Search NASA⌕ Search

SEARCH · Search NASA

Results for “1960 split level”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Existing Whole-House Solutions Case Study: Retrofitting a 1960s Split-Level Cold-Climate Home

National programs such as Home Performance with ENERGY STAR® and numerous other utility air sealing programs have brought awareness to homeowners of the benefits of energy efficiency retrofits. Yet, these programs tend to focus on the low-hanging fruit: air-sealing the thermal envelope and ductwork where accessible, switch to efficient lighting, and low-flow fixtures. At the other end of the spectrum, deep-energy retrofit programs are also being encouraged by various utilities across the country. While deep energy retrofits typically seek 50% energy savings, they are often quite costly and most applicable to gut-rehab projects. A significant potential for lowering energy usage in existing homes lies between the low hanging fruit and deep energy retrofit approaches - retrofits that save approximately 30% in energy over the existing conditions.

1960 split level↗

Retrofitting a 1960s Split-Level, Cold-Climate Home

National programs such as Home Performance with ENERGY STAR® and numerous other utility air-sealing programs have made homeowners aware of the benefits of energy-efficiency retrofits. Yet these programs tend to focus only on the low-hanging fruit: they recommend air sealing the thermal envelope and ductwork where accessible, switching to efficient lighting and low-flow fixtures, and improving the efficiency of mechanical systems (though insufficient funds or lack of knowledge to implement these improvements commonly prevent the implementation of these higher cost upgrades). At the other end of the spectrum, various utilities across the country are encouraging deep energy retrofit programs. Although deep energy retrofits typically seek 50% energy savings, they are often quite costly and are most applicable to gut-rehab projects. A significant potential for lowering energy use in existing homes lies between the lowhanging fruit and deep energy retrofit approaches—retrofits that save approximately 30% in energy compared to the pre-retrofit conditions. The energy-efficiency measures need to be nonintrusive so the retrofit projects can be accomplished in occupied homes.

1960 split level↗

Retrofitting a 1960s Split-Level, Cold-Climate Home

National programs such as Home Performance with ENERGY STAR® and numerous other utility air sealing programs have brought awareness to homeowners of the benefits of energy efficiency retrofits. Yet, these programs tend to focus on the low-hanging fruit: air-sealing the thermal envelope and ductwork where accessible, switch to efficient lighting, and low-flow fixtures. At the other end of the spectrum, deep-energy retrofit programs are also being encouraged by various utilities across the country. While deep energy retrofits typically seek 50% energy savings, they are often quite costly and most applicable to gut-rehab projects. A significant potential for lowering energy usage in existing homes lies between the low hanging fruit and deep energy retrofit approaches - retrofits that save approximately 30% in energy over the existing conditions. A key is to be non-intrusive with the efficiency measures so the retrofit projects can be accomplished in occupied homes. This cold climate retrofit project involved the design and optimization of a home in Connecticut that sought to improve energy savings by at least 30% (excluding solar PV) over the existing home's performance. This report documents the successful implementation of a cost-effective solution package that achieved performance greater than 30% over the pre-retrofit - what worked, what did not, and what improvements could be made.

1960 split level↗

Building America Case Study: Retrofitting a 1960s Split-Level, Cold-Climate Home, Westport, Connecticut; Whole-House Solutions for Existing Homes, Energy Efficiency & Renewable Energy (EERE)

??National programs such as Home Performance with ENERGY STAR(R) and numerous other utility air sealing programs have brought awareness to homeowners of the benefits of energy efficiency retrofits. Yet, these programs tend to focus on the low-hanging fruit: air-sealing the thermal envelope and ductwork where accessible, switch to efficient lighting, and low-flow fixtures. At the other end of the spectrum, deep-energy retrofit programs are also being encouraged by various utilities across the country. While deep energy retrofits typically seek 50% energy savings, they are often quite costly and most applicable to gut-rehab projects. A significant potential for lowering energy usage in existing homes lies between the low hanging fruit and deep energy retrofit approaches - retrofits that save approximately 30% in energy over the existing conditions. A key is to be non-intrusive with the efficiency measures so the retrofit projects can be accomplished in occupied homes. This cold climate retrofit project involved the design and optimization of a home in Connecticut that sought to improve energy savings by at least 30% (excluding solar PV) over the existing home's performance. This report documents the successful implementation of a cost-effective solution package that achieved performance greater than 30% over the pre-retrofit - what worked, what did not, and what improvements could be made. Confirmation of successfully achieving 30% source energy savings over the pre-existing conditions was confirmed through energy modeling and comparison of the utility bills pre- and post- retrofit.

1960 split level↗

Pile Fuel Cladding Silo Deflector Plate Removal Project Using Long Reach Tooling and Suspended Abrasive Water Jet Cutting System - 17541

The Pile Fuel Cladding Silo (PFCS) at the Sellafield decommissioning, reprocessing and nuclear waste management facility in the UK was constructed in the late 1940-s and used for the storage of Intermediate Level Waste (ILW) arising from the Windscale Piles, Calderhall and Chapelcross Reactors until the 1960's. The PFCS is 21 metres high and comprises 6 identical tall compartments with the waste added to the silo via a charge-hole at the top of each compartment; each compartment is split by a central dividing wall that runs from the base of the silo to a few metres below the underside of the silo roof. A deflector plate assembly (DPA) supported on two horizontal beams is located between the top of the dividing wall and the roof and allowed the waste to spread as it fell into the silo and prevent excessive mounding. Sellafield Ltd is currently engaged in an overall programme of works to remove the waste for storage within modern ILW containers. Prior to the commencement of these works the Deflector Plate Assemblies (DPA) and beam structures within the silos are required to be removed to allow access for the waste retrievals equipment through the side of the silo at the point where the DPAs are situated. James Fisher Nuclear (JFN) and Sellafield Ltd have developed a system using suspended water jet cutting equipment combined with custom long reach tooling, installed through penetrations made in the side of the silo, to enable the remote size reduction of the DPA and beams within each compartment. The use of a low pressure suspended water jet cutting system has enabled a single water/abrasive hose to be routed down a tool deployment pole and allowed long hose lengths up to 80 m from pump to nozzle enabling siting of equipment on a congested and difficult access site. The use of lightweight, yet high strength, carbon fibre poles within the tools has enabled the deployment of tool end effectors at distances of up to 6.5 m from the compartment walls using a relatively small 60 mm diameter pole. This maximised articulation of the pole within the 300 mm wall penetrations to reach all areas of the DPA. Capability of the operators to install the tooling and size reduce DPA and beam assemblies have been demonstrated through the training on a Full Scale Test Rig (FSTR). The FSTR was integral to the development of the equipment and techniques and to providing assurance to the client that the project was technically achievable given the tight building restraints and safety issues. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