SolarAPP+ Performance Review (2023 Data)

The Solar Automated Permit Processing Plus (SolarAPP+) platform is an online portal to facilitate and expedite rooftop solar photovoltaic (PV) and battery storage permitting processes. SolarAPP+ allows PV contractors to upload system specifications, have that information automatically reviewed for code compliance, and receive instant approval for code-compliant systems, reducing authority having jurisdiction (AHJ) staff time needed for review. SolarAPP+ also provides inspection checklists to verify installation practices and adherence to approved designs. SolarAPP+ is available to AHJs at no cost. This report is part of an ongoing series of reviews of SolarAPP+ performance. Consistent with previous performance reviews, we summarize SolarAPP+ adoption trends to date and compare various metrics for PV systems permitted through SolarAPP+ versus systems permitted through traditional AHJ permitting processes. As of the end of 2023, the National Renewable Energy Laboratory (NREL) had contacted over 1,700 AHJs with significant solar permitting volume regarding SolarAPP+. Of those, 793 AHJs had expressed interest in the platform as of the end of 2023. 161 AHJs had begun piloting the platform and 97 of these had publicly launched the platform by the end of 2023. In 2023, 668 installers submitted 18,906 permits through the SolarAPP+ platform, including 4,834 permits submitted as part of a solar plus storage program. SolarAPP+ permits accounted for around 43% of all permits issued in participating AHJs. We compare permitting timelines through SolarAPP+ to traditional AHJ permitting processes to assess the platform's performance. Consistent with previous SolarAPP+ performance reviews, we find that permitting timelines are significantly shorter for SolarAPP+ projects. Based on median timelines, a typical SolarAPP+ project is permitted and inspected 14.5 business days sooner than traditional projects. We estimate that automatic SolarAPP+ permitting saved around 7,200 hours of AHJ staff time in 2023. Finally, we estimate that SolarAPP+ eliminated over 150,000 business days in permitting-related delays in 2023.

14 SOLAR ENERGY↗

SolarAPP+ Performance Review (2022 Data)

The Solar Automated Permit Processing Plus (SolarAPP+) platform is an online portal to facilitate and expedite rooftop solar photovoltaic (PV) permitting processes. SolarAPP+ allows PV contractors to upload system specifications, have those specifications automatically reviewed for code compliance, and receive instant approval for code-compliant systems. SolarAPP+ also provides inspection checklists to verify installation practices and adherence to approved designs. SolarAPP+ is available to authorities having jurisdiction (AHJs) at no cost. This report is part of an ongoing series of reviews of SolarAPP+ performance. Consistent with previous performance reviews, we summarize SolarAPP+ adoption trends to date and compare various metrics for PV systems permitted through SolarAPP+ versus systems permitted through conventional AHJ permitting processes. As of the end of 2022, the National Renewable Energy Laboratory (NREL) had contacted over 1,500 AHJs with significant solar permitting volume regarding SolarAPP+. Of those, 607 AHJs had at least expressed interest in the platform. 16 AHJs had begun piloting the platform and 15 of these had publicly launched the platform by the end of 2022. In 2022, 206 installers submitted 11,092 permits through the SolarAPP+ platform, including 708 permits for solar+storage systems. SolarAPP+ permits accounted for around 37% of all permits issued in participating AHJs. We compare permitting timelines through SolarAPP+ to traditional AHJ permitting processes to assess the platform's performance. Consistent with previous SolarAPP+ performance reviews, we find that permitting timelines are significantly shorter for SolarAPP+ projects. Based on median timelines, a typical SolarAPP+ project is permitted and inspected 8 business days sooner than traditional projects. We estimate that automatic SolarAPP+ permitting saved between 3,500 and 13,900 hours of AHJ staff time in 2022. Finally, we find evidence that SolarAPP+ may improve inspection outcomes, with SolarAPP+ projects failing inspections about 28% less frequently than traditional projects.

