Results for “29 ENERGY PLANNING, POLICY, AND ECONOMY”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Expanding market opportunities: cogeneration strategies for integrated PWR and thermal energy storage systems

We assess the economic viability of nuclear cogeneration by investigating three different modes—fixed dispatch, fully flexible dispatch, and flexible dispatch with minimum heat supply requirements. The analysis focuses on an existing pressurized water reactor (PWR) integrated with thermal energy storage (TES). Heat production costs are estimated under these modes for two U.S. electricity markets: the Electric Reliability Council of Texas (ERCOT) and the Pennsylvania–New Jersey–Maryland Interconnection (PJM). A sensitivity analysis examines profitability at varying heat market prices. Results indicate that fixed heat dispatch inflates heat production costs, often rendering projects economically feasible only at higher heat price levels. Fully-flexible dispatch lowers heat production costs by an average of 43 % compared to fixed dispatch. However, the current 30 % thermal dispatch limit may be insufficient to serve high baseline industrial demands cost‐effectively; higher maximum dispatch rates could enhance project economics. Markets with higher and more volatile electricity prices (e.g., ERCOT) offer greater total energy sales potential (i.e., heat and electricity), but also increase opportunity costs when heat production scheduling restrictions are imposed. In contrast, lower-price, less volatile markets (e.g., PJM) experience smaller impacts from such constraints and provide greater flexibility in accommodating varying cogeneration modes. In conclusion, these findings provide a framework to guide nuclear plant operators in aligning cogeneration strategies with industrial process requirements and electricity market conditions.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Floating Photovoltaics in Hydropower Reservoirs in the United States

This report presents a comprehensive analysis of the feasibility of floating photovoltaics (FPV) in federally regulated reservoirs within the continental United States (CONUS) and to present a methodology for capturing the true costs of deployment, potential environmental impacts, and regulatory pathways for open-loop hydropower reservoirs. It is intended for stakeholders who may not be solar industry experts but who are interested in exploring the potential for FPV in their reservoirs. While there are promising opportunities, particularly in enhancing dissolved oxygen (DO) levels and potentially improving compliance with existing hydropower licenses, the current capital costs of FPV are not yet competitive with traditional land-based solar installations at the utility-scale when comparing the LCOE results. A competitive financial outlook is achievable when applying a 30% Investment Tax Credit (ITC) and considering a 5% reduction from the baseline capital expenditures (CapEx) at the Tuckertown Reservoir in North Carolina case study. The study is structured around three key pillars of research: technical potential, environmental impacts and regulatory considerations, and technoeconomic analysis. This report provides a nationwide assessment of the opportunities for FPV in terms of capacity, measured in direct current megawatts (MWDC), in reservoirs managed by the U.S. Bureau of Reclamation (USBR), the U.S. Army Corps of Engineers (USACE), and the Federal Energy Regulatory Commission (FERC). Additionally, the report introduces a heuristic model for estimating the CapEx of utility-scale FPV projects (1–100 MW), offering a baseline cost estimate for stakeholders. Finally, the report applies these models to a case study of a hydropower reservoir in North Carolina to present site-specific results.

13 - HYDRO ENERGY↗

Cybersecurity Incident Response Guide for Wind

As wind energy systems become increasingly digitized and interconnected, they face a growing array of cyber threats that can disrupt operations, compromise safety, and trigger cascading impacts across the energy ecosystem. The Wind Incident Response Guide provides a structured, wind-specific framework for preparing for, detecting, responding to, and recovering from cyber incidents. Drawing on lessons from field demonstrations, cyber-physical testbeds, and stakeholder engagement across the wind sector, this guide integrates technical, operational, and regulatory considerations to support asset owners, operators, and responders. It outlines key roles and responsibilities, maps incident response phases to wind-specific scenarios, and highlights applicable laws, regulations, standards, and best practices. By tailoring general cybersecurity principles to the unique architectures and operational constraints of wind systems—including remote access, legacy components, and environmental interfaces—this guide aims to enhance resilience, reduce response time, and support coordinated action across public and private stakeholders. It is intended as a practical resource for utilities, developers, regulators, and emergency managers working to secure the future of wind energy.

