Ares Knowledge Capture: Summary and Key Themes Presentation

This report has been developed by the National Aeronautics and Space Administration (NASA) Human Exploration and Operations Mission Directorate (HEOMD) Risk Management team in close coordination with the MSFC Chief Engineers Office. This document provides a point-in-time, cumulative, summary of actionable key lessons learned derived from the design project. Lessons learned invariably address challenges and risks and the way in which these areas have been addressed. Accordingly the risk management thread is woven throughout the document.

Ares Knowledge↗

Ares I-X Flight Test Vehicle Similitude to the Ares I Crew Launch Vehicle

The Ares I-X Flight Test Vehicle is the first in a series of flight test vehicles that will take the Ares I Crew Launch Vehicle design from development to operational capability. The test flight is scheduled for April 2009, relatively early in the Ares I design process so that data obtained from the flight can impact the design of Ares I before its Critical Design Review. Because of the short time frame (relative to new launch vehicle development) before the Ares I-X flight, decisions about the flight test vehicle design had to be made in order to complete analysis and testing in time to manufacture the Ares I-X vehicle hardware elements. This paper describes the similarities and differences between the Ares I-X Flight Test Vehicle and the Ares I Crew Launch Vehicle. Areas of comparison include the outer mold line geometry, aerosciences, trajectory, structural modes, flight control architecture, separation sequence, and relevant element differences. Most of the outer mold line differences present between Ares I and Ares I-X are minor and will not have a significant effect on overall vehicle performance. The most significant impacts are related to the geometric differences in Orion Crew Exploration Vehicle at the forward end of the stack. These physical differences will cause differences in the flow physics in these areas. Even with these differences, the Ares I-X flight test is poised to meet all five primary objectives and six secondary objectives. Knowledge of what the Ares I-X flight test will provide in similitude to Ares I as well as what the test will not provide is important in the continued execution of the Ares I-X mission leading to its flight and the continued design and development of Ares I.

Huebner, Lawrence D.↗

Ares I-X Flight Test Vehicle Similitude to the Ares I Crew Launch Vehicle

The Ares I-X Flight Test Vehicle is the first in a series of flight test vehicles that will take the Ares I Crew Launch Vehicle design from development to operational capability. Ares I-X is scheduled for a 2009 flight date, early enough in the Ares I design and development process so that data obtained from the flight can impact the design of Ares I before its Critical Design Review. Decisions on Ares I-X scope, flight test objectives, and FTV fidelity were made prior to the Ares I systems requirements being baselined. This was necessary in order to achieve a development flight test to impact the Ares I design. Differences between the Ares I-X and the Ares I configurations are artifacts of formulating this experimental project at an early stage and the natural maturation of the Ares I design process. This paper describes the similarities and differences between the Ares I-X Flight Test Vehicle and the Ares I Crew Launch Vehicle. Areas of comparison include the outer mold line geometry, aerosciences, trajectory, structural modes, flight control architecture, separation sequence, and relevant element differences. Most of the outer mold line differences present between Ares I and Ares I-X are minor and will not have a significant effect on overall vehicle performance. The most significant impacts are related to the geometric differences in Orion Crew Exploration Vehicle at the forward end of the stack. These physical differences will cause differences in the flow physics in these areas. Even with these differences, the Ares I-X flight test is poised to meet all five primary objectives and six secondary objectives. Knowledge of what the Ares I-X flight test will provide in similitude to Ares I - as well as what the test will not provide - is important in the continued execution of the Ares I-X mission leading to its flight and the continued design and development of Ares I.

