Search NASA⌕ Search

SEARCH · Search NASA

Results for “launch control systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,783 records · Page 99

Mercury contamination study for flight system safety

The effects and prevention of possible mercury pollution from the failure of solar electric propulsion spacecraft using mercury propellant were studied from tankage loading of post launch trajector injection. During preflight operations and initial flight mode there is little danger of mercury pollution if proper safety precautions are taken. Any spillage on the loading, mating, transportation, or launch pad areas is obvious and can be removed by vacuum cleaning soil and chemical fixing. Mercury spilled on Cape Kennedy ground soil will be chemically complexed and retained by the sandstone subsoil. A cover layer of sand or gravel on spilled mercury which has settled to the bottom of a water body adjacent to the system operation will control and eliminate the formation of toxic organic mercurials. Mercury released into the earth's atmosphere through leakage of a fireball will be diffused to low concentration levels. However, gas phase reactions of mercury with ozone could cause a local ozone depletion and result in serious ecological hazards.

Gorzynski, C. S., Jr.↗

The Space Shuttle - Key considerations

Typical Space Shuttle flight operations, including launch/insertion, on-orbit operations, de-orbit, and ground turnaround, are summarized. The orbiter, main engine, and solid rocket boosters will be reusable. The Shuttle will be able to abort ascent and return the orbiter plus payload to the launch site if necessary. Mission capabilities include a 7-30 day duration, crew of 4-7 (with 1-4 payload specialists), and 14,500-29,500 kg payloads. Payload accommodations, including cabin, crew provisions, pointing and position stability, thermal constraints, electric power, communications, payload deployment and retrieval, contamination control, and kits for extended missions, are considered. The Thermal Protection System, utilizing pyrolized carbon and silica tiles, is described. The Space Shuttle Main Engine design and performance are considered and compared to those of the J-2 engine used on Saturn/Apollo missions.

Malkin, M. S.↗

The simulation of time varying ascent loads on arrays of Shuttle tiles in a large transonic tunnel

A large variety of tests were made to determine the strength, fatigue and thermal characteristics of the thermal-protection system of the Shuttle orbiter. The present paper describes first-launch-critical tests which were conducted in the Langley 8-Foot Transonic Pressure Tunnel (8'TPT) which simulated the time histories of Shuttle ascent loads on tile arrays bonded to structures which accurately duplicated those of the Shuttle. The time varying free-stream conditions were provided by controlling the deflection angle history of diffuser spoiler flaps in an automated way. Time histories of the critical-load parameters imposed on the tile arrays in the tunnel are compared in the paper to those expected in flight. In addition, the effect of repeated load pulses on the smoothness of the surface and condition of the tiles is discussed briefly.

Bobbitt, P. J.↗

Space Flight Operations Center local area network

The existing Mission Control and Computer Center at JPL will be replaced by the Space Flight Operations Center (SFOC). One part of the SFOC is the LAN-based distribution system. The purpose of the LAN is to distribute the processed data among the various elements of the SFOC. The SFOC LAN will provide a robust subsystem that will support the Magellan launch configuration and future project adaptation. Its capabilities include (1) a proven cable medium as the backbone for the entire network; (2) hardware components that are reliable, varied, and follow OSI standards; (3) accurate and detailed documentation for fault isolation and future expansion; and (4) proven monitoring and maintenance tools.

Goodman, Ross V.↗

Space Shuttle 2 Advanced Space Transportation System. Volume 1: Executive Summary

An investigation into the feasibility of establishing a second generation space transportation system is summarized. Incorporating successful systems from the Space Shuttle and technological advances made since its conception, the second generation shuttle was designed to be a lower-cost, reliable system which would guarantee access to space well into the next century. A fully reusable, all-liquid propellant booster/orbiter combination using parallel burn was selected as the base configuration. Vehicle characteristics were determined from NASA ground rules and optimization evaluations. The launch profile was constructed from particulars of the vehicle design and known orbital requirements. A stability and control analysis was performed for the landing phase of the orbiter's flight. Finally, a preliminary safety analysis was performed to indicate possible failure modes and consequences.