14 SOLAR ENERGY↗

SolarAPP+ Performance Review (2024 Data)

The Solar Automated Permit Processing Plus (SolarAPP+) platform is an online portal to facilitate and expedite rooftop solar photovoltaic (PV) and battery storage permitting processes. SolarAPP+ allows PV contractors to upload system specifications, have that information automatically reviewed for code compliance, and receive instant approval for code-compliant systems, reducing authority having jurisdiction (AHJ) staff time needed for review. SolarAPP+ also provides inspection checklists to verify installation practices and adherence to approved designs. This report is part of an ongoing series of reviews of SolarAPP+ performance. Consistent with previous performance reviews, we summarize SolarAPP+ adoption trends to date and compare various metrics for PV systems permitted through SolarAPP+ versus systems permitted through traditional AHJ permitting processes. As of the end of 2024, 799 AHJs had expressed interest in the platform, with 264 fully adopting (215) or piloting (49) the platform. In 2024, 861 installers submitted 37,393 permits through the SolarAPP+ platform, including 27,375 permits for PV+storage systems. SolarAPP+ permits accounted for around 43% of all permits issued in all participating AHJs, and more than 60% of all permits in several participating AHJs. We compare permitting timelines through SolarAPP+ to traditional AHJ permitting processes to assess the platform's performance. Consistent with previous SolarAPP+ performance reviews, we find that permitting timelines are significantly shorter for SolarAPP+ projects. Based on median timelines, a typical SolarAPP+ project is permitted and inspected 12 business days sooner than traditional projects. We estimate that automatic SolarAPP+ permitting saved around 18,400 hours of AHJ staff time in 2024. Finally, we estimate that SolarAPP+ eliminated over 100,000 business days in permitting-related delays in 2024.

14 SOLAR ENERGY↗

Explaining jurisdictional compliance with California’s top-down streamlined solar permitting law (AB 2188)

In the U.S., the process by which residential rooftop solar photovoltaic (PV) system installations are permitted and inspected by an “authority having jurisdiction” (AHJ) varies across AHJs. As the U.S. has roughly 23,000 AHJs with varying degrees of local autonomy, improving the cross-jurisdictional consistency of permitting and inspection is not a straightforward task. One promising approach is a “top-down” streamlined solar permitting (SSP) mandate by U.S. States to their AHJs. This study set out to understand the factors associated with the likelihood that an AHJ either did or did not comply with California’s top-down streamlined solar permitting law, AB2188, and then to consider how these factors might be relevant to the future prospects of top-down SSP outside of California. This report provides background material on AB2188 and tests five hypotheses about the factors that affect the likelihood that an AHJ will comply or not comply with AB2188, as developed from the policy diffusion literature and background knowledge on AB2188 and its implementation.

14 SOLAR ENERGY↗

SolarAPP+ Performance Review: 2021 Data

Accelerating rooftop solar photovoltaic (PV) deployment has strained the capacity of local authorities responsible for permitting, inspection, and interconnection (PII). Given the ongoing expansion of rooftop PV, a growing number of authorities having jurisdiction (AHJs) and utilities are reforming PII processes to reduce delays. AHJs could significantly reduce PII timelines through reforms such as expedited reviews for small-scale systems, online customer portals, and over-the-counter permitting. However, independent reforms do not resolve issues associated with PII variability across AHJs, and many AHJs lack the resources to implement reforms. In response to these challenges, the National Renewable Energy Laboratory (NREL) developed the Solar Automated Permit Processing Plus (SolarAPP+) platform, in collaboration with local governments, code development organizations, and industry stakeholders. This report shows SolarAPP+ performance in 2021 across AHJs.

14 SOLAR ENERGY↗

SolarAPP+ Pilot Analysis: Performance and Impact of Instant, Online Solar Permitting

The National Renewable Energy Laboratory (NREL) led a collaborative effort to develop the Solar Automated Permit Processing Plus (SolarAPP+), a no-cost solar permitting software solution to address residential solar photovoltaic (PV) permitting resource constraints and streamline solar adoption processes among authorities having jurisdiction (AHJs). The SolarAPP+ is an online portal that automates permit plan review, enabling an instant permit approval process for code-compliant residential PV systems. Based on national model building, electrical, and fire codes, the SolarAPP+ automatically performs a compliance check of permit inputs against code requirements and produces an inspection checklist that can be used to verify installation practices, workmanship, and adherence to the approved design. NREL conducted a two-phase pilot with five participating AHJs and 16 solar contractors, spanning from November 2020 through December 2021, evaluating the ability of SolarAPP+ to deliver instant permits and its impact on four critical areas within each AHJ: permit review timelines; solar adoption timelines; AHJ time saved; and inspection results. The pilot confirmed that SolarAPP+ reduced permit review times to less than one day, reduced solar adoption timelines by an average of 12 days, saved an estimated 2,067 staff hours, and had comparable inspection results to those found in traditional permitting. The pilot further identified key lessons for improving SolarAPP+, including ways to streamline SolarAPP+ adoption, development of training resources, and expansion of supported products.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Understanding Adoption of a Key Soft Cost Reduction Strategy: Modeling Administrative Choices Regarding Streamlined Solar Permitting (Final Technical Report)

