Search NASA⌕ Search

SEARCH · Search NASA

Results for “RADIOACTIVE WASTE STORAGE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,783 records · Page 99

Development of a Waste Management Organization for the Whiteshell Laboratories Closure Project - 18317

Whiteshell Laboratories (WL) has been generating and managing radioactive waste for over fifty years in support of a wide variety of research and operational applications. The current mission of the WL site, located in Manitoba, Canada, is to fully decommission the site to an approved end-state criterion and to disposition the waste in compliance with national and provincial regulations. To expedite the decommissioning schedule from over thirty years to nine years, which was a contractual commitment for the site operating company, Canadian Nuclear Laboratories (CNL), it became apparent that a centralized and optimized organization be established to coordinate all waste management activities and to fulfill the mission to process, condition, transport and disposition all radioactive wastes, which include Low-Level Waste (LLW), Intermediate-Level Waste (ILW) and High-Level Waste (HLW). The WL Waste Management Division was effectively established as a two-person operation in 2016 and has rapidly expanded to fulfill the mandate of managing nearly 30,000 cubic meters of LLW, ILW and HLW. This paper outlines the early lessons learned from managing important organizational changes without disrupting ongoing work practices; developing executive-level waste management strategies based on options studies and cost-benefit analysis comparisons; selection of storage vs. disposal disposition strategies; evaluation and selection of transportation methods and packages for LLW, ILW and HLW; and the need to develop an entire suite of programmatic documentation and procedures to support and instill a strong conduct of operations culture. The waste management strategy, which now focuses on transporting the waste to another province (Ontario) in a disposal ready form, represents the first large-scale radioactive waste transportation campaign in Canada that includes all three classes of waste. This paper provides additional insight on the overall waste management strategies for the WL Closure Project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Identification and prioritization of high risk deteriorating support infrastructure - 15475

Identification and prioritization for the re-capitalization of deteriorating waste processing and storage support infrastructure and information technology (IT) is essential for a safe, cost effective, and sustainable waste management program. Funding restraints have limited programs to performing only maintenance on aging infrastructure support systems whose operational costs, technological obsolescence, and reliability risks continue to grow without a disciplined and balanced re-capitalization program. Savannah River Site (SRS) comprises both Department of Energy Environmental Management and NNSA missions, and includes a lab, Savannah River National Laboratory. SRS has developed a crosscutting identification and prioritization tool and process that provides integration of all Site mission support infrastructure re-capitalization requirements and prioritizes into a single database that can be readily accessed for infrastructure investment decisions. This database, referred to as the SRS Critical Integrated Infrastructure Priority List (CIIPL) captures risk data that includes impacts toward safety, regulatory compliance, mission, and cost for inclusion in its prioritization process. Further, the CIIPL provides a status of each entered project's readiness for execution that includes funding source, reliability of current cost estimate, and an out year budget profile. The SRS CIIPL, created in 2009, was initially comprised of re-capitalization projects for the Site's common infrastructure (i.e. shared roads and utilities) that supported all Site missions and activities. As mission program funding became constrained, the value for a Site wide integrated prioritization tool became more apparent and the CIIPL grew to include all Site mission and tenant activities which included safeguards and security requirements. The SRS CIIPL has become a highly effective tool for achieving senior management situational awareness of the Site's most pressing support infrastructure and IT needs. The mission programs have used the CIIPL to prioritize and fund high risk projects within their own program budgets. This past year, the CIIPL was used as a budgeting and decision making tool to allocate funding for two common infrastructures high risk projects for the FY16 Site budget submission and has received laudatory comments from DOE headquarters review teams. The SRS CIIPL and its process can be a benefit to other waste management organizations by demonstrating a proven approach toward the integration of support infrastructure and IT re-capitalization requirements across diverse mission and tenant boundaries. The SRS CIIPL can provide senior management with an objective decision making tool that delivers a balanced evaluation of project requirements in terms of multiple risk criteria; safety, regulatory, mission, and cost impacts. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

