Search NASA⌕ Search

SEARCH · Search NASA

Results for “2023”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Meteorological Conditions in Urban Sites in Knoxville, USA. 2023

This 2023 dataset, which contains four csv files, reports hourly air temperature, wind speed, solar radiation, incident short wave, reflected short wave, incident long wave, emitted long wave, net radiation, and photosynthetically active radiation (PAR) data measured in urban parks in Knoxville, Tennessee, USA. The sites include Cumberland Estates Park (CEP), Socially Equal Energy Efficient Development (SEEED), West Hills (WHP), and Victor Ashe Park (VAP). Air temperature, wind speed and direction, and solar radiation data were obtained from a METER ATMOS 41 All-in-One Weather Station (Pullman, Washington, USA). Incident and emitted radiation (shortwave and longwave) measurements were made using an Apogee (Logan, Utah, USA) net radiometer (Model SN-500-SS). The SQ-521 Full-Spectrum Quantum sensor (Apogee Instruments, Inc) recorded the PAR. The measurement data for CEP, SEEED, and VAP started on July 1, 2023, while WHP started on August 26, 2023. All measurement ended on December 31, 2023. This work is a part of a larger study which investigates the impact of soil moisture and plant evapotranspiration on ambient temperature and relative humidity in several city parks in Knoxville, Tennessee.

Salvador, Christian [ORNL] (ORCID:0000000283287777↗

Total metal, carbon, anion, iron speciation, and sulfide concentrations; Slate River, East River, and Trail Creek surface water and floodplains, Crested Butte, CO; May 2023–August 2023

This data package comprises analytical results and metadata from stream and groundwater samples collected from the Slate River, East River, Trail Creek, and their respective floodplains. This dataset contains five files: (1) a samples file (2023_SFA_Field_samples.csv) that contains site information; (2) a chemical analysis data file (2023_FieldWaterSampleData_IC__ICPOES__ICPMS__TOC__Fe__S_chem_data.csv) that contains sample analysis values; (3) a file-level metadata file (flmd.csv) that lists each file contained in the dataset with associated metadata; (4) a data dictionary file (dd.csv) that contains column/row headers used throughout the files along with definitions, units, and data types; and (5) a methods file (methods.csv) that contains ID, type, description, instrument, and lab information for each method.The samples’ anion concentrations were measured using ion chromatography (IC), total metal concentrations using inductively coupled plasma emission spectrometry (ICP-OES) and inductively coupled plasma mass spectrometry (ICP-MS), non-purgeable organic carbon using total organic carbon (TOC) analysis, dissolved sulfide concentration using methylene blue spectrophotometry, and iron speciation using the ferrozine assay. To support bulk chemical analyses and colloid characterization, samples were collected from multiple depths ranging from the surface to 3.5 meters below ground.Update on 2024-10-18: Updates were made to the 2023_FieldWaterSampleData_IC__ICPOES__ICPMS__TOC__Fe__S_chem_data.csv and dd.csv files to correct units (ppb instead of ppm).

54 ENVIRONMENTAL SCIENCES↗

Organic Matter Composition in June 2023 and September 2023 Across the McKenzie Sub-Basin Impacted by the 2020 Holiday Farm Fire

