Search NASA⌕ Search

SEARCH · Search NASA

Results for “AUTOMATIC PILOTS - BOYKOW”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Resource Analysis of NP Kunta Solar Park Site (White Paper)

India has set a target of 175 GW of renewable energy (RE) capacity by 2022 and 450 GW by 2030. Flexibility is key for efficient integration of renewables. The modern-day RE plants are grid-friendly and can also provide this flexibility. A pilot to demonstrate this flexibility by implementing automatic generation control (AGC) at a solar plant is being done by the U.S. Agency for International Development (USAID) under USAID’s Greening the Grid (GTG) Program and Renewable Integration & Sustainable Energy (RISE) initiative. This paper presents the resource variability analysis of the 250-MW NP Kunta solar plant site where the AGC pilot project is being implemented. This paper also demonstrates the use of publicly available resource quality data, which can be utilized by various stakeholders to better understand the variability of any existing or potential RE site in India and possibly increase confidence in decisions or help to understand the impacts that can be expected.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Sorbent Based Post-Combustion CO 2 Slipstream Testing

TDA Research, Inc. has developed a low-cost sorbent (alkalized alumina) based technology for post-combustion CO 2 capture. The sorbent runs in an isothermal process for adsorption and regeneration. Neither temperature swing nor pressure swing is needed. TDA designed a system which operated 10 fixed beds to simulate a moving bed process. The flow pattern was optimized to minimize the steam usage for regeneration. An excellent sorbent (Batch 1) was also developed with collaboration with our partner. The sorbent degraded after long term operation. We developed a reprocessing procedure, which can be conducted in situ, to restore the sorbent capture capacity as the fresh sorbent after running for about 1250 hours. The reprocessing extended the sorbent longevity significantly. TDA designed a pilot unit (40’ x 32’ x 11.5’), processing flue gas equivalent to 0.5 MW of power generation. It had 10 beds and each bed could hold 1.75 m 3 of sorbent. We worked with Springs Fabrication, Inc. to complete the construction of the pilot unit. It was then shipped and installed at NCCC. The pilot unit was kept running in 24-hour mode when the flue gas and steam were available. It could run automatically without operator on site. Parametric and long-term (2 months) tests were carried out successfully. The results showed that TDA’s process can achieve 90% capture and 95% CO 2 purity for both coal and NG flue gases. For coal flue gas, the system reached performance target when processing up to 0.62 MW flue gas, 24% higher than the design capacity. Thus, capital cost could be saved on the reactors and sorbent. The strip air flow was designed to be 0.25 of that of the flue gas. The test data showed the strip/flue ratio can be reduced to as little as 0.18, which saves the power consumption for the strip air blower. The pressure drop was found to be lower than what the empirical equation calculated. The sorbent still had 91.7% of original capacity after 3-month test. With the data from the pilot test, we updated the TEA. For a 550-MW e supercritical coal fired power plant with CO 2 capture, the capture cost for TDA’s process is $34.9/tonne CO 2 captured, which meets DOE’s goal of $40/tonne and is 17.1% less than the DOE baseline Case 12. Therefore, TDA’s process has a good potential for commercialization.

01 COAL, LIGNITE, AND PEAT↗

SolarAPP+ Pilot Analysis: Performance and Impact of Instant, Online Solar Permitting

The National Renewable Energy Laboratory (NREL) led a collaborative effort to develop the Solar Automated Permit Processing Plus (SolarAPP+), a no-cost solar permitting software solution to address residential solar photovoltaic (PV) permitting resource constraints and streamline solar adoption processes among authorities having jurisdiction (AHJs). The SolarAPP+ is an online portal that automates permit plan review, enabling an instant permit approval process for code-compliant residential PV systems. Based on national model building, electrical, and fire codes, the SolarAPP+ automatically performs a compliance check of permit inputs against code requirements and produces an inspection checklist that can be used to verify installation practices, workmanship, and adherence to the approved design. NREL conducted a two-phase pilot with five participating AHJs and 16 solar contractors, spanning from November 2020 through December 2021, evaluating the ability of SolarAPP+ to deliver instant permits and its impact on four critical areas within each AHJ: permit review timelines; solar adoption timelines; AHJ time saved; and inspection results. The pilot confirmed that SolarAPP+ reduced permit review times to less than one day, reduced solar adoption timelines by an average of 12 days, saved an estimated 2,067 staff hours, and had comparable inspection results to those found in traditional permitting. The pilot further identified key lessons for improving SolarAPP+, including ways to streamline SolarAPP+ adoption, development of training resources, and expansion of supported products.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Computer vision-based rock bolt detection in orthomosaic imagery obtained in the Waste Isolation Pilot Plant underground facility

