Search NASA⌕ Search

SEARCH · Search NASA

Results for “Accelerators, Instrumentation,ACCPHY, INST”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Beam Diagnostics for FACET

FACET, the Facility for Advanced Accelerator and Experimental Tests, is a new facility being constructed in sector 20 of the SLAC linac primarily to study beam driven plasma wakefield acceleration beginning in summer 2011. The nominal FACET parameters are 23GeV, 3nC electron bunches compressed to about 20 {micro}m long and focussed to about 10 {micro}m wide. Characterization of the beam-plasma interaction requires complete knowledge of the incoming beam parameters on a pulse-to-pulse basis. FACET diagnostics include Beam Position Monitors, Toroidal current monitors, X-ray and Cerenkov based energy spectrometers, optical transition radiation (OTR) profile monitors and coherent transition radiation (CTR) bunch length measurement systems. The compliment of beam diagnostics and their expected performance are reviewed. Beam diagnostic measurements not only provide valuable insights to the running and tuning of the accelerator but also are crucial for the PWFA experiments in particular. Beam diagnostic devices are being set up at FACET and will be ready for beam commissioning in summer 2011.

43 PARTICLE ACCELERATORS↗

Operational Performance of LCLS Beam Instrumentation

The Linac Coherent Light Source (LCLS) X-ray FEL utilizing the last km of the SLAC linac has been operational since April 2009 and finished its first successful user run last December. The various diagnostics for electron beam properties including beam position monitors, wire scanners, beam profile monitors, and bunch length diagnostics are presented as well as diagnostics for the X-ray beam. The low emittance and ultra-short electron beam required for X-ray FEL operation has implications on the transverse and longitudinal diagnostics. The coherence effects of the beam profile monitors and the challenges of measuring fs long bunches are discussed.

43 PARTICLE ACCELERATORS↗

Electron Bunch Profile Diagnostics in the Few FS Regime Using Coherent Smith-Purcell Radiation

The rapid developments in the field of laser-driven particle acceleration hold the prospect of intense, highly relativistic electron bunches that are only a few fs long. The determination of the temporal profile of such bunches presents new challenges. The use of a radiative process such as Smith-Purcell radiation (SPR), is particularly promising in this respect. In this technique the beam is made to radiate a small amount of e/m radiation and the temporal profile is reconstructed from the measured spectral distribution of the radiation. We summarise the advantages of SPR and present the design parameters and preliminary results of the experiments at the FACET facility at SLAC. We also discuss a new approach to the problem of the recovery of the 'missing phase', which is essential for the accurate reconstruction of the temporal bunch profile.

43 PARTICLE ACCELERATORS↗

Beam-Beam Interaction at the PEP-II E+ E- Collider

The PEP-II B-Factory at SLAC (3.1 GeV e{sup +} x 9.0 GeV e{sup -}) operated from 1999 to 2008, delivering luminosity to the BaBar experiment. The design luminosity was reached after one and a half years of operation. PEP-II ultimately surpassed by four times its design luminosity reaching 1.21 x 10{sup 34} cm{sup -2} s{sup -1}. It also set world records for stored beam currents of 2.1 A e{sup -} and 3.2 A e{sup +}. Continuous injection was implemented with BaBar taking data. The total delivered luminosity to the BaBar detector was 557.4 fb{sup -1} spanning five upsilon resonances. PEP-II was constructed by SLAC, LBNL, and LLNL with help from BINP, IHEP, the BaBar collaboration, and the US DOE OHEP. In order to reach four times the design luminosity the PEP-II accelerator had to manage higher beam currents, lower {beta}{sub y}*s, more bunches, and increased beam-beam tune shifts. In this note the effects of these changes on the beam-beam interaction are discussed.