This dataset represents results from a field study aiming to understand the variability in post-fire responses of dissolved organic matter and determine drivers of post-fire responses. Samples were collected at 58 sites within the McKenzie River Watershed (Oregon, USA) that were upstream, within, and downstream of the Holiday Farm Fire burn perimeter. The samples were collected in June 2023 and September 2023 during storm events, approximately 3 years post-fire. Samples were characterized for benezenepolycarboxylic acids (BPCA) and ultra-high resolution mass spectrometry. Dissolved organic carbon and optics (absorbance and fluorescence) data can be found in a separate data packages (https://ir.library.oregonstate.edu/concern/datasets/zc77sz60m, https://ir.library.oregonstate.edu/concern/datasets/mc87q034m). Related data from a subset of sites from 2020-2022 can be found at https://data.ess-dive.lbl.gov/datasets/doi:10.15485/1869708 and https://data.ess-dive.lbl.gov/datasets/doi:10.15485/2478546. For details on how to navigate data packages generated by this project, see https://data.ess-dive.lbl.gov/portals/PNNLRiverCorridorSFA/About. This dataset contains (1) file-level metadata; (2) data dictionary; (3) data package readme; (4) metadata; (5) methods information; (6) benzene polycarboxylic acid (BPCA) concentration data; (7) Fourier transform ion cyclotron resonance mass spectrometry (FTICR-MS) methods; (8) folder of high resolution characterization of organic matter via 12 Tesla FTICR-MS data generated through the Environmental Molecular Sciences Laboratory (EMSL; https://www.pnnl.gov/environmental-molecular-sciences-laboratory). This package contains the following file types: csv, xml, pdf.

54 ENVIRONMENTAL SCIENCES↗

Post-fire soil respiration in late growing season (2023 and 2024), Kougarok Fire Complex, Seward Peninsula, Alaska

Field soil respiration data collected in 2023 and 2024 from burned and unburned tussock tundra sites in the Kougarok Fire Complex, near Nome, on the Seward Peninsula of Alaska. Specifically, we measured soil properties and late-growing season CO2 fluxes in patches of unique plant functional types (forbs, shrubs, and graminoids) across two years in tundra recovering from repeated wildfires over the decade. The goal was to identify the main drivers of soil respiration in Arctic tundra underlain by discontinuous permafrost that is recovering from two recent, repeated wildfires that differed in fire age and number of times burned, thereby resulting in different levels of vegetation and subsurface property changes (i.e., successional trajectories). There are five files in *.csv format with one data file and four data description files including data, dictionary, methods, terminology, and file-level metadata. The Next-Generation Ecosystem Experiments: Arctic (NGEE Arctic), is a research effort to reduce uncertainty in Earth System Models by developing a predictive understanding of carbon-rich Arctic ecosystems and feedbacks to climate. NGEE Arctic was supported by the Department of Energy's Office of Biological and Environmental Research. The NGEE Arctic Phase 3 project had two field research sites: 1) located within the Arctic polygonal tundra coastal region on the Barrow Environmental Observatory (BEO) and the North Slope near Utqiagvik (Barrow), Alaska and 2) multiple areas on the discontinuous permafrost region of the Seward Peninsula north of Nome, Alaska. Through observations, experiments, and synthesis with existing datasets, NGEE Arctic provided an enhanced knowledge base for multi-scale modeling and contributed to improved process representation at global pan-Arctic scales within the Department of Energy's Earth system Model (the Energy Exascale Earth System Model, or E3SM), and specifically within the E3SM Land Model component (ELM).

Santos, Fernanda [ORNL] (ORCID:0000000191555623)↗

TRAC Time Tags of individual particle samples collected for microscopy analysis at RMBL [AMF2] from June 2023 to August 2023

The dataset presents the time tags of individual particle samples collected on microscopy substrates during the Surface Atmosphere Integrated Field Laboratory (SAIL) campaign in Gothic, CO. A Time Resolved Aerosol Collector was deployed at the Rocky Mountain Biological Laboratory, 200 m north of AMF2 to collect ambient particles. The instrument inlet was placed 5 m above ground level. Particles are deposited on 400 mesh copper carbon-B film TEM grids (Ted Pella 01814-F). Samples are sealed and currently stored at Purdue University. A subset of the samples can be shared. Please contact dataset authors for more information. The dataset reports the sample start times in UTC and MST along with the sample ID, used to guide its location and retrieval from the storage plate. TRAC sampling started on June 17, 2023, and ended on July 31, 2023.