Assessing structural integrity of large underground tunnel facilities is often a time consuming and human-labor intensive task. Thus, research using various modes of sensing and automated detection of key structural components in mines is posed to aid in safety assessments and establishing overall structural health. We propose an approach utilizing off-the-shelf camera and lidar technology fixed to a custom sensing platform, image stitching techniques, fine-tuned object detection models, and specialized model-inference methods to automatically detect, count, and map roof bolts for assessment of structural safety in man-made underground tunnels. Results show a novel workflow for effective object counting in orthomosaic tunnel ceiling images generated from collections in GPS-denied mining environments. Additionally, we demonstrate effective fine-tuning of EfficientDet object detectors utilizing state-of-the-art image augmentation techniques known as the mosaic and mixup transformations. Our work is demonstrated on sensed data and imagery collected from the Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) where miles of tunnel ceiling must be assessed for structural integrity.

42 ENGINEERING↗

SolarAPP+ Performance Review (2024 Data)

The Solar Automated Permit Processing Plus (SolarAPP+) platform is an online portal to facilitate and expedite rooftop solar photovoltaic (PV) and battery storage permitting processes. SolarAPP+ allows PV contractors to upload system specifications, have that information automatically reviewed for code compliance, and receive instant approval for code-compliant systems, reducing authority having jurisdiction (AHJ) staff time needed for review. SolarAPP+ also provides inspection checklists to verify installation practices and adherence to approved designs. This report is part of an ongoing series of reviews of SolarAPP+ performance. Consistent with previous performance reviews, we summarize SolarAPP+ adoption trends to date and compare various metrics for PV systems permitted through SolarAPP+ versus systems permitted through traditional AHJ permitting processes. As of the end of 2024, 799 AHJs had expressed interest in the platform, with 264 fully adopting (215) or piloting (49) the platform. In 2024, 861 installers submitted 37,393 permits through the SolarAPP+ platform, including 27,375 permits for PV+storage systems. SolarAPP+ permits accounted for around 43% of all permits issued in all participating AHJs, and more than 60% of all permits in several participating AHJs. We compare permitting timelines through SolarAPP+ to traditional AHJ permitting processes to assess the platform's performance. Consistent with previous SolarAPP+ performance reviews, we find that permitting timelines are significantly shorter for SolarAPP+ projects. Based on median timelines, a typical SolarAPP+ project is permitted and inspected 12 business days sooner than traditional projects. We estimate that automatic SolarAPP+ permitting saved around 18,400 hours of AHJ staff time in 2024. Finally, we estimate that SolarAPP+ eliminated over 100,000 business days in permitting-related delays in 2024.

14 SOLAR ENERGY↗

Fermilab's Transition to Token Authentication

Fermilab is the first High Energy Physics institution to transition from X.509 user certificates to authentication tokens in production systems. All the experiments that Fermilab hosts are now using JSON Web Token (JWT) access tokens in their grid jobs. Many software components have been either updated or created for this transition, and most of the software is available to others as open source. The tokens are defined using the WLCG Common JWT Profile. Token attributes for all the tokens are stored in the Fermilab FERRY system which generates the configuration for the CILogon token issuer. High security-value refresh tokens are stored in Hashicorp Vault configured by htvault-config, and JWT access tokens are requested by the htgettoken client through its integration with HTCondor. The Fermilab job submission system jobsub was redesigned to be a lightweight wrapper around HTCondor. The grid workload management system GlideinWMS which is also based on HTCondor was updated to use tokens for pilot job submission. For automated job submissions a managed tokens service was created to reduce duplication of effort and knowledge of how to securely keep tokens active. The existing Fermilab file transfer tool ifdh was updated to work seamlessly with tokens, as well as the Fermilab POMS (Production Operations Management System) which is used to manage automatic job submission and the RCDS (Rapid Code Distribution System) which is used to distribute analysis code via the CernVM FileSystem. The dCache storage system was reconfigured to accept tokens for authentication in place of X.509 proxy certificates. As some services and sites have not yet implemented token support, proxy certificates are still sent with jobs for backwards compatibility, but some experiments are beginning to transition to stop using them.

