Search NASA⌕ Search

SEARCH · Search NASA

Results for “2023”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Launch Complex 39B, SWMU 009, 2023 Performance Monitoring and Air Sparge Expansion Construction Completion Report, Kennedy Space Center, Florida

The 2023 Performance Monitoring and Construction Completion Report (PM-CCR) presents the findings, observations, and results for Air Sparging (AS) operations and expansion activities, as well as sitewide groundwater monitoring for Launch Complex 39B (LC39B), Solid Waste Management Unit (SWMU) 009, at Kennedy Space Center (KSC), Florida. The reporting period for activities covered under this PM-CCR is from January 1, 2023, to December 31, 2023. At LC39B, AS operations began in 2017 in the area west of the launch pad, in the liquid oxygen (LOX) tank area located northwest of the launch pad, and in an area outside of the perimeter fence to protect nearby Outstanding Florida Waters (OFW). The LC39B AS system was installed with 279 AS wells to depths ranging from 23 to 60 feet below land surface (bls), including the sump, correlating to top of screen depths ranging from 20 to 57 feet bls. In December 2022, a total of 22 AS wells were abandoned to support launch pad crane operations, and in November 2023, the system was expanded with five additional AS wells installed to 13 or 17 feet bls near the LOX tank. The remedial objective of the LC39B AS Interim Measure (IM) is to actively decrease concentrations of contaminants of concern (COCs) in groundwater, specifically trichloroethene (TCE), cis-1,2-Dichloroethene (cDCE), and vinyl chloride (VC), to less than their respective Natural Attenuation Default Concentrations (NADCs), so LC39B can transition into a Long-Term Monitoring (LTM) program. This PM-CCR presents the following information for LC39B: • AS system operations and maintenance (O&M) (Year 7 of operation) from January 2023 to December 2023, to include AS trailer relocation in March 2023 and subsequent replacement and re-start in June 2023. • Construction completion details for AS system expansion, which included installation of five new AS wells and one new monitoring well in November 2023. As part of expansion activities, soil samples were also collected for petroleum analysis; no exceedances were identified, and no further investigation for petroleum is warranted. • Performance monitoring results for groundwater sampling events conducted in May/June 2023 (30 wells) and November 2023 (31 wells) in the AS IM area and in the Low Concentration Plume (LCP) areas located north and east of the launch pad for volatile organic compound (VOC) analysis. • Sampling results for one monitoring well, LOX-IW0012S, which is sampled for aluminum on an annual basis (May/June 2023). This well was resampled in November 2023 for both total and dissolved aluminum. Due to a communication error with the laboratory, the May/June 2023 sample was analyzed for total aluminum only. • Groundwater sampling results for per- and polyfluoroalkyl substances (PFAS) collected from seven monitoring wells during the May/June 2023 event to further investigate the Former Sewage Treatment Plant #6 and Percolation Pond area, west of the launch pad. O&M and performance monitoring results show that the AS system at LC39B is operating as designed and meeting performance criteria. Overall runtime was 45 percent (%) during the reporting period (January to December), but the operational runtime was 78% during the timeframe when the system could run (June to December). The most significant downtime contributor was post-launch crane operations following the Artemis launch on November 16, 2022, which lasted until June 2023. During that timeframe, the AS trailer at LC39B was relocated to another KSC remediation site (Wilson Corners) and was subsequently replaced with the AS trailer from the Paint & Oil Locker (POL) remediation site at KSC to resume AS system operations. Performance monitoring results in the AS IM and LCP areas continue to show reduction in COC concentrations over time when compared to baseline levels. In 2023, only one monitoring well (MW0048) detected a COC exceeding its NADC (VC at 740 micrograms per liter [µg/L]), which marks the baseline result for this new well installed during system expansion. Across the rest of the site, VC concentrations have declined or remained stable during the 2023 sampling events. Excluding MW0048, the highest VC result in 2023 was during the May/June sampling event with a concentration of 63 µg/L at MW0032, which is located near MW0048 and the AS expansion area by the LOX tank. TCE was detected in select monitoring wells in the IM area in 2023, but only two locations exceeded the State of Florida Groundwater Cleanup Target Level (GCTL): MW0032 (21 µg/L in May/June 2023 and 9.1 µg/L in November 2023) and MW0036 (5.0 µg/L in November 2023). MW0036 is also located near the LOX tank, on the north side, where the AS system is still operational (Zone Z4). cDCE and trans-1,2-dichloroethene concentrations were less than laboratory method detection limits or their respective GCTLs in all wells sampled in 2023. Near the OFW located northwest of the launch complex, all COC concentrations were less than laboratory method detection limits from monitoring wells (MW0039, MW0040, and LOXTA0002S) sampled in 2023. Aluminum results from LOX-IW0012S, which has been sampled routinely since 2006, detected a total aluminum concentration of 3,900 µg/L during the May/June 2023 sampling event. Results from the November 2023 event detected 5,700 µg/L for total aluminum and 5,500 µg/L for dissolved aluminum. These concentrations slightly decreased from the previous year but remain relatively consistent with historical detections. Aluminum will continue to be sampled on an annual basis at this well as results still exceed the GCTL of 200 µg/L and the Upper Limit of the KSC Background Concentration of 280 µg/L. PFAS results detected nine different PFAS compounds (out of 32 analyzed) from seven wells sampled. Two PFAS compounds, perfluorooctanesulfonic acid (PFOS) and perfluorooctanoic acid (PFOA), currently have FDEP Provisional GCTLs of 70 nanograms per liter (ng/L). All seven samples collected resulted in concentrations less than the FDEP Provisional GCTLs for both PFAS compounds; no exceedances were observed. PFOS and PFOA also have assigned United States Environmental Protection Agency (USEPA) Maximum Contaminant Levels (MCLs) of 4 nanograms per liter (ng/L). None of the PFOS results exceeded the USEPA MCLs. PFOA was detected in two samples above the USEPA MCL at concentrations of 5.8 ng/L (ECS-IW0009I) and 5.5 ng/L (ECS-IW0009S). Three other PFAS compounds, perfluorohexanesulfonic acid (PFHxS), perfluoro-n-nonanoic acid (PFNA), and hexafluoropropylene oxide dimer acid (GenX), currently have USEPA MCLs of 10 ng/L. PFHxS, PFNA, and GenX were not detected at concentrations greater than their respective USEPA MCLs in any of the seven wells. PFAS compounds without FDEP Provisional GCTLs or USEPA MCLs were screened against USEPA RSLs. No other detections exceeded their respective USEPA RSLs. Additional PFAS sampling will be conducted as part of a future PFAS Site Assessment. Based on O&M activities and performance monitoring, the following is recommended for LC39B: • Continue with Year 8 AS system operation within Zone Z4, which includes the AS expansion area. Zone Z3, which has been off since 2018, should remain off as no rebound has been observed. Zones Z1 and Z2, which were turned off at the end of 2022, will remain shut down as monitoring well results have consistently been below GCTLs or have low-level detections with stable or decreasing trends (Meeting Minute 2402-M10, Decision 2402-D30). • Continue with performance monitoring in 2024 with the same monitoring well network as 2023, except with the addition of MW0048 in both semi-annual events. Baseline concentrations for this well were collected during the November 2023 performance monitoring event. Semi-annual sampling should be planned for the May 2024 and November 2024 timeframes (Meeting Minute 2402-M10, Decision 2402-D31). • Continue sampling monitoring well, LOX-IW0012S, for aluminum (total and dissolved) on an annual basis in May 2024. It is also recommended to re-develop this well prior to the next sampling event (Meeting Minute 2402-M10, Decision 2402-D32). The above recommendations for LC39B were presented at the February 2024 KSCRT Meeting, with Team consensus reached on the path forward. The contents of this PM-CCR were also presented at this meeting.

