At least 19 records

Hydrothermal Liquefaction Treatment Hazard Analysis Report

Hazard analyses were performed to evaluate the modular hydrothermal liquefaction treatment system. The hazard assessment process was performed in 2 stages. An initial assessment utilizing Hazard Identification and Preliminary Hazards Analysis (PHA) techniques identified areas with significant or unique hazards (process safety-related hazards) that fall outside of the normal operating envelope of PNNL and warranted additional analysis. The subsequent assessment was based on a qualitative What-If analysis. The analysis was augmented, as necessary, by additional quantitative analysis for scenarios involving a release of hazardous material or energy with the potential for affecting the public. The following selected hazardous scenarios received increased attention: •Scenarios involving a release of hazardous material or energy, controls were identified in the What-If analysis table that prevent the occurrence or mitigate the effects of the release. •Scenarios with significant consequences that could impact personnel outside the immediate operations area, quantitative analyses were performed to determine the potential magnitude of the scenario. The set of “critical controls” were identified for these scenarios (see Section 4) which prevent the occurrence or mitigate the effects of the release of events with significant consequences.

09 BIOMASS FUELS↗

HAZARD ANALYSIS OF DIGITAL ENGINEERED SAFETY FEATURES ACTUATION SYSTEM IN ADVANCED NUCLEAR POWER PLANTS USING A REDUNDANCY-GUIDED APPROACH

Replacing the existing aging analog instrumentation and control (I&C) systems with modern safety control and protection digital technology offers one of the foremost means of performance improvements and cost reductions for the existing nuclear power plants (NPPs). However, the qualification of digital I&C systems remains a challenge, especially considering the issue of software common-cause failures (CCFs), which are difficult to address. With the application and upgrades of advanced digital I&C systems, software CCFs have become a potential threat to plant safety because most redundant designs use similar digital platforms or software in the operating and application systems. With complex designs of multilayer redundancy to meet the single-failure criterion, digital I&C safety systems (e.g., engineered safety-features actuation system [ESFAS]) are of a particular concern in the U.S. Nuclear Regulatory Commission (NRC) licensing procedures. This paper applies a modularized approach to conduct redundancy-guided systems-theoretic hazard analysis for an advanced digital ESFAS with multilevel redundancy designs. Systematic methods and risk-informed tools are incorporated to address both hardware and software CCFs, which provide guidance to eliminate the triggers of potential single points of failure in the design of digital safety systems in advanced plant designs.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

A Redundancy-Guided Approach for the Hazard Analysis of Digital Instrumentation and Control Systems in Advanced Nuclear Power Plants

We report digital instrumentation and control (I&C) upgrades are a vital research area for the nuclear industry. Despite their performance benefits, deployment of digital I&C in nuclear power plants (NPPs) has been limited. Digital I&C systems exhibit complex failure modes including common cause failures (CCFs), which can be difficult to identify. This paper describes the development of a redundancy-guided application of the Systems-Theoretic Process Analysis and fault tree analysis for the hazard analysis of digital I&C in advanced NPPs. The resulting Redundancy-Guided Systems-Theoretic Hazard Analysis (RESHA) is applied for the case study of a representative state-of-the-art digital reactor trip system. The analysis qualitatively and systematically identifies the most critical CCFs and other hazards of digital I&C systems. Ultimately, the RESHA can help researchers make informed decisions for how, and to what degree, defensive measures such as redundancy, diversity, and defense in depth can be used to mitigate or eliminate the potential hazards of digital I&C systems.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Assessing the need for an update of a probabilistic seismic hazard analysis using a SSHAC Level 1 study and the Seismic Hazard Periodic Reevaluation Methodology

A key decision for nuclear facilities is evaluating the need for an update of an existing seismic hazard analysis in light of new data and information that has become available since the time that the analysis was completed. We introduce the newly developed risk-informed Seismic Hazard Periodic Review Methodology (referred to as the SHPRM) and present how a Senior Seismic Hazard Analysis Committee (SSHAC) Level 1 probabilistic seismic hazard analysis (PSHA) was performed in an implementation of this new methodology. The SHPRM offers a defensible and documented approach that considers both the changes in seismic hazard and engineering-based risk information of an existing nuclear facility to assess the need for an update of an existing PSHA. The SHPRM has seven evaluation criteria that are employed at specific analysis, decision, and comparison points which are applied to seismic design categories established for nuclear facilities in United States. The SHPRM is implemented using a SSHAC Level 1 study performed for the Idaho National Laboratory, USA. The implementation focuses on the first six of the seven evaluation criteria of the SHPRM which are all provided from the SSHAC Level 1 PSHA. Finally, to illustrate outcomes of the SHPRM that do not lead to the need for an update and those that do, the example implementations of the SHPRM are performed for nuclear facilities that have target performance goals expressed as the mean annual frequency of unacceptable performance at 1x10 -4 , 4x10 -5 and 1x10 -5 .

