Search NASA⌕ Search

SEARCH · Search NASA

Results for “AC Level 2 charging”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

What can be learned from The EV Project to inform others who may be interested in a similar study?

In 2009, a project proposed by Electric Transportation Engineering Corporation (ETEC, a subsidiary of ECOtality Inc.) was selected via a competitive bid process as part of the American Recovery and Reinvestment Act’s (ARRA) Funding Opportunity Announcement 28 - Transportation Electrification. At the start of the fourth quarter of 2009, ETEC signed an agreement with the US Department of Energy (DOE) as recipient of a cost-share grant funded by the ARRA to study the use of charging infrastructure by Plug-in Electric Vehicle (PEV) drivers. The project was subsequently called The EV Project. By studying the use of the vehicles and the charge infrastructure, the EV Project would attempt to understand; • how many publicly accessible charge sites would be needed to promote widespread adoption of EVs, • where and at which venues should publicly accessible charging sites be located to be most effective, • which type of charging (AC Level 2 vs DC Level 2 (fast chargers)) would be most utilized by PEV driver’s, • how much would EV drivers be willing to pay for the convenience of away-from-home charging, • what impact did (and would) the PEV charging at (residential and publicly accessible) sites have on the local electrical grid, • which type of away-from-home charging was of more interest, workplace or publicly available, • could charging site hosts realize enough benefit from the chargers to support the deployment levels desired or needed, and • how did the geographically diverse regions of the United States differ with respect to the above? This paper examines The EV Project to learn what was done to meet the ambitious objectives of this infrastructure study, and what was learned from both failures and successes. What can the experience of having conducted The EV Project inform others about what worked, what didn’t work, and what could be done better if undertaking a similar project?

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Early Battery Performance Prediction for Mixed Use Charging Profiles Using Hierarchal Machine Learning

A key step limiting how fast batteries can be deployed is the time necessary to provide evaluation and validation of performance. Using data analysis approaches, such as machine learning, the validation process can be accelerated. However, questions on the validity of projecting models trained on limited data or simple cycling profiles, such as constant current cycling, to real-world scenarios with complex loads remains. Here, we present the ability to predict performance with less than 1.2% mean absolute percent error when trained on cells aged using complex electric vehicle discharge profiles, and either AC Level 2 charge or DC Fast charge profiles, using only the first 45 cycles, namely 5% of the total testing time. While error is low across the projections, this study also highlights that battery lifetime analysis using only cycling data may not extrapolate safely to certain real-world conditions due to the impact of calendar degradation.

25 ENERGY STORAGE↗

Characterize Plug-In Electric Vehicle Driver Away-From-Home Parking Behavior in The EV Project

The EV Project deployed over 5,000 AC Level 2 charging stations and over 100 dual-port DC fast chargers for commercial use in 17 geographic regions across the united States. Approximately 8,300 Nissan LEAFs™ and Chevrolet Volts PEVs participated in The EV Project by allowing data to be collected characterizing operation of their PEV and their charging usage. In the San Diego region, final PEV enrollment included 681 Leafs and 272 Volt owners. The PEV charging stations deployed as part of The EV Project included both residential and non-residential sites. Non-residential sites included electric vehicle supply equipment (EVSE) installed in workplace environments, fleet applications and those that were publicly accessible near retail centers, parking lots, and similar locations. The EV Project utilized its Micro-Climate® planning process to determine potential sites for publicly accessible EVSE in San Diego. This process worked with local stakeholders to target EVSE deployment near areas where The EV Project residential participants resided and where significant PEV traffic was expected. Using this process, The EV Project installed 545 non-residential fleet, workplace, and publicly accessible EVSE at 164 locations in the San Diego region. Another report: “Do PEV Drivers Park near Publicly Accessible EVSE in San Diego but not use them?” 1 investigated the San Diego PEV drivers’ use of 139 of these publicly accessible EVSE locations. It examined how frequently drivers parked near publicly accessible EVSE locations, but did not use them for charging. It concluded that parking near EVSE installed by The EV Project accounted for 3% of vehicle away-from-home parking. This report looks in greater detail at the PEV parking locations in San Diego to determine if there are highly utilized parking locations that should have EVSE available.