Deborah M Wilson↗

Wilson Corners, Solid Waste Management Unit 001(SWMU 01) 2023 Annual Long-Term Monitoring Report

This report presents a summary of the long-term monitoring (LTM) activities that occurred in 2023 at Wilson Corners, Solid Waste Management Unit 001, at Kennedy Space Center (KSC), Florida. Annual LTM of groundwater is being conducted at the site. Based on results from groundwater sampling activities performed during the 2019 through 2020 LTM reporting period and the 2020 and 2021 DPT groundwater sampling, it was determined that the LTM sampling plan was no longer meeting the goal of LTM because delineation was not verified and the installation of an air sparge (AS) system to treat the area of the High Concentration Plume was recommended. The AS System was installed in late 2022 and early 2023. System start-up activities were initiated in April 2023. Following system startup, several site wells required retrofitting to equip wellheads for withstanding the air pressure released from air sparge wells during system operation. Some site wells also required repair or abandonment, and replacement. Survey of location and top-of-casing of newly installed monitoring wells was combined with scheduled AS system survey activities and was completed in January 2024. The activities presented in this report include the February and April 2023 LTM monitoring well installations; March and April 2023 LTM and performance monitoring well water level gauging and sampling; November 2023 LTM well retrofits and repairs; a summary of December 2023 LTM well abandonments and installations (complete site well abandonment activities will be presented under a separate cover); and January 2024 LTM well survey. During the March and April 2023 sampling events, the low-flow sampling method was used, and samples were analyzed for a select list of volatile organic compounds. In March 2023, groundwater flow for the site was generally to the west was generally consistent with historical observations at the site. The Low Concentration Plume (LCP) continues to extend both horizontally and vertically beyond the terminal depth of the current monitoring well network. Data, inclusive of the 2023 LTM and baseline performance monitoring sampling events, indicate that the LCP encompasses an estimated 19.5 acres, compared to the 2021 LCP footprint, inclusive of the 2020 and 2021 DPT sampling events of 20.7 acres. The vertical extent of VOCs was historically delineated by monitoring wells screened greater than 48 feet below land surface (bls). The results from the three vertical extent monitoring wells screened below 48 feet bls that were sampled during the 2023 LTM indicate that groundwater vinyl chloride concentrations in these three wells are greater than the GCTL. As presented in the 2021 Long-Term Monitoring Report (NASA 2022), the KSCRT agreed to delay deeper investigations in this area to prevent the creation of additional pathways for vertical migration. Based on groundwater sampling activities performed in 2023, recommendations are to perform the next annual LTM sampling event, scheduled for April 2024 and to conduct quarterly performance monitoring of the AS System. The current selection of monitoring wells in the recommended 2024 LTM plan will provide an adequate data set for monitoring groundwater plume behavior; however, the LTM monitoring well network will be evaluated and refined based on 2024 LTM and year one performance monitoring data.