Dykstra, Dave [Fermilab] (ORCID:0000000326539015)↗

SolarAPP+ Performance Review (2022 Data)

The Solar Automated Permit Processing Plus (SolarAPP+) platform is an online portal to facilitate and expedite rooftop solar photovoltaic (PV) permitting processes. SolarAPP+ allows PV contractors to upload system specifications, have those specifications automatically reviewed for code compliance, and receive instant approval for code-compliant systems. SolarAPP+ also provides inspection checklists to verify installation practices and adherence to approved designs. SolarAPP+ is available to authorities having jurisdiction (AHJs) at no cost. This report is part of an ongoing series of reviews of SolarAPP+ performance. Consistent with previous performance reviews, we summarize SolarAPP+ adoption trends to date and compare various metrics for PV systems permitted through SolarAPP+ versus systems permitted through conventional AHJ permitting processes. As of the end of 2022, the National Renewable Energy Laboratory (NREL) had contacted over 1,500 AHJs with significant solar permitting volume regarding SolarAPP+. Of those, 607 AHJs had at least expressed interest in the platform. 16 AHJs had begun piloting the platform and 15 of these had publicly launched the platform by the end of 2022. In 2022, 206 installers submitted 11,092 permits through the SolarAPP+ platform, including 708 permits for solar+storage systems. SolarAPP+ permits accounted for around 37% of all permits issued in participating AHJs. We compare permitting timelines through SolarAPP+ to traditional AHJ permitting processes to assess the platform's performance. Consistent with previous SolarAPP+ performance reviews, we find that permitting timelines are significantly shorter for SolarAPP+ projects. Based on median timelines, a typical SolarAPP+ project is permitted and inspected 8 business days sooner than traditional projects. We estimate that automatic SolarAPP+ permitting saved between 3,500 and 13,900 hours of AHJ staff time in 2022. Finally, we find evidence that SolarAPP+ may improve inspection outcomes, with SolarAPP+ projects failing inspections about 28% less frequently than traditional projects.

14 SOLAR ENERGY↗

SolarAPP+ Performance Review (2023 Data)

The Solar Automated Permit Processing Plus (SolarAPP+) platform is an online portal to facilitate and expedite rooftop solar photovoltaic (PV) and battery storage permitting processes. SolarAPP+ allows PV contractors to upload system specifications, have that information automatically reviewed for code compliance, and receive instant approval for code-compliant systems, reducing authority having jurisdiction (AHJ) staff time needed for review. SolarAPP+ also provides inspection checklists to verify installation practices and adherence to approved designs. SolarAPP+ is available to AHJs at no cost. This report is part of an ongoing series of reviews of SolarAPP+ performance. Consistent with previous performance reviews, we summarize SolarAPP+ adoption trends to date and compare various metrics for PV systems permitted through SolarAPP+ versus systems permitted through traditional AHJ permitting processes. As of the end of 2023, the National Renewable Energy Laboratory (NREL) had contacted over 1,700 AHJs with significant solar permitting volume regarding SolarAPP+. Of those, 793 AHJs had expressed interest in the platform as of the end of 2023. 161 AHJs had begun piloting the platform and 97 of these had publicly launched the platform by the end of 2023. In 2023, 668 installers submitted 18,906 permits through the SolarAPP+ platform, including 4,834 permits submitted as part of a solar plus storage program. SolarAPP+ permits accounted for around 43% of all permits issued in participating AHJs. We compare permitting timelines through SolarAPP+ to traditional AHJ permitting processes to assess the platform's performance. Consistent with previous SolarAPP+ performance reviews, we find that permitting timelines are significantly shorter for SolarAPP+ projects. Based on median timelines, a typical SolarAPP+ project is permitted and inspected 14.5 business days sooner than traditional projects. We estimate that automatic SolarAPP+ permitting saved around 7,200 hours of AHJ staff time in 2023. Finally, we estimate that SolarAPP+ eliminated over 150,000 business days in permitting-related delays in 2023.

