Search NASA⌕ Search

SEARCH · Search NASA

Results for “AREA COMPLETION PROJECT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Sediment Properties: E-Area Completion Project

To accommodate a future need for additional waste disposal facilities at the Savannah River Site, the Solid Waste Management Division (SWMD) designated nine additional plots for development (Kasraii 2007; SRS 2010); these plots are collectively known as the E Area Completion Project (ECP). Subsurface samples were collected from ECP plots 6, 7, 8 and 9 (Figure 1) for chemical and physical property analyses to support Performance Assessment (PA) and Special Analyses (SA) modeling. This document summarizes the sampling and analysis scheme and the resultant data, and provides interpretations of the data particularly in reference to existing soil property data. Analytical data in this document include: gamma log, cone penetrometer log, grain size (sieve and hydrometer), water retention, saturated hydraulic conductivity (falling head permeameter), porosity, dry bulk density, total organic carbon, x-ray diffraction, and x-ray fluorescence data. SRNL provided technical and safety oversight for the fieldwork, which included completion of eight soil borings, four geophysical logs, and the collection of 522 feet of core and 33 Shelby tubes from ECP plots 6, 7, 8, and 9. Boart Longyear provided sonic drilling and logging services. Two soil borings were completed at each location. The first set of boreholes extended into (but did not fully penetrate) the Warley Hill Formation. These boreholes were continuously cored, then geophysically (gamma ray) logged. The recovered core was split, photographed, and described; one half of the core was archived at SRS's Core Lab facilities, and the remaining half was consumed as necessary for testing at SRS and off-site labs. Core descriptions and geophysical data were used to calculate target elevations for Shelby tube samples, which were obtained from the second set of boreholes. Shelby tubes were shipped to MACTEC Engineering and Consulting Inc. (MACTEC) in Atlanta for physical property testing. SRNL deployed their Site Characterization and Analysis Penetrometer System (SCAPS) cone penetrometer test (CPT) truck at ECP plots 6, 7, 8 and 9 to collect inferred lithology data for the vadose zone. Results from this study are used to make recommendations for future modeling efforts involving the ECP plots. The conceptual model of the ECP hydrogeology differs from the conceptual model of the current ELLWF disposal area in that for the ECP plots, the topography (ground surface) is generally lower in elevation; The Upland and top of Tobacco Road lithostratigraphic units are missing (eroded); The water table occurs lower in elevation (i.e., it occurs in lower stratigraphic units); and the Tan Clay Confining Zone (TCCZ) often occurs within the vadose zone (rather than in the saturated zone). Due to the difference in the hydrogeology between the current ELLWF location and the ECP plots, different vadose zone properties are recommended for the ECP plots versus the properties recommended by Phifer et al. (2006) for the current disposal units. Results from this study do not invalidate or conflict with the current PA's use of the Upper and Lower Vadose Zone properties as described by Phifer et al. (2006) for the current ELLWF disposal units. The following modeling recommendations are made for future modeling of the ECP plots where vadose zone properties are required: (1) If a single vadose zone property is preferred, the properties described by Phifer et al. (2006) for the Upper Vadose Zone encompass the general physical properties of the combined sands and clays in the ECP vadose zone sediments despite the differences in hydrostratigraphic units. (2) If a dual zone system is preferred, a combination of the Lower Zone properties and the Clay properties described by Phifer et al. (2006) are appropriate for modeling the physical properties of the ECP vadose zone. The Clay properties would be assigned to the Tan Clay Confining Zone (TCCZ) and any other significant clay layers, while the Lower Zone properties would be assigned for the remainder of the vadose zone. No immediate updates or changes are recommended for the saturated zone properties for modeling of the ECP plots. The hydrogeology and saturated hydraulic conductivity values resulting from the ECP work are consistent with existing data for the area. The following recommendations are provided for consideration in future work: (1) When the database is next updated, we recommend checking/refining hydrostratigraphic interpretations (picks) in addition to revising physical property data for both the vadose zone and saturated zone. (2) Results from this work suggest that separate ECP vadose zone properties may be appropriate for the various ECP plots. Consideration should be given to the fact that the plots toward the northwest (ECP plots 6, 7 and 8) all have the TCCZ within the vadose zone whereas the TCCZ occurs within the saturated zone to the east (ECP plot 9). (3) Further data may be needed at ECP plot 7.