33 ADVANCED PROPULSION SYSTEMS↗

Demand and Energy Characteristics of Non-Residential Alternating Current Level 2 Electric Vehicle Supply Equipment

Because the power required to recharge a PEV can be a significant additional electrical load for the charging site host and can contribute to overall load on the electric grid, a frequently asked question related to adoption of PEVs is, “What is the impact of PEV charging on the electrical grid?” This question can be directed at the big picture of total utility system load or at the impact to the local business hosting the EVSE. The local effects to the business owner for clustering of non-residential charging PEVs were addressed in Characterize Clustering of Commercial Alternating Current Level 2 Electric Vehicle Supply Equipment ,1 and the effects on utility demand charges were addressed in What is the Impact of Utility Demand Charges on the Alternating Current Level 2 Host? .2 The focus of this paper is on the impact of PEV charging on total system load and identification of the distinguishing features of a typical non-residential AC Level 2 EVSE charge, including its charge profile (i.e., load duration curve).

25 ENERGY STORAGE↗

Fast charge implications: Pack and cell analysis and comparison

This study investigates the effect of 50-kW (about 2C) direct current fast charging on a full-size battery electric vehicle's battery pack in comparison to a pack exclusively charged at 3.3 kW, which is the common alternating current Level 2 charging power level. Comparable scaled charging protocols are also independently applied to individual cells at three different temperatures, 20 °C, 30 °C, and 40 °C, to perform a comparative analysis with the packs. Dominant cell-level aging modes were identified through incremental capacity analysis and compared with full packs to gain a clear understanding of additional key factors that affect pack aging. While the cell-level study showed a minor impact on performance due to direct current fast charging, the packs showed a significantly higher rate of capacity fade under similar charging protocols. This indicates that pack-level aging cannot be directly extrapolated from cell evaluation. With this being said, delayed fast charging, completing shortly before discharge, was found to have less of an impact on battery degradation than conventional alternating current Level 2 charging

25 ENERGY STORAGE↗

Effects of Electric Vehicle Fast Charging on Battery Life and Vehicle Performance

As part of the U.S. Department of Energy’s Advanced Vehicle Testing Activity, four new 2012 Nissan Leaf battery electric vehicles were instrumented with data loggers and operated over a fixed on-road test cycle. Each vehicle was operated over the test route, and charged twice daily. Two vehicles were charged exclusively by AC level 2 EVSE, while two were exclusively DC fast charged with a 50 kW charger. The vehicles were performance tested on a closed test track when new, and after accumulation of 50,000 miles. The traction battery packs were removed and laboratory tested when the vehicles were new, and at 10,000-mile intervals. Battery tests include constant-current discharge capacity, electric vehicle pulse power characterization test, and low peak power tests. The on-road testing was carried out through 70,000 miles, at which point the final battery tests were performed. The data collected over 70,000 miles of driving, charging, and rest are analyzed, including the resulting thermal conditions and power and cycle demands placed upon the battery. Battery performance metrics including capacity, internal resistance, and power capability obtained from laboratory testing throughout the test program are analyzed. Results are compared within and between the two groups of vehicles. Specifically, the impacts on battery performance, as measured by laboratory testing, are explored as they relate to battery usage and variations in conditions encountered, with a primary focus on effects due to the differences between AC level 2 and DC fast charging. The contrast between battery performance degradation and the effect on vehicle performance is also explored.

Electric Vehicle↗

In-route inductive versus stationary conductive charging for shared automated electric vehicles: A university shuttle service

In-route inductive charging technology, as applied to automated electric vehicles, can help realize a fully automated system of both vehicles and chargers. This study presents a planning optimization analysis for fixed-route automated shuttles supported by in-route inductive charging technology. A techno-economic feasibility of inductive charging was assessed in comparison with stationary charging, including Level 2 AC chargers, and DC fast chargers (DCFCs). This analysis considered both present-day and future vehicle operations and overall system costs. A real project with two circulator Navya Arma shared automated electric vehicles (SAEVs) at the University of Michigan was investigated using real-world collected energy and travel data. The outcomes show that the proper design of quasi-dynamic inductive chargers at designated stops allows SAEVs to realize unlimited driving range and be cost-competitive to DCFC technology. Considering present-day costs and vehicles, low-speed SAEVs can realize charge-sustaining operation at a minimum cost either by implementing a 50-kW inductive charger at two stops with one segment per position and a 29-kWh onboard battery, or by installing a 100-kW inductive charger at one stop with one segment per position and a 28-kWh onboard battery. Overall, considering future costs and vehicles, either a 40-kW charger at one stop with a 29-kWh battery or a 50-kW charger at the north stop with a 14-kWh battery would enable charge-sustaining operation. In addition, quasi-dynamic inductive solution can reduce the onboard battery by about 15% while providing unlimited driving range, but stationary scenarios require about 112% additional battery capacity to support a 12-h driving range.

