techniques for planned PIE evolutions, and contributing general expertise to this effort.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