58 GEOSCIENCES↗

Evaluating FRI3D for Cost Savings in Fire Hazard Analysis at DOE Sites

A fire hazard analysis, required for many U.S. Department of Energy (DOE) facilities, is a complex, cumbersome, and costly process. Fire hazard analyses may be viewed as a checkbox, but ideally and in spirit with the DOE-STD-1066, the fire hazard analysis (FHA) should be a part of the workflow and used to help in modifications, maintenance, and improving operational safety. With current FHA development processes, it is both time and cost prohibitive for true integration. A tool called Fire Risk Investigation in 3D or FRI3D was developed under the DOE Light Water Reactor Sustainability program to simplify and automate many aspects of a fire probabilistic risk analysis for existing nuclear power plants. The FRI3D tool automates fire scenarios by combining approved fire simulation codes, U.S. Nuclear Regulatory Commission fire calculations methods, 3D modeling and visualization, and probabilistic risk analysis models into a single workflow supported with a user interface. FRI3D was initially designed for used in combination with a PRA, this case study, evaluated using FRI3D for a plant modification, determined the benefits that detailed fire modeling can have for U.S. Department of Energy facilities with or without a PRA model. It also looked at what tasks from DOE requirements could be reduced using the tool and what is needed to integrate fire hazard analysis into site workflow.

97 - MATHEMATICS AND COMPUTING↗

Demonstration of Integrated Hazard Analysis for Digital Reactor Trip Systems

Digital instrumentation and control (I&C) upgrades are a vital research area for nuclear industry. Despite their performance benefits, deployment of digital I&C in nuclear power plants (NPPs) has been limited. Digital I&C systems exhibit complex failure modes including common cause failures (CCFs) which can be difficult to identify. This paper describes the development of a redundancy-guided application of the Systems-Theoretic Process Analysis (STPA) and Fault Tree Analysis (FTA) for the hazard analysis of digital I&C in advanced NPPs. The resulting Redundancy-guided System-theoretic Hazard Analysis (RESHA) is applied for the case study of a representative state-of-the-art digital reactor trip system. The analysis qualitatively and systematically identifies the most critical CCFs and other hazards of digital I&C systems. Ultimately, RESHA can help researchers make informed decisions for how, and to what degree, defensive measures such as redundancy, diversity, and defense-in-depth can be used to mitigate or eliminate the potential hazards of digital I&C systems.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Hanford Site-Wide Probabilistic Seismic Hazard Analysis

The site-wide probabilistic seismic hazard analysis (PSHA) of the Hanford Site (hereafter Hanford PSHA) in southeastern Washington State was undertaken by Pacific Northwest National Laboratory (PNNL) and its contractors for the U.S. Department of Energy (DOE) Office of River Protection (ORP), DOE Richland Operations Office (RL), and Energy Northwest to provide a detailed characterization of the vibratory ground motion hazard at the Hanford Site from potential future earthquakes. The study was conducted to fulfill the requirements for DOE facilities as well as those for commercial nuclear power plants, through a collaboration and joint sponsorship between DOE and Energy Northwest. The study fulfills the requirement to develop an update to the PSHA as required by DOE Order. In addition, the study fulfills the requirement from the U.S. Nuclear Regulatory Commission (NRC) that Energy Northwest conduct a PSHA using Senior Seismic Hazard Analysis Committee (SSHAC) Level 3 procedures for the Columbia Generating Station. Because the Hanford Site includes several facility sites, the PSHA has been conducted such that seismic hazard is calculated at five sites that are located across the Hanford Site.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

WE-G-BRA-07: Analyzing the Safety Implications of a Brachytherapy Process Improvement Project Utilizing a Novel System-Theory-Based Hazard-Analysis Technique

