Search NASA⌕ Search

SEARCH · Search NASA

Results for “Accelerator Design, Technology, Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Lansce Wire Scanning Diagnostics Device Mechanical Design

The Accelerator Operations & Technology Division at Los Alamos National Laboratory operates a linear particle accelerator which utilizes 110 wire scanning diagnostics devices to gain position and intensity information of the proton beam. In the upcoming LANSCE improvements, 51 of these wire scanners are to be replaced with a new design, up-to-date technology and off-the-shelf components. This document outlines the requirements for the mechanical design of the LANSCE wire scanner and presents the recently developed linac wire scanner prototype. Additionally, this document presents the design modifications that have been implemented into the fabrication and assembly of this first linac wire scanner prototype. Also, this document will present the design for the second, third, and fourth wire scanner prototypes being developed. Prototypes 2 and 3 belong to a different section of the particle accelerator and therefore have slightly different design specifications. Prototype 4 is a modification of a previously used wire scanner in our facility. Lastly, the paper concludes with a plan for future work on the wire scanner development.

Accelerator Design, Technology, and Operations↗

Advancement of LANSCE accelerator facility as a 1-MW Fusion Prototypic Neutron Source

The Fusion Prototypic Neutron Source (FPNS) is considered to be a testbed for scientific understanding of material degradation in future nuclear fusion reactors (Zinkle and Moeslang, 2013; Summary Report on the FPNS Workshop, 2018; Pitcher et al., 2019). The primary mission of FPNS is to provide a damage rate in iron samples of 8-11 dpa/calendar year with He/dpa ratio of 10 appm in irradiation volume of 50 cm 3 or larger with irradiation temperature 300–1000 °C and flux gradient less than 20%/cm in the plane of the sample. The Los Alamos Neutron Science Center (LANSCE) is an attractive candidate for the FPNS project. The Accelerator Facility was designed and operated for an extended period as a 0.8-MW Meson Factory. The existing setup of the LANSCE accelerator complex can nearly fulfill requirements of the fusion neutron source station. The primary function of the upgraded accelerator systems is the safe and reliable delivery of a 1.25-mA continuous proton beam current at 800-MeV beam energy from the switchyard to the target assembly to create 1 MW power of proton beam interacting with a solid tungsten target. The present study describes existing accelerator setup and further development required to meet the needs of FPNS project.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

LANSCE Diagnostic Robot Localization

Los Alamos Neutron Science Center (LANSCE) operates a linear particle accelerator (LINAC) that is used for a number of scientific research projects. Due to the presence of harmful radiation, researchers are not allowed in the beam tunnel during operation. Since the beam tunnel is inaccessible, an autonomous mobile robot is to be developed and deployed in the tunnel, monitoring the accelerator during operation. The robot will present real time data for operators and scientists from sensors such as a video camera, thermal camera, microphones, and muon detectors; allowing for beam diagnostics previously unavailable. Localization is a fundamental step in autonomous navigation of mobile robots, answering the “where am I” question. For this project, an Extended Kalman Filter (EKF) algorithm is implemented as a positional estimator. The EKF relies on an odometric motion model to predict the robot’s position and LIDAR measurement data to update the robot’s position. The measurement model is based on v features extracted from the LIDAR point cluster using the Split-and-Merge algorithm, and the nearest neighbor algorithm associates the features to an a priori feature map of the beam tunnel. The predicted and measured positions are then joined using a weighted value by means of the Kalman gain. The effectiveness of this localization technique is demonstrated using the LabVIEW robotics simulator.

42 ENGINEERING↗

High-Power Options for LANSCE

The LANSCE linear accelerator at Los Alamos National Laboratory has a long history of successful beam operations at 800 kW. We have recently studied options for restoration of high-power operations including approaches for increasing the performance to multi-MW levels. In this paper we will discuss the results of this study including the present limitations of the existing accelerating structures at LANSCE, and the high-voltage and RF systems that drive them. Several options will be discussed and a preferred option will be presented that will enable the first in a new generation of scientific facilities for the materials community. The emphasis of this new facility is 'Matter-Radiation Interactions in Extremes' (MaRIE) which will be used to discover and design the advanced materials needed to meet 21st century national security and energy security challenges.