14 SOLAR ENERGY↗

Exploiting CRIC to streamline the configuration management of GlideinWMS factories for CMS support

GlideinWMS is a workload management and provisioning system that allows sharing computing resources distributed over independent sites. Based on the requests made by GlideinWMS frontends, a dynamically sized pool of resources is created by GlideinWMS pilot factories via pilot job submission to resource sites’ CEs. More than 400 CEs are currently serving more than ten virtual organizations through GlideinWMS, with CMS being the biggest user with 230 CEs. The complex configurations of the parameters defining resource requests, as submitted to those CEs, have been historically managed by manually editing a set of different XML files. New possibilities arise with CMS adopting the CRIC, an information system that collects, aggregates, stores, and exposes, among other things, computing resource data coming from various data providers. The paper will describe the challenges faced when CMS started to use CRIC to automatically generate the GlideinWMS factory configurations. The architecture of the prototype, and the ancillary tools developed to ease this transition, will be discussed. Finally, future plans and milestones will be outlined.

Dost, Jeffrey↗

Advanced Computational Modeling of High-Level Waste Vitrification at the Hanford Site

The U.S. Department of Energy (DOE) has selected vitrification for stabilizing legacy tank waste at the Hanford site, where radioactive waste from plutonium production was historically stored in underground tanks. This waste will be separated into low-activity waste (LAW) and high-level waste (HLW) fractions and processed at the Waste Treatment and Immobilization Plant (WTP). At WTP, glass melters are used for the vitrification of radioactive tank waste, transforming it into a stable borosilicate glass form for safe long-term storage. The melter vessel is constructed from highly durable and heat-resistant materials, where the vitrification process occurs. The main regions that are modeled are the melt pool, plenum, cold cap, riser/discharge chamber, and surrounding structure with insulation layers. Forced convection induced by air bubblers at the base of the melter ensure uniform temperature distribution and provide heat to the cold cap layer. The cold cap is a region of reacting batch feed that floats on top of the molten glass and is where the batch-to-glass reactions occur. Joule heating provided by electrodes mounted along the vertical walls of the melter and immersed directly in the glass, generates the necessary heat for the net endothermic conversion processes that occur in the cold cap. The high temperatures, radioactivity, and opaque nature of the glass prevent direct observation inside the melters. Therefore, computational models are essential for providing insight into factors that affect melter throughput. Thermocouples in the plenum provide operators with plenum temperature measurements. Operational adjustments include bubbling rate, voltage supplied to the electrodes, feed adjustments, and glass removal rate. Different computational fluid dynamics (CFD) models have been developed, each serving a specific purpose. There are CFD models of different scale melters, as well as models that capture the two-phase flow interfaces of rising bubbles in the molten glass or models with a simplified molten glass region so that the surrounding structure and plenum can be feasibly incorporated. Pilot-scale melter models have been developed to serve as validation of the methods employed in the simulation of the full-scale WTP melters. Models incorporating resolved bubbling are used to develop momentum source terms to implement into a single phase, multi-region, steady-state flow model that is being validated by measured process parameters such as glass production rate, voltage, input power, plenum temperatures, etc. The resolved bubbling model uses the multiphase volume of fluid approach to model the system with a high-resolution interface capturing scheme to maintain sharp interfaces between the molten glass and the air phase. The suite of CFD models is continually being improved to incorporate more realistic physics and achieve faster turnaround time. For example, an incremental controller is implemented to automatically adjust electrode voltage within the simulation to a molten glass set point temperature of 1150°C. Newer models feature improved meshes to ensure conformal meshes between regions and eliminate unnecessary mesh refinement in areas that are not of interest (such as boundary layers in offgas ports). Instead of explicitly modeling the structural, refractory, and insulation layers of the melter, a thermal resistance approach is used with published correlations used for boundary conditions. The development of robust and efficient CFD models will be instrumental in enabling the WTP to successfully fulfill its mission of safely stabilizing legacy nuclear waste.