King Linnea↗

Launch Complex 34, SWMU CC054 2023 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring and Phase Two Expansion Construction Completion Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 14 operations and performance monitoring of the hydraulic containment (HC) Interim Measure (IM), details associated with construction and implementation of the HS 6 AS system expansion (Phase Two), and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. The timeframe for activities documented in this PMR extends from April 1, 2023 to March 31, 2024. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the shallow and deep DSZ and surrounding dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to recharacterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS and install additional recovery wells in Layer 7 to more adequately capture residual contaminant mass. The operational period for Year 14 of the HCS was from April 1, 2023 to March 31, 2024. Operational runtime for the system was 94 percent during Year 14, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2024, a total of 344,849,634 cumulative gallons of groundwater containing 94,656 pounds of chlorinated volatile organic compounds (CVOCs) have been removed by the HCS. During the reporting period covered under this report, the HCS recovered 31,176,393 gallons and approximately 6,319 pounds of CVOC mass. Total combined influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 25,000 µg/L (March 2024). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in January 2024 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2022. Full vertical profile sampling was completed at each DPT from 8 to 98 feet below land surface (bls), at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 28 to 98 feet bls. An overall decreasing trend of TCE concentrations was observed in DPT samples during this reporting period, which is a reduction from the previous event (December 2022) and the peak event in December 2021, where TCE percentages appeared to increase in all depth zones because several recovery wells were turned off during the AS pilot study in the DSZ. The maximum TCE concentration in January 2024 was 1,600,000 µg/L in the 53 feet bls depth interval at DPT594 (previous maximum result in 2022 was 1,800,000 µg/L in the 48 feet bls depth interval at DPT599). This maximum concentration in the 53 feet bls depth interval is in the deep capture zone. During the January 2024 DPT event, the largest portion of TCE mass was observed in the 48 feet bls interval above/within Layer 4. This trend remains consistent with previous years and appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, annual groundwater samples were collected from 11 deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2023 to verify vertical and horizontal delineation. Three of the wells were also sampled biweekly to evaluate operations of recovery well RW21D (screened 86 to 106 feet bls), which was installed in January 2023. Of the Layer 7/8 monitoring sampled only annually, results were non-detect or less than groundwater cleanup target levels GCTLs in December 2023, with the exception of one well, IW45D2, which had a cis-1,2-dichloroethene (cDCE), detection greater than the GCTL. Of the three wells sampled biweekly during the operational period, the well located closest to Layer 7 recovery well RW21D (IW44D2, screened 105 to 115 feet bls) had concentrations of TCE, cDCE and vinyl chloride (VC) greater than GCTLs throughout the operational period, but displayed a decreasing trend since the peak concentrations in September 2023. The maximum TCE concentration during this operational period was 190,000 µg/L at IW44D2 in September 2023, but reduced to 700 µg/L in March 2024, indicating the HCS is still effectively removing mass from the source area. Expansion of the HCS and addition of new recovery wells is ongoing and will continue to be evaluated as the groundwater recovery scheme is optimized. Details of the expansion and optimization will be provided in a future PMR. The HS 6 AS IM was initiated in 2018 with 160 AS wells and expanded in 2019 with another 140 AS wells. An additional expansion of the HS 6 AS IM was completed during the reporting period covered under this report and details of the construction implementation and startup of the expansion are detailed in Section III of this report. The new expansion, referred to as Phase Two, was implemented between August 17, 2022 and August 28, 2023, and included the installation of 190 air sparge wells to treat an additional 11.2 acres. The original configuration (referred to as Phase One) operated until Phase Two came online, then all but 52 AS wells were turned off so the components could be moved and utilized in the Phase Two area. The 52 AS wells that remain on are in a barrier configuration preventing contaminated groundwater from impacting the treated area. The HS 6 AS system (both Phase One and Two) operated normally during the reporting period covered under this report. Semi-annual performance monitoring of the Phase One configuration was conducted in April and November 2023, consistent with previous years. For the Phase Two configuration, 21 new monitoring wells were installed and sampled quarterly, with a baseline event in July 2023, and quarterly events in November 2023 and February 2024 summarized in this report. Semi-annual monitoring results collected in April and October 2023 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and VC) have decreased to less than GCTLs in nearly all wells and not impacting the surface water drainage canal, indicating the HS 6 IM continues to meet objectives. The baseline and quarterly sampling for the Phase Two configuration indicate generally decreasing concentrations in wells within and around the perimeter of the treatment area. At least two more quarters of monitoring will be conducted and once those results are evaluated a reduced the sampling frequency may be considered. Overall, the tasks associated with Year 14 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with recommendations included in the previous 2022 LC34 (Year 13) PMR. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