In the U.S., the process by which residential rooftop solar photovoltaic (PV) system installations are permitted and inspected by an “authority having jurisdiction” (AHJ) and interconnected to the grid varies across the country. As the U.S. has roughly 23,000 AHJs and 3,000 utilities with varying degrees of local autonomy, permitting, inspection, and interconnection (PI&I) heterogeneity represents a significant “soft cost” barrier to the growth of the residential solar PV market. Burkhardt et al. (2015), for example, finds that variations in local permitting procedures alone can lead to differences in average residential PV prices of approximately ${$}$0.14-${$}$0.18/W. When the authors considered jurisdictional variation in permitting plus regulatory procedures, that price differential grew to ${$}$0.64-${$}$0.93/W between the least-favorable and most-favorable jurisdictions. The objective of this project was to determine suites of PI&I reforms that fit the preferences of AHJs and utilities nationwide, as mediated through the preferences of PV installers, with the hoped-for impact of significantly improving the consistency of PI&I for solar PV across the U.S. To accomplish this objective, the project team set out to design and implement survey instruments with embedded discrete choice experiments (DCEs) that used individual PI&I reforms as attributes, with levels informed by a detailed understanding of the PI&I reforms. The analysis of the surveys was to include both defined and latent class analysis of the survey results, in order to identify different sets of AHJs and utilities that would prefer different “mass customized” SSP practice combinations. Note that this project would also have advanced the social science by applying well-established choice analysis techniques to the novel setting of public administration.

14 SOLAR ENERGY↗

Residential Solar Adoption Timelines and Impacts from the COVID-19 Pandemic

In this study we evaluate PII and other PV adoption timelines from 2017-2021. We use project-level data collected by the National Renewable Energy Laboratory (NREL) for the Solar Time-Based Residential Analytics and Cycle Time Estimator (SolarTRACE). Additionally, we conducted a survey of 171 AHJs about their experiences, challenges, and process changes during the first 18 months of the COVID-19 pandemic. The survey findings were supplemented with follow up interviews with 5 AHJs from 4 states. We find that the pandemic moderately increased the duration and variability of pre-install timelines (contract signing to install), particularly in the permit review phase (permit submit to approval). In contrast, post-install timelines (install to final utility interconnection) continued to decline during the pandemic. The net result is that overall project timelines (contract signing to final interconnection) continued to decline during the pandemic. Our findings suggest that AHJs and installers faced challenges throughout the pandemic but ongoing improvements in PII processes - particularly post-install processes - more than offset these challenges. Furthermore, the pandemic may have catalyzed or accelerated a widespread adoption of online/electronic permitting, among other process efficiency improvements.

14 SOLAR ENERGY↗

Solar permitting, inspection, and interconnection cycletimes and requirements

Twenty three small-to-large residential, commercial, and industrial PV installers submitted project-level data for analysis, which included timestamps for major components of the permitting, inspection, and interconnection process as well as contract and installation dates. NREL calculated median timelines for these processes across the authorities having jurisdiction (AHJs) and utilities represented in the data. Also included are relevant permitting requirements for AHJs and interconnection process requirements for utilities. This dataset represents the underlying results shown in the Solar Time-based Residential Analytics and Cycle time Estimator (SolarTRACE) viewer. This dataset has been reviewed but errors may exist, and it may not be comprehensive. Errors in the sources (e.g., AHJ permitting requirements lists from data partners) may be duplicated in the dataset.

14 SOLAR ENERGY↗

SolarAPP+ ® (Solar Automated Permit Processing Plus) [SWR-19-51]

SolarAPP+ ®: Safe and affordable home solar through permitting automation. NREL has launched a collaborative effort with key code officials, authorities having jurisdiction (AHJs), and the solar industry to develop an instant online solar permitting platform for code compliant residential systems. SolarAPP (Solar Automated Permit Processing) will: -Provide a flexible, web-based PV-permitting tool for residential systems at no-cost to AHJs. -Enable standardization of instant permitting processes. -Evaluate applications for safety and code compliance. -Offer opportunities to incorporate energy storage and expand to other market segments.