54 ENVIRONMENTAL SCIENCES↗

U.S. Department of Energy Hydrogen Program: 2023 Annual Merit Review and Peer Evaluation Report; June 6-9, 2023

This document summarizes peer review comments and scores for the fiscal year 2023 U.S. Department of Energy (DOE) Hydrogen Program Annual Merit Review and Peer Evaluation Meeting (AMR), held June 6-9, 2023. This review process provides project- and program-level evaluations of DOE-funded research, development, demonstration, and analysis of hydrogen and fuel cell technologies.

AMR↗

Redox Potential of Intermittently Wet Soil, Old Woman Creek National Estuarine Research Reserve, Huron, OH, 2023-05-10 to 2023-12-15

This dataset contains collected reduction-oxidation (redox) potential measurements of the underlying soil at various depths within a wetland, referred to as The Cove, at Old Woman Creek Estuarine Research Reserve in Huron, OH. Redox potential was measured in the sediments of a coastal wetland to assess how redox potential varies over time with changes in hydrological events. Measurements were collected by Campbell Scientific CR1000X dataloggers paired with a PaleoTerra redox probe and reference electrodes. Measurements were collected at 3 different locations within The Cove at multiple depths into the underlying soil of the wetland and were collected every 10 minutes. The Redox_Datafile.csv contains the recorded measurements of the redox probes, and the RefElecDataFile.csv contains the background-noise measurements collected by the reference electrodes. Redox_InstallMethods describes the installation methods of the datalogger and associated probes.

54 ENVIRONMENTAL SCIENCES↗

Recycling and Reuse of Tungsten-Rhenium Refractory Alloy Powder for Additive Manufacturing (Quarterly Progress Report - 01 April 2023-30 June 2023)

Savannah River National Laboratory in partnership with 6K Inc is working on demonstrating laser and electron-beam powder bed additive manufacturing processes of W-24Re alloy and developing powder reconditioning (deoxidation) technology via plasma spheroidization and investigating the properties and performance of additively manufactured W-24Re components produced using both virgin and recycled powders.

36 MATERIALS SCIENCE↗

IMS Rapid Response 2023-2 (RR 2023-RND-2): Magnetic order in layered bismuthide RhMnBi 3 (Final Report)

Microelectronics are technologies (mostly theoretical at this point) to create electronic circuits with components of atomic length scale. One of the key materials innovations enabling this technology is exfoliatable two-dimensional materials. These materials allow thin sheets of only a few atoms thick to be easily created in the laboratory. More and more of these materials are reported every year, but few have been characterized in detail. Thus a major goal in materials research in pursuit of microelectronic devices is characterizing newly discovered materials to evaluate their properties. The goal of this project was the measure and understand the magnetic order in a newly discovered van der Waals magnet RhMnBi 3 . Bulk property experiments indicated very complicated magnetic behavior, with multiple phase transitions between 2K and 300K (room temperature). This potentially indicated highly sensitive and tunable magnetism appropriate for single-layer magnetic switches and sensors.

36 MATERIALS SCIENCE↗

Semi-Annual Report for Horizontal Compact High Temperature Gas Reactor (HC-HTGR) Development during Performance Period April 2023 – September 2023

