Search NASA⌕ Search

SEARCH · Search NASA

Results for “ARMY”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Army Reactor Program Regulatory Bases: Supporting Army Regulation 50–7

This report describes the regulatory bases for the 2025 revision of Army Regulation (AR) 50–7 - Nuclear and Chemical Weapons and Materiel: Army Reactor Program and the new associated Department of the Army pamphlet (DA PAM) Army Reactor Program Procedures.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Attack Scenarios Relating to Army Facility-Related Control Systems: Quantifying the Cost to Secure and Cost Savings of the Army’s FRCS Program

Pacific Northwest National Laboratory (PNNL) analyzed the cyber-threat environment to U.S. Army facilities. This report describes three key factors in securing Army-owned facility-related control systems (FRCS). First, Section 1.0 provides background information about the project. Section 2.0 describes the various types of cyber-attacks. Section 3.0 provides a series of attack scenarios from real-world use cases are described in Section 3. These examples are relevant to the Army because the targeted systems or operating environments are like those used at Army installations. An estimated range for the cost to secure these systems is described in Section 4.0. Finally, the cost savings of preventing these kinds of attacks are described in Section 5.0.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Advanced information processing system: The Army fault tolerant architecture conceptual study. Volume 1: Army fault tolerant architecture overview

Digital computing systems needed for Army programs such as the Computer-Aided Low Altitude Helicopter Flight Program and the Armored Systems Modernization (ASM) vehicles may be characterized by high computational throughput and input/output bandwidth, hard real-time response, high reliability and availability, and maintainability, testability, and producibility requirements. In addition, such a system should be affordable to produce, procure, maintain, and upgrade. To address these needs, the Army Fault Tolerant Architecture (AFTA) is being designed and constructed under a three-year program comprised of a conceptual study, detailed design and fabrication, and demonstration and validation phases. Described here are the results of the conceptual study phase of the AFTA development. Given here is an introduction to the AFTA program, its objectives, and key elements of its technical approach. A format is designed for representing mission requirements in a manner suitable for first order AFTA sizing and analysis, followed by a discussion of the current state of mission requirements acquisition for the targeted Army missions. An overview is given of AFTA's architectural theory of operation.

Harper, R. E.↗

Advanced information processing system: The Army fault tolerant architecture conceptual study. Volume 2: Army fault tolerant architecture design and analysis

Described here is the Army Fault Tolerant Architecture (AFTA) hardware architecture and components and the operating system. The architectural and operational theory of the AFTA Fault Tolerant Data Bus is discussed. The test and maintenance strategy developed for use in fielded AFTA installations is presented. An approach to be used in reducing the probability of AFTA failure due to common mode faults is described. Analytical models for AFTA performance, reliability, availability, life cycle cost, weight, power, and volume are developed. An approach is presented for using VHSIC Hardware Description Language (VHDL) to describe and design AFTA's developmental hardware. A plan is described for verifying and validating key AFTA concepts during the Dem/Val phase. Analytical models and partial mission requirements are used to generate AFTA configurations for the TF/TA/NOE and Ground Vehicle missions.

Harper, R. E.↗

Health Hazard Assessment and Toxicity Clearances in the Army Acquisition Process

The United States Army Materiel Command, Army Acquisition Pollution Prevention Support Office (AAPPSO) is responsible for creating and managing the U.S. Army Wide Acquisition Pollution Prevention Program. They have established Integrated Process Teams (IPTs) within each of the Major Subordinate Commands of the Army Materiel Command. AAPPSO provides centralized integration, coordination, and oversight of the Army Acquisition Pollution Prevention Program (AAPPP) , and the IPTs provide the decentralized execution of the AAPPSO program. AAPPSO issues policy and guidance, provides resources and prioritizes P2 efforts. It is the policy of the (AAPPP) to require United States Army Surgeon General approval of all materials or substances that will be used as an alternative to existing hazardous materials, toxic materials and substances, and ozone-depleting substances. The Army has a formal process established to address this effort. Army Regulation 40-10 requires a Health Hazard Assessment (HHA) during the Acquisition milestones of a new Army system. Army Regulation 40-5 addresses the Toxicity Clearance (TC) process to evaluate new chemicals and materials prior to acceptance as an alternative. U.S. Army Center for Health Promotion and Preventive Medicine is the Army's matrixed medical health organization that performs the HHA and TC mission.