Huebner, Lawrence D.↗

ARES Biennial Report 2012 Final

Since the return of the first lunar samples, what is now the Astromaterials Research and Exploration Science (ARES) Directorate has had curatorial responsibility for all NASA-held extraterrestrial materials. Originating during the Apollo Program (1960s), this capability at Johnson Space Center (JSC) included scientists who were responsible for the science planning and training of astronauts for lunar surface activities as well as experts in the analysis and preservation of the precious returned samples. Today, ARES conducts research in basic and applied space and planetary science, and its scientific staff represents a broad diversity of expertise in the physical sciences (physics, chemistry, geology, astronomy), mathematics, and engineering organized into three offices (figure 1): Astromaterials Research (KR), Astromaterials Acquisition and Curation (KT), and Human Exploration Science (KX). Scientists within the Astromaterials Acquisition and Curation Office preserve, protect, document, and distribute samples of the current astromaterials collections. Since the return of the first lunar samples, ARES has been assigned curatorial responsibility for all NASA-held extraterrestrial materials (Apollo lunar samples, Antarctic meteorites - some of which have been confirmed to have originated on the Moon and on Mars - cosmic dust, solar wind samples, comet and interstellar dust particles, and space-exposed hardware). The responsibilities of curation consist not only of the longterm care of the samples, but also the support and planning for future sample collection missions and research and technology to enable new sample types. Curation provides the foundation for research into the samples. The Lunar Sample Facility and other curation clean rooms, the data center, laboratories, and associated instrumentation are unique NASA resources that, together with our staff's fundamental understanding of the entire collection, provide a service to the external research community, which relies on access to the samples. The curation efforts are greatly enhanced by a strong group of planetary scientists who conduct peerreviewed astromaterials research. Astromaterials Research Office scientists conduct peer-reviewed research as Principal or Co-Investigators in planetary science (e. g., cosmochemistry, origins of solar systems, Mars fundamental research, planetary geology and geophysics) and participate as Co-Investigators or Participating Scientists in many of NASA's robotic planetary missions. Since the last report, ARES has achieved several noteworthy milestones, some of which are documented in detail in the sections that follow. Within the Human Exploration Science Office, ARES is a world leader in orbital debris research, modeling and monitoring the debris environment, designing debris shielding, and developing policy to control and mitigate the orbital debris population. ARES has aggressively pursued refinements in knowledge of the debris environment and the hazard it presents to spacecraft. Additionally, the ARES Image Science and Analysis Group has been recognized as world class as a result of the high quality of near-real-time analysis of ascent and on-orbit inspection imagery to identify debris shedding, anomalies, and associated potential damage during Space Shuttle missions. ARES Earth scientists manage and continuously update the database of astronaut photography that is predominantly from Shuttle and ISS missions, but also includes the results of 40 years of human spaceflight. The Crew Earth Observations Web site (http://eol.jsc.nasa.gov/Education/ESS/crew.htm) continues to receive several million hits per month. ARES scientists are also influencing decisions in the development of the next generation of human and robotic spacecraft and missions through laboratory tests on the optical qualities of materials for windows, micrometeoroid/orbital debris shielding technology, and analog activities to assess surface science operations. ARES serves as host to numerous students and visiting scientists as part of the services provided to the research community and conducts a robust education and outreach program. ARES scientists are recognized nationally and internationally by virtue of their success in publishing in peer-reviewed journals and winning competitive research proposals. ARES scientists have won every major award presented by the Meteoritical Society, including the Leonard Medal, the most prestigious award in planetary science and cosmochemistry; the Barringer Medal, recognizing outstanding work in the field of impact cratering; the Nier Prize for outstanding research by a young scientist; and several recipients of the Nininger Meteorite Award. One of our scientists received the Department of Defense (DoD) Joint Meritorious Civilian Service Award (the highest civilian honor given by the DoD). ARES has established numerous partnerships with other NASA Centers, universities, and national laboratories. ARES scientists serve as journal editors, members of advisory panels and review committees, and society officers, and several scientists have been elected as Fellows in their professional societies. This biennial report summarizes a subset of the accomplishments made by each of the ARES offices and highlights participation in ongoing human and robotic missions, development of new missions, and planning for future human and robotic exploration of the solar system beyond low Earth orbit.

