Search NASA⌕ Search

SEARCH · Search NASA

Results for “Artemis power system”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

NASA’s Space Launch System: Powering Artemis and Enabling Discovery

The debut launch of NASA’s super-heavy lift SLS (Space Launch System) rocket in November 2022 opened a new era of deep space exploration. Called the Artemis I mission, the launch sent an uncrewed Orion spacecraft more than 268,000 miles from Earth into a distant retrograde orbit (DRO) about the Moon, before splashing down in the Pacific Ocean 25 days later. While the mission was critical for multiple reasons to NASA’s Artemis campaign, the data collected during the first launch of SLS was vital to understanding how the launch vehicle performs in the flight environment. The test flight provided real-world data to ground and improve models, on-ground testing, and vehicle performance. Data returned show a nominal launch, with many parameters accurate to pre-flight predictions to within tenths of a percent. Equipped with the data, the SLS team is readying the Artemis II vehicle. Beginning with the fourth flight, SLS variants will have multiple upgrades, which increase the capability of the rocket to enable the nation’s most ambitious missions of returning astronauts to the Moon and lunar vicinity. Current hardware progress, as well as Artemis I flight data, will be provided. Additionally, the test programs that enabled the successful first flight will be discussed.

John Honeycutt↗

NASA Lunar Surface Operations & Power Grid

The National Aeronautics and Space Administration (NASA) Artemis Program is developing, testing, and demonstrating new capabilities and technologies required to support a sustainable human presence on the lunar surface and a longer-term vision of sending astronauts to Mars. Artemis lunar surface operations will begin with robotically exploring the lunar south polar regions for locations suitable for harvesting lunar surface resources. Over time activities on the lunar surface will expand beyond robotic operations to human lunar surface operations with the delivery of a lunar habitat and in-situ resource utilization (ISRU) assets increasing the need for highly reliable and available electrical power. As operations move beyond the Artemis technology demonstrations and exploration activities towards full commercial lunar surface activities, the ability to expand the original envisioned Artemis power system and repurpose power system components to support commercial activities will be crucial. One technology that will be necessary to support commercial lunar operations is a power grid. A lunar surface power grid would offer the ability to integrate various power sources to maximize power availability, including fission surface power (nuclear), solar arrays, batteries, and regenerative fuel cells. Newly designed terrestrial microgrids are flexible and can be designed to allow for islanded operation, where power is utilized near the loads to minimize power distribution losses or in a power sharing mode where power is transmitted longer distances. This capability is crucial during failures where overall power availability is reduced, and load demand exceeds generation/storage capability. These terrestrial microgrids will also allow for the power system to grow and evolve over time, meeting the need to expand beyond initial lunar surface activities. This presentation will discuss the NASA Artemis plans, potential power system architectures, and power distribution options that will enable growth from initial technology demonstrations towards a lunar economy with a lunar surface power grid that offers many of the advantages of terrestrial microgrids.

Microgrids↗

Analysis of the Artemis I Orion Spacecraft Power System Performance

NASA successfully completed an uncrewed test flight of the Orion spacecraft during the 26-day Artemis I mission in November and December 2022. The Artemis I mission profile included several potentially stressing features for Orion electrical power system (EPS) performance, including eclipse duration, multiple propulsive or navigational maneuvers which constrained positioning of the solar array wings (SAWs), and the proximity and phasing of various events together. All of these features vary significantly with Earth-sun-moon geometry, providing a unique challenge for predicting EPS performance before an exact launch date is known. This presentation will provide a brief mission overview, discuss the different computer models with varying levels of fidelity used to analyze Orion EPS performance, as well as the screening process developed to incorporate EPS performance as a consideration for launch epoch selection. Final preflight model predictions of EPS performance will be compared to in-flight telemetry measurements, and several EPS anomalies observed will be briefly discussed.

Orion↗

Establishing a Lunar Surface Power Grid

The National Aeronautics and Space Administration (NASA) is seeking to develop a lunar surface power system for its Artemis missions as well as for planned future commercial lunar surface activities. This power system is composed of a number of assets which contain electrical loads and many of these contain energy resources. These assets can be connected to form a grid, which allows power to be shared between the system’s distributed energy resources. This grid can provide backup power to existing assets as well as primary power to future assets. A trade study was conducted for an Artemis scale grid, which has identified 3 kV AC as an ideal transmission voltage. Development work has also begun for a universal modular interface converter (UMIC) which connects assets and microgrids operating at 120 V DC space power to the grid. Products from this grid definition and UMIC development work will enable highly reliable and available power for Artemis and future planetary surface missions, which is key to achieving NASA’s long term vision of space exploration.