54 ENVIRONMENTAL SCIENCES↗

D-Area Ash Basin Project

Over 90 acres of coal ash contaminated land at SRS D-Area is being remediated. The project, which began in 2015 and is expected to be finished in 2019, is managed by SRNS Area Completion Projects.

54 ENVIRONMENTAL SCIENCES↗

Radionuclide inventories for the F- and H-area seepage basin groundwater plumes

Within the General Separations Areas (GSA) at the Savannah River Site (SRS), significant inventories of radionuclides exist within two major groundwater contamination plumes that are emanating from the F- and H-Area seepage basins. These radionuclides are moving slowly with groundwater migration, albeit more slowly due to interaction with the soil and aquifer matrix material. The purpose of this investigation is to quantify the activity of radionuclides associated with the pore water component of the groundwater plumes. The scope of this effort included evaluation of all groundwater sample analyses obtained from the wells that have been established by the Environmental Compliance & Area Completion Projects (EC&ACP) Department at SRS to monitor groundwater contamination emanating from the F- and H-Area Seepage Basins. Using this data, generalized groundwater plume maps for the radionuclides that occur in elevated concentrations (Am-241, Cm-243/244, Cs-137, I-129, Ni-63, Ra-226/228, Sr-90, Tc-99, U-233/234, U-235 and U-238) were generated and utilized to calculate both the volume of contaminated groundwater and the representative concentration of each radionuclide associated with different plume concentration zones.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Applied Science Investigations to Facilitate Closure of the F-Area and H-Area Seepage Basins

This report provides a roadmap of applied science studies that will facilitate reaching long term monitoring end state corrective actions for groundwater contamination at the F-Area Seepage Basins and the H-Area Seepage Basins at the Savannah River Site in Aiken, SC. The F-Area and H-Area Seepage Basins are waste units on the Savannah River Site in Aiken, SC at which low-level radioactive solutions were disposed into unlined basins, resulting in groundwater contamination. The current contaminants of interest in the groundwater are tritium, iodine-129, strontium-90, uranium isotopes and nitrate. Remediation at both sites has continued since 1988, consisting of closure and capping of the basins, operation of a groundwater pump-and-treat system from 1997 to 2004, and replacement of this system with a comprehensive in situ attenuation-based remedy. This report was requested by the U.S. Department of Energy - Office of Environmental Management in consultation with the Savannah River National Laboratory and Savannah River Nuclear Solutions - Area Completions Projects to provide a scientific basis for proactively addressing groundwater issues that may need to be resolved prior to final corrective actions at the F-Area and H-Area Seepage Basins.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hydraulic Performance of Funnel & Gate and Base Injection at the F-Area Seepage Basins

The SGW-Support Group Environmental Compliance and Area Completion Projects (EC&ACP) of Savannah River Nuclear Solutions (SRNS) operates a funnel and gate (F&G) passive groundwater remediation system in conjunction with base injection to restore the quality of groundwater migrating from the F-Area seepage basins to Fourmile Branch. Groundwater levels were monitored biweekly and continuously over a 15-month period to study the aerial and temporal effect of operating the F&G and base injection remediation systems.