33 ADVANCED PROPULSION SYSTEMS↗

High-Fidelity Analysis of EV Integration on Real Utility Feeders in Colorado

Residential electric vehicle (EV) charging has the potential to alter long-held assumptions on load characteristics impacting distribution grid planning, operations, and design standards. This study identifies analysis and control methods to increase the affordability of residential EV charging both for Xcel Energy and their customers. The project also provides solutions for more reliable grid interconnection that can support a reliable utility business model prepared for increasing EV charging load in the coming years. For this project, we referenced Level 2 alternating current (AC) onboard charging profiles for various vehicle models and high-fidelity charging data collected at the experimental setup established at the EV Research Infrastructure Laboratory at the National Renewable Energy Laboratory (NREL). Next, we developed EV adoption models for 2030 and 2040 for the Boulder and Aurora regions in Colorado. Moreover, we evaluated different smart charging control algorithms and compared their performance. We developed time-of-use (TOU)-based and grid-aware active EV charging control methods and integrated them within the study region to understand field impacts. Diving deeper, we selected 10 feeders in Boulder and Aurora for high-fidelity grid modeling down to the house level. We executed detailed grid analysis comparing the smart charge management (SCM) algorithms we developed. Finally, we created a novel tool, Electric Vehicle Infrastructure--Distribution System Integration Tool (EVI-DiST), to integrate all the approaches in a single software environment to provide easy integration, fast simulation, and detailed evaluation capability for utility engineers and other stakeholders.

33 ADVANCED PROPULSION SYSTEMS↗

Advanced Vehicle Testing Activity Benchmark Testing of the Chevrolet Volt Onboard Charger

The Chevrolet Volt onboard charge module, which converts alternating current (AC) power into direct current (DC) power to charge the vehicle’s onboard energy storage system, was benchmark tested for AC to DC efficiency by the Idaho National Laboratory as part of its conduct of the U.S. Department of Energy’s Advanced Vehicle Testing Activity. Charging with Level 2 electric vehicle supply equipment (EVSE) at 208 VAC input (60 Hz), the Volt onboard charge module was calculated to be 91.7% efficient while operating between 3.0 AC kW and 3.3 AC kW. Charging with Level 1 EVSE at 120 VAC input (60 Hz) the Volt onboard charge module was calculated to be 90.6% efficient while operating near 1.3 AC kW. Given that most Level 2 EVSE are greater than 99% efficient1 when operating above 3.0 AC kW (Level 2) and a Level 1 EVSE was measured to be 98% efficient2 when operating above 1.25 AC kW (120VAC), the average overall AC to DC charging efficiency for the Chevrolet Volt connected to an EVSE (from the AC grid through the EVSE and the Volt’s onboard charge module OBCM) is 90.8% for Level 2 and 88.8% for Level 1.

25 ENERGY STORAGE↗

Optimized V1G and V2G Electric Vehicle Fleet Management and Grid Transaction at Marine Corps Air Station Miramar in San Diego, CA