12 - MGMT OF RADIOACTIVE AND NON-RADIOACTIVE WASTE↗

FY 2026 Midyear Report: Seismic Monitoring of Underground Vibration Sources Using Distributed Acoustic Sensing and Seismometers

Safeguards-relevant temporal changes in underground facilities can be observed using geophysical monitoring techniques. Seismic waves, in particular, provide valuable insights into subsurface activities and can serve as an important tool for detecting anomalous events that may indicate containment breaches at geological repositories. This midyear report summarizes ongoing efforts to automatically and rapidly detect and locate anomalous vibration signals that could be indicative of potential containment breaches. Previous work during FY25 focused on compiling continuous seismic datasets from two underground sites and developing a database of continuous waveforms and ground-truth event data derived from multiple sensing modalities. Building on this foundation, we are adapting anomaly detection and geolocation algorithms to explore methods for monitoring underground activities using two relatively low-maintenance sensing technologies: a dense surface geophone array deployed at the Pleasant Gap mine in Pennsylvania, and a three-dimensional fiber-optic cable array for distributed acoustic sensing (DAS) installed in the subsurface at the Sanford Underground Research Facility (SURF) in South Dakota. This report summarizes work conducted during the first two quarters of FY26, during which we refined a dynamic power spectral density (PSD)-based detector, applied it independently to each geophone station, and then combined the per‑station detections with density-based spatial clustering of applications with noise (DBSCAN) to cluster events and produce spatial maps over a nine‑day interval. In addition, we outline plans for a field trial at the Waste Isolation Pilot Plant (WIPP) in New Mexico to compare traditional seismic monitoring approaches with DAS techniques and to evaluate the benefits of combined data analysis. Activities during the past two quarters have included the preparation and submission of a Field Test Plan to WIPP for approval, as well as submission to headquarters for review and feedback.

58 GEOSCIENCES↗

AEROICESTUDY-Colorado State University Ice Spectrometer

The dataset comprises measures, using Colorado State University's Ice Spectrometer (IS, an immersion freezing device with a range from 0 °C down to -26 to -29 °C) of atmospheric ice nucleating particle (INP) concentrations taken at ARM's Southern Great Plains (SGP) Site Guest Instrument Facility (GIF), in Lamont, Oklahoma, during the Aerosol-Ice Formation Closure Pilot Study (AEROICESTUDY). A filter sampler was mounted approximately 6 m above ground level atop the GIF rooftop platform. Single-use filter units open to the atmosphere fitted with pre-cleaned and pre-sterilized, 47-mm diameter Nuclepore polycarbonate filters were used. Filters were typically drawn for either a full day period (9AM-5PM CDT) or broken up into morning (9AM-12PM CDT) and afternoon (1PM-5PM CDT) periods. Additionally, 4 overnight filters were taken (6PM-8AM CDT). The volume of air filtered was typically between 3000 and 8000 standard liters for daily samples. After collection, filters were stored at -20 °C until processed. Initial processing to obtain spectra of INP number concentration active via the immersion freezing mechanism versus temperature was conducted using CSU's IS instrument (McCluskey et al., 2018). For measurement of INPs, collected aerosol particles were re-suspended in 8 mL of 0.1 µm-filtered deionized (DI) water. Aliquots of each suspension, and serial dilutions, were dispensed into trays which were fit into aluminum blocks in the IS. Samples were cooled at 0.33 °C per min and the freezing temperatures of wells recorded automatically. Cumulative INP concentrations were determined by first calculating the INPs per mL of suspension based on Vali (1971) and then converting to concentration per standard liter of air using the proportion of the total liquid sample dispensed and the air sample volumes. Two-tailed, 95% confidence intervals for binomial sampling were based on Equation 2 from Agresti and Coull (1998). Aliquots of suspensions from selected samples were also heat treated (95 °C for 20 min) to denature and deactiv

54 ENVIRONMENTAL SCIENCES↗

Performance Evaluation of Intelligent Solar Control Software Through Hardware-in-the-Loop (CRADA Final Report)