42 ENGINEERING↗

Humate Amendment Injection Viability Testing – Supplementary Batch Mixture and Soil Column Studies

Groundwater in the Lost Lake Aquifer Zone (LLAZ) in the Southern Sector of the M-Area Hazardous Waste management Facility (HWMF) is contaminated with chlorinated ethenes, including trichloroethylene (TCE) and tetrachloroethylene (PCE). Treatment of contaminated groundwater with humic acid is being evaluated as a potential corrective action for these volatile organic compounds (VOCs) in the LLAZ in Southern Sector (SRNS, 2019). Pilot scale injections of Huma-K brand humic acid for groundwater treatment were previously performed in M-Area between 2017 and 2020 (Amidon, 2023). Groundwater was extracted from the Lost Lake Aquifer Zone (LLAZ), then a solution of humate was mixed with recovered groundwater and subsequently re-injected into the same aquifer unit. Operations of the historical humate pilot testing were discontinued in 2020 due to COVID-19 restrictions, low injection rates, and recirculation fluid spillage. No further field scale or laboratory research to investigate humate amended groundwater injection was performed at the SRS until 2024. At the request of Area Completion Projects (ACP), the Savannah River National Laboratory (SRNL) performed supplementary testing to help determine the viability of further injection of humate as a remedial option for VOCs within the LLAZ in the Southern Sector of the M-Area HWMF.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Building 235-F Goldsim Fate And Transport Model

Savannah River National Laboratory (SRNL) personnel, at the request of Area Completion Projects (ACP), evaluated In-Situ Disposal (ISD) alternatives that are under consideration for deactivation and decommissioning (D&D) of Building 235-F and the Building 294-2F Sand Filter. SRNL personnel developed and used a GoldSim fate and transport model, which is consistent with Musall 2012, to evaluate relative to groundwater protection, ISD alternatives that involve either source removal and/or the grouting of portions or all of 235-F. This evaluation was conducted through the development and use of a Building 235-F GoldSim fate and transport model. The model simulates contaminant release from four 235-F process areas and the 294-2F Sand Filter. In addition, it simulates the fate and transport through the vadose zone, the Upper Three Runs (UTR) aquifer, and the Upper Three Runs (UTR) creek. The model is designed as a stochastic model, and as such it can provide both deterministic and stochastic (probabilistic) results. The results show that the median radium activity concentrations exceed the 5 ?Ci/L radium MCL at the edge of the building for all ISD alternatives after 10,000 years, except those with a sufficient amount of inventory removed. A very interesting result was that grouting was shown to basically have minimal effect on the radium activity concentration. During the first 1,000 years grouting may have some small positive benefit relative to radium, however after that it may have a slightly deleterious effect. The Pb-210 results, relative to its 0.06 ?Ci/L PRG, are essentially identical to the radium results, but the Pb-210 results exhibit a lesser degree of exceedance. In summary, some level of inventory removal will be required to ensure that groundwater standards are met.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Savannah River Site Environmental Report for 2011

The Savannah River Site Environmental Report for 2011 (SRNS-STI-2012-00200) is an overview of effluent monitoring and environmental surveillance activities conducted on and in the vicinity of SRS from January 1 through December 31, 2011 - including the Site’s performance against applicable standards and requirements. Details are provided on major programs such as the Environmental Management System (EMS) and permit compliance. Information for the 2011 report was compiled and prepared by the Environmental Compliance and Area Completion Projects (EC&ACP) Department of Savannah River Nuclear Solutions LLC (SRNS), the Site’s Management and Operations (M&O) contractor. The “Environmental Monitoring Program Management Plan” (SRS EM Plan, 2010) documents 1) the rationale and objectives for the monitoring program, 2) the frequency of monitoring and analysis, 3) the various sampling locations, and 4) the specific analytical and sampling protocols used. The “Environmental Monitoring Quality Assurance Project Plan” (SRS EM QA Plan, 2010) describes the associated quality assurance requirements.