The overall technical goal of the project was to demonstrate an all-electric bi-directional non-tactical fleet at Marine Corps Air Station (MCAS) Miramar that was integrated and controlled with other distributed energy resources (DERs) (i.e., PV, stationary battery, and building loads) to provide resilience to critical electric loads in the event of grid outages, to minimize charging costs, and to provide economic energy resources to electricity markets. In this project, the specific, technical objectives were: 1. Demonstrate that bi-directional electric vehicles can provide critical complementary services to fixed storage batteries in microgrid applications while performing function as non-tactical vehicles. 2. Demonstrate participation of bi-directional (V2G) and unidirectional (V1G) PEVs for demand management and minimization of charging costs. 3. Demonstrate integration of multiple DERs for grid service participation. US Marine Corps Air Station (MCAS) Miramar in San Diego was the site of this electric vehicle-to-microgrid-utility grid test and demonstration project. Existing microgrid assets in this study included (1) a public works building; (2) a 30-kW rooftop photovoltaic (PV) system and (3) a separate 250 kW carport PV system. In this project, six bi-directional V2G vans were located at the MCAS Miramar’s showcase building-scale microgrid to develop and test technical capabilities that V2G can provide in microgrid applications (e.g., cost reduction and resiliency). These resources provided aggregated demand management and simulated participation in current retail DR programs. The vehicles used in this demonstration were selected because they provided functionality that MCAS Miramar needed, 15 passenger transport and facilities work cargo carrying capacity, and bi-directional charging capability that the research project required. All vehicles in this study were manufactured and distributed by VIA Motors, Inc. There were six vehicles total and each was VIA’s VTRUX eREV V2G model, a modified General Motors Chevrolet 2500 2WD van. Three of the vans were configured as passenger vans and the other three were configured as cargo vans. Each van had an on-board bi-direcrtional inverter/charger, Bel Power Solutions model 350INVCHGT150-120-240-8G nominally rated at +/-15 kW. The VIA van’s charging connector follows the J1772 charging protocol. The bi-directional EVSEs demonstrated in this study were manufactured by Coritech, Inc. Each VGI-80-AC charging station enabled enhanced V2G charging capability to a Clipper Creek CS-100 charging module. The enhanced capabilities included ethernet communication following the SEP2.0 protocol with a distributed energy resource function set and an operator screen displaying real-time SOC, voltage, and current. The VGI-80-AC charging stations are classified as level 2 with a maximum current output of 80 A or effectively 19 kW. The VIA van’s onboard charger limited the charging and discharging power to 15 kW in each direction. A control computer was installed in the EWOC and connected to an existing monitor. The V2G control communication network was a completely stand-alone closed system that did not have any connection to any other networks on the base. A cybersecure remote communication connection was created with a cellular modem, firewall hardware, and a virtual private network configuration.

24 POWER TRANSMISSION AND DISTRIBUTION↗

What Use Patterns Were Observed for PEV Drivers at Publicly Accessible AC Level 2 EVSE Sites?

The EV Project deployed over 4,000 ACL2 EVSE for drivers to charge their plug-in electric vehicle (PEV) when away-from-home. The vast majority of these EVSE stations were installed to be available to all PEV drivers at publicly accessible locations. Some were also deployed for use at workplaces and fleets. This paper examines only the use patterns of PEV drivers using the EVSE intended to be publicly accessible.

33 ADVANCED PROPULSION SYSTEMS↗

How Do The EV Project Participants Feel about Charging Their EV at Home?

Key Observations from the Survey of the EV Project Participants; In June 2013, 72% of EV Project participants were very satisfied with their home charging experience; 21% of participants relied totally on home charging for all of their charging needs; Volt owners relied more on home charging than Leaf owners, who reported more use of away-from-home charging; 74% of participants reported that they plug in their plug-in electric vehicle (PEV) every time they park at home. Others plugged in as they determined necessary to support their driving needs; 40% of participants reported that they would not have or are unsure that in June 2013 whether they would have purchased an alternating current (AC) Level 2 electric vehicle supply equipment (EVSE) for home charging if it had not been provided by The EV Project; and 61% of participants reported that The EV Project incentive was very important or important in their decision to obtain a PEV.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

What Were the Cost Drivers for Publicly Accessible Charging Installations?

Publicly accessible EVSE stations in The EV Project are defined as those installed for businesses, institutions, and municipalities to provide charging for any plug-in electric vehicle (PEV). Typically, no formal relationship exists between the charging site host and the PEV driver utilizing the EVSE. Whereas, fleet, workplace, and residential charging stations are intended to serve a restricted population of PEVs with drivers formally related to the charging site host in some manner. Costs for installation of publicly accessible EVSE units were an important consideration of The EV Project, because these costs had an impact on host participation and, subsequently, on the public’s perception of PEV adoption. In an effort to achieve the objective of establishing and studying a rich infrastructure of publicly accessible charging stations, The EV Project intended to make AC Level 2 EVSE free to the host; including installation. This would have reduced the economic influence on the host’s decision to install a station at locations that the EV Micro Climate® planning process identified as desirable. Although The EV Project provided a significant allowance toward the cost of installation, in many cases, actual installation costs exceeded that allowance. Other concerns from prospective charging site hosts included the observation that there were not enough PEVs to create demand for stations, and hosts were being requested to effectively eliminate a customer parking space to be designated for PEV charging.