Purpose: To investigate the hazards in cervical-cancer HDR brachytherapy using a novel hazard-analysis technique, System Theoretic Process Analysis (STPA). The applicability and benefit of STPA to the field of radiation oncology is demonstrated. Methods: We analyzed the tandem and ring HDR procedure through observations, discussions with physicists and physicians, and the use of a previously developed process map. Controllers and their respective control actions were identified and arranged into a hierarchical control model of the system, modeling the workflow from applicator insertion through initiating treatment delivery. We then used the STPA process to identify potentially unsafe control actions. Scenarios were then generated from the identified unsafe control actions and used to develop recommendations for system safety constraints. Results: 10 controllers were identified and included in the final model. From these controllers 32 potentially unsafe control actions were identified, leading to more than 120 potential accident scenarios, including both clinical errors (e.g., using outdated imaging studies for planning), and managerial-based incidents (e.g., unsafe equipment, budget, or staffing decisions). Constraints identified from those scenarios include common themes, such as the need for appropriate feedback to give the controllers an adequate mental model to maintain safe boundaries of operations. As an example, one finding was that the likelihood of the potential accident scenario of the applicator breaking during insertion might be reduced by establishing a feedback loop of equipment-usage metrics and equipment-failure reports to the management controller. Conclusion: The utility of STPA in analyzing system hazards in a clinical brachytherapy system was demonstrated. This technique, rooted in system theory, identified scenarios both technical/clinical and managerial in nature. These results suggest that STPA can be successfully used to analyze safety in brachytherapy and may prove to be an alternative to other hazard analysis techniques.

60 APPLIED LIFE SCIENCES↗

Hydrotreater/Distillation Column Hazard Analysis Report Rev. 2

This project Hazard and Risk Analysis Report contains the results of several hazard analyses and risk assessments. An initial assessment was conducted in 2012, which included a multi-step approach ranging from design reviews to a formal What-If hazard analysis. A second What-If hazard analysis was completed during February 2013 to evaluate the operation of the hydrotreater/distillation column processes to be installed in a process enclosure within the Process Development Laboratory West (PDL-West) facility located on the PNNL campus. The qualitative analysis included participation of project and operations personnel and applicable subject matter experts. The analysis identified potential hazardous scenarios, each based on an initiating event coupled with a postulated upset condition. The unmitigated consequences of each hazardous scenario were generally characterized as a process upset; the exposure of personnel to steam, vapors or hazardous material; a spray or spill of hazardous material; the creation of a flammable atmosphere; or an energetic release from a pressure boundary.

54 ENVIRONMENTAL SCIENCES↗

Work Plan for the Site-wide SSHAC Level 3 Probabilistic Seismic Hazard Analysis at INL

This work plan provides the overall framework, key activities, key tasks, and schedule for the execution of a probabilistic seismic hazard analysis at Idaho National Laboratory (INL). The probabilistic seismic hazard analysis will follow processes and procedures appropriate for the Senior Seismic Hazard Analysis Committee (SSHAC) Level 3 study provided in U. S. Nuclear Regulatory Commission guidance, NUREG-2213. The SSHAC Level 3 probabilistic seismic hazard analysis (PSHA) is being conducted as an INL site-wide effort. The work plan was developed and revised by participants who will perform the SSHAC Level 3 PSHA. The work plan also includes the quality assurance requirements commensurate with American Society of Mechanical Engineers Nuclear Quality Assurance NQA 1 2008/2009 and 2011 Addendum for design nuclear facilities under the U.S. Department of Energy and U. S. Nuclear Regulatory Commission. The scope of the SSHAC Level 3 PSHA is designed to produce the mean-centered definition of the seismic hazard with the appropriate treatment of uncertainties supported by the associated technical justifications. The SSHAC Level 3 study will properly implement and completely document the activities of evaluation, integration, and documentation. The evaluation process will consider data, models, and methods proposed by the larger technical community that are relevant to the PSHA at INL. The integration process will build seismic-source and ground-motion characterization models that represent the center, body, and range of technically defensible interpretations, taking into consideration the outcomes of the evaluation process. Key tasks and activities—such as a project kickoff meeting, three workshops, four formal working meetings, and a briefing meeting with the Participatory Peer Review Panel—will occur for the seven-member technical integration teams to construct seismic-source and ground-motion-characterization models. Both preliminary and final hazard-input documents will be developed to perform sensitivity analyses and the final PSHA, respectively. The entire study will be thoroughly documented in draft and final reports. The Participatory Peer Review Panel will review the SSHAC Level 3 study from start to finish, including the draft and final INL Site-wide PSHA reports, so they can provide a closure letter documenting the study’s adherence to SSHAC processes and technical adequacy of the final products.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Adapting Traditional Hazards Analysis Methods to Address Cyber Risks