43 PARTICLE ACCELERATORS↗

Longitudinal Diagnostics for Short Electron Beam Bunches

Single-pass free electron lasers require high peak currents from ultra-short electron bunches to reach saturation and an accurate measurement of bunch length and longitudinal bunch profile is necessary to control the bunch compression process from low to high beam energy. The various state-of-the-art diagnostics methods from ps to fs time scales using coherent radiation detection, RF deflection, and other techniques are presented. The use of linear accelerators as drivers for free electron lasers (FEL) and the advent of single-pass (SASE) FELs has driven the development of a wide range of diagnostic techniques for measuring the length and longitudinal distribution of short and ultra-short electron bunches. For SASE FELs the radiation power and the length of the undulator needed to achieve saturation depend strongly on the charge density of the electron beam. In the case of X-ray FELs, this requires the accelerator to produce ultra-high brightness beams with micron size transverse normalized emittances and peak currents of several kA through several stages of magnetic bunch compression. Different longitudinal diagnostics are employed to measure the peak current and bunch profile along these stages. The measurement techniques can be distinguished into different classes. Coherent methods detect the light emitted from the beam by some coherent radiation process (spectroscopic measurement), or directly measure the Coulomb field traveling with the beam (electro-optic). Phase space manipulation techniques map the time coordinate onto a transverse dimension and then use conventional transverse beam diagnostics (transverse deflector, rf zero-phasing). Further methods measure the profile or duration of an incoherent light pulse emitted by the bunch at wavelengths much shorted than the bunch length (streak camera, fluctuation technique) or modulate the electron beam at an optical wavelength and then generate a narrow bandwidth radiation pulse with the longitudinal profile of the beam mapped onto (optical replicator). The operational needs for bunch length measurements to have fast acquisitions, to be used in feedback systems, to distinguish pulse to pulse changes and to be nondestructive or parasitically have resulted into developing many of the diagnostics into single-shot techniques and in the following the main discussion will emphasize them.

43 PARTICLE ACCELERATORS↗

Measurements of the Electron Cloud Density in the PEP-II Low Energy Ring

Clouds of low energy electrons in the vacuum beam pipes of accelerators of positively charged particle beams present a serious limitation for operation of these machines at high currents. Because of the size of these accelerators, it is difficult to probe the low energy electron clouds over substantial lengths of the beam pipe. We have developed a novel technique to directly measure the electron cloud density via the phase shift induced in a TE wave that is independently excited and transmitted over a section of the accelerator. We infer the absolute phase shift with relatively high accuracy from the phase modulation of the transmission due to the modulation of the electron cloud density from a gap in the positively charged beam. We have used this technique for the first time to measure the average electron cloud density over a 50 m straight section in the positron ring of the PEP-II collider at the Stanford Linear Accelerator Center. We have also measured the variation of the density by using low field solenoid magnets to control the electrons.

43 PARTICLE ACCELERATORS↗

First Results of the LHC Longitudinal Density Monitor

The Large Hadron Collider (LHC) at CERN is the world's largest particle accelerator. It is designed to accelerate and collide protons or heavy ions up to the center-of-mass energies of 14 TeV. Knowledge of the longitudinal distribution of particles is important for various aspects of accelerator operation, in particular to check the injection quality and to measure the proportion of charge outside the nominally filled bunches during the physics periods. In order to study this so-called ghost charge at levels very much smaller than the main bunches, a longitudinal profile measurement with a very high dynamic range is needed. A new detector, the LHC Longitudinal Density Monitor (LDM) is a single-photon counting system measuring synchrotron light by means of an avalanche photodiode detector. The unprecedented energies reached in the LHC allow synchrotron light diagnostics to be used with both protons and heavy ions. A prototype was installed during the 2010 LHC run and was able to longitudinally profile the whole ring with a resolution close to the target of 50 ps. On-line correction for the effects of the detector deadtime, pile-up and afterpulsing allow a dynamic range of 105 to be achieved. First measurements with the LDM are presented here along with an analysis of its performance and an outlook for future upgrades.