54 ENVIRONMENTAL SCIENCES↗

488-4D ASH LANDFILL CLOSURE CAP HELP MODELING

At the request of Area Completion Projects (ACP) in support of the 488-4D Landfill closure, the Savannah River National Laboratory (SRNL) has performed Hydrologic Evaluation of Landfill Performance (HELP) modeling of the planned 488-4D Ash Landfill closure cap to ensure that the South Carolina Department of Health and Environmental Control (SCDHEC) limit of no more than 12 inches of head on top of the barrier layer (saturated hydraulic conductivity of no more than 1.0E-05 cm/s) in association with a 25-year, 24-hour storm event is not projected to be exceeded. Based upon Weber 1998 a 25-year, 24-hour storm event at the Savannah River Site (SRS) is 6.1 inches. The results of the HELP modeling indicate that the greatest peak daily head on top of the barrier layer (i.e. geosynthetic clay liner (GCL) or high density polyethylene (HDPE) geomembrane) for any of the runs made was 0.079 inches associated with a peak daily precipitation of 6.16 inches. This is well below the SCDHEC limit of 12 inches.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization of C-Reactor (105-C) Moderator Tanks 204 and 205

Area Completion Project (ACP)/Savannah River Nuclear Solutions (SRNS) has requested Savannah River National Laboratory (SRNL) to perform chemical and radiological analyses on moderator heavy water samples from C-Reactor (105-C) in Moderator Tanks 204 and 205. The heavy water samples have been characterized using SRNL analytical methods. Information generated from the characterization of these heavy water samples provide a basis for determining the residual contamination remaining in the tanks. These analyses are needed in order to update the C-Reactor Contaminant migration groundwater model and report, to help determine a disposition pathway for the moderator water, and to ship samples off-site to the Southwest Research Institute (SWRI). This report presents characterization results for the March 2024 C-Reactor Moderator Tank 204 and 205 heavy water samples. SRNL results are critical to allow ACP to complete this Performance Based Incentive project on time. Based on the characterization data provided in this report, results of these samples meet customer expectations and satisfy the Technical Assistance Request (TAR).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Monitored Natural Attenuation (MNA) Assessment for the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit (OU) and the Pen Branch Wetland

In October 2024, Savannah River National Laboratory (SRNL) was tasked to conduct an independent review of groundwater data and assess the monitored natural attenuation (MNA) performance related to the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit (OU) located in the central portion of the Savannah River Site (SRS). The SRNL assessment of MNA entailed an independent analysis of groundwater concentration data, groundwater elevation data, available surface water concentration data, soil concentration data, and relevant historical geological characterization logs for the CMP Pits OU. Historical data tables and records were obtained from both the Savannah River Nuclear Solutions - Area Completion Projects (SRNSACP) team and South Carolina State University (SCSU) and condensed into new data sets by the SRNL project team for more targeted analysis of MNA performance characteristics. All data pertaining to groundwater concentration, surface water concentration, and groundwater elevation were restricted to collection dates after any known active remediation for the CMP OU.