Macko, Joseph A., Jr.↗

Energy cost savings and expected payback for Re-tuning the controls of US Army buildings

The Headquarters Department of the Army (HQDA) sponsored a study to determine the national impact of deploying the Re-tuning™ methodology in 5 buildings types that account for over 40% of the Army’s conditioned building stock. Re-tuning is a systematic process that improves operational efficiency and reduces energy consumption at no- or low-cost through the building automation system (BAS) by correcting operational problems that plague buildings. The study relied on successful demonstration of the re-tuning methodology at 4 pilot US Army installations that informed a holistic effort that included simulating 12 individual re-tuning energy efficiency measures (EEMs) and 6 packages of EEMs in 5 selected Army building prototype models that represent 311 million ft2 (28.9 million m2) of the Army’s conditioned floor space. Both the baseline buildings and the packages were customized to capture the expected outcomes of re-tuning a diverse set of buildings. The study highlighted the benefit of individual re-tuning EEMs and economics of implementing packages of EEMs in applicable Army buildings across 16 climates and 2 building vintages. The average whole-building energy savings ranged from 10.8% to 40.5% by building type, with the company operations facility (COF) building having the highest value proposition from re-tuning. In addition, the study reveals that all large office (LO) buildings in the Army are economical to re-tune. The total modeled cost savings potential for re-tuning the five building types across the US Army is $204/1,000 sf ($220/100 m2), or $64M annually. This cost savings represents 5.6% of all the Army’s energy expenditures.

Fernandez, Nicholas EP↗

Basis for Dose and Reactor Safety Design Criteria for Army Regulation AR 50–7 and DA Pamphlet

This report describes the basis used to develop the radiological dose acceptance and design criteria contained in the draft updates to Army Regulation 50–7 (AR 50–7) Army Reactor Program and its accompanying draft Department of the Army (DA) Pamphlet (PAM), Army Reactor Program Procedures. These criteria will apply to Army nuclear reactors that fall under AR 50–7 and its accompanying DA PAM and ensure alignment with the overall objectives of the Army Reactor Program. The development basis for the radiological dose and design criteria supports a modern, technology-neutral, risk-informed, and performance-based approach to Army regulation of reactors and the demonstration of “adequate protection of the public.” To establish these criteria that support the Army’s unique operational requirements, multiple well-known and well-established standards and their supporting documentation were reviewed to ensure consistency with existing regulatory safety levels, including guidance from U.S. and international sources. These include the U.S. Nuclear Regulatory Commission’s (NRC’s) regulations and policy, the Canadian Nuclear Safety Commission’s (CNSC’s) regulatory documents, the International Atomic Energy Agency’s (IAEA’s) safety standards, as well as industry input that is tailored specifically to advanced microreactors. This report walks through the key definitions and associated references used for these criteria, which are outlined in Section 2.0. Based on these definitions, the dose acceptance criteria were established for various receptors for routine reactor operations (Section 3.2), design basis accidents (Section 3.3), and beyond design basis accidents (Section 3.4). Comparisons of multiple national and international dose limits are provided in these sections. Lastly, Section 4.0 outlines the reactor safety design criteria contained in the draft DA PAM and their associated bases.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Characterizing Plug Load Energy Use and Savings Potential in Army Buildings