JET MIXING ANALYSIS FOR SRS HIGH-LEVEL WASTE RECOVERY

The process of recovering the waste in storage tanks at the Savannah River Site (SRS) typically requires mixing the contents of the tank to ensure uniformity of the discharge stream. Mixing is accomplished with one to four slurry pumps located within the tank liquid. The slurry pump may be fixed in position or they may rotate depending on the specific mixing requirements. The high-level waste in Tank 48 contains insoluble solids in the form of potassium tetraphenyl borate compounds (KTPB), monosodium titanate (MST), and sludge. Tank 48 is equipped with 4 slurry pumps, which are intended to suspend the insoluble solids prior to transfer of the waste to the Fluidized Bed Steam Reformer (FBSR) process. The FBSR process is being designed for a normal feed of 3.05 wt% insoluble solids. A chemical characterization study has shown the insoluble solids concentration is approximately 3.05 wt% when well-mixed. The project is requesting a Computational Fluid Dynamics (CFD) mixing study from SRNL to determine the solids behavior with 2, 3, and 4 slurry pumps in operation and an estimate of the insoluble solids concentration at the suction of the transfer pump to the FBSR process. The impact of cooling coils is not considered in the current work. The work consists of two principal objectives by taking a CFD approach: (1) To estimate insoluble solids concentration transferred from Tank 48 to the Waste Feed Tank in the FBSR process and (2) To assess the impact of different combinations of four slurry pumps on insoluble solids suspension and mixing in Tank 48. For this work, several different combinations of a maximum of four pumps are considered to determine the resulting flow patterns and local flow velocities which are thought to be associated with sludge particle mixing. Two different elevations of pump nozzles are used for an assessment of the flow patterns on the tank mixing. Pump design and operating parameters used for the analysis are summarized in Table 1. The baseline pump orientations are chosen by the previous work [Lee et. al, 2008] and the initial engineering judgement for the conservative flow estimate since the modeling results for the other pump orientations are compared with the baseline results. As shown in Table 1, the present study assumes that each slurry pump has 900 gpm flowrate for the tank mixing analysis, although the Standard Operating Procedure for Tank 48 currently limits the actual pump speed and flowrate to a value less than 900 gpm for a 29 inch liquid level. Table 2 shows material properties and weight distributions for the solids to be modeled for the mixing analysis in Tank 48.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrating repositories with fuel cycles: The airport authority model

The organization of the fuel cycle is a legacy of World War II and the cold war. Fuel cycle facilities were developed and deployed without consideration of the waste management implications. This led to the fuel cycle model of a geological repository site with a single owner, a single function (disposal), and no other facilities on site. Recent studies indicate large economic, safety, repository performance, nonproliferation, and institutional incentives to collocate and integrate all back-end facilities. Site functions could include geological disposal of spent nuclear fuel (SNF) with the option for future retrievability, disposal of other wastes, reprocessing with fuel fabrication, radioisotope production, other facilities that generate significant radioactive wastes, SNF inspection (navy and commercial), and related services such as SNF safeguards equipment testing and training. This implies a site with multiple facilities with different owners sharing some facilities and using common facilities - the repository and SNF receiving. This requires a different repository site institutional structure. We propose development of repository site authorities modeled after airport authorities. Airport authorities manage airports with government-owned runways, collocated or shared public and private airline terminals, commercial and federal military facilities, aircraft maintenance bases, and related operations - all enabled and benefiting the high-value runway asset and access to it via taxi ways. With a repository site authority the high value asset is the repository. The SNF and HLW receiving and storage facilities (equivalent to the airport terminal) serve the repository, any future reprocessing plants, and others with needs for access to SNF and other wastes. Non-public special-built roadways and on-site rail lines (equivalent to taxi ways) connect facilities. Airport authorities are typically chartered by state governments and managed by commissions with members appointed by the state governor, county governments, and city governments. This structure (1) enables state and local governments to work together to maximize job and tax benefits to local communities and the state, (2) provides a mechanism to address local concerns such as airport noise, and (3) creates an institutional structure with large incentives to maximize the value of the common asset, the runway. A repository site authority would have a similar structure and be the local interface to any national waste management authority. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Risks from Past, Current, and Potential Hanford Single Shell Tank Leaks