Traditional hazards analysis (HA) methods, originally developed to address physical and operational risks, often fall short when it comes to identifying and mitigating cyber threats. These cyber threats pose unique and evolving risks to critical infrastructure and industrial control systems (ICS). This report explores the integration of Cyber-Informed Engineering (CIE) principles into existing HA methods to enhance their ability to address cyber-induced risks. CIE provides organizations with a practical, cost-effective approach to closing the gap between traditional HA methods and the need for cyber risk mitigation. By leveraging existing safety processes and controls, CIE allows users to examine and mitigate cyber vulnerabilities without overhauling existing HA methods. This report identifies areas where HA and CIE naturally align and where their approaches diverge. It emphasizes how CIE principles can be used to adapt HA methods, broadening their scope to include cyber risks and enabling the mitigation of cyber- induced impacts alongside traditional hazards and failure scenarios. This report examines how CIE can be applied across various HA methods—such as Hazard and Operability Studies (HAZOP), Probabilistic Risk Assessment (PRA), Failure Modes and Effects Analysis (FMEA), Systems-Theoretic Process Analysis (STPA), Hazard and Consequence Analysis for Digital Systems (HAZCADS), and Layers of Protection Analysis (LOPA). It provides strategies for integrating CIE to strengthen the identification, assessment, and mitigation of cyber-induced risks. The findings offer a structured entry point for organizations to embed CIE concepts into hazards and safety analyses, as well as broader engineering processes, ultimately supporting the design and operation of a more resilient infrastructure.

42 ENGINEERING↗

Adapting Traditional Hazards Analysis Methods to Address Cyber Risks

Traditional hazards analysis (HA) methods, originally developed to address physical and operational risks, often fall short when it comes to identifying and mitigating cyber threats. These cyber threats pose unique and evolving risks to critical infrastructure and industrial control systems (ICS). This report explores the integration of Cyber-Informed Engineering (CIE) principles into existing HA methods to enhance their ability to address cyber-induced risks. CIE provides organizations with a practical, cost-effective approach to closing the gap between traditional HA methods and the need for cyber risk mitigation. By leveraging existing safety processes and controls, CIE allows users to examine and mitigate cyber vulnerabilities without overhauling existing HA methods. This report identifies areas where HA and CIE naturally align and where their approaches diverge. It emphasizes how CIE principles can be used to adapt HA methods, broadening their scope to include cyber risks and enabling the mitigation of cyber- induced impacts alongside traditional hazards and failure scenarios. This report examines how CIE can be applied across various HA methods—such as Hazard and Operability Studies (HAZOP), Probabilistic Risk Assessment (PRA), Failure Modes and Effects Analysis (FMEA), Systems-Theoretic Process Analysis (STPA), Hazard and Consequence Analysis for Digital Systems (HAZCADS), and Layers of Protection Analysis (LOPA). It provides strategies for integrating CIE to strengthen the identification, assessment, and mitigation of cyber-induced risks. The findings offer a structured entry point for organizations to embed CIE concepts into hazards and safety analyses, as well as broader engineering processes, ultimately supporting the design and operation of a more resilient infrastructure.

42 - ENGINEERING↗

Extending and Automating a Systems-Theoretic Hazard Analysis for Requirements Generation and Analysis

Systems Theoretic Process Analysis (STPA) is a powerful new hazard analysis method designed to go beyond traditional safety techniques - such as Fault Tree Analysis (FTA) - that overlook important causes of accidents like flawed requirements, dysfunctional component interactions, and software errors. While proving to be very effective on real systems, no formal structure has been defined for STPA and its application has been ad-hoc with no rigorous procedures or model-based design tools. This report defines a formal mathematical structure underlying STPA and describes a procedure for systematically performing an STPA analysis based on that structure. A method for using the results of the hazard analysis to generate formal safety-critical, model-based system and software requirements is also presented. Techniques to automate both the analysis and the requirements generation are introduced, as well as a method to detect conflicts between the safety and other functional model-based requirements during early development of the system.