Accelerator Design, Technology, and Operations↗

Application of the Eigen-Emittance Concept to Design Ultra-Bright Electron Beams

Using correlations at the cathode to tailor a beam's eigen-emittances is a recent concept made useful by the symplectic nature of Hamiltonian systems such as beams in accelerators. While introducing correlations does not change the overall 6-dimensional phase space volume, it can change the partitioning of this volume into the longitudinal and two transverse emittances, which become these eigen-emittances if all the initial correlations are unwound and removed. In principle, this technique can be used to generate beams with highly asymmetric emittances, such as those needed for the next generation of very hard X-ray free-electron lasers. This approach is based on linear correlations, and its applicability will be limited by the magnitude of nonlinear effects in photoinjectors which will lead to mixing in phase space that cannot be unwound downstream. Here, we review the eigen-emittance concept and present a linear eigen-emittance design leading to a highly partitioned, and transverse ultra-bright, electron beam. We also present numerical tools to examine the evolution of the eigen-emittances in realistic accelerator structures and results indicating how much partitioning is practical.

Accelerator Design, Technology, and Operations↗

MaRIE X-Ray Free-Electron Laser Pre-Conceptual Design

The proposed Matter-Radiation Interactions in Extremes (MaRIE) facility at the Los Alamos National Laboratory will include a 50-keV X-Ray Free-Electron Laser (XFEL), a significant extension from planned and existing XFEL facilities. To prevent an unacceptably large energy spread arsing from energy diffusion, the electron beam energy should not exceed 20 GeV, which puts a significant constraint on the beam emittance. A 100-pC baseline design is presented along with advanced technology options to increase the photon flux and to decrease the spectral bandwidth through pre-bunching the electron beam.

Accelerator Design, Technology, and Operations↗

RF Design and Operating Results for a New 201.25 MHz RF Power Amplifier for LANSCE

A prototype VHF RF Final Power Amplifier (FPA) for Los Alamos Neutron Science Center (LANSCE) has been designed, fabricated, and tested. The cavity amplifier has met the goals of generating 2.5 MW peak and 260 kW of average power, at an elevation of 2.1 km. It was designed to use a Thales TH628 Diacrode{sup R}, a state-of-art tetrode power tube that is double-ended, providing roughly twice the power of a conventional tetrode. The amplifier is designed with tunable input and output transmission line cavity circuits, a grid decoupling circuit, an adjustable output coupler, TE mode suppressors, blocking, bypassing and decoupling capacitors, and a cooling system. The tube is connected in a full wavelength output circuit, with the lower main tuner situated 3/4{lambda} from the central electron beam region in the tube and the upper slave tuner 1/4{lambda} from the same point. We summarize the design processes and features of the FPA along with significant test results. A pair of production amplifiers are planned to be power-combined and installed at the LANSCE DTL to return operation to full beam duty factor.

Accelerator Design, Technology, and Operations↗

H-mode Accelerating Structures with PMQ Focusing for Low-Beta Beams

We report on results of the project developing high-efficiency normal-conducting RF accelerating structures based on inter-digital H-mode (IH) cavities and the transverse beam focusing with permanent-magnet quadrupoles (PMQ), for beam velocities in the range of a few percent of the speed of light. The shunt impedance of IH-PMQ structures is 10-20 times higher than that of a conventional drift-tube linac, while the transverse size is 4-5 times smaller. The H-PMQ accelerating structures following a short RFQ can be used both in the front end of ion linacs or in stand-alone applications. Results of the combined 3-D modeling -- electromagnetic computations, beam-dynamics simulations with high currents, and thermal-stress analysis -- for a full IH-PMQ accelerator tank are presented. The accelerating field profile in the tank is tuned to provide the best propagation of a 50-mA deuteron beam using coupled iterations of EM and beamdynamics modeling. Multi-particle simulations withParmela and CST Particle Studio have been used to confirm the design. Measurement results of a cold model of the IH-PMQ tank are presented.

Accelerator Design, Technology, and Operations↗

LANSCE Drift Tube Linac Water Control System Refurbishment

There are several refurbishment projects underway at the Los Alamos National Laboratory LANSCE linear accelerator. Systems involved are: RF, water cooling, networks, diagnostics, timing, controls, etc. The Drift Tube Linac (DTL) portion of the accelerator consists of four DTL tanks, each with three independent water control systems. The systems are about 40 years old, use outdated and non-replaceable equipment and NIM bin control modules, are beyond their design life and provide unstable temperature control. Insufficient instrumentation and documentation further complicate efforts at maintaining system performance. Detailed design of the replacement cooling systems is currently in progress. Previous design experience on the SNS accelerator water cooling systems will be leveraged, see the SNS DTL FDR. Plans call for replacement of water piping, manifolds, pumps, valves, mix tanks, instrumentation (flow, pressure and temperature) and control system hardware and software. This presentation will focus on the control system design with specific attention on planned use of the National Instruments Compact RIO platform with the Experimental Physics and Industrial Control system (EPICS) software toolkit.