Horizontal Compact High Temperature Gas Reactor (HC-HTGR) is being designed by a multi-disciplinary team of nuclear, mechanical, and structural engineers under the support of a DOE-NE Advanced Reactor Demonstration Program’s Advanced Reactor Concepts-20 (ARC-20) award. The objective of this ARC-20 project is to deliver a conceptual design for the proposed HC-HTGR in 3 years and support its commercialization as a safe, low-cost HTGR. Argonne National Laboratory (Argonne) is responsible for the design and analysis of the reactor cavity cooling system (RCCS) as a safety system for passive decay heat removal of the reactor concept. Additionally, Argonne is providing analysis of the primary coolant system to ensure temperatures within the core remain below safety margins during steady-state and potential accident scenarios. This fourth semi-annual report summarized the progress made at Argonne on the two tasks during the second half of FY23. As a part of the RCCS design task, recent efforts have been made to complete a conceptual design of the RCCS for the HC-HTGR, including the design update of the water panel and system configuration favorable in point of view of fabrication and system operation. Design calculations were conducted under various heat load conditions to validate the system design. Transient simulations using RELAP5-3D were conducted to investigate system dynamics under transients of interest and to evaluate the system performance in the design condition. The results demonstrated the overall system feasibility that the RCCS design maintains structures temperatures lower than maximum allowable temperature with sufficient system inventory without any active heat sink. In the primary system thermal hydraulics task, the preliminary analysis was performed for a long term pressurized conduction cooldown (PCC) transient. This analysis used a combination of a fully resolved and coarse homogenized mesh to predict the temperature distribution for the steady-state initial condition and the PCC transient. The steady-state initial condition was determined using a fully resolved full core model with 3D solid to 1D fluid coupling. The fully resolved mesh was also used to model the first 20 seconds of the PCC. The temperature difference between fuel pins and the graphite matrix becomes minimal and the dominant heat transfer shifts to a larger scale radially towards the RCCS. After 20 seconds, a homogenized coarse mesh is used, greatly reducing the computational costs of the model. These results demonstrate that the core is designed to passively remove enough decay heat in a protected loss of primary coolant flow to prevent an unsafe rise of core temperatures.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Orbitrap LC-MS Analysis of Nanoparticle Composition at the EPCAPE Mount Soledad site between 04 18 2023 and 06 14 2023

Weekly peak lists containing m/z, intensity, and assigned formula for filter samples, size selected for sub-100 nm particles. Filters were collected daily between 4/18/23 and 6/14/23, grouped based on calendar week for extraction, and analyzed via Thermo Scientific Q Exactive Plus Orbitrap LC-MS. Formulas were assigned to background-corrected peak lists and restricted to CHONS/CHONSNa atoms for the negative and positive modes respectively. Filters were grouped into calendar weeks 0-8 with dates provided in README text file.

54 ENVIRONMENTAL SCIENCES↗

Launch Complex 39B, SWMU 009, 2023 Performance Monitoring and Air Sparge Expansion Construction Completion Report, Kennedy Space Center, Florida