Planetary surface power↗

Lunar Microgrid Trade Studies to Define Interface Converter Requirements

The National Aeronautics and Space Administration (NASA) is interested in developing an incremental lunar power grid to support continuous human/robotic operations under the Artemis missions and can scale to global power utilization and industrial power levels. The initial lunar surface power system will be composed primarily of assets that contain their own power generation and energy storage. These assets can be connected to form a grid, which allows power to be shared between the system’s distributed energy resources. This grid can provide backup power to existing assets as well as primary power to future assets. A trade study was conducted for an Artemis scale grid, which has identified 3 kVAC as an ideal transmission voltage. This paper documents the analysis and findings from these trade studies. These studies were used to define the operating voltage and develop a common interface for connecting lunar surface assets to the power grid. The Universal Modular Interface Converter (UMIC) connects lunar surface assets to the high voltage grid. Products from this grid definition and UMIC development work will enable highly reliable and available power for Artemis and future planetary surface missions, which is key to achieving NASA’s long-term vision of space exploration.

Planetary surface power↗

A Modular AC to DC Interface Converter to Enable Lunar Surface Power Transmission

NASA is developing technology to enable sustained operations on extraterrestrial planetary bodies such as the Moon and Mars. One fundamentally enabling technology is long-distance electrical power transmission. This paper describes the Universal Modular Interface Converter (UMIC), which connects 120 VDC space power equipment to a 3 kVAC grid, and is intended to enable kilometer-distance transmission of 1s to 10s of kW of electrical power to support Artemis and future lunar missions. Specifically, this paper describes the technology within the UMIC product, its electrical power interfaces, and the state of its development. It also describes initial hardware and simulation test results of the UMIC.

Planetary surface power↗

Solar Array Performance Modeling for NASA’s Artemis Missions

NASA’s Artemis exploration campaign includes multiple elements that utilize photovoltaic power generation. Artemis mission profiles feature a variety of events that can limit solar array generation and stress electrical power system (EPS) performance, including eclipses, propulsive or navigational maneuvers which constrain the positioning of the solar arrays, and spiral trajectories with significant radiation degradation. These features make predicting the performance of the power system particularly important and requires accurate modeling of power generation by the solar arrays under a variety of conditions. One of the tools used to predict spacecraft EPS performance is the System Power Analysis for Capability Evaluation (SPACE) model developed at NASA Glenn Research Center. SPACE is used by NASA to model EPS performance for the Orion crew transport vehicle and the Power and Propulsion Element (PPE) of the Gateway space station. This presentation will provide an overview of how SPACE calculates solar array performance, including degradation factors considered and environmental conditions that drive the solar array designs. Additionally, Orion array performance predictions generated by SPACE will be compared to flight data collected during the Artemis I mission.

Photovoltaic↗

Analysis of Glint During the Artemis I Mission

Glint occurs when light reflects off a specular (mirror-like) surface. In the context of spacecraft, glinted light can land in places that may cause unintended negative effects. During the Artemis I mission in November and December of 2022, the Orion vehicle was configured intentionally to cause glint to occur to study its effect on the Orion electrical power system (EPS). With the vehicle in a nose-to-sun attitude, light was reflected off the crew module’s reflective skin and onto forward-pointed solar array wings (SAWs), producing more current than would result from direct solar flux alone. Along with this flight test, glint was unexpectedly observed several other times during the mission, primarily due to light reflecting from one SAW to another. The planned glint events helped to anchor the models previously used to study this phenomenon and to understand what parameters have the most significant impact on glinted current generation. With refined models, the SAW-to-SAW glint occurrences were studied with the goal of characterizing its potential impact on vehicle operation.