groundwater remediation↗

2023 Cleanroom Monitoring for OSIRIS-REx

OSIRIS-REx is an asteroid sample return mission that delivered asteroid regolith from Bennu to Earth on 9/24/2023 [1]. Cleanroom monitoring of OSIRIS-REx Curation facilities has been ongoing since 2021 when construction of the OSIRIS-REx lab at Johnson Space Center (JSC) was completed [2]. The monitoring continues inside of the OSIRIS-REx lab in Houston. Monitoring was also conducted on a temporary cleanroom constructed inside a hangar at the Utah Test and Training Range (UTTR) to initially receive the Sample Return Capsule (SRC) upon its landing there. The following reports on cleanroom monitoring that has taken place in the months leading up to as well as after OSIRIS-REx return. Monitoring techniques used include particle counts, deployment of Si wafer witness plates (Balazs, Inc.) and Al foil witness plates, gas sampling (Balazs, Inc.) and microbiological monitoring. We collected particle counts at both the lab at JSC as well as the temporary cleanroom at UTTR. Particle counts were taken monthly from six locations in the lab at JSC. Particle counts were taken from seven locations at UTTR in July, August, and September. The UTTR cleanroom particle counts were taken daily in the five days leading to OSIRIS-REx return as well as consistently the day of return (every 2 minutes and 15 seconds 7:21 am- 6:27 pm) from one location inside the cleanroom. The particle counts at UTTR consistently stayed well within the ranges of its required ISO 7 equivalent classification (352,000 maximum particles/ m3 ≥ 0.5 μm). Most analysis showed that the particle counts were far below ISO 7 requirements (highest measured count was 61,484 particles/ m3 ≥ 0.5 um). but the elevated instances correlated to exterior hangar doors being open. Particle counts were reduced when keeping exterior hangar doors closed. The particle counts at JSC have stayed consistently within their ISO 5 equivalent classification (3,520 maximum particles/ m3 ≥ 0.5 um). In most instances, the counts are much better except in one instance where the count measured 13,381 particles/ m3 ≥ 0.5 um. The high spike in particle counts in the JSC lab correlated with the air handlers being shut down temporarily the previous day. The particle counts taken in the same location quickly reduced and measured 0 when taken a month later with the air handlers on. We deployed 8-inch semiconductor polished Si wafer witness plates for 24-hour periods inside of the OSIRIS-REx Curation lab at JSC (in July, August, September, and November 2023) and the cleanroom at UTTR (July and September 2023) to test for possible organic and inorganic contaminants. We also deployed these wafers inside of the OSIRIS-REx Touch-and-Go sample Acquisition Mechanism (TAGSAM) glovebox (where Bennu sample processing occurs) and desiccator (Bennu sample storage) at JSC in August 2023. These samples were all sent to Balazs for analysis via Thermal Desorption Gas Chromatography Mass Spectroscopy (TD-GC-MS) to quantify organic compounds and vapor phase decomposition inductively coupled plasma mass spectrometry (VPD-ICP-MS) to quantify inorganic contaminants. We collected air samples using an adsorbent tube connected to a pump for six hours (100 mL/minute) inside of both the JSC lab and the UTTR cleanroom. These samples were taken at JSC in July, August, September, November, and December and at UTTR in July and September. Additionally, a sample was taken just outside of the TAGSAM glovebox airlock door in July. These samples were sent to Balazs for analysis of volatile organics in air. Overall, the OSIRIS-REx lab at JSC and cleanroom at UTTR yielded very low organic and inorganic contaminants (similar results to Genesis lab at JSC which is ISO 4 equivalent) except for boron, which is attributed to the borosilicate glass in the fan filter units. We collected monthly surface and air samples inside the JSC lab to monitor potential microbial contamination. We report the recovery rate for each sampling event, which is defined as the number of samples exhibiting bacterial or fungal growth divided by the total number of samples collected. Since the lab was commissioned in 2021 the median recovery rate is 29%. This recovery rate is consistent with other ISO 5 equivalent labs used to curate astromaterials collections. Increases in recovery rate correspond to construction and/or extra activity in the lab. However, increases in recovery rate do not reliably correlate to increases in particle counts, which highlights the need for a dedicated microbial monitoring program for biologically sensitive collections. We sampled the temporary clean room at UTTR in July, August, and September of 2023 to monitor potential microbial contamination. The recovery rate decreased from 80% in August to 29% in September. However, in all instances, the diversity of bacteria and fungi was higher in the UTTR cleanroom than in the JSC lab. We routinely collected more than twenty different organisms from the UTTR cleanroom. In the JSC lab the median diversity is 2 organisms. Based on these results we hypothesize that microbes from UTTR could be transported back to JSC with the Bennu samples. To mitigate this risk, in September of 2023, we implemented additional cleaning procedures in the JSC lab to reduce the bioburden on surfaces that could come into direct contact with hardware used to process Bennu samples. Since adopting these additional cleaning measures, the median recovery rate has decreased to 14%. We did not observe an increase in fungal or bacterial diversity in the lab in the October sampling. We will continue to monitor this trend closely for the next several months. Supported by NASA under Award NNH09ZDA007O and Contract NNM10AA11C.

