Search NASASearch

SEARCH · Search NASA

Results for “(TPF)”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Smart Contracts for Power Grid Applications Using the Advanced DLT Cyber Grid Guard Testbed

In this study is presented two power system applications with distributed ledger technology (DLT) and smart contracts (SC) that were assessed in a Cyber-Grid-Guard System (CGGS) advanced testbed, with protective relays, power meters, communication devices, DLT devices, synchronized time source, clock displays and real time simulator. This CGGS testbed was set in the Advanced Protection Lab, 252 lab space of the Grid Research Integration and Deployment Center (GRID- C), at Oak Ridge National Laboratory. In power grids, customer-owned distributed energy resources (DERs) are more frequent than in the past, and the numbers of points of interconnection (POI) with customer-owned DERs have increased. Disruptive operation from DERs presents a risk to grid operations, and protective relays located at the POI are used to isolate out-of-tolerance or poorly behaving of DERs. Ensuring the integrity of data from the relays at the POI, and DLT could enhance the security of the power grids. The first application is a SC to define and control the allowable total power factor (TPF) of the DER (wind farm) output, and the terms of the SC are implemented using DLT with a CGGS for a customer-owned DER. The TPF SC was implemented by the CGGS using DLT. The experimental model was performed with a real-time simulator using a CGGS and relay in-the-loop. The data collected from the CGGS were used to execute the TPF SC. The TPF limits were between +0.9 and +1.0, and the breakers’ operation in the POI was controlled by the relay using the SC. The events were collected from the real-time simulator, CGGS, and SEL 700GT relay to validate a successful application of the TPF SC using DLT. The second application is a SC to measure and control the allowable voltage service limits (VSL) by the CGGS using DLT. The tests were performed by using a real-time simulator, CGGS and relay in-the-loop. The data was collected from the CGGS that executed the SC. The main constraints were defined based on ANSI C84.1 service voltage limits, and the operation of the breakers in the POI. The events were collected from the CGGS, and SEL 700GT relay to assess a successful operation of the VSL SC using DLT.

24 POWER TRANSMISSION AND DISTRIBUTION

Total Power Factor Smart Contract with Cyber Grid Guard Using Distributed Ledger Technology for Electrical Utility Grid with Customer-Owned Wind Farm

In modern electrical grids, the numbers of customer-owned distributed energy resources (DERs) have increased, and consequently, so have the numbers of points of common coupling (PCC) between the electrical grid and customer-owned DERs. The disruptive operation of and out-of-tolerance outputs from DERs, especially owned DERs, present a risk to power system operations. A common protective measure is to use relays located at the PCC to isolate poorly behaving or out-of-tolerance DERs from the grid. Ensuring the integrity of the data from these relays at the PCC is vital, and blockchain technology could enhance the security of modern electrical grids by providing an accurate means to translate operational constraints into actions/commands for relays. This study demonstrates an advanced power system application solution using distributed ledger technology (DLT) with smart contracts to manage the relay operation at the PCC. The smart contract defines the allowable total power factor (TPF) of the DER output, and the terms of the smart contract are implemented using DLT with a Cyber Grid Guard (CGG) system for a customer-owned DER (wind farm). This article presents flowcharts for the TPF smart contract implemented by the CGG using DLT. The test scenarios were implemented using a real-time simulator containing a CGG system and relay in-the-loop. The data collected from the CGG system were used to execute the TPF smart contract. The desired TPF limits on the grid-side were between +0.9 and +1.0, and the operation of the breakers in the electrical grid and DER sides was controlled by the relay consistent with the provisions of the smart contract. The events from the real-time simulator, CGG, and relay showed a successful implementation of the TPF smart contract with CGG using DLT, proving the efficacy of this approach in general for implementing electrical grid applications for utilities with connections to customer-owned DERs.

24 POWER TRANSMISSION AND DISTRIBUTION

Radiation asymmetry during shattered pellet and massive gas injection in DIII-D

Infrared thermography of the first wall in DIII-D is used to show the toroidal peaking of plasma radiation during mitigated disruptions with shattered pellet injection (SPI) and with massive gas injection (MGI). During MGI, the radiation peak location is shown to be due to the n = 1 magnetohydrodynamic (MHD) activity and continuously variable in toroidal phase based on externally applied error fields, consistent with previous experimental results. Furthermore, the measured toroidal peaking factor (TPF) is in agreement with the previous estimates based on radiometry, with a total TPF of 1.07 ± 0.05 when integrated over the entire duration of the disruption, and a value of 1.3 ± 0.1 during the thermal quench (TQ). For SPI, the location of the radiation peak is found to be determined predominantly by the particle source location, and thus can be varied on DIII-D by injecting from either of two toroidally separated injectors. 3D non-linear MHD simulations with the NIMROD code support this picture. The localized SPI particle source leads to higher peaking than for MGI, with a total TPF of 1.3 ± 0.1 over the full disruption and a TQ TPF of 1.9 +0.5/−0.3, a value also consistent with the NIMROD simulations. This TQ value is close to or potentially exceeding the allowable limit for the previously planned Be first wall in ITER, pointing to the importance of radiation asymmetries depending on the choice of first wall material.

Physics - Plasma physics