Due to significant delays in constructing and operating the Waste Treatment Plant, which is needed to support retrieval of waste from Hanford’s single shell tanks (SSTs), SSTs may now be required to store tank waste for two to three more decades into the future. Many SSTs were built almost 70 years ago, and all SSTs are well beyond their design lives. Recent examination of monitoring data suggests several of the tanks, which underwent interim stabilization a decade or more ago, may be leaking small amounts (perhaps 150–300 gallons per year) to the subsurface environment. A potential leak from tank T-111 is estimated to have released approximately 2,000 gallons into the subsurface. Observations of past leak events, recently published simulation results, and new simulations all suggest that recent leaks are unlikely to affect underlying groundwater above regulatory limits. However, these recent observations remind us that much larger source terms are still contained in the tanks and are also present in the vadose zone from historical intentional and unintentional releases. Recently there have been significant improvements in methods for detecting and characterizing soil moisture and contaminant releases, understanding and controlling mass-flux, and remediating deep vadose zone and groundwater plumes. To ensure extended safe storage of tank waste in SSTs, the following actions are recommended: 1) Improve capabilities for intrusion and leak detection. 2) Develop defensible conceptual models of intrusion and leak mechanisms. 3) Apply enhanced subsurface characterization methods to improve detection and quantification of moisture changes beneath tanks. 4) Maintain a flux-based assessment of past, present, and potential tank leaks to assess risks and to maintain priorities for applying mitigation actions. 5) Implement and maintain effective mitigation and remediation actions to protect groundwater resources. These actions will enable limited resources to be applied to the most beneficial actions. A systems-based approach will support extended safe storage of tank waste, reduce the risks from tank leaks, and protect human health and the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Tank Vapors in Worker Breathing Zones - Source, Dispersion, and Receptor Data - 20373

A wide range of organic and inorganic chemicals from historical Hanford Site processes are now stored in 177 underground storage tanks at the Hanford tank farms. Workers at the Hanford tank farms have expressed concerns about chemical vapor exposures for many years. During the spring of 2014, worker reports of chemical odors and/or symptoms prompted the development of the Savannah River National Laboratory Hanford Tank Vapor Assessment Team (TVAT) and their resulting independent assessment and recommendations concerning tank farm worker reports of vapors. The Tank Vapor Assessment report included a hypothesis that 'vapors coming out of tanks in high concentration (bolus) plumes sporadically intersected with the breathing zones of workers, resulting in brief but intense exposures to some workers.' The focus of this effort is to present current knowledge to describe the mechanisms by which workers may experience short duration vapor concentrations above background in the tank farms environment. The TVAT hypothesis that workers have experienced concentrations approaching 80% of the tank headspace up to 3 meters (10 feet) from tank sources is not supported by sampling data or modeling results. Modeling indicates that concentrations are quickly reduced from the source, and that the upper end of predicted concentrations at worker breathing zones are a factor of 10 or more lower than source concentrations. Area measurements corroborate the fact that worker breathing zone concentrations are 10 to 100 times lower than source concentrations, and events with elevated concentrations are rare. These reduced vapor concentration levels may result in detectable odors or irritation, depending on a worker's specific odor threshold and sensitivity to the chemical species. Short-duration vapor events may be mitigated by evaluating daily atmospheric conditions in conjunction with planned tank farm activities. Monitoring changing conditions related to tank vapors concentrations at the source and within worker breathing zone is also an important step to protect workers from short duration elevated concentration events. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Protecting the Columbia River through Removal and Packaging of Radioactive Sludge in Hanford's K Area - 16572

The Columbia River once provided power and cooling water to operations on the Hanford Site; today, more than a million people downstream from Hanford rely on the river for agriculture, fishing and recreation. The Department of Energy and contractor CH2M HILL Plateau Remediation Company (CH2M) is making significant progress in protecting that vital resource. Eight of nine reactors along the river have been cocooned and soil and groundwater remediation is successfully reducing the concentration of contaminants in groundwater. The 100-K area is the last area where significant work remains to protect the river. CH2M has accomplished much in the past ten years, including demolishing the K East reactor fuel storage basin in 2009. Prior to demolition of the basin, highly radioactive sludge from that basin was transferred into containers located in the nearby K West reactor fuel storage basin. Today, the K East reactor is in interim surveillance mode, and work is underway in the K West basin to remove the sludge, which is a mixture of tiny fuel corrosion particles, fuel rod and metal fragments and soil and sand less than 1/4-inch in diameter. CH2M has designed a sludge removal system that will safely and efficiently remove the sludge from the K West basin and deposit it into specially designed containers which will be relocated to a storage facility on Hanford's Central Plateau. Procurement, fabrication and delivery of the sludge removal system is underway, with extensive testing and training planned for 2016 and 2017 ahead of the goal of removing sludge from the river by September 30, 2018. This project must account for many technical and safety considerations that render the project very challenging. Several safety measures have been incorporated as a result of safety evaluations. This paper will describe the issues facing the project team in developing the safety basis requirements and incorporating them into the design of the process equipment and construction of the facility to house the repackaging operations. This paper will allow CH2M and DOE-RL to share lessons learned and progress to date with other complex and hazardous projects across the DOE complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Water Chemistry Control System for Recovery of Damaged and Degraded Spent Fuel