The 2023 Performance Monitoring and Construction Completion Report (PM-CCR) presents the findings, observations, and results for Air Sparging (AS) operations and expansion activities, as well as sitewide groundwater monitoring for Launch Complex 39B (LC39B), Solid Waste Management Unit (SWMU) 009, at Kennedy Space Center (KSC), Florida. The reporting period for activities covered under this PM-CCR is from January 1, 2023, to December 31, 2023. At LC39B, AS operations began in 2017 in the area west of the launch pad, in the liquid oxygen (LOX) tank area located northwest of the launch pad, and in an area outside of the perimeter fence to protect nearby Outstanding Florida Waters (OFW). The LC39B AS system was installed with 279 AS wells to depths ranging from 23 to 60 feet below land surface (bls), including the sump, correlating to top of screen depths ranging from 20 to 57 feet bls. In December 2022, a total of 22 AS wells were abandoned to support launch pad crane operations, and in November 2023, the system was expanded with five additional AS wells installed to 13 or 17 feet bls near the LOX tank. The remedial objective of the LC39B AS Interim Measure (IM) is to actively decrease concentrations of contaminants of concern (COCs) in groundwater, specifically trichloroethene (TCE), cis-1,2-Dichloroethene (cDCE), and vinyl chloride (VC), to less than their respective Natural Attenuation Default Concentrations (NADCs), so LC39B can transition into a Long-Term Monitoring (LTM) program. This PM-CCR presents the following information for LC39B: • AS system operations and maintenance (O&M) (Year 7 of operation) from January 2023 to December 2023, to include AS trailer relocation in March 2023 and subsequent replacement and re-start in June 2023. • Construction completion details for AS system expansion, which included installation of five new AS wells and one new monitoring well in November 2023. As part of expansion activities, soil samples were also collected for petroleum analysis; no exceedances were identified, and no further investigation for petroleum is warranted. • Performance monitoring results for groundwater sampling events conducted in May/June 2023 (30 wells) and November 2023 (31 wells) in the AS IM area and in the Low Concentration Plume (LCP) areas located north and east of the launch pad for volatile organic compound (VOC) analysis. • Sampling results for one monitoring well, LOX-IW0012S, which is sampled for aluminum on an annual basis (May/June 2023). This well was resampled in November 2023 for both total and dissolved aluminum. Due to a communication error with the laboratory, the May/June 2023 sample was analyzed for total aluminum only. • Groundwater sampling results for per- and polyfluoroalkyl substances (PFAS) collected from seven monitoring wells during the May/June 2023 event to further investigate the Former Sewage Treatment Plant #6 and Percolation Pond area, west of the launch pad. O&M and performance monitoring results show that the AS system at LC39B is operating as designed and meeting performance criteria. Overall runtime was 45 percent (%) during the reporting period (January to December), but the operational runtime was 78% during the timeframe when the system could run (June to December). The most significant downtime contributor was post-launch crane operations following the Artemis launch on November 16, 2022, which lasted until June 2023. During that timeframe, the AS trailer at LC39B was relocated to another KSC remediation site (Wilson Corners) and was subsequently replaced with the AS trailer from the Paint & Oil Locker (POL) remediation site at KSC to resume AS system operations. Performance monitoring results in the AS IM and LCP areas continue to show reduction in COC concentrations over time when compared to baseline levels. In 2023, only one monitoring well (MW0048) detected a COC exceeding its NADC (VC at 740 micrograms per liter [µg/L]), which marks the baseline result for this new well installed during system expansion. Across the rest of the site, VC concentrations have declined or remained stable during the 2023 sampling events. Excluding MW0048, the highest VC result in 2023 was during the May/June sampling event with a concentration of 63 µg/L at MW0032, which is located near MW0048 and the AS expansion area by the LOX tank. TCE was detected in select monitoring wells in the IM area in 2023, but only two locations exceeded the State of Florida Groundwater Cleanup Target Level (GCTL): MW0032 (21 µg/L in May/June 2023 and 9.1 µg/L in November 2023) and MW0036 (5.0 µg/L in November 2023). MW0036 is also located near the LOX tank, on the north side, where the AS system is still operational (Zone Z4). cDCE and trans-1,2-dichloroethene concentrations were less than laboratory method detection limits or their respective GCTLs in all wells sampled in 2023. Near the OFW located northwest of the launch complex, all COC concentrations were less than laboratory method detection limits from monitoring wells (MW0039, MW0040, and LOXTA0002S) sampled in 2023. Aluminum results from LOX-IW0012S, which has been sampled routinely since 2006, detected a total aluminum concentration of 3,900 µg/L during the May/June 2023 sampling event. Results from the November 2023 event detected 5,700 µg/L for total aluminum and 5,500 µg/L for dissolved aluminum. These concentrations slightly decreased from the previous year but remain relatively consistent with historical detections. Aluminum will continue to be sampled on an annual basis at this well as results still exceed the GCTL of 200 µg/L and the Upper Limit of the KSC Background Concentration of 280 µg/L. PFAS results detected nine different PFAS compounds (out of 32 analyzed) from seven wells sampled. Two PFAS compounds, perfluorooctanesulfonic acid (PFOS) and perfluorooctanoic acid (PFOA), currently have FDEP Provisional GCTLs of 70 nanograms per liter (ng/L). All seven samples collected resulted in concentrations less than the FDEP Provisional GCTLs for both PFAS compounds; no exceedances were observed. PFOS and PFOA also have assigned United States Environmental Protection Agency (USEPA) Maximum Contaminant Levels (MCLs) of 4 nanograms per liter (ng/L). None of the PFOS results exceeded the USEPA MCLs. PFOA was detected in two samples above the USEPA MCL at concentrations of 5.8 ng/L (ECS-IW0009I) and 5.5 ng/L (ECS-IW0009S). Three other PFAS compounds, perfluorohexanesulfonic acid (PFHxS), perfluoro-n-nonanoic acid (PFNA), and hexafluoropropylene oxide dimer acid (GenX), currently have USEPA MCLs of 10 ng/L. PFHxS, PFNA, and GenX were not detected at concentrations greater than their respective USEPA MCLs in any of the seven wells. PFAS compounds without FDEP Provisional GCTLs or USEPA MCLs were screened against USEPA RSLs. No other detections exceeded their respective USEPA RSLs. Additional PFAS sampling will be conducted as part of a future PFAS Site Assessment. Based on O&M activities and performance monitoring, the following is recommended for LC39B: • Continue with Year 8 AS system operation within Zone Z4, which includes the AS expansion area. Zone Z3, which has been off since 2018, should remain off as no rebound has been observed. Zones Z1 and Z2, which were turned off at the end of 2022, will remain shut down as monitoring well results have consistently been below GCTLs or have low-level detections with stable or decreasing trends (Meeting Minute 2402-M10, Decision 2402-D30). • Continue with performance monitoring in 2024 with the same monitoring well network as 2023, except with the addition of MW0048 in both semi-annual events. Baseline concentrations for this well were collected during the November 2023 performance monitoring event. Semi-annual sampling should be planned for the May 2024 and November 2024 timeframes (Meeting Minute 2402-M10, Decision 2402-D31). • Continue sampling monitoring well, LOX-IW0012S, for aluminum (total and dissolved) on an annual basis in May 2024. It is also recommended to re-develop this well prior to the next sampling event (Meeting Minute 2402-M10, Decision 2402-D32). The above recommendations for LC39B were presented at the February 2024 KSCRT Meeting, with Team consensus reached on the path forward. The contents of this PM-CCR were also presented at this meeting.