Stansbery, Eileen↗

The J-2X Upper Stage Engine: From Heritage to Hardware

NASA's Global Exploration Strategy requires safe, reliable, robust, efficient transportation to support sustainable operations from Earth to orbit and into the far reaches of the solar system. NASA selected the Ares I crew launch vehicle and the Ares V cargo launch vehicle to provide that transportation. Guiding principles in creating the architecture represented by the Ares vehicles were the maximum use of heritage hardware and legacy knowledge, particularly Space Shuttle assets, and commonality between the Ares vehicles where possible to streamline the hardware development approach and reduce programmatic, technical, and budget risks. The J-2X exemplifies those goals. It was selected by the Exploration Systems Architecture Study (ESAS) as the upper stage propulsion for the Ares I Upper Stage and the Ares V Earth Departure Stage (EDS). The J-2X is an evolved version ofthe historic J-2 engine that successfully powered the second stage of the Saturn I launch vehicle and the second and third stages of the Saturn V launch vehicle. The Constellation architecture, however, requires performance greater than its predecessor. The new architecture calls for larger payloads delivered to the Moon and demands greater loss of mission reliability and numerous other requirements associated with human rating that were not applied to the original J-2. As a result, the J-2X must operate at much higher temperatures, pressures, and flow rates than the heritage J-2, making it one of the highest performing gas generator cycle engines ever built, approaching the efficiency of more complex stage combustion engines. Development is focused on early risk mitigation, component and subassembly test, and engine system test. The development plans include testing engine components, including the subscale injector, main igniter, powerpack assembly (turbopumps, gas generator and associated ducting and structural mounts), full-scale gas generator, valves, and control software with hardware-in-the-loop. Testing expanded in 2007, accompanied by the refinement of the design through several key milestones. This paper discusses those 2007 tests and milestones, as well as updates key developments in 2008.

Byrd, THomas↗

The Next Giant Leap: NASA's Ares Launch Vehicles Overview

The next chapter in NASA's history also promises to write the next chapter in America's history, as the Agency makes measurable strides toward developing new space transportation capabilities that wi!! put astronauts on course to explore the Moon as the next giant leap toward the first human footprint on Mars. This paper will present top-level plans and progress being made toward fielding the Ares I crew launch vehicle in the 2013 timeframe and the Ares V cargo launch vehicle in the 2018 timeframe. It also gives insight into the objectives for the first test flight, known as the Ares I-X, which is scheduled for April 2009. The U.S. strategy to scientifically explore space will fuel innovations such as solar power and water recycling, as well as yield new knowledge that directly benefits life on Earth. For the Ares launch vehicles, NASA is building on heritage hardware and unique capabilities; as well as almost 50 years of lessons learned from the Apollo Saturn, Space Shuttle, and commercial launch vehicle programs. In the Ares I Project's inaugural year, extensive trade studies and evaluations were conducted to improve upon the designs initially recommended by the Exploration Systems Architecture Study, resulting in significant reduction of near-term and long-range technical and programmatic risks; conceptual designs were analyzed for fitness against requirements; and the contractual framework was assembled to enable a development effort unparalleled in American space flight since the Space Shuttle. The Exploration Launch Projects team completed the Ares I System Requirements Review (SRR) at the end of 2006--the first such engineering milestone for a human-rated space transportation system in over 30 years.

Cook, Stephen A.↗

On the Shoulders of Giants - Apollo's Contribution to Ares

It has been over 35 years since NASA developed new human spaceflight capabilities. As NASA builds vehicles to once again venture beyond Earth's orbit, it has the advantage of a powerful legacy of seasoned professionals who have already been there. Apollo-era veterans are lending their knowledge and expertise to nearly every aspect of the new Ares I crew launch vehicle and the Ares V cargo launch vehicle, from management to design and manufacturing techniques. Through group discussions, personal interviews, and consultant relationships, these talented individuals are sharing their "lessons lived" to help a new generation of engineers repeat the successes and avoid some of the pitfalls of America's first journeys to the Moon. In addition to learning from resident and retired experts, Ares will draw on legacy facilities, tooling, and hardware like the J-2 engine from the Apollo era and the Reusable Solid Rocket Boosters from the Space Shuttle Program. NASA needs to re-learn the skills required to send astronauts to the Moon, Mars, and beyond. The new Ares team is training with the best and building on the work of their eminent predecessors. They are standing on the shoulders of giants to see a future that is bright with possibilities on the space frontier.

Cook, Stephen A.↗

The Aerial Regional-Scale Environmental Surveyor (ARES): New Mars Science to Reduce Human Risk and Prepare for the Human Exploration

Obtaining critical measurements for eventual human Mars missions while expanding upon recent Mars scientific discoveries and deriving new scientific knowledge from a unique near surface vantage point is the focus of the Aerial Regional-scale Environmental Surveyor (ARES) exploration mission. The key element of ARES is an instrumented,rocket-powered, well-tested robotic airplane platform, that will fly between one to two kilometers above the surface while traversing hundreds of kilometers to collect and transmit previously unobtainable high spatial measurements relevant to the NASA Mars Exploration Program and the exploration of Mars by humans.