The International Atomic Energy Agency (IAEA) and the government of Serbia have led the project cosponsored by the U.S, Russia, European Commission, and others to repackage and repatriate approximately 8000 spent fuel elements from the RA reactor fuel storage basins at the VIN?A Institute of Nuclear Sciences to Russia for reprocessing. The repackaging and transportation activities were implemented by a Russian consortium which includes the Sosny Company, Tekhsnabeksport (TENEX) and Mayak Production Association. High activity of the water of the fuel storage basin posed serious risk and challenges to the fuel removal from storage containers and repackaging for transportation. The risk centered on personnel exposure, even above the basin water, due to the high water activity levels caused by Cs-137 leached from fuel elements with failed cladding. A team of engineers from the U.S. DOE-NNSA's Global Threat Reduction Initiative, the Vinca Institute, and the IAEA performed the design, development, and deployment of a compact underwater water chemistry control system (WCCS) to remove the Cs-137 from the basin water and enable personnel safety above the basin water for repackaging operations. Key elements of the WCCS system included filters, multiple columns containing an inorganic sorbent, submersible pumps and flow meters. All system components were designed to be remotely serviceable and replaceable. The system was assembled and successfully deployed at the Vinca basin to support the fuel removal and repackaging activities. Following the successful operations, the Cs-137 is now safely contained and consolidated on the zeolite sorbent used in the columns of the WCCS, and the fuel has been removed from the basins. This paper reviews the functional requirements, design, and deployment of the WCCS.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cavern/Vault Disposal Concepts and Thermal Calculations for Direct Disposal of 37-PWR Size DPCs

This report provides two sets of calculations not presented in previous reports on the technical feasibility of spent nuclear fuel (SNF) disposal directly in dual-purpose canisters (DPCs): 1) thermal calculations for reference disposal concepts using larger 37-PWR size DPC-based waste packages, and 2) analysis and thermal calculations for underground vault-type storage and eventual disposal of DPCs. The reader is referred to the earlier reports (Hardin et al. 2011, 2012, 2013; Hardin and Voegele 2013) for contextual information on DPC direct disposal alternatives.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transuranic Waste Volume Reduction Methods for Los Alamos National Laboratory

Los Alamos National Laboratory (LANL, or the Lab) is one of the United States’ (U.S.) weapons complex nuclear security laboratories; it is owned by the Department of Energy (DOE) and operated by Triad National Security, LLC. LANL’s mission is to solve national security challenges through scientific excellence, which includes nuclear deterrence and stockpile stewardship. Such activities generate a variety of radioactive waste types, including transuranic (TRU) waste. The National Nuclear Security Administration (NNSA) is under a congressional mandate to produce no fewer than 80 plutonium pits per year by 2030 to meet Department of Defense requirements and support the nuclear deterrent. LANL is responsible for producing at least 30 pits per year by 2026, while the Savannah River Site will produce 50 pits per year by 2030. As of August 2018, the NNSA TRU waste inventory at LANL was at 53% capacity. In order to ensure the nuclear material missions are able to continue uninterrupted, the storage of TRU waste needs to remain below 60% of total capacity. As LANL increases production and prepares to meet the 30 pits per year goal, waste generation will increase substantially. Thus, there is a need to rejuvenate current infrastructure and implement TRU waste reduction methods in the coming years.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Summary of Calcine Disposal Development Using Hot Isostatic Pressing