Adinaro, James N.↗

Lunar surface vehicle model competition

During Fall and Winter quarters, Georgia Tech's School of Mechanical Engineering students designed machines and devices related to Lunar Base construction tasks. These include joint projects with Textile Engineering students. Topics studied included lunar environment simulator via drop tower technology, lunar rated fasteners, lunar habitat shelter, design of a lunar surface trenching machine, lunar support system, lunar worksite illumination (daytime), lunar regolith bagging system, sunlight diffusing tent for lunar worksite, service apparatus for lunar launch vehicles, lunar communication/power cables and teleoperated deployment machine, lunar regolith bag collection and emplacement device, soil stabilization mat for lunar launch/landing site, lunar rated fastening systems for robotic implementation, lunar surface cable/conduit and automated deployment system, lunar regolith bagging system, and lunar rated fasteners and fastening systems. A special topics team of five Spring quarter students designed and constructed a remotely controlled crane implement for the SKITTER model.

Source record↗

Launch vehicle performance using metallized propellants

Metallized propellant propulsion systems are considered as replacements for the solid rocket boosters and liquid sustainer stages on the current launch vehicles: both the Space Transportation System (STS) and the Titan 4. Liquid rocket boosters for the STS were analyzed as replacements for current solid rocket boosters. These boosters can provide a liquid propulsion system within the volume constraints of a solid rocket booster. A replacement for the Space Shuttle Main Engines using metallized O2/H2/Al was studied. The liquid stages of the Titan 4 were also investigated; the Aerozine-50 (A-50) fuel was replaced with metallized storable A-50/Al. A metallized propellant is similar to a traditional liquid propellant. However, it has metal particles, such as aluminum, that are suspended in a gelled fuel, such as hydrogen, RP-1, A-50 or monomethyl hydrazine (MMH). The fuels then undergo combustion with liquid oxygen or nitrogen tetroxide (NTO). These propellants provide options for increasing the performance of existing launch vehicle chemical propulsion systems by increasing fuel density or specific impulse or both. These increases in density and specific impulse can significantly reduce the propulsion system liftoff weight and allow a liquid rocket booster to fit into the same volume as an existing solid rocket booster. Also, because gelled fuels are akin to liquid propellants, metallized systems can provide enhanced controllability over solid propulsion systems. Gelling of the propellant also reduces the sensitivity to impacts and consequently reduces the propellant explosion hazard.

Palaszewski, Bryan A.↗

Personnel Launch System definition

A lifting-body Personnel Launch System (PLS) is defined for assured manned access to space for future U.S. space missions. The reusable craft described is configured for reliable and safe operations, maintainability, affordability, and improved operability, and could reduce life-cycle costs associated with placing personnel into orbit. Flight simulations show the PLS to be a very flyable vehicle with very little control and propellant expenditure required during entry. The attention to crew safety has resulted in the design of a system that provides protection for the crew throughout the mission profile. However, a new operations philosophy for manned space vehicles must be adopted to fully achieve low-cost, manned earth-to-orbit transportation.

Piland, William M.↗

Launch vehicle performance using metallized propellants

Metallized propellant propulsion systems are considered as replacements for the solid rocket boosters and liquid sustainer stages on the current launch vehicles: both the Space Transportation System (STS) and the Titan 4. Liquid rocket boosters for the STS were analyzed as replacements for current solid rocket boosters. These boosters can provide a liquid propulsion system within the volume constraints of a solid rocket booster. A replacement for the Space Shuttle Main Engines using metallized 02/H2/A1 was studied. The liquid stages of the Titan 4 were also investigated; the Aerozine-50 (A-50) fuel was replaced with metallized storable A-50/A1. A metallized propellant is similar to a traditional liquid propellant. However, it has metal particles, such as aluminum, that are suspended in a gelled fuel, such as hydrogen, RP-1, A-50 or monomethyl hydrazine (MMH). The fuels then undergo combustion with liquid oxygen or nitrogen tetroxide (NTO). These propellants provide options for increasing the performance of existing launch vehicle chemical propulsion systems by increasing fuel density or specific impulse or both. These increases in density and specific impulse can significantly reduce the propulsion system liftoff weight and allow a liquid rocket booster to fit into the same volume as an existing solid rocket booster. Also, because gelled fuels are akin to liquid propellants, metallized systems can provide enhanced controllability over solid propulsion systems. Gelling of the propellant also reduces the sensitivity to impacts and consequently reduces the propellant explosion hazard.