43 PARTICLE ACCELERATORS↗

A Proposed Fast Luminosity Feedback for the Super-B Accelerator

We present a possible design for a fast luminosity feedback for the SuperB Interaction Point (IP). The design is an extension of the fast luminosity feedback installed on the PEP-II accelerator. During the last two runs of PEP-II and BaBar (2007-2008), we had an improved luminosity feedback system that was able to maintain peak luminosity with faster correction speed than the previous system. The new system utilized fast dither coils on the High-Energy Beam (HEB) to independently dither the x position, the y position and the y angle at the IP, at roughly 100 Hz. The luminosity signal was then read out with three independent lock-in amplifiers. An overall correction was computed based on the lock-in signal strengths and beam corrections for position in x and y and in the y angle at the IP were simultaneously applied to the HEB. With the 100 times increase in luminosity for the SuperB design, we propose using a similar fast luminosity feedback that can operate at frequencies between DC and 1 kHz, high enough to follow any beam motion from the final focusing magnets.

43 PARTICLE ACCELERATORS↗

A Simple, Low Cost Longitudinal Phase Space Diagnostic

For proper operation of the LCLS [1] x-ray free-electron laser (FEL), and other similar machines, measurement and control of the electron bunch longitudinal phase space is critical. The LCLS accelerator includes two bunch compressor chicanes to magnify the peak current. These magnetic chicanes can generate significant coherent synchrotron radiation (CSR), which can distort the phase space distribution. We propose a diagnostic scheme by exciting a weak skew quadrupole at an energy-chirped, high dispersion point in the first LCLS bunch compressor (BC1) to reconstruct longitudinal phase space on an OTR screen after BC1, allowing a time-resolved characterization of CSR effects.

43 PARTICLE ACCELERATORS↗

First Beam to FACET

The SLAC 3km linear electron accelerator has been reconfigured to provide a beam of electrons to the new Facility for Advanced Accelerator Experimental Tests (FACET) while simultaneously providing an electron beam to the Linac Coherent Light Source (LCLS). On June 23, 2011, the first electron beam was transported through this new facility. Commissioning of FACET is in progress. On June 23, 2011, an electron beam was successfully transported through the new FACET system to a dump in Sector 20 in the linac tunnel. This was achieved while the last third of the linac, operating from the same control room, but with a separate injector system, was providing an electron beam to the Linac Coherent Light Source (LCLS), demonstrating that concurrent operation of the two facilities is practical. With the initial checkout of the new transport line essentially complete, attention is now turning toward compressing the electron bunches longitudinally and focusing them transversely to support a variety of accelerator science experiments.

43 PARTICLE ACCELERATORS↗

Polarimeters and Energy Spectrometers for the ILC Beam Delivery System

This article gives an overview of current plans and issues for polarimeters and energy spectrometers in the Beam Delivery System of the ILC. It is meant to serve as a useful reference for the Detector Letter of Intent documents currently being prepared. Concepts for high precision polarization and energy measurements exist. These concepts have resulted in detailed system layouts that are included in the RDR description for the Beam Delivery System. The RDR includes both upstream and downstream polarimeters and energy spectrometers for both beams. This provides needed complementarity and redundancy for achieving the precision required, with adequate control and demonstration of systematic errors. The BDS polarimeters and energy spectrometers need to be a joint effort of the ILC BDS team and the Detector collaborations, with collaboration members responsible for the performance and accuracy of the measurements. Details for this collaboration and assigning of responsibilities remain to be worked out. There is also a demonstrated need for Detector physicists to play an active role in the design and evaluation of accelerator components that impact beam polarization and beam energy capabilities, including the polarized source and spin rotator systems. A workshop was held in 2008 on ILC Polarization and Energy measurements, which resulted in a set of recommendations for the ILC design and operation. Additional input and action is needed on these from the Detector collaborations, the Research Director and the GDE. Work is continuing during the ILC engineering design phase to further optimize the polarimeter and energy spectrometer concepts and fully implement them in the ILC. This includes consideration for alternative methods, detailed design and cost estimates, and prototype and test beam activities.