Levine, Joel S.↗

A New Heavy-Lift Capability for Space Exploration: NASA's Ares V Cargo Launch Vehicle

The National Aeronautics and Space Administration (NASA) is developing new launch systems and preparing to retire the Space Shuttle by 2010, as directed in the United States (U.S.) Vision for Space Exploration. The Ares I Crew Launch Vehicle (CLV) and the Ares V heavy-lift Cargo Launch Vehicle (CaLV) systems will build upon proven, reliable hardware derived from the Apollo-Saturn and Space Shuttle programs to deliver safe, reliable, affordable space transportation solutions. This approach leverages existing aerospace talent and a unique infrastructure, as well as legacy knowledge gained from nearly 50 years' experience developing space hardware. Early next decade, the Ares I will launch the new Orion Crew Exploration Vehicle (CEV) to the International Space Station (ISS) or to low-Earth orbit for trips to the Moon and, ultimately, Mars. Late next decade, the Ares V's Earth Departure Stage will carry larger payloads such as the lunar lander into orbit, and the Crew Exploration Vehicle will dock with it for missions to the Moon, where astronauts will explore new territories and conduct science and technology experiments. Both Ares I and Ares V are being designed to support longer future trips to Mars. The Exploration Launch Projects Office is designing, developing, testing, and evaluating both launch vehicle systems in partnership with other NASA Centers, Government agencies, and industry contractors. This paper provides top-level information regarding the genesis and evolution of the baseline configuration for the Ares V heavy-lift system. It also discusses riskbased, management strategies, such as building on powerful hardware and promoting common features between the Ares I and Ares V systems to reduce technical, schedule, and cost risks, as well as development and operations costs. Finally, it summarizes several notable accomplishments since October 2005, when the Exploration Launch Projects effort officially kicked off, and looks ahead at work planned for 2007 and beyond.

Sumrall, John P.↗

Lessons Learned in Building the Ares Projects

Since being established in 2005, the Ares Projects at Marshall Space Flight Center have been making steady progress designing, building, testing, and flying the next generation of exploration launch vehicles. Ares is committed to rebuilding crucial capabilities from the Apollo era that made the first human flights to the Moon possible, as well as incorporating the latest in computer technology and changes in management philosophy. One example of an Apollo-era practice has been giving NASA overall authority over vehicle integration activities, giving civil service engineers hands-on experience in developing rocket hardware. This knowledge and experience help make the agency a "smart buyer" of products and services. More modern practices have been added to the management tool belt to improve efficiency, cost effectiveness, and institutional knowledge, including knowledge management/capture to gain better insight into design and decision making; earned value management, where Ares won a NASA award for its practice and implementation; designing for operability; and Lean Six Sigma applications to identify and eliminate wasted time and effort. While it is important to learn technical lessons like how to fly and control unique rockets like the Ares I-X flight test vehicle, the Ares management team also has been learning important lessons about how to manage large, long-term projects.

Sumrall, John Phil↗

J-2X: Progress on the Ares Upper Stage Engine

NASA's Vision for Exploration requires a safe, reliable, affordable upper stage engine to power the Ares I Crew Launch Vehicle (CLV) and the Ares V Cargo Launch Vehicle (CaLV). The J-2X engine epitomizes NASA's philosophy of employing legacy knowledge, heritage hardware, and commonality to carry the next generation of explorers into low-Earth orbit and out into the solar system. As envisioned by the Exploration Systems Architecture Study (ESAS), the reference lunar mission would begin by launching the Ares V into orbit with the Earth Departure Stage (EDS) transporting the Lunar Surface Access Module (LSAM), followed by the Ares I, carrying the Orion Crew Exploration Vehicle, which would rendezvous with the EDS/LSAM before beginning its journey to the Moon.