Rachel Comstock Funk↗

The wavelength dependence of polarization in NGC 2023

NGC 2023 is a bright reflection nebula illuminated by the central star HD37903. At 2 microns the nebula is seen solely by reflected light from the central star but in the NIR there is excess radiation that is supposed to arise from thermal emission from a population of small grains (Sellgren, 1984). The unexpectedly high surface brightness at R and I wavelengths has led to the suggestion that even at these wavelengths there is a significant contribution from this thermal emission process (Witt, Schild, and Kraiman, 1984). If the nebula is seen by reflected starlight then this radiation will be linearly polarized. The level of polarization depends on the scattering geometry, grain size distribution, etc., and is typically 20 to 40 percent for nebulae such as NGC 1999 which is morphologically similar to NGC 2023. If, in any waveband, there is a contribution of radiation from emission processes this radiation will be unpolarized and will serve to dilute the scattered radiation to give a lower level of observed polarization. A study of the wavelength dependence of polarization in nebulae in which there may be thermal emission from grains will indicate the contribution from this process to the total luminosity. Polarization maps were produced in BVRI wavebands for the NGC 2023 nebulosity which confirm that at all wavelengths it is a reflection nebula illuminated by a central star. The wavelength dependence of polarization at representative points in the nebula and in a scatter plot of polarization in V and I wavebands at all points at which measurements are given. Results indicate that throughout the nebula there is a general trend for the level of polarization to increase with wavelength and that maximum levels of polarization occur at the longest wavelengths. No evidence is seen in the data for any significant contribution from the thermal emission from grains in the BVRI luminosity of NGC 2023.

Rolph, C. D.↗

Radio recombination line observations of the C II region NGC 2023

The reflection nebula NGC 2023 has been observed at four frequencies in a study of its carbon recombination line emission. The observations show the recombination line region to be about 2 pc in diameter, with an average electron density of about 0.2 per cu cm and electron temperature of about 20 K. The electron density increases exponentially near the B1.5 star HD 37903, the illuminating star of NGC 2023. The most reasonable interpretation of the observational results is that the carbon emission lines arise in a cold C II region surrounding HD 37903. The coexistence of the C II region with a region of enhanced CO emission suggests that the CO in NGC 2023 may be excited by electron collisions.

Knapp, G. R.↗

Scattering of infrared radiation by dust in NGC 7023 and NGC 2023

The contribution of scattered light to the total nebular emission is determined on the basis of linear polarization measurements at 1.25, 1.65, and 2.2 microns of the visual reflection nebulae NGC 7023 and NGC 2023. The percentage polarization of NGC 7023 slowly increases from 0.3 to 1 micron, with peak polarizations of up to 26 percent at 1.25 micron, then rapidly decreases, with values of 4-7 percent at 2.2 microns. This is interpreted as implying that scattered starlight contributes most to the SW emission, while unpolarized emission from small grains or large molecules dominates at longer wavelengths. IR polarization and surface brightness measurements are combined to derive the intensity of scattered light, which is then compared with scattering models. While the near-IR emission of both NGC 2023 and NGC 7023 is dominated by small-grain or large-molecule emission, IR scattered light plays a larger role in NGC 2023 than in NGC 7023.

Sellgren, K.↗

Challenges in Observing, Modeling, and Forecasting the June 2023 Smoke Event Over the Northeast United States

In the first week of May 2023, boreal Canada began an early start to the biomass burning season when fires erupted across Alberta and western Saskatchewan. Smoke entered the troposphere and spread across the United States as biomass burning emissions in Canada quadrupled the prior maximum since the onset of the MODIS satellite record. Adding to the already existing smoke, wildfires ignited in Quebec on June 2, 2023, producing a heavy plume of aerosol over the northeastern part of the continent. Meteorological factors, including an area of low pressure situated, nearly stationary, over Maine, transported the smoke into a densely populated corridor containing the cities of Washington, DC, Baltimore, Philadelphia, and New York City. Air quality alerts became widespread as near-surface levels of fine particulate matter (PM2.5) exceeded harmful levels due the low altitude of the smoke plume. Forecasting the smoke transport and impacts of such events requires a complex combination of observed initial conditions for meteorology and aerosols, knowledge of the emissions from wildfires, and a state-of-the-art Earth System model that couples these components together. Using a case-study perspective with the Goddard Earth Observing System (GEOS), challenges associated with near real time forecasting of the smoke plume are presented. Analyzed and forecasted aerosol optical depth will be evaluated using available satellite and AERONET observations, while surface aerosol will be assessed relative to observations of PM2.5. Lacking real time estimates of biomass burning emissions for inputs to our forecast model, particular attention is given to the use of day-old biomass burning emissions throughout the forecast period covering the first ten days in June 2023, and the resulting reduction in forecast skill will be quantified.