Accelerator Design, Technology, and Operations↗

Upgrading the Data Acquisition and Control System of the LANSCE LINAC

Los Alamos National Laboratory LANL is in the process of upgrading the control system for the Los Alamos Neutron Science Center (LANSCE) linear accelerator. The 38 year-old data acquisition and control equipment is being replaced with COTS hardware. An overview of the current system requirements and how the National Instruments cRIO system meets these requirements will be given, as well as an update on the installation and operation of a prototype system in the LANSCE LINAC.

Accelerator Design, Technology, and Operations↗

Collimation Systems for the PSR

This note provides a review of collimator systems being used or considered in high-intensity proton accelerators like SNS, J-PARC, LHC, and PIP-II. These facilities use collimators to remove beam halo, restrict transverse size and momentum in the beam to constrain beam losses around collimators and minimize beam losses downstream, particularly losses arising from particles missing the design location at the stripping foil when injected into the proton storage ring. Collimators are placed either in the transport injection lines (single-pass collimators) or in the rings (multi-pass collimators). Collimators in the transport line are placed around stripping foils in H- accelerators, allowing the beamline optics to get rid of the unstripped protons into well localized absorbers. Rings and proton accelerators mostly rely on tungsten scrapers and collimators in a multi-stage configuration to clean the scattered beam particles mainly responsible for heavy losses at high energies. Placement of the collimators is carefully chosen in terms of the right phase advance to maximize the collimating efficiency, whether the collimation is intended to match an injection stripping foil or a downstream acceptance. Collimation systems are designed with the specific concerns of each facility in mind, although all of them prioritize the minimization of activation due to beam losses to enable hands-on access during maintenance periods. At LANSCE, there are no high-energy collimators, although pairs of horizontal and vertical jaws are routinely used in the LEBT to clean and control the transverse beam profile delivered downstream. This report will help in understanding, together with the beam dynamics simulations, which collimation schemes would be most effective for the PSR upgrade. For example, SNS designed off-momentum collimators to be placed in a 90° arc bend, a high-dispersion region in the beam injection line, very similar to the bend at Line D in LANSCE. This system was very effective at minimizing losses during injection into the SNS accumulator ring and is being re-designed for future operation.

43 PARTICLE ACCELERATORS↗

LANL Activities Supporting Electron Accelerator Production of 99 Mo for NorthStar Medical Radioisotopes, LLC

Summary of LANL FY12 Activities are: (1) Preparation, performance, and data analysis for the FY12 accelerator tests at ANL - (a) LANL designed and installed a closed-loop helium target cooling system at ANL for the FY12 accelerator tests, (b) Thermal test was performed on March 27, (c) 24 h production test to follow the accelerator upgrade at ANL; (2) Local target shielding design and OTR/IR recommendations - (a) Target dose rate and activation products were calculated with MCNPX, (b) 206 Pb(γ,2n) 204m Pb vs 204g Pb branching ratio unpublished, will measure using the LANL microtron, (c) OTR system nearing final configuration, (d) IR prototype system demonstrated during the recent thermal test at ANL; (3) Target housing lifetime estimation - Target housing material specifications and design to be finalized following the thermal test, lifetime not believed to be an issue; and (4) Target cooling system reliability - Long duration system characterizations will begin following the thermal test.

42 ENGINEERING↗

Multi-purpose 805 MHz Pillbox RF Cavity for Muon Acceleration Studies

An 805 MHz RF pillbox cavity has been designed and constructed to investigate potential muon beam acceleration and cooling techniques. The cavity can operate at vacuum or under pressure to 100 atmospheres, at room temperature or in a liquid nitrogen bath at 77 K. The cavity is designed for easy assembly and disassembly with bolted construction using aluminum seals. The surfaces of the end walls of the cavity can be replaced with different materials such as copper, aluminum, beryllium, or molybdenum, and with different geometries such as shaped windows or grid structures. Different surface treatments such as electro polished, high-pressure water cleaned, and atomic layer deposition are being considered for testing. The cavity has been designed to fit inside the 5-Tesla solenoid in the MuCool Test Area at Fermilab. Current status of the cavity prepared for initial conditioning and operation in the external magnetic field is discussed.