Byrd, Thomas D.↗

Simulation of Ground Winds Time Series

A simulation process has been developed for generation of the longitudinal and lateral components of ground wind atmospheric turbulence as a function of mean wind speed, elevation, temporal frequency range and distance between locations. The distance between locations influences the spectral coherence between the simulated series at adjacent locations. Short distances reduce correlation only at high frequencies; as distances increase correlation is reduced over a wider range of frequencies. The choice of values for the constants d1 and d3 in the PSD model is the subject of work in progress. An improved knowledge of the values for zO as a function of wind direction at the ARES-1 launch pads is necessary for definition of d1. Results of other studies at other locations may be helpful as summarized in Fichtl's recent correspondence. Ideally, further research is needed based on measurements of ground wind turbulence with high resolution anemometers at a number of altitudes at a new KSC tower located closer to the ARES-1 launch pad .The proposed research would be based on turbulence measurements that may be influenced by surface terrain roughness that may be significantly different from roughness prior to 1970 in Fichtl's measurements. Significant improvements in instrumentation, data storage end processing will greatly enhance the capability to model ground wind profiles and ground wind turbulence.

Adelfang, S. I.↗

Quantitative Characterization of Lunar Regolith Simulants for Direct Comparison to Apollo Soil Samples

Introduction: Sustained characterization efforts of lunar regolith simulant properties are not only integral for verification of commercially-produced material designed for a wide array of testing applications but are also necessary in establishing a comprehensive comparison to a lunar reference source. As a resource for the lunar science and engineering communities, the Simulant Development Lab (SDL) within the Astromaterials Research & Exploration Science (ARES) division at the Johnson Space Center (JSC) is actively pursuing closure of existing knowledge gaps in fundamental simulant attributes, including chemistry, mineralogy, particle size distribution, particle geometry, bulk and relative density, magnetic susceptibility, and shear strength (i.e., cohesion and angle of internal friction), as well as producing Figures of Merit for comparison of lunar simulants to Apollo regolith samples.

R. Kovtun↗

A New Heavy-Lift Capability for Space Exploration: NASA's Ares V Cargo Launch Vehicle

The National Aeronautics and Space Administration (NASA) is developing new launch systems in preparation for the retirement of the Space Shuttle by 2010, as directed in the United States (U.S.) Vision for Space Exploration. The Ares I Crew Launch Vehicle (CLV) and the Ares V heavy-lift Cargo Launch Vehicle (CaLV) systems will build upon proven, reliable hardware derived from the Apollo Saturn (1961 to 1975) and Space Shuttle (1972 to 2010) programs to deliver safe, reliable, affordable space transportation solutions. This approach leverages existing aerospace talent and a unique infrastructure, as well as the vast amount of legacy knowledge gained from almost a half-century of hard-won experience in the space enterprise. Beginning early next decade, the Ares I will launch the new Crew Exploration Vehicle (CEV) to the International Space Station (ISS) or to low-Earth orbit for trips to the Moon and, ultimately, Mars. Late next decade, the Ares V's Earth Departure Stage will carry larger payloads such as the lunar lander into orbit, and the Crew Exploration Vehicle will dock with it for missions to the Moon, where astronauts will explore new territories and conduct science and technology experiments. Both the Ares I and Ares V systems are being designed to support longer future trips to Mars. The Exploration Launch Projects Office, located at NASA's Marshall Space Flight Center, is designing, developing, testing, and evaluating both launch vehicle systems in partnership with other NASA Centers, Government agencies, and industry contractors. This paper provides top-level information regarding the genesis and evolution of the baseline configuration for the Ares V heavy-lift system. It also touches on risk-based management strategies, such as building on powerful hardware and promoting common features between the Ares I and Ares V systems to reduce technical, schedule, and cost risks, as well as development and operations costs. Finally, it gives a summary of several notable accomplishments over the past year, since the Exploration Launch Projects effort officially kicked off in October 2005, and looks ahead at work planned for 2007 and beyond.