Allison Collow↗

2023 Artemis Crew Health and Performance System Model Development

While the NASA Human Research Program (HRP) utilizes a Crew Health and Performance (CHP) System to represent all the Agency’s efforts to ensure the health and performance of NASA astronauts, there is no shared mental model of a CHP system at NASA. Some groups may consider a CHP system to be only a medical kit, while others may not be using the concept at all. To facilitate the integration of functions and capabilities to ensure astronaut health and performance during vehicle development, HRP has proposed a CHP Shared Mental Model derived from the NASA Human Health, Medical, and Performance Spaceflight Standards (NASA-STD-3001 Vol.1/Vol.2). [1] Even though many vehicle, ground, and communication systems as well as mission operations are modeled for the Artemis Campaigns, no mission level CHP system model was created to achieve the intent of the HRP CHP Shared Mental Model. The lack of this model renders it difficult to visualize and understand how the many programs work together to provide the necessary cross program functions and capabilities to ensure the health and performance of the crew throughout an Artemis mission. For this purpose, the Exploration Medical Capability (ExMC) element of HRP developed a CHP system model for the Artemis III and IV missions to provide a view of how each program contributes to and interacts with the overall CHP system. To develop the 2023 Artemis CHP system model, ExMC leveraged existing data and models from the Moon to Mars Program Office, the Office of the Chief Health and Medical Officer (OCHMO) and the Orion, Gateway, Extravehicular Activity and Human Surface Mobility (EHP) and Human Landing System (HLS) programs. By using a Model-Based Systems Engineering (MBSE) approach, existing requirements, functions, and concepts of operations were combined to create a single system model focused on representing CHP from the launch to the return to Earth segments of the Artemis III and IV missions. Additionally, by incorporating the HRP Systems Platform for Aggregating and Relating Capabilities, or SPARC tool, the data from the programs was also related back to the 2nd volume of the NASA Human Health, Medical, and Performance Spaceflight Standard (NASA-STD-3001, Vol.2) and the human system risks identified by the Human System Risk Board (HSRB). The first version of the 2023 Artemis CHP system model was baselined in Fall of 2023 after the model was demonstrated to be a potentially useful tool for systems engineers integrating CHP capabilities in vehicle development as well as members of the Health and Medical Technical Authority providing oversight of those programs. The model may also be useful to any stakeholder of astronaut health and performance by providing insights on how an Artemis mission satisfies the NASA Human Health, Medical, and Performance Spaceflight Standards as well as how they mitigate the HSRB Human System Risks. This presentation highlights how the model was developed and the possible benefits of the model. [1] NASA HRP (2022), Crew Health and Performance System Whitepaper

Systems engineering↗

Challenges in Observing, Modeling, and Forecasting the June 2023 Smoke Event over the Northeast United States

In the first week of May 2023, boreal Canada began an early start to the biomass burning season when fires erupted across Alberta and western Saskatchewan. Smoke entered the troposphere and spread across the United States as biomass burning emissions in Canada quadrupled the prior maximum since the onset of the MODIS satellite record. Adding to the already existing smoke, wildfires ignited in Quebec on June 2, 2023, producing a heavy plume of aerosol over the northeastern part of the continent. Meteorological factors, including an area of low pressure situated, nearly stationary, over Maine, transported the smoke into a densely populated corridor containing the cities of Washington, DC, Baltimore, Philadelphia, and New York City. Air quality alerts became widespread as near-surface levels of fine particulate matter (PM2.5) exceeded harmful levels due the low altitude of the smoke plume. Forecasting the smoke transport and impacts of such events requires a complex combination of observed initial conditions for meteorology and aerosols, knowledge of the emissions from wildfires, and a state-of-the-art Earth System model that couples these components together. Using a case-study perspective with the Goddard Earth Observing System (GEOS ), challenges associated with near real time forecasting of the smoke plume are presented. Analyzed and forecasted aerosol optical depth will be evaluated using available satellite and AERONET observations, while surface aerosol will be assessed relative to observations of PM2.5. Lacking real time estimates of biomass burning emissions for inputs to our forecast model, particular attention is given to the use of day-old biomass burning emissions throughout the forecast period covering the first ten days in June 2023, and the resulting reduction in forecast skill will be quantified.

Allison Collow↗

Orbital Debris Quarterly News, October 2023

In this issue: - ISS Maneuvers to Avoid Potential Collisions Twice in August 2023 - Derelict Cosmos Communications Spacecraft Breaks Up in June 2023 - Gene Stansbery, Former NASA Program Manager for Orbital Debris, Passes - HUSIR Radar Measurements of the Orbital Debris Environment: 2022 - Thirty Years Later: A Look Back at the 1993 JSC Perseid Stormwatch Center - IOC II Commences in December 2023 - NASA ODPO and HVIT Abstract - Conference Report - Orbital Debris Environment Plots - Space Missions and Satellite Box Score

Heather Mae Cowardin↗

2023 Artemis Crew Health and Performance (CHP) System Model Development

While the NASA Human Research Program (HRP) utilizes a Crew Health and Performance (CHP) System to represent all the Agency’s efforts to ensure the health and performance of NASA astronauts, there is no shared mental model of a CHP system at NASA. Some groups may consider a CHP system to be only a medical kit, while others may not be using the concept at all. To facilitate the integration of functions and capabilities to ensure astronaut health and performance during vehicle development, HRP has proposed a CHP Shared Mental Model derived from the NASA Human Health, Medical, and Performance Spaceflight Standards (NASA-STD-3001 Vol.1/Vol.2). [1] Even though many vehicle, ground, and communication systems as well as mission operations are modeled for the Artemis Campaigns, no mission level CHP system model was created to achieve the intent of the HRP CHP Shared Mental Model. The lack of this model renders it difficult to visualize and understand how the many programs work together to provide the necessary cross program functions and capabilities to ensure the health and performance of the crew throughout an Artemis mission. For this purpose, the Exploration Medical Capability (ExMC) element of HRP developed a CHP system model for the Artemis III and IV missions to provide a view of how each program contributes to and interacts with the overall CHP system. To develop the 2023 Artemis CHP system model, ExMC leveraged existing data and models from the Moon to Mars Program Office, the Office of the Chief Health and Medical Officer (OCHMO) and the Orion, Gateway, Extravehicular Activity and Human Surface Mobility (EHP) and Human Landing System (HLS) programs. By using a Model-Based Systems Engineering (MBSE) approach, existing requirements, functions, and concepts of operations were combined to create a single system model focused on representing CHP from the launch to the return to Earth segments of the Artemis III and IV missions. Additionally, by incorporating the HRP Systems Platform for Aggregating and Relating Capabilities, or SPARC tool, the data from the programs was also related back to the 2nd volume of the NASA Human Health, Medical, and Performance Spaceflight Standard (NASA-STD-3001, Vol.2) and the human system risks identified by the Human System Risk Board (HSRB). The first version of the 2023 Artemis CHP system model was baselined in Fall of 2023 after the model was demonstrated to be a potentially useful tool for systems engineers integrating CHP capabilities in vehicle development as well as members of the Health and Medical Technical Authority providing oversight of those programs. The model may also be useful to any stakeholder of astronaut health and performance by providing insights on how an Artemis mission satisfies the NASA Human Health, Medical, and Performance Spaceflight Standards as well as how they mitigate the HSRB Human System Risks. This presentation highlights how the model was developed and the possible benefits of the model. [1] NASA HRP (2022), Crew Health and Performance System Whitepaper

