Search NASA⌕ Search

SEARCH · Search NASA

Results for “ARGONNE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

CROCUS Tipping Bucket Rain Gauge Data from Argonne Deployable Mast Deployed at Argonne National Laboratory During Urban Flooding Campaign

The Tipping Bucket Rain Gauge (TBRG) dataset contains data from a non-heated Met One 12-inch tipping bucket rain gauge that was mounted on the Argonne Deployable Mast (ADM). The ADM is a rapid deployable meteorological trailer that can be outfitted with instrumentation to measure urban heat island effects, urban flooding or urban flux measurements. During the urban flooding field campaign, the ADM was outfitted with multiple precipitation measurement systems, including the TBRG. This dataset contains one minute measurements for precipitation accumulation during the ADM's deployment at the Argonne Testbed for Multiscale Observational Science (ATMOS) site. These data are helpful for identifying periods of precipitation, leading to potential flooding. TBRGs can be used to validate optical rain gauge data and disdrometer data collected during the CROCUS urban flooding campaign. Data were collected at ATMOS, a 20-acre prairie site at Argonne National Laboratory in Lemont, Illinois. The data is presented as daily NetCDF (.nc) files, each containing approximately 24 hours of observations. Files follow the naming convention of: the project (CROCUS), location (ADM-atmos), instrument name (tbrg), data level (raw, a1), and date (year, month, day). The NetCDF format can be accessed using common scientific software such as Python using xarray, netCDF4 or act-doe.

1-min Precipitation Accumulation↗

Implementation of a 1550-nm laser system for beam characterization at the Argonne Wakefield Accelerator

Accurately recording an electron bunch’s longitudinal profile is an important diagnostic for wakefield accelerators employing shaped bunches to increase transformer ratios. Electro-optic sampling of terahertz radiation from the bunch is an attractive approach due to its non-destructive nature. In preparation for future characterization experiments, the Argonne Wakefield Accelerator test facility has recently installed a 1550 nm laser system, including the necessary support systems to synchronize with the photoinjector laser system at 81.25 MHz. We report here on the initial installation and synchronization demonstrations.

Ody, Alexander [Argonne, PHY]↗

Authorized limits for disposal of PCB capacitors from Buildings 361 and 391 at Argonne National Laboratory, Argonne, Illinois.

This report contains data and analyses to support the approval of authorized release limits for the clearance from radiological control of polychlorinated biphenyl (PCB) capacitors in Buildings 361 and 391 at Argonne National Laboratory, Argonne, Illinois. These capacitors contain PCB oil that must be treated and disposed of as hazardous waste under the Toxic Substances Control Act (TSCA). However, they had been located in radiological control areas where the potential for neutron activation existed; therefore, direct release of these capacitors to a commercial facility for PCB treatment and landfill disposal is not allowable unless authorized release has been approved. Radiological characterization found no loose contamination on the exterior surface of the PCB capacitors; gamma spectroscopy analysis also showed the radioactivity levels of the capacitors were either at or slightly above ambient background levels. As such, conservative assumptions were used to expedite the analyses conducted to evaluate the potential radiation exposures of workers and the general public resulting from authorized release of the capacitors; for example, the maximum averaged radioactivity levels measured for capacitors nearest to the beam lines were assumed for the entire batch of capacitors. This approach overestimated the total activity of individual radionuclide identified in radiological characterization by a factor ranging from 1.4 to 640. On the basis of this conservative assumption, the capacitors were assumed to be shipped from Argonne to the Clean Harbors facility, located in Deer Park, Texas, for incineration and disposal. The Clean Harbors facility is a state-permitted TSCA facility for treatment and disposal of hazardous materials. At this facility, the capacitors are to be shredded and incinerated with the resulting incineration residue buried in a nearby landfill owned by the company. A variety of receptors that have the potential of receiving radiation exposures were analyzed. Based on the dose assessment results, it is indicated that, if the disposition activities are completed within a year, the maximum individual dose would be about 0.021 mrem/yr, which is about 0.02% of the primary dose limit of 100 mrem/yr set by U.S. Department of Energy (DOE) for members of the public. The maximum individual dose was associated with a conservative and unlikely scenario involving a hypothetical farmer who intruded the landfill area to set up a subsistence living above the disposal area 30 years after burial of the incineration residue. Potential collective dose for worker and the general public combined was estimated to be less than 4 x 10{sup -4} person-rem/yr, about 0.004% of the DOE authorized release objective of 10 person-rem/yr for collective exposure. In reality, the actual radiation doses incurred by workers and the general public are expected to be at least two orders of magnitude lower than the estimated values. To follow the ALARA (as low as reasonably achievable) principle of reducing potential radiation exposures associated with authorized release of the PCB capacitors, a dose constraint of 1 mrem/yr, corresponding to a small fraction of the 25 mrem/yr limit set by DOE, was initially used as a reference to derive the authorized release limits. On the basis of the dose assessment results, the following authorized release limits are proposed - 0.6 pCi/g for Mn-54, 0.6 pCi/g for Na-22, 0.1 pCi/g for Co-57, and 2.3 pCi/g for Co-60, with a corresponding maximum individual dose of 0.21 mrem/yr. This maximum dose, about 0.2% of the DOE primary dose limit of 100 mrem/yr for members of the public from all sources and exposure pathways, was then selected as the final dose constraint for releasing the PCB capacitors through the authorized process. The proposed authorized release limits would satisfy the DOE requirements for the release of non-real properties to a commercial treatment and disposal facility. In addition, due to the relatively short half-lives (< 5.27 years) of radionuclides of concern, there will be no long-term buildup of doses either in groundwater or through other exposure pathways associated with this particular release action. Contact with Clean Harbors and the State of Texas has been initiated. The radioactivity levels in the PCB capacitors meet the State of Texas radiological exemption limits and would be accepted by Clean Harbors, subject to the approval by DOE for the authorized release process. Cost benefit analysis shows that authorized release of the PCB capacitors would provide significant cost saving over the low-level radioactive waste (LLRW) disposition alternative, i.e. sending the PCB capacitors to a certified LLRW facility for treatment and disposal, and would not cause a significantly different impact in terms of human health protection. Therefore, authorized release is determined to be the preferred alternative for the disposition of Argonne PCB capacitors.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Argonne Director Eric Isaacs talks about ARRA funding at Argonne