Palaszewski, Bryan↗

Truss structure tele-manipulation experiment using ETS-7

A robot experiment concept of space truss telemanipulation by National Aerospace Laboratory (NAL) is described in its flight model development. The experiment will be carried out on the Engineering Test Satellite No. 7 (ETS-7) using its robot arm. The satellite is scheduled to be launched in 1997 by National Space Development Agency of Japan (NASDA). The truss flight model is composed of deployable truss system and assemble truss joint. Those truss components will be manipulated by the ETS-7 robot arm using its small grapple fixture type-N (GPF-N), and the experimental task operation will be executed from the ground control station.

Matsumoto, Kohtaro↗

Design of the Heat Receiver for the U.S./Russia Solar Dynamic Power Joint Flight Demonstration

A joint U.S./Russia program is being conducted to develop, fabricate, launch, and operate a solar dynamic demonstration system on Space Station Mir. The goal of the program is to demonstrate and confirm that solar dynamic power systems are viable for future space applications such as the International Space Station Alpha The major components of the system include a heat receiver, a closed Brayton cycle power conversion unit, a power conditioning and control unit, a concentrator, a radiator, a thermal control system, and a Space Shuttle Carrier. This paper discusses the design of the heat receiver component. The receiver comprises a cylindrical cavity, the walls of which are lined with a series of tubes running the length of the cavity. The engine working fluid, a mixture of xenon and helium, is heated by the concentrated sunlight incident on these tubes. The receiver incorporates integral thermal storage, using a eutectic mixture of lithium fluoride and calcium difluoride as the thermal storage solid-to-liquid phase change materiaL This thermal storage is required to enable power production during eclipse. The phase change material is contained in a series of individual containment canisters.

Strumpf, Hal J.↗

The Lifting Body Legacy...X-33

NASA has a technology program in place to enable the development of a next generation Reusable Launch Vehicle that will carry our future payloads into orbit at a much-reduced cost. The VentureStar, Lifting Body (LB) flight vehicle, is one of the potential reusable launch vehicle configurations being studied. A LB vehicle has no wings and derives its lift solely from the shape of its body, and has the unique advantages of superior volumetric efficiency, better aerodynamic efficiency at high angles-of-attack and hypersonic speeds, and reduced thermal protection system weight. Classically, in a ballistic vehicle, drag has been employed to control the level of deceleration in reentry. In the LB, lift enables the vehicle to decelerate at higher altitudes for the same velocity and defines the reentry corridor which includes a greater cross range. This paper outlines the flight stability and control aspects of our LB heritage which was utilized in the design of the VentureStar LB and its test version, the X-33. NASA and the U.S. Air Force have a rich heritage of LB vehicle design and flight experience. In the initial LB Program, eight LB's were built and over 225 LB test flights were conducted through 1975. Three LB series were most significant in the advancement of today's LB technolocy: the M2-F; the HL-10; and the X-24 series. The M2-F series was designed by NASA Ames Research Center, the HL-10 series by NASA Langley Research Center, and the X-24 series by the U. S. Air Force. LB vehicles are alive again today with the X- 33, X-38, and VentureStar.

Barret, Chris↗

Gap-Opening, Disk Clearing, and the Survival of the Regular Satellites of Jupiter and Saturn

It is only recently that the theory of disk-companion interactions yields migration rates due to the gas tidal torque that are in agreement with numerical simulations and up to an order of magnitude slower than previous estimates. Also, for a weakly turbulent disk, the gap size is controlled primarily by the damping length of acoustic waves launched by the secondary at Lindblad resonances, which in turn depends on whether the waves are 2D or 3D. At least for small azimuthal wavenumbers this damping length is of the order of the radial location of the Lindblad resonance. This may have important consequences for disk dispersal in satellite systems. In the case of Jupiter, it means that the inner Galilean satellites may have jointly opened a gap. On the other hand, in Saturn's system the satellites inside of Titan are probably too small to have opened gaps in the gas disk at the time of their formation; but the possibility exists that, by effectively clearing the gas disk inside its own orbit, Titan may have allowed smaller satellites to survive, depending on whether Titan can clear the disk in a timescale comparable to the migration rates due to gas drag and gas tidal torque for these objects.