Deborah M Wilson↗

Wilson Corners, Solid Waste Management Unit 001(SWMU 01) 2023 Annual Long-Term Monitoring Report

This report presents a summary of the long-term monitoring (LTM) activities that occurred in 2023 at Wilson Corners, Solid Waste Management Unit 001, at Kennedy Space Center (KSC), Florida. Annual LTM of groundwater is being conducted at the site. Based on results from groundwater sampling activities performed during the 2019 through 2020 LTM reporting period and the 2020 and 2021 DPT groundwater sampling, it was determined that the LTM sampling plan was no longer meeting the goal of LTM because delineation was not verified and the installation of an air sparge (AS) system to treat the area of the High Concentration Plume was recommended. The AS System was installed in late 2022 and early 2023. System start-up activities were initiated in April 2023. Following system startup, several site wells required retrofitting to equip wellheads for withstanding the air pressure released from air sparge wells during system operation. Some site wells also required repair or abandonment, and replacement. Survey of location and top-of-casing of newly installed monitoring wells was combined with scheduled AS system survey activities and was completed in January 2024. The activities presented in this report include the February and April 2023 LTM monitoring well installations; March and April 2023 LTM and performance monitoring well water level gauging and sampling; November 2023 LTM well retrofits and repairs; a summary of December 2023 LTM well abandonments and installations (complete site well abandonment activities will be presented under a separate cover); and January 2024 LTM well survey. During the March and April 2023 sampling events, the low-flow sampling method was used, and samples were analyzed for a select list of volatile organic compounds. In March 2023, groundwater flow for the site was generally to the west was generally consistent with historical observations at the site. The Low Concentration Plume (LCP) continues to extend both horizontally and vertically beyond the terminal depth of the current monitoring well network. Data, inclusive of the 2023 LTM and baseline performance monitoring sampling events, indicate that the LCP encompasses an estimated 19.5 acres, compared to the 2021 LCP footprint, inclusive of the 2020 and 2021 DPT sampling events of 20.7 acres. The vertical extent of VOCs was historically delineated by monitoring wells screened greater than 48 feet below land surface (bls). The results from the three vertical extent monitoring wells screened below 48 feet bls that were sampled during the 2023 LTM indicate that groundwater vinyl chloride concentrations in these three wells are greater than the GCTL. As presented in the 2021 Long-Term Monitoring Report (NASA 2022), the KSCRT agreed to delay deeper investigations in this area to prevent the creation of additional pathways for vertical migration. Based on groundwater sampling activities performed in 2023, recommendations are to perform the next annual LTM sampling event, scheduled for April 2024 and to conduct quarterly performance monitoring of the AS System. The current selection of monitoring wells in the recommended 2024 LTM plan will provide an adequate data set for monitoring groundwater plume behavior; however, the LTM monitoring well network will be evaluated and refined based on 2024 LTM and year one performance monitoring data.