Argonne is set to receive over $150 million in stimulus funds. Director Eric Isaacs describes how these funds will be put to good use—hiring employees and contractors, cleaning up the nuclear footprint, and investing in technologies for America's future. More info on Argonne and ARRA here: http://www.anl.gov/recovery/index.html

99 GENERAL AND MISCELLANEOUS↗

Beam dynamics simulations of the transverse-to-longitudinal emittance exchange proof-of-principle experiment at the Argonne Wakefield Accelerator

Transverse-to-longitudinal emittance exchange has promising applications in various advanced acceleration and light source concepts. A proof-of-principle experiment to demonstrate this phase space manipulation method is currently being planned at the Argonne Wakefield Accelerator. The experiment focuses on exchanging a low longitudinal emittance with a high transverse horizontal emittance and also incorporates room for possible parametric studies e.g. using an incoming flat beam with tunable horizontal emittance. In this paper, we present realistic start-to-end beam dynamics simulation of the scheme, explore the limitations of this phase space exchange.

43 PARTICLE ACCELERATORS↗

Momentum-space Argonne V18 interaction

This paper gives a momentum-space representation of the Argonne V18 potential as an expansion in products of spin-isospin operators with scalar coefficient functions of the momentum transfer. Two representations of the scalar coefficient functions for the strong part of the interaction are given. One is as an expansion in an orthonormal basis of rational functions and the other as an expansion in Chebyshev polynomials on different intervals. Both provide practical and efficient representations for computing the momentum-space potential that do not require integration or interpolation. Programs based on both expansions are available as supplementary material. Analytic expressions are given for the scalar coefficient functions of the Fourier transform of the electromagnetic part of the Argonne V18. A simple method for computing the partial-wave projections of these interactions from the operator expressions is also given.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Picosecond Synchronization System for the Distribution of Photon Pairs Through a Fiber Link Between Fermilab and Argonne National Laboratories

Here we demonstrate a three-node quantum network for C-band photon pairs using 2 pairs of 59 km of deployed fiber between Fermi and Argonne National Laboratories. The C-band pairs are directed to nodes using a standard telecommunication switch and the detection system is synchronized to picosecond scale timing resolution using a coexisting O-or L-band optical clock distribution system. We measure a reduction of coincidence to-accidental ratio (CAR) of the C-band pairs from 51 ± 2 to 5.3 ± 0.4 due to Raman scattering of the O-band clock pulses. Despite this reduction, the CAR is nevertheless suitable for quantum networks.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

A non-destructive internal nuclear forensic investigation at Argonne: discovery of a Pu planchet from 1948

A plutonium alpha standard dating from 1948 was discovered at Argonne National Laboratory and characterized using a number of non-destructive analytical techniques. The principle radioactive isotope was found to be 239 Pu and unique ring structures were found across the surface of the deposition area. Due to chronological constraints on possible sources and its high isotopic purity, the plutonium in the sample was likely produced by the Oak Ridge National Lab X-10 Reactor. As a result, it is proposed that the rings are resultant through a combination of polishing and electrodeposition, though the hypothesis fails to address a few key features of the ring structures.