Battelle Energy Alliance, LLC, has demonstrated the effectiveness of the hot isostatic press (HIP) process for treatment of hazardous high-level waste known as calcine that is stored at the Idaho Nuclear Technology and Engineering Center (INTEC) at Idaho National Laboratory. HIP trials performed with simulated calcines at Idaho National Laboratory’s Materials and Fuels Complex and an Australian Nuclear Science and Technology Organization facility from 2007 to 2010 produced a dense, monolithic waste form with increased chemical durability and effective (storage) volume reductions of ~10 to ~70% compared to granular calcine forms. In December 2009, the U.S. Department of Energy signed an amended Record of Decision selecting HIP technology as the treatment method for the 4,400 m3 of granular zirconia and alumina calcine stored at INTEC. Testing showed that HIP treatment reduces the risks associated with radioactive and hazardous constituent release, post-production handling, and long-term (repository) storage of calcines and would result in estimated storage cost savings in the billions of dollars. Battelle Energy Alliance has the ability to complete pilot-scale HIP processing of INTEC calcine, which is the next necessary step in implementing HIP processing as a calcine treatment method.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overview of Remote Handling Equipment Used for the NPP A1 Decommissioning - 12141

The first Czechoslovak NPP A1 was in operation from 1972 to 1977 and it was finally shutdown due to an accident (level 4 according to the INES). The presence of radioactive, toxic or hazardous materials limits personnel access to facilities and therefore it is necessary to use remote handling technologies for some most difficult characterization, retrieval, decontamination and dismantling tasks. The history of remote handling technologies utilization started in nineties when the spent nuclear fuel, including those fuel assemblies damaged during the accident, was prepared for the transport to Russia. Subsequent significant development of remote handling equipment continued during implementation of the NPP A1 decommissioning project - Stage I and ongoing Stage II. Company VUJE, Inc. is the general contractor for both mentioned stages of the decommissioning project. Various remote handling manipulators and robotics arms were developed and used. It includes remotely controlled vehicle manipulator MT-15 used for characterisation tasks in hostile and radioactive environment, special robust manipulator DENAR-41 used for the decontamination of underground storage tanks and multi-purposes robotics arms MT-80 and MT-80A developed for variety of decontamination and dismantling tasks. The heavy water evaporator facility dismantling is the current task performed remotely by robotics arm MT-80. The heavy water evaporator is located inside the main production building in the room No. 220 where loose surface contamination varies from 10 Bq/cm{sup 2} to 1x10{sup 3} Bq/cm{sup 2}, dose rate is up to 1.5 mGy/h and the feeding pipeline contained liquid RAW with high tritium content. Presented manipulators have been designed for broad range of decommissioning tasks. They are used for recognition, sampling, waste retrieval from large underground tanks, decontamination and dismantling of technological equipments. Each of the mentioned fields claims specific requirements on design of manipulator, their operation and control systems as well as tools of manipulators. Precise planning of decontamination and dismantling tasks is necessary for its successful performance by remotely controlled manipulator. The example of the heavy water evaporator demonstrates typical procedure for decommissioning of contaminated technological equipment by remotely controlled manipulators - planning of decommissioning tasks, preparatory tasks, modification of applied tools and design of specific supporting constructions for manipulator and finally decontamination and dismantling themselves. Due to the particularly demanding conditions in highly contaminated A1 NPP, a team of experts with special know-how in the field of decommissioning has grown up, and unique technological equipment enabling effective and safe work in environment with a high radiation level has been developed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preliminary waste management plan of European spallation

The European Spallation Source (ESS) is the European common effort in designing and building a next generation large-scale user facility for studies of the structure and dynamics of materials. The proposed schematic layout of the ESS facility is based on a linear driver (linac) directing the proton beam (5 MW of 2.5 GeV) of 2.8 ms long pulses with a 20 Hz on a tungsten target where neutrons are produced via spallation reactions. Further the neutrons will be moderated to thermal and sub-thermal energies in a couple of moderators placed around the target. The moderators feed 22 beamlines guiding the neutrons to the scattering instruments, mainly for neutron scattering research, as has been previously mentioned. The objective of this work is to develop a waste management plan for ESS facility. In this respect two important aspects are analyzed. First the present status of the problem is outlined as follow. Estimate types and quantities of waste that the ESS project will generate at different stages: commission, operation, decommissioning were derived using: i) precise Monte Carlo calculations ii) scaling the activity from the operation experience of the existing spallation source installations for waste such it is difficult to predict level of activation or for components of the facility in stage of the preconceptual model. Associated waste treatment/conditioning options and final disposal route were further analyzed in order to define the waste type and packet descriptions in agreement with Swedish regulations and policy. It was found that the compilation of completely new waste type descriptions for qualification of the ESS waste for disposal will be necessary. Particular attention was devoted to 'problematic waste' as Beryllium reflector, C-14 from graphite used as core zone of the beam-dump and collimators or waste arising from the purification systems of both Helium and water cooling circuits. Management of waste on ESS site: collection/segregation systems, characterization system, storage options, is also described. In the second step, the acquired information is used for planning and implementing actions involving all participants (ESS, treatment facility operator, disposal operator, regulatory body and other authorized authorities). (authors)