King Linnea↗

Launch Complex 34, SWMU CC054 2023 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring and Phase Two Expansion Construction Completion Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 14 operations and performance monitoring of the hydraulic containment (HC) Interim Measure (IM), details associated with construction and implementation of the HS 6 AS system expansion (Phase Two), and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. The timeframe for activities documented in this PMR extends from April 1, 2023 to March 31, 2024. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the shallow and deep DSZ and surrounding dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to recharacterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS and install additional recovery wells in Layer 7 to more adequately capture residual contaminant mass. The operational period for Year 14 of the HCS was from April 1, 2023 to March 31, 2024. Operational runtime for the system was 94 percent during Year 14, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2024, a total of 344,849,634 cumulative gallons of groundwater containing 94,656 pounds of chlorinated volatile organic compounds (CVOCs) have been removed by the HCS. During the reporting period covered under this report, the HCS recovered 31,176,393 gallons and approximately 6,319 pounds of CVOC mass. Total combined influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 25,000 µg/L (March 2024). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in January 2024 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2022. Full vertical profile sampling was completed at each DPT from 8 to 98 feet below land surface (bls), at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 28 to 98 feet bls. An overall decreasing trend of TCE concentrations was observed in DPT samples during this reporting period, which is a reduction from the previous event (December 2022) and the peak event in December 2021, where TCE percentages appeared to increase in all depth zones because several recovery wells were turned off during the AS pilot study in the DSZ. The maximum TCE concentration in January 2024 was 1,600,000 µg/L in the 53 feet bls depth interval at DPT594 (previous maximum result in 2022 was 1,800,000 µg/L in the 48 feet bls depth interval at DPT599). This maximum concentration in the 53 feet bls depth interval is in the deep capture zone. During the January 2024 DPT event, the largest portion of TCE mass was observed in the 48 feet bls interval above/within Layer 4. This trend remains consistent with previous years and appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, annual groundwater samples were collected from 11 deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2023 to verify vertical and horizontal delineation. Three of the wells were also sampled biweekly to evaluate operations of recovery well RW21D (screened 86 to 106 feet bls), which was installed in January 2023. Of the Layer 7/8 monitoring sampled only annually, results were non-detect or less than groundwater cleanup target levels GCTLs in December 2023, with the exception of one well, IW45D2, which had a cis-1,2-dichloroethene (cDCE), detection greater than the GCTL. Of the three wells sampled biweekly during the operational period, the well located closest to Layer 7 recovery well RW21D (IW44D2, screened 105 to 115 feet bls) had concentrations of TCE, cDCE and vinyl chloride (VC) greater than GCTLs throughout the operational period, but displayed a decreasing trend since the peak concentrations in September 2023. The maximum TCE concentration during this operational period was 190,000 µg/L at IW44D2 in September 2023, but reduced to 700 µg/L in March 2024, indicating the HCS is still effectively removing mass from the source area. Expansion of the HCS and addition of new recovery wells is ongoing and will continue to be evaluated as the groundwater recovery scheme is optimized. Details of the expansion and optimization will be provided in a future PMR. The HS 6 AS IM was initiated in 2018 with 160 AS wells and expanded in 2019 with another 140 AS wells. An additional expansion of the HS 6 AS IM was completed during the reporting period covered under this report and details of the construction implementation and startup of the expansion are detailed in Section III of this report. The new expansion, referred to as Phase Two, was implemented between August 17, 2022 and August 28, 2023, and included the installation of 190 air sparge wells to treat an additional 11.2 acres. The original configuration (referred to as Phase One) operated until Phase Two came online, then all but 52 AS wells were turned off so the components could be moved and utilized in the Phase Two area. The 52 AS wells that remain on are in a barrier configuration preventing contaminated groundwater from impacting the treated area. The HS 6 AS system (both Phase One and Two) operated normally during the reporting period covered under this report. Semi-annual performance monitoring of the Phase One configuration was conducted in April and November 2023, consistent with previous years. For the Phase Two configuration, 21 new monitoring wells were installed and sampled quarterly, with a baseline event in July 2023, and quarterly events in November 2023 and February 2024 summarized in this report. Semi-annual monitoring results collected in April and October 2023 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and VC) have decreased to less than GCTLs in nearly all wells and not impacting the surface water drainage canal, indicating the HS 6 IM continues to meet objectives. The baseline and quarterly sampling for the Phase Two configuration indicate generally decreasing concentrations in wells within and around the perimeter of the treatment area. At least two more quarters of monitoring will be conducted and once those results are evaluated a reduced the sampling frequency may be considered. Overall, the tasks associated with Year 14 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with recommendations included in the previous 2022 LC34 (Year 13) PMR. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