Systems engineering↗

2023 Land Use Control Inspections Report

2023 Land Use Control (LUC) Inspections Report for John F. Kennedy Space Center (KSC), Florida. This letter report documents the quarterly LUC inspections the KSC Remediation Group conducts at Remediation Sites. No LUC findings occurred in 2023. A Corrective Action to address arsenic-impacted soil at the KSC Child Development Center was performed in July 2023. This letter report provides a summary and documents the field activities for that Corrective Action. Copies of the formal LUC Implementation Plans (LUCIPs) for 71 Remediation Sites at KSC are presented in this letter report. For the Remediation Sites that do not have formal LUCIPs, the report documents that informal LUCs that the Remediation Group has implemented at these sites.

Christopher Adkison↗

Launch Complex 39A, SWMU 008 2023 Long-Term Monitoring Report Kennedy Space Center, Florida

The 2023 Long-Term Monitoring (LTM) Report (LTMR) presents the annual and semi-annual groundwater monitoring results for Launch Complex 39A (LC39A), Solid Waste Management Unit (SWMU) 008, at Kennedy Space Center (KSC), Florida. The reporting period covered under this LTMR is from January to December 2023, and represents the first year of site-wide monitoring following Air Sparge (AS) system shutdown at the end of 2022. AS system operation at LC39A began operation in 2015. The AS system consisted of a total of 173 AS wells ranging in depth from 11 to 37 feet below land surface. The overall remedial objective for the AS Interim Measure was to actively decrease concentrations of COCs to less than their respective Florida Department of Environmental Protection Natural Attenuation Default Concentrations, so that LC39A can transition into an LTM program. This objective was achieved in 2022, with 2023 marking Year 1 of the LTM program to monitor the residual groundwater plume. VOC results indicate that COC concentrations have continued to decrease or stabilize, with no rebound observed since AS system shutdown. Vinyl chloride was the only COC detected above its GCTL, with the highest concentration detected at 8.0 μg/L. PFAS results detected 15 different PFAS compounds (out of 32 analyzed) between the six monitoring wells sampled. Two PFAS compounds, perfluorooctanesulfonic acid (PFOS) and perfluorooctanoic acid (PFOA), currently have FDEP Provisional GCTLs of 70 nanograms per liter (ng/L). PFOS was detected in one of the six samples above the FDEP Provisional GCTL at a concentration of 200 ng/L. PFOA was not detected above the FDEP Provisional GCTL in any of the six samples. PFOS and PFOA also currently have United States Environmental Protection Agency (USEPA) Maximum Contaminant Levels (MCLs) of 4 ng/L. PFOS was detected in all six samples above the USEPA MCL. PFOA was detected in three of the six samples above the USEPA MCL. Three other PFAS compounds, perfluorohexanesulfonic acid (PFHxS), perfluoro-n-nonanoic acid (PFNA), and hexafluoropropylene oxide dimer acid (GenX), currently have USEPA MCLs of 10 ng/L. PFHxS, PFNA, and GenX were not detected at concentrations greater than their respective USEPA MCLs in any of the six wells. Additional PFAS sampling will occur as part of a PFAS Site Assessment to be conducted in the future. Based on Year 1 LC39A LTM results, recommendations for 2024 are to continue with the second year of LTM in 2024 with the same monitoring well network as Year 1 (18 wells). The three wells that were on a semi-annual schedule will transition to an annual schedule to align with the remaining wells. The next annual event is scheduled for May 2024. The three wells that were found to be inadvertently destroyed will be properly abandoned and a replacement well in the vicinity of former monitoring well 21ST-MW0030I will be installed. This new well will be added to the LTM sampling plan upon installation.