07 ISOTOPE AND RADIATION SOURCES↗

SLUDGE WASHING AND DEMONSTRATION OF THE DWPF FLOWSHEET IN THE SRNL SHIELDED CELLS FOR SLUDGE BATCH 7A QUALIFICATION

Waste Solidification Engineering (WSE) has requested that characterization and a radioactive demonstration of the next batch of sludge slurry (Sludge Batch 7a*) be completed in the Shielded Cells Facility of the Savannah River National Laboratory (SRNL) via a Technical Task Request (TTR). This characterization and demonstration, or sludge batch qualification process, is required prior to transfer of the sludge from Tank 51 to the Defense Waste Processing Facility (DWPF) feed tank (Tank 40). The current WSE practice is to prepare sludge batches in Tank 51 by transferring sludge from other tanks. Discharges of nuclear materials from H Canyon are often added to Tank 51 during sludge batch preparation. The sludge is washed and transferred to Tank 40, the current DWPF feed tank. Prior to transfer of Tank 51 to Tank 40, SRNL simulates the Tank Farm and DWPF processes with a Tank 51 sample (referred to as the qualification sample). Sludge Batch 7a (SB7a) is composed of portions of Tanks 4, 7, and 12; the Sludge Batch 6 heel in Tank 51; and a plutonium stream from H Canyon. SRNL received the Tank 51 qualification sample (sample ID HTF-51-10-125) following sludge additions to Tank 51. This report documents: (1) The washing (addition of water to dilute the sludge supernate) and concentration (decanting of supernate) of the SB7a - Tank 51 qualification sample to adjust sodium content and weight percent insoluble solids to Tank Farm projections. (2) The performance of a DWPF Chemical Process Cell (CPC) simulation using the washed Tank 51 sample. The simulation included a Sludge Receipt and Adjustment Tank (SRAT) cycle, where acid was added to the sludge to destroy nitrite and reduce mercury, and a Slurry Mix Evaporator (SME) cycle, where glass frit was added to the sludge in preparation for vitrification. The SME cycle also included replication of five canister decontamination additions and concentrations. Processing parameters were based on work with a non-radioactive simulant. (3) Vitrification of a portion of the SME product and characterization and durability testing (as measured by the Product Consistency Test (PCT)) of the resulting glass. (4) Rheology measurements of the initial slurry samples and samples after each phase of CPC processing. This program was controlled by a Task Technical and Quality Assurance Plan (TTQAP), and analyses were guided by an Analytical Study Plan. This work is Technical Baseline Research and Development (R&D) for the DWPF. It should be noted that much of the data in this document has been published in interoffice memoranda. The intent of this technical report is bring all of the SB7a related data together in a single permanent record and to discuss the overall aspects of SB7a processing.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A STRUCTURAL IMPACT ASSESSMENT OF FLAWS DETECTED DURING ULTRASONIC EXAMINATION OF TANK 15