43 PARTICLE ACCELERATORS↗

3 GeV Injector Design Handbook

This Design Handbook is intended to be the main reference book for the specifications of the 3 GeV SPEAR booster synchrotron project. It is intended to be a consistent description of the project including design criteria, key technical specifications as well as current design approaches. Since a project is not complete till it's complete changes and modifications of early conceptual designs must be expected during the duration of the construction. Therefore, this Design Handbook is issued as a loose leaf binder so that individual sections can be replaced as needed. Each page will be dated to ease identification with respect to latest revisions. At the end of the project this Design Handbook will have become the 'as built' reference book of the injector for operations and maintenance personnel.

43 PARTICLE ACCELERATORS↗

Feedback Techniques and Ecloud Instabilites - Design Estimates

The SPS at high intensities exhibits transverse single-bunch instabilities with signatures consistent with an Ecloud driven instability. While the SPS has a coupled-bunch transverse feedback system, control of Ecloud-driven motion requires a much wider control bandwidth capable of sensing and controlling motion within each bunched beam. This paper draws beam dynamics data from the measurements and simulations of this SPS instability, and estimates system requirements for a feedback system with 2-4 GS/sec. sampling rates to damp Ecloud-driven transverse motion in the SPS at intensities desired for high-current LHC operation.

43 PARTICLE ACCELERATORS↗

Fabrication and Characterization of Woodpile Structures for Direct Laser Acceleration

An eight and nine layer three dimensional photonic crystal with a defect designed specifically for accelerator applications has been fabricated. The structures were fabricated using a combination of nanofabrication techniques, including low pressure chemical vapor deposition, optical lithography, and chemical mechanical polishing. Limits imposed by the optical lithography set the minimum feature size to 400 nm, corresponding to a structure with a bandgap centered at 4.26 {micro}m. Reflection spectroscopy reveal a peak in reflectivity about the predicted region, and good agreement with simulation is shown. The eight and nine layer structures will be aligned and bonded together to form the complete seventeen layer woodpile accelerator structure.

36 MATERIALS SCIENCE↗

A large hadron electron collider at CERN

This document provides a brief overview of the recently published report on the design of the Large Hadron Electron Collider (LHeC), which comprises its physics programme, accelerator physics, technology and main detector concepts. The LHeC exploits and develops challenging, though principally existing, accelerator and detector technologies. This summary is complemented by brief illustrations of some of the highlights of the physics programme, which relies on a vastly extended kinematic range, luminosity and unprecedented precision in deep inelastic scattering. Illustrations are provided regarding high precision QCD, new physics (Higgs, SUSY) and eletron-ion physics. The LHeC is designed to run synchronously with the LHC in the twenties and to achieve an integrated luminosity of O(100)fb –1 . It will become the cleanest high resolution microscope of mankind and will substantially extend as well as complement the investigation of the physics of the TeV energy scale, which has been enabled by the LHC.

43 PARTICLE ACCELERATORS↗

Results from a Prototype Chicane-Based Energy Spectrometer for a Linear Collider

The International Linear Collider (ILC) and other proposed high energy e{sup +}e{sup -} machines aim to measure with unprecedented precision Standard Model quantities and new, not yet discovered phenomena. One of the main requirements for achieving this goal is a measurement of the incident beam energy with an uncertainty close to 10{sup -4}. This article presents the analysis of data from a prototype energy spectrometer commissioned in 2006-2007 in SLAC's End Station A beamline. The prototype was a 4-magnet chicane equipped with beam position monitors measuring small changes of the beam orbit through the chicane at different beam energies. A single bunch energy resolution close to 5 {center_dot} 10{sup -4} was measured, which is satisfactory for most scenarios. We also report on the operational experience with the chicane-based spectrometer and suggest ways of improving its performance.

43 PARTICLE ACCELERATORS↗