Bethel Wind Energy Construction Project. Final report

Final report for the Bethel (Alaska) Wind Construction project. Under this project, Alaska Village Electric Cooperative, Inc. (AVEC) constructed and commissioned one new 900 kW-capacity wind turbine at a site in Bethel about 3.3 miles NE of the diesel-fired prime power plant. The wind generator’s output will augment the prime source generation provided by the diesel-powered generators.

17 WIND ENERGY↗

Pitka's Point/St. Mary's Wind Energy Construction Project. Final report

This is the final report for the St. Mary’s/Pitka’s Point Wind Construction Project. Under the project Alaska Village Electric Cooperative, Inc. (AVEC) constructed and commissioned one new 900 kW-capacity wind turbine at a site in Pitka’s Point about 4 miles from the diesel-fired prime power plant in St. Mary’s. The main objective of this project is to generate electric power from a renewable resource in an effort to reduce the local dependency on fuel oil as the sole source of electric power generation. The wind generator’s output augments the prime source generation provided by the diesel-powered generators.

17 WIND ENERGY↗

Shaktoolik Battery System Construction Project

Alaska Village Electric Cooperative, Inc. (AVEC) and Shaktoolik IRA Tribal Council (Tribe) have created a Tribal Energy Development Organization (TEDO), known as AVEC/Shaktoolik Renewable Energy Joint Venture TEDO (ASRA), for building a community-scale energy storage “grid bridging system” (GBS) for the existing power plant and wind turbines on Tribal Lands in Shaktoolik, Alaska.