Recent research has highlighted the potential for solar to act as a zero-marginal-cost and zero-emission flexibility resource on the bulk power system when operated with advanced control systems. To increase the performance of these systems, leading technologies, including machine learning (ML) and hierarchical inverter set point allocation, have been developed by Latimer Controls, Inc. to estimate the headroom of large PV plants for grid operation and control; however, these technologies lack comprehensive validation under real-world application scenarios. Latimer Controls, Inc. received two voucher awards for research at a national laboratory from the Department of Energy American Made Solar Prize Round 6. The National Renewable Energy Laboratory (NREL) was selected to collaborate with Latimer staff to conduct a performance evaluation of Latimer PV control software. The NREL team will develop a hardware-in-the-loop (HIL) testbed to perform testing and validation of the Latimer PV control technology in a de-risked yet realistic testbed environment. Latimer and NREL worked together to analyze the test data, draw conclusions from the results, and disseminate the resulting scientific findings. In this CRADA work, we propose to test and validate the real-world application of the Latimer Control solution in an HIL environment. We evaluate the performance of different flexible solar technologies in responding to automatic generation control signals in a closed-loop fashion. In particular, a data-driven potential high limit (PHL) estimation is developed for large solar plants to accurately estimate their headroom so that they have fast and short-time regulation and control capability to participate in grid services and respond to grid signals in real time (e.g., AGC). This PHL estimation algorithm is embedded in a hardware power plant controller (PPC) and tested with an IEEE-39 bus system model developed in RTDS. To account for the varying cloud conditions and diverse inverter dispatches, we developed a 135-MW PV plant with detailed modeling of 27 individual PV modules and inverters using RTDS. The real-world communications used in such big plants, such as ModBus TCP/IP for inverter level and DNP3 for plant level, were developed to emulate the real-world applications in big PV plants. The ML-based PHL estimation method is tested under nine separate weather scenarios against the ‘reference-control’ solution, hereafter referred to as the baseline solution. The baseline method reserves a subset of inverters (reference group) to operate at their PHL at all times and dispatches only the remaining inverters (control group) at curtailed levels to fulfill the flexibility need. Despite being successfully piloted by NREL in California in 2017 and Chile in 2020, there exist two gaps in the state of the art to fully unlock the flexibility of PV plants: a. There is a trade-off between the PHL estimation accuracy and the flexibility range. b. There lacks granularity in the PHL estimation to capture the variation across inverters. The Latimer solution seeks to address these gaps by applying machine learning methods to improve PHL estimation accuracy while accounting for variability at every inverter. Performance metrics were taken from the 2023 Georgia Power CARES utility-scale RFP. The results demonstrate that the ML-based approach outperforms the traditional baseline method in PHL estimation accuracy for 7 of 9 scenarios. The average PHL error across the nine scenarios was 7.40% for the ML-based method, 2.06% less than the 9.46% PHL error average across scenarios that was exhibited by the baseline method. Additionally, the PHL error was below 5% for at least 95% of the testing interval for 3 of 9 tested intervals with the ML approach, whereas it did not achieve this metric for any of the baseline tests. Overall, simulation results indicate the superior performance of an ML-based approach compared to the conventional baseline reference-control approach, showcasing its potential to support grid stability and operational efficiency. This laboratory HIL testing using real PPC, representative power system simulation models in real-time with detailed PV plant and inverter models, and real-world communication protocols gives us confidence that this machine learning based PHL estimation algorithm works well in the hardware PPC and therefore de-risks future field commissioning. The end goal of this project is to advance grid technology to address the grid operation challenges brought by solar plant’s variability and uncertainties in power generation.

14 SOLAR ENERGY↗

Evaluating the Effectiveness of a Detection and Deterrent System in Reducing Golden Eagle Fatalities at Operational Wind Facilities