The Assistant Secretary of the Army (Installations, Energy and Environment) tasked the Pacific Northwest National Laboratory to examine plug loads in typical Army buildings. Plug loads (also known as miscellaneous electric loads (MELs)) represent the electricity used by appliances and devices that are plugged in or hardwired and serve functions outside of a building’s core end uses. Common plug loads include computers, printers, copiers, networking devices, refrigerators, and vending machines. They also include personal electronic devices such as televisions, smart phones, tablets, and gaming systems. Examples of hardwired MELs include elevators, air compressors, and fire and security systems. The findings from this study confirm that significant energy is consumed within Army buildings by plug load devices and hardwired MEL equipment. A number of opportunities are identified for reducing unnecessary energy use that could save the Army over $5 million per year when broadly applied. Army regulations clearly spell out expectations for the purchase and operation of information technology equipment (computers, laptops, monitors, printers, and multi-function devices). However, the policies regarding the shutdown or activation of sleep and other lower power modes after 30 minutes of inactivity (15 minutes for monitors) do not appear to be consistently followed. There are many effective approaches and pathways for impacting change as it relates to improving awareness, implementing measures, and adjusting behaviors to identify and reduce plug load energy use. The Army should prioritize and consider deploying all of these to better understand and manage plug load equipment to save energy and enhance resilience across their facilities. Engaging the building occupants who use these devices daily via outreach and education should be a strong component of the strategy. The focus should be on reducing waste without sacrificing productivity or the benefits that many of these devices provide. Continued evaluation of plug loads beyond that performed here is important to gather lessons from additional building and equipment types, and to stay aware of evolving device technology and management options. This will highlight additional needs for policies, best practices, control technologies, and education of personnel to achieve real reductions in energy waste from plug load equipment. It is recommended that this study may serve as the foundation for a broader and sustained focus on plug loads and MELs, towards simultaneously enhancing the productivity, readiness, and resilience of the Army while reducing energy use and demand, and freeing up resources to better support the mission.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Installation Assignment Durations and Patterns of Army Personnel

The purpose of this document is to report on the development of personnel assignment duration statistical metrics and statistical descriptions for groups of Army personnel aggregated by rank, career management field, and other descriptors for 32 Continental United States (CONUS) Army installations. This information can be used for generating evidence-based measures of personnel exposure times associated with environmental health considerations at the installation and career management field levels. Assignment duration statistical descriptions were developed to provide temporal metrics for groups of personnel at Army installations as foundational data to support a variety of assessments. Statistical results of personnel assignment durations at the installation level are provided in several formats. The 50th percentile assignment duration represents the median number of days personnel in groups aggregated by rank and career management field spend at the 32 CONUS Army installations in this study. Likewise, other duration percentiles (90th) and quartiles of assignment durations for groups aggregated by rank and career management field spend at each installation were developed. Assignment path analysis provide statistical descriptions of assignment durations at Army installations throughout increments of time (e.g., 5 years, 10 years). Key groupings of assignment paths were achieved by analyzing the duration of assignments at installations in chronological order from entry throughout specified increments of military service to generate the most common assignment paths across the 32 CONUS Army installations in this study. The developed assignment duration analytics and duration statistical descriptions provide foundational temporal metrics for groups of personnel at 32 CONUS Army installations to support a variety of assessments including those by human resource planners and environmental health specialists.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Maximizing the U.S. Army’s Future Contribution to Global Security Using the Capability Portfolio Analysis Tool (CPAT)

We report that recent budget reductions have posed tremendous challenges to the U.S. Army in managing its portfolio of ground combat systems (tanks and other fighting vehicles), thus placing many important programs at risk. To address these challenges, the Army and a supporting team developed and applied the Capability Portfolio Analysis Tool (CPAT) to optimally invest in ground combat modernization over the next 25–35 years. CPAT provides the Army with the analytical rigor needed to help senior Army decision makers allocate scarce modernization dollars to protect soldiers and maintain capability overmatch. CPAT delivers unparalleled insight into multiple-decade modernization planning using a novel multiphase mixed-integer linear programming technique and illustrates a cultural shift toward analytics in the Army’s acquisition thinking and processes. CPAT analysis helped shape decisions to continue modernization of the $10 billion Stryker family of vehicles (originally slated for cancellation) and to strategically reallocate over $20 billion to existing modernization programs by not pursuing the Ground Combat Vehicle program as originally envisioned. Ultimately, more than 40 studies have been completed using CPAT, applying operations research methods to optimally prioritize billions of taxpayer dollars and allowing Army acquisition executives to base investment decisions on analytically rigorous evaluations of portfolio trade-offs.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Army Energy and Water Reporting System Assessment