54 ENVIRONMENTAL SCIENCES↗

Idaho National Laboratory Directed Research and Development FY-2009

The FY 2009 Laboratory Directed Research and Development (LDRD) Annual Report is a compendium of the diverse research performed to develop and ensure the INL's technical capabilities can support the future DOE missions and national research priorities. LDRD is essential to the INL - it provides a means for the laboratory to pursue novel scientific and engineering research in areas that are deemed too basic or risky for programmatic investments. This research enhances technical capabilities at the laboratory, providing scientific and engineering staff with opportunities for skill building and partnership development. Established by Congress in 1991, LDRD proves its benefit each year through new programs, intellectual property, patents, copyrights, publications, national and international awards, and new hires from the universities and industry, which helps refresh the scientific and engineering workforce. The benefits of INL's LDRD research are many as shown in the tables below. Last year, 91 faculty members from various universities contributed to LDRD research, along with 7 post docs and 64 students. Of the total invention disclosures submitted in FY 2009, 7 are attributable to LDRD research. Sixty three refereed journal articles were accepted or published, and 93 invited presentations were attributable to LDRD research conducted in FY 2009. The LDRD Program is administered in accordance with requirements set in DOE Order 413.2B, accompanying contractor requirements, and other DOE and federal requirements invoked through the INL contract. The LDRD Program is implemented in accordance with the annual INL LDRD Program Plan, which is approved by the DOE, Nuclear Energy Program Secretarial Office. This plan outlines the method the laboratory uses to develop its research portfolio, including peer and management reviews, and the use of other INL management systems to ensure quality, financial, safety, security and environmental requirements and risks are appropriately handled. The LDRD Program is assessed annually for both output and process efficiency to ensure the investment is providing expected returns on technical capability enhancement. The call for proposals and project selection process for the INL LDRD program begins typically in April, with preliminary budget allocations, and submittal of the technical requests for preproposals. A call for preproposals is made at this time as well, and the preparation of full proposals follows in June and closes in July. The technical and management review follows this, and the portfolio is submitted for DOE-ID concurrence in early September. Project initiation is in early October. The technical review process is independent of, and in addition to the management review. These review processes are very stringent and comprehensive, ensuring technical viability and suitable technical risk are encompassed within each project that is selected for funding. Each proposal is reviewed by two or three anonymous technical peers, and the reviews are consolidated into a cohesive commentary of the overall research based on criteria published in the call for proposals. A grade is assigned to the technical review and the review comments and grade are released back to the principal investigators and the managers interested in funding the proposals. Management criteria are published in the call for proposals, and management comments and selection results are available for principal investigator and other interested management as appropriate. The DOE Idaho Operations Office performs a final review and concurs on each project prior to project authorization, and on major scope/budget changes should they occur during the project's implementation. This report begins with several research highlights that exemplify the diversity of scientific and engineering research performed at the INL in FY 2009. Progress summaries for all projects are organized into sections reflecting the major areas of research focus at the INL. These sections begin with the DOE-NE Nuclear Science and Technology mission support area, followed by the National and Homeland Security and the Energy and Environmental Science and Technology areas. The major INL initiatives and the INL's Distinctive Signatures areas complete the project summaries. The appendices provide information on project relevance to DOE missions and major national programs as well as an author index, list of refereed publications and index of key terms.

99 GENERAL AND MISCELLANEOUS↗

Evaluation of activation products in remaining K-, L- and C-reactor structures

An analytic model and calculational methodology was previously developed for P-reactor and R-reactor1 to quantify the radioisotopes present in Savannah River Site (SRS) reactor tanks and the surrounding structural materials as a result of neutron activation of the materials during reactor operation. That methodology has been extended to K-reactor, L-reactor, and C-reactor. The analysis was performed to provide a best-estimate source term input to the Performance Assessment for an in-situ disposition strategy by Area Completion Projects-Deactivation and Decommissioning (ACP-D&D). The reactor structure model developed earlier for the P-reactor and R-reactor analyses was also used for the K-reactor and L-reactor. The model was suitably modified to handle the larger C-reactor tank and associated structures. For all reactors, the structure model consisted of 3 annular zones, homogenized by the amount of structural materials in the zone, and 5 horizontal layers. The curie content on an individual radioisotope basis and total basis for each of the regions was determined. A summary of these results are provided herein. The efficacy of this methodology to accurately predict the radioisotopic content of the reactor systems in question has been demonstrated and is documented in Reference 1. As noted in that report, results for one reactor facility cannot be directly extrapolated to other SRS reactors.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

300 Area D4 Project Fiscal Year 2009 Building Completion Report

This report summarizes the deactivation, decontamination, decommissioning, and demolition activities of seven facilities in the 300 Area of the Hanford Site in fiscal year 2009. The D4 of these facilities included characterization; engineering; removal of hazardous and radiologically contaminated materials; equipment removal; utility disconnection; deactivation, decontamination, demolition of the structure; and stabilization or removal of slabs and foundations. This report also summarizes the nine below-grade slabs/foundations removed in FY09 of buildings demolished in previous fiscal years.