Ultrasonic (UT) inspection of Tank 15 was conducted between April and July 2007 in accordance with the Tank 15 UT inspection plan. This was a planned re-inspection of this tank, the previous one was performed in 2002. Ten cracks were characterized in the previous examination. The re-inspection was performed to verify the present models and understanding for stress corrosion cracking. During this re-examination, one indication that was initially reported as a 'possible perpendicular crack <25% through wall' in 2002, was clearly shown not to be a crack. Additionally, examination of a new area immediately adjacent to other cracks along a vertical weld revealed three new cracks. It is not known when these new cracks formed as they could very well have been present in 2002 as well. Therefore, a total of twelve cracks were evaluated during the re-examination. A critical review of the information describing stress corrosion crack behavior for the SRS waste tanks, as well as a summary review of the service history of Tank 15, was performed. Each crack was then evaluated for service exposure history, consistency of the crack behavior with the current understanding of stress corrosion cracking, and present and future impact to the structural integrity of the tank. Crack instability calculations were performed on each crack for a bounding waste removal loading condition in Tank 15. In all cases, the crack behavior was determined to be consistent with the previous understanding of stress corrosion cracking in the SRS waste tank environment. The length of the cracks was limited due to the short-range nature of the residual stresses near seam, repair and attachment welds. Of the twelve cracks, nine were located in the vapor space above the sludge layer, including the three new cracks. Comparison of the crack lengths measured in 2002 and 2007 revealed that crack growth had occurred in four of the six previously measured vapor space cracks. However, the growth remained within the residual stress zone. None of the three cracks beneath the sludge showed evidence of growth. The impact of the cracks that grew on the future service of Tank 15 was also assessed. Tank 15 is expected to undergo closure activities including sludge waste removal. A bounding loading condition for waste removal of the sludge at the bottom of Tank 15 was considered for this analysis. The analysis showed that the combination of hydrostatic, seismic, pump and weld residual stresses are not expected to drive any of the cracks identified during the Tank 15 UT inspection to instability. Wall thickness mapping for general thinning and pitting was also performed. No significant wall thinning was observed. The average wall thickness values were well above nominal. Two isolated pit-like indications were observed. Both were approximately 30 mils deep. However, the remaining wall thickness was still greater than nominal specified for the original construction plate material. It was recommended that a third examination of selected cracks in Tank 15 be performed in 2014. This examination would provide information to determine whether any additional detectable degradation is occurring in Tank 15 and to supplement the basis for characterization of conditions that are non-aggressive to tank corrosion damage. The in-service inspection program is re-evaluated on a three year periodicity. The Type I and II tanks are not active receipt tanks at present, and are therefore not a part of the In-Service Inspection Program for the Type III Tanks [1]. Changes to the mission for Tank 15 and other Type I and II tanks may be considered by the In-Service Inspection Review Committee (ISIRC) and the program adjusted accordingly.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Operations research modeling in support of the Hanford direct feed low activity waste program - 15538

Operations Research (OR) modeling is a supplemental system planning tool for the Hanford Tank Farm Contractor. OR models are designed to quantify the impact of equipment failures and other constraints on mission duration; to determine overall system performance; and to identify any potential bottleneck areas and identify any potential improvement areas. OR models are being developed to provide critical insights into the expected operational performance of current and planned facilities and to help identify any operational risks which impact performance of plant and equipment. This information is used to aid decision making on facility design and operations. A new OR model is being developed in support of the Direct Feed Low Activity Waste (DFLAW) Program and will be a valuable tool in the development of overall operational and management strategies as well as providing input to facility design. The OR model will identify predicted system availability, process bottlenecks, and key equipment influencing system performance. The OR model will also test proposed solutions to improve system availability by resolving process bottlenecks and provide this information to the design agent for incorporation into the DFLAW process design. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation and Application of Phyto-remediation at FUSRAP Projects - 16275

The Niagara Falls Storage Site (NFSS) and associated vicinity properties (VPs) occupy approximately 607 hectares (1,500 acres) of the original 3,035-hectare (7,500-acre) Lake Ontario Ordnance Works (LOOW). The NFSS was used to store radioactive materials, residues and waste from uranium ore processing between 1944 and 1952. A field-study is currently underway to evaluate the potential use of hybridized trees to stabilize radionuclides, mainly uranium, and chlorinated solvents derived from trichloroethylene degradation in groundwater at the NFSS. The purpose of this effort is to support the USACE-Buffalo District in the evaluation and implementation of phyto-remediation approaches to contain groundwater impacts on the site. This demonstration project is considered a site maintenance action and will have relevance to the Formerly Utilized Sites Remedial Action Program (FUSRAP) mission. The demonstration is designed to determine the ability of trees to withstand and uptake Uranium (U), and to a lesser extent Trichloroethylenes (TCEs), and hydraulically control groundwater where historical practices produced a series of disconnect plumes. Although the groundwater at the NFSS is naturally high in total dissolved solids that preclude untreated consumption, the groundwater contaminant levels are very high in some areas and may limit the options for future site re-use. Active groundwater remediation is impractical due to the clayey site soils and low risk of transport. The phyto-remediative approach is a passive action to lessen the groundwater impacts during the project's life cycle and property re-use planning. The target contaminant sources and plumes occur near the property boundaries, along legacy sanitary sewer lines, and near on-site surface-water courses. The demonstration includes soil characteristic determinations, the testing of optimal hybrid tree species, field implementation at target sites, and soil moisture and groundwater monitoring during the long-term evaluation phase. The final disposition of the trees will be included in future site decision and maintenance documents. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