239Pu↗

Performance of the Argonne National Laboratory electron cyclotron resonance charge breeder

An electron cyclotron resonance charge breeder for the Californium rare ion breeder upgrade (CARIBU), a new radioactive beam facility for the Argonne Tandem Linac Accelerator System (ATLAS), has been constructed and commissioned. Charge breeding efficiencies up to 15.6% have been realized for stable beams with a typical breeding time of 10 ms/charge state. The CARIBU system has been undergoing commissioning tests utilizing a 100 mCi {sup 252}Cf fission source. A charge breeding efficiency of 14.8 {+-} 5% has been achieved for the first radioactive beam of {sup 143}Cs{sup 27+}.

43 PARTICLE ACCELERATORS↗

Independent Verification Survey Summary and Results for the Argonne National Laboratory Building 330 Project Footprint, Argonne, Illinois (Final Report)

ORISE conducted onsite verification activities of the Building 330 project footprint during the period of June 6 through June 7, 2011. The verification activities included technical reviews of project documents, visual inspections, radiation surface scans, and sampling and analysis. The draft verification report was issued in July 2011 with findings and recommendations. The contractor performed additional evaluations and remediation.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Natural Gas and Hydrogen Infrastructure Opportunities Workshop, October 18-19, 2011, Argonne National Laboratory, Argonne, IL : Summary Report.

The overall objective of the Workshop was to identify opportunities for accelerating the use of both natural gas (NG) and hydrogen (H{sub 2}) as motor fuels and in stationary power applications. Specific objectives of the Workshop were to: (1) Convene industry and other stakeholders to share current status/state-of-the-art of NG and H{sub 2} infrastructure; (2) Identify key challenges (including non-technical challenges, such as permitting, installation, codes, and standards) preventing or delaying the widespread deployment of NG and H{sub 2} infrastructure. Identify synergies between NG and H{sub 2} fuels; and (3) Identify and prioritize opportunities for addressing the challenges identified above, and determine roles and opportunities for both the government and industry stakeholders. Plenary speakers and panel discussions summarized the current status of the NG and H{sub 2} infrastructure, technology for their use in transportation and stationary applications, and some of the major challenges and opportunities to more widespread use of these fuels. Two break-out sessions of three groups each addressed focus questions on: (1) infrastructure development needs; (2) deployment synergies; (3) natural gas and fuel cell vehicles (NGVs, FCVs), specialty vehicles, and heavy-duty trucks; (4) CHP (combined heat and power), CHHP (combined hydrogen, heat, and power), and synergistic approaches; and (5) alternative uses of natural gas.

03 NATURAL GAS↗

Argonne National Laboratory summary site environmental report for calendar year 2007.