There are many areas of desired improvement for the Army Energy and Water Reporting System. The purpose of system is to serve as a data repository for collecting information from energy managers, which is then compiled into an annual energy report. This document summarizes reported shortcomings of the system and provides several alternative approaches for improving application usability and adding functionality. The U.S. Army has been using Army Energy and Water Reporting System (AEWRS) for many years to collect and compile energy data from installations for facilitating compliance with Federal and Department of Defense energy management program reporting requirements. In this analysis, staff from Pacific Northwest National Laboratory found that substantial opportunities exist to expand AEWRS functions to better assist the Army to effectively manage energy programs. Army leadership must decide if it wants to invest in expanding AEWRS capabilities as a web-based, enterprise-wide tool for improving the Army Energy and Water Management Program or simply maintaining a bottom-up reporting tool. This report looks at both improving system functionality from an operational perspective and increasing user-friendliness, but also as a tool for potential improvements to increase program effectiveness. The authors of this report recommend focusing on making the system easier for energy managers to input accurate data as the top priority for improving AEWRS. The next major focus of improvement would be improved reporting. The AEWRS user interface is dated and not user friendly, and a new system is recommended. While there are relatively minor improvements that could be made to the existing system to make it easier to use, significant improvements will be achieved with a user-friendly interface, new architecture, and a design that permits scalability and reliability. An expanded data set would naturally have need of additional requirements gathering and a focus on integrating with other existing data sources, thus minimizing manually entered data.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Highlights and Lessons Learned from Army Re-tuning™ Pilot Demonstrations

The Army has aggressively pursued policy and energy efficiency projects and programs in recent years to meet Federal mandates and reduction goals organizationally (EISA 2007, AR 420-1, 42 U.S.C. § 8253), resulting in a 9.6% reduction in energy use intensity (EUI) from FY2015 to FY2017. Despite these successes, the Army remains the largest consumer of electricity in the Federal government and spent approximately $1.1 billion in energy-related costs in FY2017. Many of the low-cost/no-cost conservation measures have been deployed, so finding additional savings and projects that either (a) are cost effective or (b) can be bundled with more costly capital improvement projects to improve life cycle cost effectiveness, is imperative for the Army. Leveraging building control systems (BCS) and optimizing building performance through re-tuning represents a great opportunity for the Army. In 2016, the Pacific Northwest National Laboratory (PNNL), in support of the Assistant Secretary of the Army (Installations, Energy and Environment), i.e. ASA (IEE), was tasked in 2016 with a multi-year study and pilot demonstration to develop a business case for the potential energy and cost reduction benefits from re-tuning efforts for the Army.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

An Environmental Approach for Construction, Operation, and Maintenance of Floating Solar Array Renewable Energy Projects on Army Installations

The U.S. Army Office of Energy Initiatives (OEI) has primary responsibility over renewable projects to help achieve the Army’s renewable energy goals. The OEI serves as the central management office for partnering with U.S. Army installations to implement cost-effective, renewable energy projects, leveraging private sector financing. Siting, construction, and operation of solar power systems on U.S. Army installations help to achieve renewable energy goals. This report provides a general framework for environmental analysis for the siting, construction, and operation of floating solar renewable energy projects on U.S. Army installations, to include joint bases managed by the Department of the Army. This report includes specific information by resource area regarding the potential environmental impacts and probable best management practices or minimization approaches that afford environmental protection. This report provides analyses and suggestions that could support a programmatic analysis or site-specific action.