17 - WIND ENERGY↗

Navigating Integration: Key Challenges for Data Centers, Nuclear Stakeholders, and Utility Operators

The rapid expansion of data centers, driven by the exponential growth in data-processing and storage needs, presents significant challenges and opportunities for various stakeholders, including data center developers, nuclear energy providers, and utility companies. Data centers are projected to consume 6.7–12% of United States (U.S.) electricity by 2028, driven by artificial intelligence (AI) and cloud-computing demands. Nuclear energy offers reliability and dispatchable baseload power, but data centers need power now while nuclear still needs time to address siting, fast power ramping, and regulatory hurdles. Utilities must keep pace with the unprecedented acceleration of large load interconnection requests and urgently adapt to high-density loads while maintaining grid stability, reliability, and accelerating interconnection timelines. This report dives into these challenges and proposes key collaboration strategies to streamline data center integration that aligns with recent federal initiatives like America’s AI Action Plan and related executive orders that emphasize the importance of data center growth, nuclear energy expansion, and maintaining a competitive edge in the global AI race.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Virtual Power Plant Architecture and Resilient Design

Virtual Power Plants (VPPs) represent a fundamental shift in electric grid operations, aggregating distributed energy resources (DERs) such as solar panels and battery storage to deliver utility-scale grid services traditionally provided by centralized power plants. This report examines the unique architectural, operational, and digital assurance considerations that distinguish VPPs from conventional utility infrastructure as they scale from pilot projects to mainstream deployment across the United States. While VPPs offer significant opportunities for grid modernization and enhanced flexibility, their distributed, multi-stakeholder architecture introduces distinct security challenges that differ fundamentally from traditional generation facilities. The analysis identifies risks in VPP operations, including device-level security gaps, platform vulnerabilities, and communication protocol weaknesses that create expanded attack surfaces compared to centralized power plants. Through examination of real-world incidents and emerging threat patterns, the report demonstrates how some VPPs' reliance on consumer-owned devices, public internet infrastructure, and complex vendor ecosystems require new approaches to digital assurance and operational security. The findings provide practical guidance for utilities, regulators, and aggregators to implement robust security frameworks and operational best practices essential for maintaining grid reliability as VPP deployment accelerates under the Federal Energy Regulatory Commission (FERC) Order 2222 and related regulatory initiatives.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Digital Assurance for Grid Reliability in the Era of Large Load Growth

The rapid expansion of large electric loads is reshaping the operational and regulatory landscape of the U.S. electric grid. These facilities are reaching new scales of expansion, now exceeding a gigawatt per site, and their highly sensitive, digitally driven behaviors introduce new reliability risks. Recent grid events, including large load losses following routine transmission disturbances, highlight the consequences of limited ride-through capability, inconsistent protection settings, inadequate modeling, and lack of behind-the-meter visibility. Parallels to earlier integration challenges of new grid technologies suggest that the grid’s existing processes, standards, and interconnection frameworks are no longer adequate for emerging large loads. This brief synthesizes lessons from the evolution of inverter-based resource regulation and applies them to large-load integration. It identifies critical gaps in modeling accuracy, interconnection processes, performance standards, and compliance mechanisms. Technical recommendations emphasize advanced monitoring, improved modeling, coordinated communication protocols, modernized substations, and structured behind-the-meter control schemes. Collectively, these measures provide a roadmap to maintain bulk power system reliability while enabling the continued growth of large, electrified digital infrastructure.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Securing Grid Communications Infrastructure: Addressing Gaps Beyond NERC CIP Facility Perimeters

The North American electric grid relies on a complex communications infrastructure that extends beyond facility perimeters traditionally covered by NERC Critical Infrastructure Protection (CIP) standards. While CIP requirements have significantly strengthened cybersecurity within Electronic Security Perimeters, many operational communications—such as those between control centers, substations, and third-party networks—fall outside current regulatory scope. As grid modernization introduces new technologies and connectivity models, these external pathways present evolving security challenges. This brief explores the nature of these challenges, including emerging attack vectors and supply chain considerations, and highlights how ongoing grid transformation increases exposure to sophisticated threats. It outlines practical strategies and policy options to complement existing standards, such as expanding secure communications practices, enhancing supply chain transparency, and fostering collaboration among federal, state, and industry stakeholders. Near-term actions like encryption, authentication, and contractual safeguards can help reduce risk while longer-term frameworks are developed to ensure resilient and secure grid operations.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Securing the Modern Grid: Federal Investments, Digitization, and Supply Chain Strategy