25 ENERGY STORAGE↗

Communications Reliability for Vehicle Grid Integration

Electric Vehicles (EVs) adoption rate has been steadily increasing in the US leading to a growing number of charging stations including faster DC (Direct Current) chargers and slower Level 1 and Level 2 AC (Alternating Current) chargers. This increase in demand for electricity is further exacerbated by recent developments in Artificial Intelligence (AI) technology, advanced manufacturing, and digitization. These factors will require electric utilities to upgrade their infrastructure to keep up with the increasing electrical demand (especially during peak hours). An easy way to counteract the need for these upgrades is to shift a major chunk of active charge sessions (durations where there is energy transfer from charger to EV's propulsion battery) to off-peak hours thereby flattening the load curve and making the infrastructure more resilient. This concept is known as Smart Charge Management (SCM). EV owners also benefit from SCM since it lowers their charging costs and consequently their transportation costs by prioritizing charging during off-peak hours. SCM takes advantage of EV's capability to act as a controllable load or DER (Distributed Energy Resource). This report summarizes the reliability analysis performed on the communication required for two of these SCM use-cases. This analysis only focuses on SCM strategies for unidirectional charging (energy transfer from EVSE to EV or V1G) and not bidirectional charging.

24 POWER TRANSMISSION AND DISTRIBUTION↗

What is the Impact of Utility Demand Charges on a DCFC host

The PEV Electric Vehicle Supply Equipment (EVSE) delivered by The EV Project included both AC Level 2 and DCFC units. Over 100 of these dual-port Blink DC fast chargers were deployed by The EV Project. These DCFCs were installed in workplaces and in publicly accessible locations near traffic hubs, retail centers, parking lots, restaurants, and similar locations. The Blink DCFC is capable of charging at power up to 60 kW. Its dual-port design sequences the charge from one port to the other, delivering power to only one of two vehicles connected at a time. The actual power delivered through a port is determined by the PEV’s on-board battery management system (BMS). Both the power and the total energy used to recharge a PEV can represent a significant cost for the charging site host. Many electric utilities impose fees for power demand as part of their commercial rate structure. The demand charge incurred by a customer is related to the peak power used during a monthly billing cycle. This is in contrast to the cumulative total energy usage that is the more familiar utility charge seen for most residential services. A demand charge is typically assessed for the highest average power over any 15 minute interval during the monthly billing cycle. One objective of The EV Project was to identify and elucidate the motivations and barriers to potential DCFC site hosts. The application of electric utility demand charges is one such potential barrier. This subject was introduced in the paper: DC Fast Charge - Demand Charge Reduction1. It discussed demand charge impact in general terms in order to focus on potential mitigation actions. This paper identifies specific cases in order to quantify the impact of demand charges on EV Project DCFC hosts.

33 ADVANCED PROPULSION SYSTEMS↗

A First Preliminary Look: Are Corridor Charging Stations Used to Extend the Range of Electric Vehicles in The EV Project?

A preliminary analysis of data from The EV Project was performed to begin answering the question: are corridor charging stations used to extend the range of electric vehicles? Data analyzed were collected from Blink brand electric vehicle supply equipment (EVSE) units based in California, Washington, and Oregon. Analysis was performed on data logged between October 1, 2012 and January 1, 2013. It should be noted that as additional AC Level 2 EVSE and DC fast chargers are deployed, and as drivers become more familiar with the use of public charging infrastructure, future analysis may have dissimilar conclusions.

33 ADVANCED PROPULSION SYSTEMS↗

Effect of the Chemical Composition of TlIn{sub 1 –} {sub x}Er{sub x}S{sub 2} (0 ≤ x ≤ 0.01) Crystals on Their Dielectric Characteristics and the Parameters of Localized States

The frequency dependences of the real (ε') and imaginary (ε'') parts of the complex dielectric permittivity, the dielectric loss tangent (tanδ), and the ac conductivity (σ{sub ac}) in the frequency range f = 5 × 10{sup 4}–3.5 × 10{sup 7} Hz have been studied in the TlIn{sub 1 –} {sub x}Er{sub x}S{sub 2} (0 ≤ x ≤ 0.01) crystals synthesized in this work. It is found that, in TlIn{sub 1 –} {sub x}Er{sub x}S{sub 2}, the relaxation dispersions of ε' and ε'' take place. The effect of the erbium concentration (Er) in the TlIn{sub 1 –} {sub x}Er{sub x}S{sub 2} crystals on their dielectric coefficients has been studied. At high frequencies, the ac conductivity of the TlIn{sub 1 –} {sub x}Er{sub x}S{sub 2} crystals obeys the relationship σ{sub ac} ~ f {sup 0.8}, which is characteristic of the hopping mechanism of the charge transfer over states localized near the Fermi level. The parameters of the states localized in the forbidden band of TlIn{sub 1 –} {sub x}Er{sub x}S{sub 2} and the influence of the chemical composition of the crystals on these parameters are estimated.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