14 SOLAR ENERGY↗

An Evaluation of Army Wellness Center Clients’ Health-Related Outcomes

Purpose: To examine whether Army community members participating in a best-practice based workplace health promotion program (WHPP) experience goal-moderated improvements in health-related outcomes. Design: Pretest/posttest outcome evaluation examining an autonomously participating client cohort over 1 year. Setting: Army Wellness Center facilities on 19 Army installations. Participants: Army community members sample (N = 5703), mostly Active Duty Soldiers (64%). Intervention: Assessment of health risks with feedback, health assessments, health education classes, and health coaching sessions conducted by health educators at a recommended frequency of once a month for 3 to 12 months. Measures: Initial and follow-up outcome assessments of body mass index (BMI), body fat, cardiorespiratory fitness, blood pressure, and perceived stress. Analysis: Mixed model linear regression testing for goal-moderated improvements in outcomes. Results: Clients experienced significant improvements in body fat (−2% change), perceived stress (−6% to −12% change), cardiorespiratory fitness (+6% change), and blood pressure (−1% change) regardless of health-related goal. Only clients with a weight loss goal experienced BMI improvement (−1% change). Follow-up outcome assessment rates ranged from 44% (N = 2509) for BMI to 6% (N = 342) for perceived stress. Conclusion: Army Wellness Center clients with at least 1 follow-up outcome assessment experienced improvements in military readiness correlates and chronic disease risk factors. Evaluation design and follow-up-related limitations notwithstanding results suggest that best practices in WHPPs can effectively serve a globally distributed military force.

Rivera, L. Omar↗

Impact response of US Army and National Football League helmet pad systems

Lawrence Livermore National Laboratory [LLNL] was tasked to compare the impact response of NFL helmet pad systems and U.S. Army pad systems compatible with an Advanced Combat Helmet [ACH] at impact velocities up to 20 ft/s. This was a one-year study funded by the U.S. Army and JIEDDO. The Army/JIEDDO point of contact is COL R. Todd Dombroski, DO, JIEDDO Surgeon. LLNL was chosen by committee to perform the research based on prior published computational studies of the mechanical response of helmets and skulls to blast. Our collaborators include the U.S. Army Aeromedical Research Laboratory [USAARL] (a DoD laboratory responsible for impact testing helmets), Team Wendy and Oregon Aero (current and former ACH pad manufacturers), Riddell and Xenith (NFL pad manufacturers), and d3o (general purpose sports pad manufacturer). The manufacturer-supplied pad systems that were studied are shown in the figure below. The first two are the Army systems, which are bilayer foam pads with both hard and soft foam and a water-resistant airtight wrapper (Team Wendy) or a water-resistant airtight coating (Oregon Aero). The next two are NFL pad systems. The Xenith system consists of a thin foam pad and a hollow air-filled cylinder that elastically buckles under load. The Riddell system is a bilayer foam pad that is encased in an inflatable airbag with relief channels to neighboring pads in the helmet. The inflatable airbag is for comfort and provides no enhancement to impact mitigation. The d3o system consists of a rate-sensitive homogeneous dense foam. LLNL performed experiments to characterize the material properties of the individual foam materials and the response of the complete pad systems, to obtain parameters needed for the simulations. LLNL also performed X-ray CT scans of an ACH helmet shell that were used to construct a geometrically accurate computational model of the helmet. Two complementary sets of simulations were performed. The first set of simulations reproduced the experimental helmet impact certification tests performed by USAARL, who provided data for comparison. The goal of this set of simulations was to demonstrate the overall validity of LLNL's computational analyses and methods and understand the general physics of helmet impacts. In these tests and the corresponding simulations, an inverted ACH containing pads and a head-form are dropped onto a hemispherical anvil, at 10 and 14.14 ft/s impact velocities. The simulations predicted peak accelerations (the metric used by USAARL for comparing the performance of pad systems), rebound velocities, and impact durations consistent with the experimental data, thus demonstrating the validity and relevance of the simulation methods. Because the NFL pad systems are approximately double the thickness of the U.S. Army pads, they do not fit into the ACH. As a result, the NFL pads could not be simply placed into an ACH shell in either a simulation or an experiment without modifying their size and shape. Since impact mitigation depends critically on the available stopping distance and the area over which the stopping force is applied, it is important to consider identically shaped pads in order to compare their performance in a fair and meaningful manner. Consequently, the second set of simulations utilized a simplified simulation geometry consisting of a 5 kg cylindrical impactor (equal in mass to a head) striking equally sized pads from each manufacturer. The simulated bilayer foam pads had the same proportions of hard and soft foam as the actual pad systems, while the Xenith pads were simulated as a bilayer foam pad with material properties adjusted to give the same response as the actual Xenith pads. The effects of trapped air were included in the simulations of the Team Wendy and Oregon Aero pads. All simulations used material properties derived from the experiments conducted at LLNL. The acceleration history of the center of mass of the impactor was used to calculate the Head Injury Criterion (HIC) for each simulation, to assess the pad performance. The HIC is a well-established metric that combines both acceleration and duration of impact to assess the danger of injury, and is a more robust measure than peak acceleration. Our key findings are: (1) The performance of a pad depends on the range of impact velocities. At lower impact velocity, softer pads perform better. At higher impact velocity, harder pads perform better; (2) Thicker pads perform better at all velocities, but especially at high velocities; and (3) For comparable thicknesses, neither the NFL systems nor the Oregon Aero pads outperform the Team Wendy pads currently used in the ACH system in militarily-relevant impact scenarios (impact speeds less than 20 ft/s). The second finding suggests a commercial off-the-shelf solution for mitigating impact-related traumatic brain injury to soldiers.