Deborah M. Wilson↗

Photometric study of NGC 2023 in the 3500 A to 10000 A region - Confirmation of a near-IR emission process in reflection nebulae

A surface brightness study of the reflection nebula NGC 2023 covering the 3500-10,000 A wavelength region performed with uvby photoelectric photometry and BVRI imaging with a CCD detector is reported along with VRI photometry of a cluster of embedded red stars. The nebular radiation in the 3500-5500 A region is dust-scattered starlight originating in the star HD 37903. The embedded red stars are probably pre-main sequence stars. The nebular surface brightness in R and I exceeds that expected on the basis of a reasonable radiative transfer model by factors of two and more than three, respectively. The excess radiation is extended across the nebula in a manner similar to the scattered light. The extended red emission may be interpreted as the high-frequency extension of extended emission discovered by Sellgren, Werner, and Dinerstein (1983) in the 2-5 micron region in NGC 2023 and two other reflection nebulae.

Schild, R. E.↗

Red fluorescence and 3-12 micron emission in NGC 2023, HD 44179, M 82, and Lynds 1780

A red excess observed in the Red Rectangle (HD 44179), was attributed to a possible molecular fluorescence mechanism was discovered in NGC 2023 and analyzed in subsequent work in this and other nebulae. An unexpected red light excess was also noticed in a high latitude dark cloud L 1780. The fluorescence was attributed to hydrogenated amorphous carbon by Duley (1985), on the basis of laboratory work. Alternatively, transitions between electronic states of free polycyclic aromatic hydrocarbon molecules, by-passing the cascade along the vibrational states was considered. In L 1780, the red excess was related to the 12 micron emission detected by IRAS. A quantitative comparison of the intensity of the red fluorescence and that of the 3 to 12 micron features is thus warranted in helping assess the physical properties of large interstellar molecules. The red fluorescence radiation, F(R), appears as a bump on the spectra between 0.6 and 0.9 micron. Values were deduced from the spectra for HD 44179, and for the high latitude cloud L 1780. Corrections for the extinction, both interstellar and internal to the nebulae, were included. The 3 to 12 micron brightness, F(IR), was obtained through integration of the spectra for NGC 2023, and for HD 44179 after removal of a smooth continuum due to hot large grains. The values of the ratio of fluorescence flux to the infrared flux, F(R)/F(IR), are summarized. Red fluorescence and infrared radiation are two separate ways to access to the size of the molecules through observation, and it is rewarding that both approaches give similar results. These findings bring a striking coherence into the physical description of the particles, and add further support to the initial attribution of the infrared features to polycyclic aromatic hydrocarbons (PAHs).

Ryter, Charles↗

AIAA ASCEND 2023 Panel Session Proposal: Community Perspectives on Establishing a Government-Funded National Laboratory in a Commercially-Driven LEO Ecosystem

AIAA ASCEND 2023 Panel Session Proposal: Community Perspectives on Establishing a Government-Funded National Laboratory in a Commercially-Driven LEO Ecosystem Submitted by the NASA Office of Technology, Policy, and Strategy March 8, 2023 Session Format: Panel Session Topic: Expanding and Evolving the Space Economy Session Title: Community Perspectives on Establishing a Government-Funded National Laboratory in a Commercially-Driven LEO Ecosystem Short Session Description: NASA is preparing for the retirement of the ISS and transition of government-sponsored low-Earth orbit (LEO) activities to Commercial LEO Destinations (CLDs), which includes a government-funded national lab. This transition necessitates new models to connect government-funded users of the LEO environment to CLDs. This panel will highlight updates on what may constitute a national laboratory, share perspectives from members of LEO user communities, and open the discussion for additional comments. Requested Session Duration: 90 minutes Extended Session Description: NASA is preparing for the retirement of the ISS and transition of low-Earth orbit (LEO) activities to Commercial LEO Destinations (CLDs), including planning for a national laboratory. This transition necessitates new models for connecting government-funded users of the LEO environment to CLDs. NASA has made progress on models and a stepwise strategy to enable this national laboratory. This session will discuss guiding national strategies and highlight perspectives on what constitutes a national laboratory from current user communities. A NASA panel participant will introduce the rationale for continuing a national laboratory utilizing CLDs and speak on progress-to-date. This includes furthering national priorities to continue a space-based microgravity national laboratory. It also may include a brief overview of a study conducted by NASA which elucidates a trade space of models for a national laboratory and highlights from an interagency working group on microgravity for additional context. A moderator and five panelists representing diverse LEO user communities will then share perspectives on topics relating to this new dynamic ecosystem, expectations for models and activities, and other thoughts on NASA’s progress. Panelists may consist of members from the following communities: NASA, other U.S. government agencies, startups, small businesses, academia, and non-profits. The panel then plans to open discussion to the audience for questions, input, and additional feedback. Session Goal(s)/Outcome(s): By hosting a panel session, NASA aims to accomplish two goals. First, NASA wishes to update the community on progress towards establishing a national laboratory in low-Earth orbit. This includes sharing key perspectives heard from stakeholder communities. The second goal is to highlight the collaborative nature of such an undertaking and to facilitate additional discussion with other current and future users of the LEO community. Participants (not exhaustive): Erica Rodgers; Robyn Gatens

Erica Marie Rodgers Heusinkveld↗

Possible shower outburst in December 2023 associated with comet 46P/Wirtanen

This document supplements the 2023 meteor shower activity forecast for low Earth orbit. We advise spacecraft operators that a possible shower outburst associated with comet 46P/Wirtanen is predicted for December 12, 2023, two days prior to the Geminid peak. If the outburst occurs, activity will be brief but could rival that of the Geminid meteor shower at small particle sizes

Althea Moorhead↗