Estrada, P. R.↗

2nd Generation QUATARA Flight Computer Project

Single core flight computer boards have been designed, developed, and tested (DD&T) to be flown in small satellites for the last few years. In this project, a prototype flight computer will be designed as a distributed multi-core system containing four microprocessors running code in parallel. This flight computer will be capable of performing multiple computationally intensive tasks such as processing digital and/or analog data, controlling actuator systems, managing cameras, operating robotic manipulators and transmitting/receiving from/to a ground station. In addition, this flight computer will be designed to be fault tolerant by creating both a robust physical hardware connection and by using a software voting scheme to determine the processor's performance. This voting scheme will leverage on the work done for the Space Launch System (SLS) flight software. The prototype flight computer will be constructed with Commercial Off-The-Shelf (COTS) components which are estimated to survive for two years in a low-Earth orbit.

Falker, Jay↗

Quirky Circling Behavior in Mice Informs Research on Humans in Space

As interest in long duration effects of space habitation increases, understanding the behavior of model organisms living within the habitats engineered to fly them is vital for designing, validating, and interpreting future spaceflight studies. We previously conducted a detailed phenotypic analysis of mouse behavior during long duration (33-day) spaceflight in the NASA Rodent Habitat (Rodent Research-1; RR1 mission). Notably, we documented the emergence within the 8-10 days of launch of spontaneous ambulatory behavior in the form of circling or ‘race-tracking’ behavior in spaceflight but not in an identical ground control condition. Circling is unique to the NASA RH not having been reported to occur in other mouse habitats that provide limited opportunity for grasping, and/or are characterized by smaller habitable volumes viz., Italian Mice Drawer System (MDS) flown on ISS; Russian Block Obespecheniya Soderzhaniya (BOS) flown on Bion M-1, or JAXA Habitat Cage Unit (HCU) flown in the ISS Kibo module. Over time, circling became the primary dark cycle activity of FLT mice, occurring in individuals then as a coordinated group activity. Here we discuss possible interpretations of circling behavior including: (1) Stereotypic or abnormal repetitive behaviors (ARBs) that are unvarying, and apparently functionless behavior patterns documented numerous species in laboratory and zoo settings, possibility related to insufficient environmental enrichment and stress, (2) Rewarding effects of physical activity that are well-documented in terrestrial studies of rodents given the opportunity to run in wheels, and (3) Vestibular self-stimulation, i.e., the generation biologically-relevant amounts of vestibular sensory input to reduce the effects of microgravity. Affording mice the opportunity to grab and run in the RH resembles physical activities that the crew participate in routinely. Our approach is yielding an interesting analogue for better understanding human responses to spaceflight, and providing the opportunity to begin to address how physical movement influences responses to microgravity.

spaceflight↗

Space Suit Portable Life Support System (PLSS) 2.0 Pre-Installation Acceptance (PIA) Testing

Following successful completion of the space suit Portable Life Support System (PLSS) 1.0 development and testing in 2011, the second system-level prototype, PLSS 2.0, was developed in 2012 to continue the maturation of the advanced PLSS design which is intended to reduce consumables, improve reliability and robustness, and incorporate additional sensing and functional capabilities over the current Space Shuttle/International Space Station Extravehicular Mobility Unit (EMU) PLSS. PLSS 2.0 represents the first attempt at a packaged design comprising first generation or later component prototypes and medium fidelity interfaces within a flight-like representative volume. Pre-Installation Acceptance (PIA) is carryover terminology from the Space Shuttle Program referring to the series of test sequences used to verify functionality of the EMU PLSS prior to installation into the Space Shuttle airlock for launch. As applied to the PLSS 2.0 development and testing effort, PIA testing designated the series of 27 independent test sequences devised to verify component and subsystem functionality, perform in situ instrument calibrations, generate mapping data to define set-points for control algorithms, evaluate hardware performance against advanced PLSS design requirements, and provide quantitative and qualitative feedback on evolving design requirements and performance specifications. PLSS 2.0 PIA testing was carried out from 3/20/13 - 3/15/14 using a variety of test configurations to perform test sequences that ranged from stand-alone component testing to system-level testing, with evaluations becoming increasingly integrated as the test series progressed. Each of the 27 test sequences was vetted independently, with verification of basic functionality required before completion. Because PLSS 2.0 design requirements were evolving concurrently with PLSS 2.0 PIA testing, the requirements were used as guidelines to assess performance during the tests; after the completion of PIA testing, test data served to improve the fidelity and maturity of design requirements as well as plans for future advanced PLSS functional testing.