300 Area↗

2014 Well Completion Report for Corrective Action Unit 447 Project Shoal Area Churchill County, Nevada October 2015

This report summarizes the drilling program conducted by the U.S. Department of Energy (DOE) Office of Legacy Management at the Project Shoal Area (Shoal) Subsurface Corrective Action Unit 447 in Churchill County, Nevada. Shoal was the location of an underground nuclear test conducted on October 26, 1963, as part of the Vela Uniform program sponsored jointly by the U.S. Department of Defense and the U.S. Atomic Energy Commission (a predecessor to DOE). The test consisted of detonating a 12-kiloton nuclear device in granitic rock at a depth of approximately 1,211 feet (ft) below ground surface (bgs) (AEC 1964). The corrective action strategy for the site is focused on revising the site conceptual model and evaluating the adequacy of the monitoring well network at the site. Field activities associated with the project were conducted in accordance with the Federal Facility Agreement and Consent Order (FFACO 1996, as amended) and applicable Nevada Division of Environmental Protection (NDEP) policies and regulations.

54 ENVIRONMENTAL SCIENCES↗

Remediation of Temporary Storage Sites in Support of the Port Hope Area Initiative - 20295

The Port Hope Area Initiative is a community-based solution for the long-term management of historic low level radioactive waste (LLRW) resulting from 60 years of uranium and radium processing operations in the Town of Port Hope which is located in Ontario, Canada. The Eldorado refinery, on the north shore of Lake Ontario, began refining radium-226 from pitchblende ore, later transitioning to the refining of uranium. Through the history of the operation, LLRW was deposited throughout the town of Port Hope as a result of fugitive emissions from the plant and/or through the re-use of process residues as building material and backfill. Historical clean-up activities conducted in the late 1970's involved the remediation of approximately 400 properties and the relocation of 100,000 cubic metres of contaminated soil to a disposal facility in Chalk River operated by Atomic Energy of Canada Limited (AECL). Owing to space limitations at that disposal facility, any LLRW identified through construction monitoring since that time has been stored in the community at three temporary storage sites located throughout the town. These include: the Centre Pier mound that contained approximately of 19,800 m{sup 3} of LLRW-impacted soil that originated from the construction of a new water treatment plant; two mounds located at a licensed storage facility containing LLRW obtained from residential clean-up activities (11,000 m{sup 3}); and a small pad adjacent to the municipal sewage treatment plant containing 2200 m{sup 3} of LLRW-containing sludge. With the construction of a new long-term waste management facility (LTWMF) that has been designed to house all of the LLRW identified within Port Hope, the three sites were early candidates for remediation. The clean-up of the three temporary storage sites was a significant milestone for the Port Hope Area Initiative. After a decade of planning and consultation, this work represents the first sites in the municipality to be remediated with the waste being safety removed and transferred to the newly constructed LTWMF. This paper discusses the challenges associated with the clean-up activities for these three sites and the strategies employed to address those challenges. These included weather-related challenges, owing to the seasons over which the work was conducted as well as those associated with working within a closely-knit community. Canadian Nuclear Laboratories (CNL), working on behalf of the federal government, has worked diligently to develop a positive and trusting relationship with the community. Consequently, the successful execution of this project needed to be sensitive to, and respectful of the needs of the community. In addition to the usual Health, Safety and Environment training, project staff received community awareness training that spoke to the history of this community-based initiative and the expected behavior when working within the community. Transportation routes were defined based on safety and the need to minimize disruption to local traffic while haul-times where scheduled around school bus hours to enhance public safety. The successful completion of this first of many remediation projects to be completed under the Port Hope Area Initiative reflected years of careful planning. Nevertheless, there were a number of 'lessons learned' that have been applied on other ongoing projects be completed under the Port Hope Area Initiative. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