Sumrall, John P.↗

From ESAS to Ares: A Chronology

Throughout my career, I have observed many launch vehicle efforts come and go. Although it may appear on the surface that those were dead-end streets, the knowledge we gained through them actually informs the work in progress. Following the tragic loss of the Space Shuttle Columbia's crew, the administration took the Columbia Accident Investigation Board's findings to heart and united the Agency behind the Vision for Space Exploration, with clear goals and objectives, including fielding a new generation of safe, reliable, and affordable space transportation. The genesis of the Ares I Crew Launch Vehicle and Ares V Cargo Launch Vehicle activities now under way by a nationwide Government and industry team was the confirmation of the current NASA Administrator in April 2005. Shortly thereafter, he commissioned a team of aerospace experts to conduct the Exploration Systems Architecture Study (ESAS), which gave shape to launch vehicles that will empower America's resurgence in scientific discovery through human and robotic space exploration. In October 2005, I was asked to lead this effort, building the team and forming the partnerships that will, in turn, build America's next human-rated space transportation system. In November 2006, the Ares I team began conducting the System Requirements Review milestone, just 1 year after its formation. We are gaining momentum toward the first test flight of the integrated vehicle system in 2009, just a few short years away. The Agency is now poised to deliver on the commitment this nation has made to advance our interests in space. In its inaugural year, the Ares team has conducted the first human-rated launch vehicle major milestone in over 30 years. Using the Exploration Systems Architecture Study recommendations as a starting point, the vehicle designs have been evolved to best meet customer and stakeholder requirements to fulfill the strategic goals outlined in the Vision for Space Exploration.

Cook, Stephen A.↗

Simulated Service and Stress Corrosion Cracking Testing for Friction Stir Welded Spun Form Domes

Damage tolerance testing development was required to help qualify a new spin forming dome fabrication process for the Ares 1 program at Marshall Space Flight Center (MSFC). One challenge of the testing was due to the compound curvature of the dome. The testing was developed on a sub-scale dome with a diameter of approximately 40 inches. The simulated service testing performed was based on the EQTP1102 Rev L 2195 Aluminum Lot Acceptance Simulated Service Test and Analysis Procedure generated by Lockheed Martin for the Space Shuttle External Fuel Tank. This testing is performed on a specimen with an induced flaw of elliptical shape generated by Electrical Discharge Machining (EDM) and subsequent fatigue cycling for crack propagation to a predetermined length and depth. The specimen is then loaded in tension at a constant rate of displacement at room temperature until fracture occurs while recording load and strain. An identical specimen with a similar flaw is then proof tested at room temperature to imminent failure based on the critical offset strain achieved by the previous fracture test. If the specimen survives the proof, it is then subjected to cryogenic cycling with loads that are a percentage of the proof load performed at room temperature. If all cryogenic cycles are successful, the specimen is loaded in tension to failure at the end of the test. This standard was generated for flat plate, so a method of translating this to a specimen of compound curvature was required. This was accomplished by fabricating a fixture that maintained the curvature of the specimen rigidly with the exception of approximately one-half inch in the center of the specimen containing the induced flaw. This in conjunction with placing the center of the specimen in the center of the load train allowed for successful testing with a minimal amount of bending introduced into the system. Stress corrosion cracking (SCC) tests were performed using the typical double beam assembly and with 4-point loaded specimens under alternate immersion conditions in a 3.5% NaCl environment for 90 days. In addition, experiments were conducted to determine the threshold stress intensity factor for SCC (K1SCC) of Al-Li 2195 which to our knowledge has not been determined previously. The successful simulated service and stress corrosion testing helped to provide confidence to continue to Ares 1 scale dome fabrication.

Stewart, Thomas J.↗

Lift-Off Acoustics Predictions for the Ares I Launch Pad

The vibroacoustic environment associated with large launch vehicles is of concern for the integrity of the launch complex and the vehicle itself. A large body of knowledge of this environment was developed during the early years of the missile and space flight, particularly during the Apollo program. Reference 1, prepared by Sutherland and others during that era, contains much of that knowledge. A specific process for predicting noise on and around the vehicle itself and the launcher is presented in Reference 2, prepared by Eldred, et al. Recent reviews of the process, e.g., Reference 3, have suggested some revised details but generally support the methodology in Reference 2.

Launch Pad↗

Progress on the J-2X Upper Stage Engine for the Ares I Crew Launch Vehicle and the Ares V Cargo Launch Vehicle

NASA's Vision for Exploration requires a safe, reliable, affordable upper stage engine to power the Ares I Crew Launch Vehicle (CLV) and the Ares V Cargo Launch Vehicle. The J-2X engine is being developed for that purpose, epitomizing NASA's philosophy of employing legacy knowledge, heritage hardware, and commonality to carry the next generation of explorers into low-Earth orbit and out into the solar system This presentation gives top-level details on accomplishments to date and discusses forward work necessary to bring the J-2X engine to the launch pad.

Byrd, Thomas D.↗