Cook, Jeffrey↗

Solar Automated Permit Processing Software for Distributed PV (Cooperative Research and Development Final Report, CRADA Number CRD-19-00825)

NREL and its project partners built and commercialized the novel Solar Automated Permitting Processing Plus (SolarAPP+) software platform that delivers instant residential rooftop solar permits. The tool provides installers with a standard portal for entering permit information for residential solar systems across all Authorities Having Jurisdiction (AHJs) using SolarAPP+, thereby providing a streamlined plan review form, transparency into permitting timelines, and required specifications. The project has proven to reduce permitting timelines from as many as 20 business days to zero, delivering solar projects faster in the four participating AHJs using the platform. Streamlining permitting timelines, all else equal, results in consumers installing their systems and reducing their electricity bills faster. The continued expansion of SolarAPP+ features and adoption nationwide will expand the benefits of the SolarAPP+ beyond the current user base.

14 SOLAR ENERGY↗

Residential and Small Commercial Solar Photovoltaic and Storage Permitting, Inspection, and Interconnection Timelines: A Retrospective Review (2017-2023)

This report is part of the ongoing Solar Time-Based Residential Analytics and Cycle Time Estimator (SolarTRACE) project, led by the National Renewable Energy Laboratory (NREL). The SolarTRACE project utilizes time-stamped project-level data provided by installer-partners to assess nationwide and AHJ- and utility-level PI&I and other solar PV adoption timelines since 2017. Our dataset now covers 22% of residential solar and 33% of residential storage installs in the U.S. since 2017. This report provides an update to our previous 2022 report (Cruce et al., 2022b) and includes: updated 2017 2023 project timelines for residential rooftop solar PV up to 20kW; updated tracking of permitting process changes at nearly 4,000 AHJs nationwide; and first-ever reporting of timelines for residential PV+storage projects up to 20kW.

14 SOLAR ENERGY↗

Streamline, Organizational, Legislative and Administrative Response to Permitting, PV Market Share, and Solar Energy Costs (Broward Go SOLAR)

Broward County and its partners (the Go SOLAR Team), operating under a Department of Energy Rooftop Solar Challenge Agreement, designed, developed and implemented an online permitting system for rooftop solar PV systems. This is a single web based system with a single permit fee that will issue a permit, with a set of design plans preapproved by partner building officials, within one hour. The system is currently available at gosolar.broward.org for use within any of the partner Authorities Having [permitting] Jurisdiction (AHJ). Additionally, the Go SOLAR Team researched, developed and to the extent feasible, implemented three best management practices to make a fertile environment for the new online permit system. These included Net Metering and Interconnection Standards, Solar-Friendly Financing, and Planning and Zoning Ordinances. Finally, the team implemented a substantial outreach effort to advocate for the development of solar in Broward County, with an emphasis on Solar Rights, concluding with a Go SOLAR Fest day and a half conference with over 1,200 attendees and 50 exhibitors. The Go SOLAR project was completed on time, under DOE’s budgeted amount, and all project objectives were met or exceeded.

14 SOLAR ENERGY↗

PVMapper: Report on the Second Public Opinion Survey

This report has been developed as an integral part of the PVMapper project, funded by the U.S. Department of Energy’s Office of Energy Efficiency and Renewable Energy’s SunShot program. The objective of the SunShot program is to reduce the total costs of solar energy systems. The scope of PVMapper is to develop a geographic information system (GIS) based project planning tool to identify optimal utility-scale solar facility sites. The specific objectives of the project are to 1) develop the software on an open-source platform; 2) integrate the appropriate data sets and GIS layers; 3) include a measure of social risk and public acceptance; 4) enable customization of variable weights; 5) provide a free and accessible platform for software download; and 6) provide a sustainability plan to ensure future relevance of the software. When completed, PVMapper is intended to be used by solar developers, Authorities Having Jurisdiction (AHJs), and other interested parties. This project supports SunShot’s objective by reducing the non-hardware balance of system costs (“soft costs”) for utility-scale solar project development. In order to accomplish the third project objective – including a measure of social risk and public acceptance within PVMapper – the project team has developed a time-series public opinion survey, administered yearly over the course of the three-year project. This report highlights the results and preliminary analyses from the second survey in this series. While the results of this survey are valuable to both PVMapper and future utility-scale solar development, the time-series design is extremely important. The completion of the series enables the extension of the dataset to much richer information. For example, the research team altered this iteration to sharpen the focus on specific topics (those posing potentially higher risks) and target specific locations in the oversample (such as communities near existing facilities). Using similar approaches for each iteration leads to an increasingly greater amount of detail regarding siting risks. The need for this extended dataset to aid in siting utility-scale solar projects is evident, as developers continue to scale back initial plans due to unidentified or incorrectly quantified social risks. It should be noted that this report provides the complete dataset from the survey, encompassing the wide-ranging responses from all of the survey questions. Although the methods used to integrate these data into PVMapper’s siting algorithms is not the purpose of this report, allusions to integration can be found in the discussions surrounding the design of questions and types of data to be used.

