Collimation Systems for the PSR
This note provides a review of collimator systems being used or considered in high-intensity proton accelerators like SNS, J-PARC, LHC, and PIP-II. These facilities use collimators to remove beam halo, restrict transverse size and momentum in the beam to constrain beam losses around collimators and minimize beam losses downstream, particularly losses arising from particles missing the design location at the stripping foil when injected into the proton storage ring. Collimators are placed either in the transport injection lines (single-pass collimators) or in the rings (multi-pass collimators). Collimators in the transport line are placed around stripping foils in H- accelerators, allowing the beamline optics to get rid of the unstripped protons into well localized absorbers. Rings and proton accelerators mostly rely on tungsten scrapers and collimators in a multi-stage configuration to clean the scattered beam particles mainly responsible for heavy losses at high energies. Placement of the collimators is carefully chosen in terms of the right phase advance to maximize the collimating efficiency, whether the collimation is intended to match an injection stripping foil or a downstream acceptance. Collimation systems are designed with the specific concerns of each facility in mind, although all of them prioritize the minimization of activation due to beam losses to enable hands-on access during maintenance periods. At LANSCE, there are no high-energy collimators, although pairs of horizontal and vertical jaws are routinely used in the LEBT to clean and control the transverse beam profile delivered downstream. This report will help in understanding, together with the beam dynamics simulations, which collimation schemes would be most effective for the PSR upgrade. For example, SNS designed off-momentum collimators to be placed in a 90° arc bend, a high-dispersion region in the beam injection line, very similar to the bend at Line D in LANSCE. This system was very effective at minimizing losses during injection into the SNS accumulator ring and is being re-designed for future operation.