ACCELERATION↗

Development of an accelerator-based neutron source to prototype Mo-99 production, part I: A liquid LBE windowless target

In this article, Molybdenum-99 (Mo-99)’s decay product, technetium-99 (Tc-99 m), is one of the most critical isotopes for medical diagnostics. To provide U.S. domestic supply of Mo-99 without using high-enriched uranium (HEU), a subcritical uranium target assembly (UTA) is irradiated by an accelerator-based neutron source to create Mo-99 through fission. This study discusses the development of the accelerator-based neutron source. The high-energy electrons from the accelerator irradiate a liquid lead-bismuth eutectic (LBE) target to produce neutrons. Part I of this work focuses on numerical and experimental analysis towards the development of a liquid LBE windowless target. Unlike the existing windowless targets in literature, the current design creates a vertical free surface for a beam to irradiate. First, a hydrodynamic analysis of the LBE windowless target is performed. Simplified analytical calculations are assisted by 2D computational fluid dynamics (CFD) simulations to design the target, with the focus on eliminating recirculation zones and avoiding cavitation. With the optimized geometry, the experimental study is performed to investigate the flow hydrodynamics using liquid LBE. The experiments (1) compare pressure drop in the system to correlation predictions; (2) visualize the free surface liquid LBE flow from the beam view; (3) validate the LBE flow profile using temperature sensitive paint from the side view; and (4) validate the liquid LBE film thickness using gamma densitometer measurements. Second, the power handling capability of the designed windowless target is investigated. The divider plate in the current design is susceptible to overheating due to the thin LBE film in front. As LBE erosion and corrosion is likely to occur at an LBE velocity of 2.0 m/s and temperature above 500 °C, a power limit of 10 kW of beam power was established to prevent this corrosion from occurring, which is calculated by a Nusselt number correlation. The divider plate surface temperature at 10 kW agrees well with the 3D CFD simulation results. Part I demonstrates the fundamental physics in liquid LBE windowless target design and associated testing. A companion paper, Part II will demonstrate how to couple this windowless target into the Mo-99 production system, including an accelerator system operating under an ultra-high vacuum and the UTA cooled by water at room temperature.

43 PARTICLE ACCELERATORS↗

New High Power Test Facility for VHF Power Amplifiers at LANSCE

A new test facility was designed and constructed at Los Alamos Neutron Science Center (LANSCE) for testing the Thales TH628 Diacrode{sup R} and TH781 tetrode power amplifiers. Anode power requirements for the TH628 are 28 kV DC, with peak currents of 190 Amperes in long pulses. A charging power supply was obtained by reconfiguring a 2 MW beam power supply remaining from another project. A traditional ignitron crowbar was designed to rapidly discharge the 88 kJ stored energy. The anode power supply was extensively tested using a pulsed tetrode switch and resistor load. A new Fast Protect and Monitor System (FPMS) was designed to take samples of RF reflected power, anode HV, and various tube currents, with outputs to quench the HV charging supply, remove RF drive and disable the conduction bias pulse to the grid of each tube during fault events. The entire test stand is controlled with a programmable logic controller (PLC), for normal startup sequencing and timing, protection against loss of cooling, and provision for operator GUI.

Accelerator Design, Technology, and Operations↗

Intense combined source of neutrons and photons for interrogation based on compact deuteron RF accelerator

Interrogation of special nuclear materials can benefit from mobile sources providing significant fluxes of neutrons (10 8 /s at 2.5 MeV, 10 10 /s at 14.1 MeV) and of photons (>10 12 /s at 1-3 MeV). We propose a source that satisfies these requirements simultaneously plus also provides, via the reaction 11 B(d,n) 12 C(γ 15.1 ), a significant flux of 15-MeV photons, which are highly penetrating and optimal for inducing photo-fission in actinides. The source is based on a compact (< 5 m) deuteron RF accelerator that delivers an average current of a few mA of deuterons at 3-4 MeV to a boron target. The accelerator consists of a short RFQ followed by efficient inter-digital H-mode structures with permanent-magnet-quadrupole beam focusing [Kurennoy et al. (2012)], which suit perfectly for deuteron acceleration at low energies. Our estimates, based on recent measurements, indicate that the required fluxes of both neutrons and photons can be achieved at ~1 mA of 4-MeV deuterons. The goal of the proposed study is to confirm feasibility of the approach and develop requirements for future full system implementation.

43 PARTICLE ACCELERATORS↗