Search NASASearch

SEARCH · Search NASA

Results for “ARC Overview”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Overview of the physics basis for the ARC fusion power plant

Commonwealth Fusion Systems plans to build ARC as the first fusion power plant at a site in Chesterfield County, Virginia, USA by the early 2030s. We present an overview of analysis comprising the physics basis of the ARC V3A design, a high-magnetic-field tokamak with 𝐵 0 =11.4 T, 𝐼 𝑝 =12.0 MA, 𝑅 0 =4.62 m, 𝑎 =1.18 m. ARC V3A is designed to produce 𝑃 𝑓⁡𝑢⁢𝑠 ≈1.13 GW DT fusion power and deliver ⩾400 MW net electric power to the grid. This overview includes quantitative analysis of fundamental issues for design of and operational plasma scenarios for a tokamak power plant, and lays out the design targets and strategic choices for ARC, including empirical fusion performance projections, assessment of H-mode access, ion cyclotron resonance heating simulations, alpha particle physics and time-dependent full-pulse simulations. This is complemented by topical papers on fusion performance and transport, disruption physics, boundary physics and magnetohydrodynamic stability. Critically, these studies identify key model uncertainties and physics risks to be retired through SPARC operation. Due to the modular nature of ARC, early results from SPARC can be incorporated into the design of the first ARC as well as subsequent replacements of the ARC vacuum vessel.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY

Status Update of Permanent Magnet Radiation Resiliency Studies at CEBAF

The proposed energy upgrade of the Continuous Electron Beam Accelerator Facility (CEBAF) incorporates Fixed-Field Alternating-gradient (FFA) arcs utilizing permanent magnet technology. Given the radiation environment within the CEBAF tunnel enclosure, validating the long-term magnetic stability of these materials is a critical step for the project's technical feasibility. This contribution presents an overview of the ongoing permanent magnet radiation resiliency program at Jefferson Lab. We briefly review the experimental methodology used to monitor demagnetization in situ and summarize the operational experience from the initial data-taking campaign. Furthermore, we discuss the upgrades implemented for the second exposure campaign, currently underway, which aims to refine dose correlation and reduce systematic uncertainties. We report on the general status of the program and the roadmap for certifying permanent magnet optics for the proposed upgrade energies.

Bodenstein, R. [Thomas Jefferson National Accelera

Universal Injector at LERF – Baseline Design

A new electron injector complex has been proposed within the Low Energy Recirculating Facility (LERF) vault, which would serve both the 22 GeV CEBAF and the positron programs, while being compatible with the electron source required to produce positrons for Ce+BAF. The baseline design of a 3-pass recirculator features a main linac configured with three cryomodules, five isochronous arcs and three straight sections, allowing electron beam acceleration up to 650 MeV. The injector offers the flexibility to extract 1-pass and 2-pass energy electrons, as needed for positron production, with final reconfiguration to a 3-pass 650 MeV injector for 22 GeV CEBAF. This paper provides an overview of the baseline design of the Universal injector complex, including the 8 MeV injector and the recirculator. A comprehensive suite of beam dynamics studies to validate our design is being launched, starting with start-to-end tracking with Elegant followed by the orbit correction and error mitigation.

Bogacz, A. [Thomas Jefferson National Accelerator

‘Universal Injector’ at LERF - Layout and Optics Architecture

Here, we present a next level design of a compact injector within the LERF vault, which would serve both the 22 GeV CEBAF and the positron program, while being compatible with the electron source required to produce positrons for Ce+BAF. The baseline design of a 3-pass recirculator features a main linac configured with three C-75 cryo-modules, five isochronous return arcs and three straight sections, facilitating electron beam acceleration up to 650 MeV. The Universal Injector offers flexibility of extraction 1-pass and 2-pass energy electrons, as needed for positron production, with a final 3-pass extraction required by the 650 MeV injector for 22 GeV CEBAF. This note provides an overview of the baseline optics design of the Universal Injector complex, including the 8 MeV injector merger and the recirculator racetrack, including individual extraction lines for all three passes. A comprehensive suite of beam dynamics studies to validate the design is under way; starting with the orbit correction scheme, followed by start-to-end tracking with lattice misalignments and magnet errors.

Bogacz, Alex [Thomas Jefferson National Accelerato

Titanium Wire Arc Additive Manufacturing Inert Enclosure and Material Handling Safety Considerations

Wire arc additive manufacturing (WAAM) via metal inert gas (MIG)/gas metal arc welding (GMAW) is a viable option for fabrication of large-scale titanium parts; however, it introduces new safety hazards associated with both the material and the additional system hardware required for the process. Localized gas shielding of the weld arc via standard GMAW torch is inadequate for titanium due to its affinity for oxygen; thereby requiring the use of an inert enclosure to protect the weld from entraining oxygen. The use of the inert enclosure presents potential safety hazards such as operator asphyxiation and brings up discussion of confined space considerations. In addition, the titanium welding process creates pyrophoric titanium soot residue around the deposit, which can undergo deflagration during part cleaning and part removal. This paper provides an overview of the titanium WAAM process along with safety considerations for the design and operation of the inert enclosure as well as functional solutions for the safe handling of the titanium soot by-product.

Walters, Alex

Overview of advanced plasma-facing materials testing for Fusion Pilot Plants at DIII-D

Characterization and testing of advanced plasma-facing materials (PFMs) for Fusion Pilot Plants (FPP) is being conducted at the DIII-D National Fusion Facility through the ongoing two-year FPP Candidate Materials Thrust. Year one tested 17 novel materials utilizing the Divertor Materials Evaluation System (DiMES), with samples analyzed pre- and post-experiment via SEM, EDS, and confocal microscopy. Repeatable reference discharges were developed to ensure uniformity between experiments, including a new strike-point rastering scenario to provide more uniform heat/particle flux across DiMES during ELMing H-mode discharges. Various sample geometries and temperatures were used to achieve FPP-relevant conditions, including samples angled 10° towards the incident plasma flux and pre-heating up to 500 °C. The first exposure of liquid lithium (Li) capillary porous structures in a tokamak demonstrated uniform emission of Li vapor and suppression of Li droplets in H-mode when preheated to 350 °C. Dispersoid-strengthened W with 1 wt% TaC, TiC, and ZrC exposed to H-mode showed cracking and dispersoid ejection for all varieties except TiC, providing a clear down-selection. Ultra-high temperature ceramic materials TiB 2 and ZrB 2 showed minimal degradation under L-mode exposure. Silicon carbide (SiC) fiber composites showed arcing along edges, while CVD SiC remained pristine. Atmospheric plasma-sprayed W and SiC coatings endured H-mode exposure without macroscopic delamination; SiC exhibited granular ejection, while W showed increased outgassing. Additional W-based alloys were stress tested in H-mode, including Ni-based W heavy alloys, W f SiC f /W composites, W multi-principle element alloys, and functionally-graded W/SiC, to varying degrees of success.

DIII-D