This summary of Argonne National Laboratory's Site Environmental Report for calendar year 2007 was written by 20 students at Downers Grove South High School in Downers Grove, Ill. The student authors are classmates in Mr. Howard's Bio II course. Biology II is a research-based class that teaches students the process of research by showing them how the sciences apply to daily life. For the past seven years, Argonne has worked with Biology II students to create a short document summarizing the Site Environmental Report to provide the public with an easy-to-read summary of the annual 300-page technical report on the results of Argonne's on-site environmental monitoring program. The summary is made available online and given to visitors to Argonne, researchers interested in collaborating with Argonne, future employees, and many others. In addition to providing Argonne and the public with an easily understandable short summary of a large technical document, the participating students learn about professional environmental monitoring procedures, achieve a better understanding of the time and effort put forth into summarizing and publishing research, and gain confidence in their own abilities to express themselves in writing. The Argonne Summary Site Environmental Report fits into the educational needs for 12th grade students. Illinois State Educational Goal 12 states that a student should understand the fundamental concepts, principles, and interconnections of the life, physical, and earth/space sciences. To create this summary booklet, the students had to read and understand the larger technical report, which discusses in-depth many activities and programs that have been established by Argonne to maintain a safe local environment. Creating this Summary Site Environmental Report also helps students fulfill Illinois State Learning Standard 12B5a, which requires that students be able to analyze and explain biodiversity issues, and the causes and effects of extinction. The same standard requires that Illinois students examine the impact of diminishing biodiversity due to human activity. An example of this would be the Argonne Restoration Prairie, which is discussed within the report. Because humans had to destroy part of a natural prairie in order to build, they must also plant an equivalent amount of prairie to make up for what was destroyed. The summary project perfectly meets Illinois State Learning Standard 13B section 5b, which requires students to be able to design and conduct an environmental impact study, analyze findings, and justify recommendations. Students volunteered for the project for two main reasons: We would become published authors, and could include that fact on important documents, like college applications, and we felt we were doing a good deed for the public, considering that without our summary the public may have no real idea how Argonne complies with various environmental protection acts and programs within the state. The summarization process was not easy, considering that we had never seen much of this kind of information before, especially in such detail. The project required a high level of commitment from all involved. This commitment ensured that the summary would be done on time and would be available to the public in the shortest time possible. Argonne representatives Norbert Golchert and Dave Baurac met with students and gave background information on Argonne and explained the importance of the research being done. In addition, they explained in-depth how the public benefits from the summarization. At the end of the presentation, students asked some questions, which were answered in specifics. The Report was divided into 10 sections, with groups of two students covering each section. The groups were eager to begin work on their assigned sections. After reading the complete report each group focused on a particular section. After much careful reading and analysis, we produced an outline. From the outline, partners divided work equally and began to carefully summarize. Groups summaries were edited, not only within groups, but also by other groups, in order to acquire a different perspective. Finally, Mr. Howard, our Biology II instructor, took a final look at the products before sending them off for the final review by Argonne. The final project was a 16-page pamphlet. The students reacted positively to the project. Asked if she was glad that she chose to work on the Argonne project, Katie Hanson said, 'Yes. I have enjoyed having the opportunity to become a published author. Also, it is an honor to be able to work with a prestigious, nationally recognized laboratory such as Argonne'. There were difficult aspects as well. Student Olga Zagariya said the hardest part of the project was 'trying to choose which information to put in the summary and which information to leave out, because it all seemed to be important'. It seems that everyone was satisfied with his or her section.

54 ENVIRONMENTAL SCIENCES↗

Argonne National Laboratory Site Environmental Report for Calendar Year 2024

This report discusses the status and accomplishments of the environmental protection program at Argonne National Laboratory for calendar year 2024. The status of Argonne environmental protection activities with respect to compliance with the various laws and regulations is discussed, along with environmental management, efficiency efforts, environmental corrective actions, and habitat restoration. To evaluate the effects of Argonne operations on the environment, samples of environmental media collected on the site, at the site boundary, and off the Argonne site were analyzed and compared with applicable guidelines and standards. A variety of radionuclides were measured in air, surface water, groundwater, and bottom sediment samples. In addition, chemical constituents in surface water, groundwater, and wastewater were analyzed. External penetrating radiation doses were measured, and the potential for radiation exposure to off-site population groups and on-site members of the public was estimated. Results are interpreted with respect to the origin of radioactive and chemical substances (i.e., natural, Argonne, and other) and are compared with applicable standards intended to protect human health and the environment. A U.S. Department of Energy (DOE) dose calculation methodology, based on International Commission on Radiological Protection (ICRP) recommendations and the U.S. Environmental Protection Agency’s (EPA) CAP 88 computer code, was used in preparing this report.

54 ENVIRONMENTAL SCIENCES↗

Managing Workplace Charging: Argonne National Laboratory’s Reservation-Based Smart EV Charging Platform

The Smart Electric Power Alliance (SEPA) partnered with Argonne National Laboratory (Argonne) to produce a case study on Argonne’s workplace electric vehicle (EV) charging program, designed to optimize employees’ ability to reserve EV chargers and allow Argonne to implement a workplace managed charging solution. Formally known as EVrez, the program offers Argonne’s employees access to more than 50 Level 2 chargers and 4 DC fast chargers (DCFC). Employees must reserve and manage their EV sessions through the EVrez mobile app platform. This report outlines the EVrez program, from inception to maturity, highlighting key learnings and best practices from the Argonne team. As other workplaces seek to offer their own workplace charging offerings, this report highlights foundational steps and considerations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Argonne National Laboratory Annual Report of Laboratory Directed Research and Development Program Activities FY 2012

