Contributing to Net Zero Building: High Energy Efficient EIFS Wall Systems

The team led by Dow Corning collaborated to increase the thermal performance of exterior insulation and finishing systems (EIFS) to reach R-40 performance meeting the needs for high efficiency insulated walls. Additionally, the project helped remove barriers to using EIFS on retrofit commercial buildings desiring high insulated walls. The three wall systems developed within the scope of this project provide the thermal performance of R-24 to R-40 by incorporating vacuum insulation panels (VIPs) into an expanded polystyrene (EPS) encapsulated vacuum insulated sandwich element (VISE). The VISE was incorporated into an EIFS as pre-engineered insulation boards. The VISE is installed using typical EIFS details and network of trained installers.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Steady-State Thermal Performance Evaluation of Steel-Framed Wall Assembly with Local Foam Insulation

During January and May, 2009, two configurations of steel-framed walls constructed with conventional 2 4 steel studs insulated with R-19 ~14cm. (5.5-in. thick) and R-13 ~9cm. (3.5-in. thick) fiberglass insulation batts were tested in the Oak Ridge National Laboratory (ORNL) guarded hot-box using ASTM C1363 test procedure. The first test wall used conventional 2 4 steel studs insulated with 2.5-cm. (1-in.) thick foam profiles, called stud snugglers. These stud snugglers converted the 2 4 wall assembly into a 2 6 assembly allowing application of R-19 fiberglass insulation. The second wall tested for comparison was a conventional 2 4 steel stud wall using R-13 insulation batts. Further, numerical simulations were performed in order to evaluate the steady-state thermal performance of various wood- and steel-framed wall assemblies. The effects of adding the stud-snugglers to the wood and steel studs were also investigated numerically. Different combinations of insulation and framing factor were used in the simulations.

09 BIOMASS FUELS↗

HOT BOX TESTING OF BUILDING ENVELOPE ASSEMBLIES; A SIMPLIFIED PROCEDURE FOR ESTIMATION OF MINIMUM TIME OF THE TEST

Cost of performing hot-box experiments on building envelope assemblies is relatively high. That is why proper estimation of the minimum amount of time necessary to achieve required test accuracy is critical to all hot-box operators. In this paper, two methods are proposed for determining wall specimen time constants, for the hot-box apparatus testing. The requirements published in ASTM C1363-05 Standard Test Method for the Thermal Performance of Building Materials and Envelope Assemblies by Means of a Hot Box Apparatus, concerning determination of the time to reach the steady state of heat flow are discussed. One method requires numerical calculations of the response factors with subsequent determination of time constants. The second method makes use of the approximate relation between the time constant and the product of resistance, capacity, and a structure factor. Both methods may serve for the optimization of the minimum test time during hot-box experiments.

36 MATERIALS SCIENCE↗

Hot-box testing of building envelope assemblies - A simplified procedure for estimation of minimum time of the test

Cost of performing hot-box experiments on building envelope assemblies is relatively high. That is why proper estimation of the minimum amount of time necessary to achieve required test accuracy is critical to all hot-box operators. In this paper, two methods are proposed for determining wall specimen time constants, for the hot-box apparatus testing. The requirements published in ASTM C1363-05 'Standard Test Method for the Thermal Performance of Building Materials and Envelope Assemblies by Means of a Hot Box Apparatus,' concerning determination of the time to reach the steady state of heat flow are discussed. One method requires numerical calculations of the response factors with subsequent determination of time constants. The second method makes use of the approximate relation between the time constant and the product of resistance, capacity, and a structure factor. Both methods may serve for the optimization of the minimum test time during hot-box experiments.

99 GENERAL AND MISCELLANEOUS↗