Watts, Carly↗

Space Suit Portable Life Support System (PLSS) 2.0 Pre-Installation Acceptance (PIA) Testing

Following successful completion of the space suit Portable Life Support System (PLSS) 1.0 development and testing in 2011, the second system-level prototype, PLSS 2.0, was developed in 2012 to continue the maturation of the advanced PLSS design. This advanced PLSS is intended to reduce consumables, improve reliability and robustness, and incorporate additional sensing and functional capabilities over the current Space Shuttle/International Space Station Extravehicular Mobility Unit (EMU) PLSS. PLSS 2.0 represents the first attempt at a packaged design comprising first generation or later component prototypes and medium fidelity interfaces within a flight-like representative volume. Pre-Installation Acceptance (PIA) is carryover terminology from the Space Shuttle Program referring to the series of test sequences used to verify functionality of the EMU PLSS prior to installation into the Space Shuttle airlock for launch. As applied to the PLSS 2.0 development and testing effort, PIA testing designated the series of 27 independent test sequences devised to verify component and subsystem functionality, perform in situ instrument calibrations, generate mapping data, define set-points, evaluate control algorithms, evaluate hardware performance against advanced PLSS design requirements, and provide quantitative and qualitative feedback on evolving design requirements and performance specifications. PLSS 2.0 PIA testing was carried out in 2013 and 2014 using a variety of test configurations to perform test sequences that ranged from stand-alone component testing to system-level testing, with evaluations becoming increasingly integrated as the test series progressed. Each of the 27 test sequences was vetted independently, with verification of basic functionality required before completion. Because PLSS 2.0 design requirements were evolving concurrently with PLSS 2.0 PIA testing, the requirements were used as guidelines to assess performance during the tests; after the completion of PIA testing, test data served to improve the fidelity and maturity of design requirements as well as plans for future advanced PLSS functional testing.

Anchondo, Ian↗

Explanation Constraint Programming for Model-based Diagnosis of Engineered Systems

We can expect to see an increase in the deployment of unmanned air and land vehicles for autonomous exploration of space. In order to maintain autonomous control of such systems, it is essential to track the current state of the system. When the system includes safety-critical components, failures or faults in the system must be diagnosed as quickly as possible, and their effects compensated for so that control and safety are maintained under a variety of fault conditions. The Livingstone fault diagnosis and recovery kernel and its temporal extension L2 are examples of model-based reasoning engines for health management. Livingstone has been shown to be effective, it is in demand, and it is being further developed. It was part of the successful Remote Agent demonstration on Deep Space One in 1999. It has been and is being utilized by several projects involving groups from various NASA centers, including the In Situ Propellant Production (ISPP) simulation at Kennedy Space Center, the X-34 and X-37 experimental reusable launch vehicle missions, Techsat-21, and advanced life support projects. Model-based and consistency-based diagnostic systems like Livingstone work only with discrete and finite domain models. When quantitative and continuous behaviors are involved, these are abstracted to discrete form using some mapping. This mapping from the quantitative domain to the qualitative domain is sometimes very involved and requires the design of highly sophisticated and complex monitors. We propose a diagnostic methodology that deals directly with quantitative models and behaviors, thereby mitigating the need for these sophisticated mappings. Our work brings together ideas from model-based diagnosis systems like Livingstone and concurrent constraint programming concepts. The system uses explanations derived from the propagation of quantitative constraints to generate conflicts. Fast conflict generation algorithms are used to generate and maintain multiple candidates whose consistency can be tracked across multiple time steps.

Narasimhan, Sriram↗