Across the United States (U.S.) grid expansion and modernization is underway, paving the way for accelerated load growth and intelligent resource management. Digitization of the grid is supported by several state and federal programs, providing support for utilities installing advanced metering infrastructure (AMI), AI-powered analytics systems, battery energy storage systems (BESS), and distributed energy resource management systems (DERMS) to transform the grid from a one-way power delivery system into an intelligent, responsive network that will enable faster load growth and power expansion of data centers for advanced artificial intelligence (AI) applications. The digital transformation of America's grid presents opportunity for increased efficiency and resiliency but also introduces new digital risks that require careful management. Digital equipment often contains several vulnerabilities such as unencrypted communication protocols, and persistent remote access capabilities that could be exploited to manipulate device settings, coordinate service disruptions, or inject false data into grid operations. These digital risks become particularly important as the grid must rapidly scale to support AI-driven data centers, which the administration has identified as essential for maintaining U.S. technological leadership and economic competitiveness. These vulnerabilities are compounded by supply chain realities: Chinese manufacturers currently produce 70-90% of essential grid components including inverters, batteries, and control systems, with the U.S. lacking domestic manufacturing capacity for critical assets like extra-high voltage transformers. Recent federal legislation has established Foreign Entity of Concern (FEOC) restrictions to address these risks, requiring projects to achieve escalating thresholds of non-FEOC content to receive tax credits while utilities work to expand sourcing channels for their supply chains and strengthen security measures. These restrictions arrive precisely when utilities face unprecedented electricity demand growth driven by the rapid growth in data centers, creating a considerable challenge: rapidly expanding infrastructure while navigating complex compliance requirements while lacking viable alternatives for many critical components. Idaho National Laboratory (INL) and its partners have developed practical approaches to help utilities navigate these intersecting challenges as they leverage federal investment to strengthen and grow the grid. These solutions include Cyber-Informed Engineering (CIE) principles that build resilience directly into systems, the Cirrus tool for secure cloud migration, and enhanced procurement guidance that embeds security requirements throughout equipment lifecycles. Federal initiatives, such as the Technical Assistance for Digital Assurance (TADA) project, provide direct support to utilities implementing these approaches while facilitating knowledge sharing across the industry. While these tools and frameworks cannot eliminate all risks inherent in foreign supply chain dependencies, they offer pragmatic pathways for strengthening security posture without sacrificing the deployment momentum essential to meeting surging electricity demand. Ultimately, securing America's digital energy infrastructure demands dedicated coordination across multiple fronts: building domestic supply chains, implementing robust digital assurance practices, and maintaining the aggressive modernization timeline necessary for reliability, resilience, and energy independence.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Navigating United States Standards and Regulation for Digital Energy Systems

This report provides an analysis of the U.S. standards and regulatory landscape for digital energy systems, focusing on cybersecurity, safety, and reliability requirements. It examines the interplay between federal mandates, state regulations, voluntary industry standards, and utility-specific policies, highlighting critical gaps between compliance and real-world risk mitigation. While NERC CIP standards enforce cybersecurity for Bulk Electric System assets, distribution-level infrastructure and emerging technologies often fall outside mandatory oversight, creating vulnerabilities. The report identifies systemic challenges such as reliance on self-attestation, uneven state adoption of safety codes, and lagging standards for advanced technologies like battery energy storage and inverter-based resources. Through a detailed gap analysis, it underscores the urgency of proactive risk-based approaches, independent verification, and strategic engagement with state and federal entities. Recommendations include adopting tiered security frameworks, strengthening procurement practices, and addressing emerging technology risks to ensure resilient and secure digital energy infrastructure. This guidance is intended for utilities, regulators, and stakeholders navigating compliance obligations and seeking to enhance cybersecurity and safety beyond minimum standards.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Impact of Nuclear Power Plant Energy Storage on Grid Reliability and Generation Costs with Variable Power Generation

This report examines the impact of combining integrated energy systems (IES), specifically hydrogen-based energy-storage systems, with nuclear power plants (NPPs) on grid reliability and generation flexibility in scenarios with substantial variable-power generation from solar energy. The analysis focuses on the challenges and solutions associated with high-levels of solar energy penetration, highlighting the role of advanced energy-storage solutions and flexible-generation technologies in enhancing grid stability and reliability.