Our plans to upgrade the Advanced Photon Source are proceeding on schedule, and we hope to receive CD-2 approval sometime in spring 2013. When complete, the APS Upgrade will equip this vital facility for continued scientific leadership in the 21st century, providing the 5,000-plus members of our user community with greatly increased time, energy and spatial resolution. We also have successfully installed “Mira,” the new IBM Blue Gene/Q system at the Argonne Leadership Computing Facility. The world’s fourth-fastest supercomputer, Mira is now providing leading-edge computational power across all scientific disciplines. I am also pleased to report that Argonne’s new Energy Sciences Building is proceeding on schedule; we expect it to be finished and ready for occupancy by June 30, 2013. When complete, the ESB will be one of the most modern and most flexible energy labs in the world, creating a new home for researchers focused on a wide range of energy science challenges. Research is under way at the new multidisciplinary Institute for Molecular Engineering (IME), a joint program of the University of Chicago and Argonne. Over the past year, four new faculty members, including IME’s director, – all pre-eminent researchers who hold joint appointments at Argonne – have joined the IME. We look forward to working in collaboration with the IME to find new ways to address the interfaces between molecular-level science and powerful new technologies. In FY 2012, we continued support for the final year of the “Beyond Lithium-Ion” Director’s Grand Challenge LDRD project. That project enabled significant work on the performance of lithium-based energy storage systems, pointing the way to new high-energy-density lithium-air batteries. I believe this Grand Challenge contributed significantly to our successful bid to win designation of the Argonne-based Joint Center for Energy Storage Research (JCESR) as the DOE’s new Batteries and Energy Storage Hub. JCESR, which brings together a world-class “dream team” of national laboratories, universities and private sector partners, strongly benefited from LDRD program investments, both in FY2012 and in previous years. As we move forward in FY2013, the Director’s Grand Challenge is now focused on new ways to address the challenges of “big data” – the acquisition, storage, transfer, and analysis of both experimental and simulated data at scales approaching the limits of our current computational capacities. In managing Argonne’s LDRD program, we have adhered to the requirements of DOE Order 413.2b and associated guidelines. Our program management continually strives for increased efficiency. In addition to meeting all reporting requirements during FY 2012, our LDRD Program Office continues to implement intranet-based process enhancements to better serve all LDRD stakeholders, including our DOE Site Office colleagues. As the following individual project reports demonstrate, Argonne’s researchers are pursuing projects at the leading edge of science and engineering, and making significant contributions to the advancement of our laboratory’s major strategic initiatives. Evidence of the continuing strength of this program is found in the follow-on sponsorship won by many of these research projects, as well as in the numbers of publications, invited presentations, inventions, and new staff hires that are direct results of LDRD. LDRD enables exploration of new scientific directions and makes it possible to adapt quickly to a changing landscape with unexpected opportunities, while enhancing the capabilities of our researchers and our scientific facilities. For these reasons, LDRD remains an invaluable resource to address the future science and technology needs of DOE, and of our nation.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

2018 LDRD Annual Report (Argonne National Laboratory)

Argonne National Laboratory’s Laboratory Directed Research and Development (LDRD) program encourages the development of novel technical concepts, enhances the Laboratory’s research and development (R&D) capabilities, and enables pursuit of strategic laboratory goals. Argonne’s LDRD projects are proposal based and peer reviewed, supporting ideas that require advanced exploration so they can be sufficiently developed to pursue support through normal programmatic channels. Among the aims of the projects supported by the LDRD program are the establishment of engineering proofs of principle, assessment of design feasibility for prospective facilities, development of instrumentation or computational methods or systems, and discoveries in fundamental science and exploratory development. All LDRD projects have demonstrable ties to one or more of the science, energy, environment, and national security missions of the U.S. Department of Energy (DOE) and its National Nuclear Security Administration (NNSA), and many are also relevant to the missions of other federal agencies that sponsor work at Argonne. A natural consequence of the more “applied” type projects is their concurrent relevance to industry. The LDRD program is managed in overarching portfolios, each containing multiple projects each fiscal year. The LDRD Prime portfolio is further divided into strategic focus areas aligned with Argonne’s strategic plan. The largest component of Argonne’s program is LDRD Prime, which emphasizes R&D explicitly aligned with Laboratory major initiatives in support of Argonne’s strategic plan. The choice of Focus Areas under the LDRD Prime component reflects the major initiatives; the state of development of relevant technical fields; the potential value of advancing those fields to DOE/NNSA and the nation; and the compatibility of the fields with existing facilities, capabilities, and staff expertise at Argonne. Focus Areas with projects that ended in FY18 are: Advanced Computing, Biological and Environmental Science Capability Development, Energy Manufacturing Science and Engineering, Hard X-ray Sciences, Materials and Chemistry, Securing Energy and Critical Resources, and The Universe as Our Laboratory (ULab).

99 GENERAL AND MISCELLANEOUS↗