14 SOLAR ENERGY↗

Training for Cost-Effective Code-Compliant Maintenance Facilities

The overarching goal for this project was to create training and guidance materials about garage upgrades and building modifications for facilities that service natural gas, propane, and/or hydrogen vehicles. Toward this end, the technical approach involved educating key stakeholders, such as Code Officials and Authorities Having Jurisdiction (AHJs).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Application of Manufacturing Quality Management Principles to PV System Installations

To help SETO/DOE achieve its goals, the IBTS team proposed a project addressing system reliability by improving installation standards and quality management. The proposed approach was designed to help achieve measurable reductions in installation defect density and improvements in the performance of PV systems by optimizing design and installation of residential and commercial PV systems. This approach addressed the soft costs associated with installations and quality management. The project demonstrated improved system reliability and reduced PV system installation costs. The software developed improved operations, decreased risk, and increased the overall value of PV systems across their lifecycle. The project used several data collection methods, including extensive industry surveys, face-to-face high-level interviews at industry conferences, stakeholder teleconferences, and in-depth interviews conducted by IBTS staff. Results from the research found the industry needs a uniform assessment method for national providers to be more efficient; the software should support both code officials and installers; most industry stakeholders would find value in a centralized software system that allows them to collect, report, and review information on in-process and completed solar installations; and mobile solutions that bridge existing knowledge gaps with inspectors and integrate with existing methodologies (such as permitting software) are of great value. The software solution developed is web-based, allowing for national access, and is built on a Google Firebase platform that can handle significant users and data. It can be used onsite or remotely, allowing for code compliance to continue despite ongoing pandemic related delays or shutdowns for local economies. The information provided by the software tool allows users to uniformly assess a system for compliance and use that aggregated data to identify training topics or create internal process designed to improving issues and reducing occurrence. This solution has multiple benefits in managing quality at time of use and promoting an increase in future safety and quality through education. Perhaps most importantly, this software increases public safety by ensuring compliance of installed systems and allows for local AHJs to remotely engage specialized and qualified solar specific expertise for oversite of the installation in their jurisdictions. Data analysis provides the quality feedback loop identifying the root cause of failure and drives installation practices to improve through training and education, resulting in systems with higher performance, greater reliability, and reduced operations and maintenance costs. With the successful completion of this project, the industry can expect reduced soft costs and increased performance and safety and will ultimately benefit from longer performing systems that cost less to operate.

14 SOLAR ENERGY↗

Codes and Standards Assessment for Hydrogen Blends into the Natural Gas Infrastructure

Energy utilities are evaluating emerging energy technologies to reduce reliance on carbon as an energy carrier. Hydrogen has been identified as a potential substitute for carbon-based fuels that can be blended into other gaseous energy carriers, such as natural gas. However, hydrogen blending into natural gas has important implications on safety which need to be evaluated. Designers and installers of systems that utilize hydrogen gas blending into natural gas distribution systems need to adhere to local building codes and engage with the authority having jurisdiction (AHJ) for safety and permitting approvals. These codes and standards must be considered to understand where safety gaps might be apparent when injecting hydrogen into the natural gas infrastructure. This report generates a list of relevant codes and standards for hydrogen blending on existing, upgraded, or new pipelines. Additionally, a preliminary assessment was made to identify the codes and standards that need to be modified to enable this technology as well as potential gaps due to the unique nature and safety concerns of gaseous hydrogen.

03 NATURAL GAS↗