29 - ENERGY PLANNING, POLICY AND ECONOMY↗

Bridging the Gap for Powering Data Centers

The rapid expansion of data centers, primarily driven by artificial intelligence, is outpacing the adaptability of the U.S. electric grid. This report, developed by Idaho National Laboratory (INL) , presents a gap analysis of some of the infrastructure challenges associated with large-scale data center deployment. Drawing from a national workshop hosted by INL in October of 2025, the report synthesizes stakeholder insights, survey data, and technical discussions to identify critical barriers and research needs. Key findings highlight the growing preference for behind-the-meter generation, the perceived inadequacy of legacy interconnection processes, and the urgent need for improved coordination between utilities, regulators, and data center developers. Environmental concerns such as water use and noise pollution, as well as economic constraints like equipment lead times and cost allocation, are also explored. The report outlines national lab capabilities in modeling, simulation, and technical assistance, and proposes targeted R&D priorities to support resilient, scalable, and efficient integration of data centers into the grid.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

CalderaCast User Manual Version 1.0

CalderaCast is a user-friendly web-based tool for electrical-load forecast, providing stakeholders with a fully customizable decision-support framework that estimates the likely power draw from a possible future electric-vehicle (EV) charging station at a given location on a given day along an alternative fuel corridor (AFC). These EV charging profiles are accurately modeled in CalderaCast using the Caldera software framework developed by Idaho National Laboratories (INL), reflecting the realistic charging levels observed in actual charge events. This tool was developed as part of the National Electric Vehicle Infrastructure (NEVI) program, which is quickly generating substantial interest from would-be charging station operators (CSO), large and small electric utilities, and state transportation planners, some of whom had not seriously considered EV charging previously. All these entities—with or without background in EV infrastructure—must estimate the electricity load that a proposed charging station will generate. This load forecast is critically important for a utility to properly assess the capacity of their distribution network to support the proposed station or properly size grid upgrades for potential load growth due to future EV adoption, vehicle technology improvements, or station growth. This document describes each aspect of the CalderaCast tool and provides guidance to users who are interested in utilizing the tool for their work.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Advanced Transmission Technologies (ATTs) Supplier Cohort Workshops Cohort Summary [Slides]

This Summary slide deck summarizes the key outcomes of the Advanced Transmission Technologies (ATTs) supplier cohort, part of Idaho National Laboratory’s (INL) Technical Assistance for Digital Assurance (TADA) program. The program aimed to strengthen grid resilience through cybersecurity controls, supply-chain security, and Cyber-Informed Engineering (CIE) for advanced transmission technologies. The cohort brought together vendors representing the full range of Grid-Enhancing Technologies (GETs), including providers of Dynamic Line Ratings (DLR), Advanced Power Flow Control (APFC), Transmission Topology Optimization (TTO), and High-Performance Conductors (HPCs). Discussions focused on institutional, integration, and operational barriers limiting GET adoption; cybersecurity risks at EMS/SCADA, cloud, and network integration points; and supply-chain transparency issues such as semiconductor dependence and SBOM/HBOM expectations. Participants also addressed operator trust, human-in-the-loop requirements, and challenges with utility adoption, while exploring how CIE can support secure deployment of GETs. This deck represents a consolidated summary of challenges and risks identified by vendors, cross-cutting themes and technology-specific insights from three cohort workshops, and actionable mitigations to guide utilities, vendors, and the Department of Energy in advancing secure, trusted deployment of GETs.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

MegaWatt Mayhem: Grid Operator Challenges Center Loads

This report provides a summary of the challenges faced by United States electricity grid operators in accommodating and anticipating the rapid deployment of large loads, particularly data centers, based on academic literature and industry working groups. The report highlights the unique requirements and operational characteristics of data centers, which differ significantly from traditional industrial loads. Key issues addressed utility planning considerations, with emphasis on the implications for grid operators, impacts to normal operations for grid operators, reliability considerations during periods of grid stress, and resilience considerations for the changing operational paradigms based on data centers. Real-world examples are used to highlight these challenges and the changes that grid operators must address. The findings underscore the necessity for coordinated efforts and innovative solutions from both grid operators and regulatory bodies to ensure the stable integration of large loads into the grid. This report is the first in a series that will explore the challenges of data center deployments based on several key power system perspectives.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Data Center Cybersecurity, Supply Chain Risk Management, and Emerging Regulation Cohort Summary: Takeaways and Action Plans