groundwater remediation↗

Radiological Impact of 2023 Operations at the Savannah River Site

This report presents the environmental dose assessment methods and the estimated potential doses to the public from 2023 Savannah River Site (SRS) air and liquid radioactive releases. Also documented are potential doses from special-case exposure scenarios, such as the consumption of wildlife or goat milk. Dose to the Offsite Representative Person The 2023 dose to the offsite representative person from SRS liquid releases was 0.14 mrem and from SRS air releases it was 0.016 mrem. To show compliance with the U. S. Department of Energy (DOE) all pathway dose standard of 100 mrem/yr, SRS conservatively adds these two doses for a total representative person dose of 0.16 mrem which is 0.16% of the DOE standard. Sportsman Doses Onsite Hunter: SRS conducts annual hunts to control onsite deer and feral hog populations. The estimated dose from consuming harvested deer or hog meat is determined for every onsite hunter. During 2023, the maximum potential dose an onsite hunter received was 9.42 mrem, or 9.42% of DOE’s 100 mrem/yr all pathway dose standard. Creek Mouth Fisherman: SRS estimated the maximum potential dose from fish consumption at 0.17 mrem from bass collected at the mouth of Lower Three Runs. This dose is 0.17% of the DOE standard. SRS bases this hypothetical dose on the low probability scenario that, during 2023, a fisherman consumed 24 kg (53 lbs) of bass caught exclusively from the mouth of Lower Three Runs. Release of Material Containing Residual Radioactivity SRS did not release any real property (land or buildings) in 2023. SRS unconditionally released a total of 13,324 items of personal property (such as tools) from radiological areas in 2023. Most of these items did not leave the Site. However, all of these items required no additional radiological controls post-survey as they met DOE Order 458.1 release criteria. Radiation Dose to Aquatic and Terrestrial Biota SRS conducts screening evaluations of plant and animal doses for aquatic and terrestrial ecosystems. For 2023, all SRS aquatic system locations passed the initial (Level 1) screenings and no further assessments were required at those locations. For the land-based systems evaluation, SRS performed initial screenings using concentration data from the five onsite radiological soil sampling locations. Typically, SRS collects and analyzes only one soil sample per year from each location. For 2023, all land-based locations passed their initial (Level 1) pathway screenings.

54 ENVIRONMENTAL SCIENCES↗