The Renewable Energy Wildlife Institute (REWI) was appointed as the prime awardee of DOE award number DE-EE0007883 to lead a team of scientists, wind developers, and technology manufacturers toward the overarching goal of evaluating the effectiveness of the current DTBird system in minimizing the risk of golden eagles (Aquila chrysaetos) and other large soaring raptors from approaching the rotor-swept zone (RSZ) of operating wind turbines. As part of this goal, the team set out to 1) quantify the expected reduction in collision risk for golden eagles from operation of the detection and deterrence modules in a manner that supports the approach used by the U.S. Fish and Wildlife Service (USFWS) to assess and credit facility operators for their efforts to minimize predicted collision fatalities and 2) provide information to help improve the technology to maximize its effectiveness. DTBird is an automated detection and audio deterrent system created by the Spanish company Liquen, designed to discourage birds from entering the RSZ of spinning wind turbines. The system uses cameras to automatically detect airborne targets of interest, records each such event in an online database, and triggers a warning signal (loud sound) if the tracked object has moved close to the turbine. If the object moves even closer to the RSZ, a more aggressive dissuasion signal is broadcast. To meet our objectives, the team conducted a two-year experiment at the Goodnoe Hills wind facility in Washington state, in which 14 turbines were outfitted with DTBird units. Daily, each DTBird-equipped turbine was randomly assigned to a control or treatment group. Treatment turbines operated with DTBird running as intended—broadcasting warning or deterrent signals when DTBird detected a target within range. On control turbines, no sound signals were broadcast if a moving target triggered the DTBird system. The team also flew unmanned aerial vehicles (UAVs) designed to coarsely mimic the general size, weight, and coloration of golden eagles in programmed flight transects across DTBird detection ranges to quantify DTBird’s ability to detect intended targets and to evaluate factors that influence the probability of detection and DTBird’s response distances. Additionally, the team evaluated the behavioral responses of in situ eagles exposed to spinning turbines alone (visual and sound influences) versus spinning turbines plus broadcasted DTBird audio deterrents, to estimate the effectiveness of deterrence by the DTBird system. The data and results from these investigations were combined with those from a pilot study conducted at the Manzana Wind Power Project in California to better evaluate DTBird’s effectiveness across different landscapes.

17 WIND ENERGY↗

WIPP Safety Significant Confinement Ventilation System (SSCVS) HEPA Filtration System - 20165

Construction and major equipment fabrication are underway for a new ventilation exhaust system at the Waste Isolation Pilot Plant (WIPP). The new system will provide continuous High Efficiency Particulate Air (HEPA) filtration of the exhaust from the WIPP underground while meeting the ventilation demands for expanded waste emplacement and mining operations over the next 40 years. The integrated system design provides for reducing the salt, clay and diesel particulates from the exhaust airflow from the mine, prior to full filtration using Nuclear Safety Significant HEPA filters. The SSCVS design and equipment provides for continuous HEPA filtration over a wide range of operating and environmental conditions. The new exhaust system connects to the existing underground exhaust shaft, and the exhaust air flows from the underground through Salt Reduction Units (SRUs) to protect the final filter banks from excessive moisture and rapid salt/dust buildup. Each of the six (6) SRUs consists of a demister to remove entrained moisture, a dry salt remover unit to filter approximately 90% of the entrained salt/dust, and an automated water treatment system to periodically clean the demisters and to remove salt from the SRU filters. At the maximum expected exhaust flowrate of 540,000 Cubic Feet per Minute (CFM) / 255 Cubic Meters per Second (m{sup 3}/s), five (5) salt removal units will be in operation with one unit in standby or maintenance. An in-line variable frequency drive booster fan will offset pressure losses through each SRU and reduce the relative humidity of the air exiting the SRUs. In the event of a high radiation alarm from the underground Continuous Air Monitors (CAMs), the SRUs will be automatically bypassed, which places the SRS and building outside of the Safety Significant confinement boundary. From the SRUs, the exhaust is directed to the HEPA filter banks located in the New Filter Building. The exhaust system is designed to provide continuous HEPA filtration prior to release to the exhaust stack. There are 22 HEPA filter banks rated at 27,000 CFM / 12.75 m{sup 3}/s each. Each filter bank has two stages of pre-filters and two stages of HEPA filters. The filtered air from each of the 22 filter banks discharges into a common concrete plenum, which is maintained under a negative pressure by the main exhaust fans. Six 1,000 HP variable frequency drive exhaust fans are provided on the south side of the plenum. At the maximum expected exhaust flow of 540,000 CFM, four exhaust fans and twenty filter banks will be in operation. The fans discharge vertically to a separate concrete exhaust plenum. The filtered exhaust is routed from the exhaust plenum to a 125-foot-tall exhaust stack via a 13-foot diameter duct. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