This report summarizes the outcomes of the Data Center Cohort under the Department of Energy’s Technical Assistance for Digital Assurance (TADA) initiative, aimed at enhancing grid resilience through cybersecurity, supply chain risk management (SCRM), and Cyber-Informed Engineering (CIE). The cohort engaged 17 organizations across utilities, data center operators, vendors, and technology providers in three sessions combining presentations, discussions, and exercises. Key topics included AI-driven load behavior, cybersecurity vulnerabilities in UPS/BESS and cooling systems, governance gaps at utility–data center boundaries, and supply chain integrity. Five cross-cutting themes emerged: interconnection architecture vulnerabilities, fragmented governance, AI-driven stability risks, lack of regulatory frameworks, and long-term supply chain concerns. Actionable recommendations were developed, including implementing DMZ segmentation, formalizing vendor access agreements, designing AI workload limits, and advancing standards through NERC and state-level programs. These strategies aim to strengthen resilience, clarify responsibilities, and ensure secure integration of data centers into the grid.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Considerations for Maritime Nuclear Technologies, Economic Viability and Public Acceptance

The Maritime Nuclear Application Group (MNAG) is a working group convened by the National Reactor Innovation Center at Idaho National Laboratory (INL), the American Bureau of Shipping, and Morgan, Lewis, and Bockius LLP. This report documents an MNAG examination of considerations relevant to implementing nuclear technology in commercial maritime applications. In general, two types of use case are examined: maritime nuclear power plants and nuclear reactors used on board shipping vessels for propulsion and other ship needs. The report finds that there may be economic benefits related to maritime nuclear technologies, including the flexible deployment of maritime nuclear reactors, which would allow them to complement land-based nuclear projects, and operational differences for nuclear cargo ships that may lead to an overall increase in revenue. High-level analyses in this report show that, based on general small modular reactor and microreactor cost estimates developed by INL, maritime nuclear reactors may be economically competitive for electricity production in remote regions and for use in the propulsion of large cargo ships. Besides economic viability, public acceptance will be key to implementing maritime nuclear technologies. The report discusses the public’s current perception of nuclear technologies. Engaging with the public will be important to improving this perception. The report discusses some key benefits and risks associated with maritime nuclear technologies. Benefits include the creation of jobs, the production of reliable energy, and the potential to improve air quality. Risks that concern the public are the potential for radioactive releases during operation and decommissioning, as well as those related to waste management. Communicating the benefits and the risks of maritime nuclear technologies will be essential to improving public perception.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Arbitrage and Capacity Firming in Coordination with Day-Ahead Bidding of a Hybrid PV Plant

A hybrid PV plant (HPP) combines a photovoltaic (PV) plant with a battery energy storage system (BESS), which is considered a promising step towards the future of renewable power plants by the U.S. Department of Energy. When the renewable penetration reaches a significant level, a hybrid PV plant can bid in as a controllable thermal plant in the future electricity market. In this study, a bidding and BESS scheduling model is proposed for the HPP. The robust optimization (RO) technique has been utilized to identify the worst-case scenario of uncertainties during the bidding process. To address the overly conservative issue of the single-stage RO, we have decoupled the BESS schedule for arbitrage and PV capacity firming by a two-stage RO formulation. By comparing the output of single-stage RO and two-stage RO, the two-stage RO bids and schedules in a more aggressive manner, which increases the income of HPP. Also, the penalty of under-generation is considered in our model so that the day-ahead bidding decision and arbitrage schedules can be adjusted based on the potential UNDER-GENERATION penalty. Because the proposed model is non-convex and contains multi-stages, the Column-and-Constraint Generation (C&CG) algorithm is applied to the model as the solution. The proposed model has shown better economic performance compared to a state-of-art single-stage bidding method in case studies.

BESS scheduling↗

A Retrospective Analysis of Distributed Solar Interconnection Timelines and Related State Mandates

Most distributed residential photovoltaic (PV) systems must secure an interconnection agreement prior to operation that ensures the local electrical system will operate safely within the broader electrical grid. PV installers generally submit an interconnection application to the local utility that provides all the necessary details the utility needs to evaluate the proposed system. To encourage timely execution of this process, many states’ utility commissions have established mandates that limit the maximum number of days allowed for utility review and approval of interconnection for certain small, often residential applications. In this paper, we derive the median and range of cycle times for the pre-installation approval phase of the interconnection process (i.e., from application submission to approval by the utility) across 24 U.S. states, using a data set of approximately 170,000 projects. We evaluate the percentage of projects that are approved within respective state-mandated timelines from 2017– 2019. We further evaluate how timelines have evolved since 2012 for a subset of five states: Arizona, California, Colorado, New Jersey, and New York. The analyses are divided into two size ranges: systems that are ≤10 kilowatts (kW), and systems that are 11–50 kW.

14 SOLAR ENERGY↗