99 GENERAL AND MISCELLANEOUS↗

Advanced Human-System Interface Risk Analysis Based on Redundancy-guided Systems-theoretic Hazard Analysis and Human Reliability Analysis

Human-system interfaces (HSIs) play an important role in enabling operators to communicate with the nuclear power plant (NPP) side. Getting the information required to understand a NPP’s current status or perform necessary actions for responding to a given operational context are representative operator tasks performed using HSIs. To date, HSIs have been mainly evaluated in the context of human reliability analysis (HRA). However, the current HSI evaluation that occurs during HRA may be challengeable on two fronts: (1) reflecting the unique characteristics of HSI systems and (2) considering situations in which HSIs are poorly operated due to software/hardware malfunctions. Accordingly, this study proposes an approach for specifically evaluating HSIs for digital instrumentation and controls (DI&C) systems, using Redundancy-guided Systems-theoretic Hazard Analysis (RESHA) and HRA. RESHA is a method for analyzing DI&C systems with redundancy features. In this study, we investigate how HSIs are evaluated in existing HRA methods, and what challenges exist in the current approaches. To better evaluate HSIs for DI&C systems, this study modifies the existing HSI evaluation process by additionally modeling the HSI back- and front- ends. In this paper, a HSI fault tree for the APR1400 DI&C system is introduced through a piping and instrumentation diagram. It then touches upon what aspects of the suggested method must be further researched.

99 GENERAL AND MISCELLANEOUS↗

SSHAC Level 1 Probabilistic Seismic Hazard Analysis for the Idaho National Laboratory

A Probabilistic Seismic Hazard Analysis (PSHA) was completed for the Materials and Fuels Complex (MFC), Naval Reactors Facility (NRF), and the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) (Figure 1-1). The PSHA followed the approaches and procedures appropriate for a Study Level 1 provided in the guidance advanced by the Senior Seismic Hazard Analysis Committee (SSHAC) in U.S. Nuclear Regulatory Commission (NRC) NUREG/CR-6372 and NUREG-2117 (NRC, 1997; 2012a). The SSHAC Level 1 PSHAs for MFC and ATR were conducted as part of the Seismic Risk Assessment (SRA) project (INL Project number 31287) to develop and apply a new-risk informed methodology, respectively. The SSHAC Level 1 PSHA was conducted for NRF to provide guidance on the potential use of a design margin above rock hazard levels. The SRA project is developing a new risk-informed methodology that will provide a systematic approach for evaluating the need for an update of an existing PSHA. The new methodology proposes criteria to be employed at specific analysis, decision, or comparison points in its evaluation process. The first four of seven criteria address changes in inputs and results of the PSHA and are given in U.S. Department of Energy (DOE) Standard, DOE-STD-1020-2012 (DOE, 2012a) and American National Standards Institute/American Nuclear Society (ANSI/ANS) 2.29 (ANS, 2008a). The last three criteria address evaluation of quantitative hazard and risk-focused information of an existing nuclear facility. The seven criteria and decision points are applied to Seismic Design Category (SDC) 3, 4, and 5, which are defined in American Society of Civil Engineers/Structural Engineers Institute (ASCE/SEI) 43-05 (ASCE, 2005). The application of the criteria and decision points could lead to an update or could determine that such update is not necessary.

58 GEOSCIENCES↗

SSHAC Level 1 Probabilistic Seismic Hazard Analysis for the Idaho National Laboratory

A Probabilistic Seismic Hazard Analysis (PSHA) was completed for the Materials and Fuels Complex (MFC), Advanced Test Reactor (ATR), and Naval Reactors Facility (NRF) at the Idaho National Laboratory (INL). The PSHA followed the approaches and procedures for Senior Seismic Hazard Analysis Committee (SSHAC) Level 1 study and included a Participatory Peer Review Panel (PPRP) to provide the confident technical basis and mean-centered estimates of the ground motions. A new risk-informed methodology for evaluating the need for an update of an existing PSHA was developed as part of the Seismic Risk Assessment (SRA) project. To develop and implement the new methodology, the SRA project elected to perform two SSHAC Level 1 PSHAs. The first was for the Fuel Manufacturing Facility (FMF), which is classified as a Seismic Design Category (SDC) 3 nuclear facility. The second was for the ATR Complex, which has facilities classified as SDC-4. The new methodology requires defensible estimates of ground motion levels (mean and full distribution of uncertainty) for its criteria and evaluation process. The INL SSHAC Level 1 PSHA demonstrates the use of the PPRP, evaluation and integration through utilization of a small team with multiple roles and responsibilities (four team members and one specialty contractor), and the feasibility of a short duration schedule (10 months). Additionally, a SSHAC Level 1 PSHA was conducted for NRF to provide guidance on the potential use of a design margin above rock hazard levels for the Spent Fuel Handling Recapitalization Project (SFHP) process facility.