42 ENGINEERING↗

Army Re-tuning™ Implementation Guides

The Army is a large, geographically dispersed organization with 156 installations and over 980 million square feet of building space to operate and maintain. The building stock spans a wide range of vintages and missions, with many serving cross-cutting functions and purposes. To meet Federal mandates and reduction goals organizationally, in recent years the Army has aggressively pursued policy and energy efficiency projects and programs resulting in a 9.6% reduction in energy use intensity (EUI) from fiscal year (FY) 2015 to FY2017. Despite these successes, the Army remains the largest consumer of electricity in the Federal government and spent approximately $1.1 billion in energy-related costs in FY2017 The Pacific Northwest National Laboratory (PNNL), in support of the Assistant Secretary of the Army (Installations, Energy and Environment) (ASA (IE&E)), was tasked with a multi-year study and pilot demonstration to develop a business case for the potential energy and cost reduction benefits from re-tuning™ efforts for the Army. Re tuning is a systematic process aimed at minimizing building energy consumption by identifying and correcting operational problems that plague buildings. The methodology was developed by PNNL research staff in an effort to improve building operational efficiency at no- or low-cost, primarily through building automation system (BAS) controls. The methodology is based on two basic principles: If the equipment is not needed, turn it off; and if the equipment is not needed at full power, turn it down. Implementation of identified low-cost/no-cost operational improvements through the re-tuning process results in increased building energy efficiency, reduced operating costs, and improvement to occupant comfort.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Lessons Learned from Comprehensive Energy and Water Evaluations at U.S. Army Campus Installations

The U.S. Department of Energy’s Pacific Northwest National Laboratory has engaged in a multi-year collaboration with the U.S. Army to support comprehensive energy and water evaluations at large Army campus installations. Initiated to help the Army achieve compliance with facility evaluation requirements dictated by the Energy Independence and Security Act of 2007, this effort has resulted in the evaluation of 530 buildings at 14 installations across the U.S., and the identification of annual savings potential of over 212 billion Btu of energy and 29 million gallons of water. This paper highlights the nature of the evaluation process applied at these Army installations and discusses a number of key findings that can be considered for ongoing and future evaluations at Army and other federal agency facilities, particularly those buildings within campus settings.

Woodward, James C.↗