Photovoltaic↗

A Notional Artemis Lunar Surface Exploration Package (ArLSEP) based on the Gandalf Staff Platform

Introduction: The Artemis program is planning to deliver crew and cargo to the lunar surface, but there is no current package for supporting lunar in-struments and experiments similar to the Apollo Lunar Surface Exploration Package (ALSEP). This abstract provides a possible concept for such a package using the Gandalf Staff Platform as a common core. Gandalf Staff: The Gandalf Staff is an early prototype system developed over FY’21/FY’22 using NASA Science Technology Mission Directorate (STMD) Center Information Fund (CIF) grants to de-sign, build and test “proof-of-concept” components. These components include a 24v battery powered monopole that powers a suite of subsystems, including a Graphical User Interface (GUI) for crew, surface voice and data communications, Lunar Search and Rescue (LunaSAR) navigation and communications, LiDAR, field site external lighting, 360-degree camera, and a geothermal instrument for measuring sub-surface temperature gradient. The staff can be carried independently by an Extra-Vehicular Activity (EVA) astronaut, or can be mounted into a tripod for “hands free” support at a surface site being investigated. The staff can be attached to an external solar array and power storage system for long-duration operations. [1,2] ALSEP: An ASLEP flew on each mission Apollo 12 to Apollo 17. For Apollo 11, a simplified packaged called the Early Apollo Scientific Experiments Pack-age (EASEP) was flown. Each package included a “Central Station” that provided the power and communications connected to a variety of instruments and sensors. The power was provided by a Radioisotope Thermoelectric Generator (RTG) fueled by Plutoni-um-238 generating 70 watts of power (initially, decayed over time) [3]. The communications system provide for direct to Earth data transfer from the lunar surface. Each pack-age was stowed externally in the Lunar Module (LM) Scientific Equipment (SEQ) bay with a mass up to 163 kg (Apollo 17). The crew unloaded the ALSEP from the LM and deployed the instruments on the lunar surface. Although designed to operate for only 1 year, many sites operated for up to 8 years successfully [4]. The Active Seismic Experiment (ASE) included 3 geophones for detecting seismic waves created by mortars and thumpers deployed by the crew. Other active experiments measured the lunar atmosphere, the heat flow in the subsurface, the lunar gravity and potential gravity waves, the lunar magnetic field, the solar wind and plasma interactions in cislunar space. Passive experiments included collectors for dust and cosmic rays, and retroreflectors for precise measurements of distance using a laser from Earth. The ALSEP program continues to generate insights into lunar formation and evolution. ArLSEP Concepts: The lunar surface science package for the Artemis program will hopefully exceed the capability of the ALSEP. There are multiple issues for discussion leading to the design of a new ArLSEP, needing requirements definition from the science community, NASA mission architecture, and NASA budget planners. 1. Delivery Mechanism Two possible projects currently provide capability to deliver scientific cargo to the lunar surface: 1) the Commercial Lunar Payload Services (CLPS) [5] and the Human Landing System (HLS) [6, 7]. Each project is controlled by a different organization within NASA and budgeted with different criteria although both support lunar exploration. The HLS system delivers crew (and potentially cargo) to human landing sites. If an ArLSEP is “predeployed” to such a site, the design must include power (either from the vehicle or independently) to keep the electronics functioning until deployed by the crew. If an ArLSEP is delivered on a vehicle after the crew is present on the lunar surface, safety protocols require adequate distance from the humans for impact from descent propelled sur-face regolith ejecta. This distance can not exceed the capability of the crew to walk (if no rover) to the vehicle for ArLSEP deployment. 2. Overall Guidelines The general design of ArLSEP will likely follow the ALSEP with a common system for communications and power; however, significant architecture differences between Apollo and Artemis exist. Power: The RTG will not be available for early Artemis missions nor likely follow-on Lunar Exploration Transportation Services (LETS) missions [8]. Thus, ArLSEP power must be supplied by solar arrays with sufficient battery capability to “keep alive” necessary electronics during any lunar surface eclipse period. Communication: The Artemis program is developing a series of communications satellites for lunar orbit to provide surface transmission of data and voice to Earth. Called “LunaNET”, this network is component useful for ArLSEP since south polar locations may not always have direct “line-of-sight” to Earth [9]. 3. Concept of Operations (ConOps) The general ConOps for ArLSEP is to deliver the package to lunar surface before the crew arrives, and then have the crew deploy the package after some period of time. This requires coordinated design (for power systems) and launch window (for schedule) on both the cargo and crew missions. Once the ArLSEP is deployed, it will operate autonomously for a number of years. It should be designed to be EVA compatible for crew maintenance and upgrade. 4. Notional Design (for discussion purpose only) The landing site near the South Pole is expected to have no eclipse cycle exceeding 5 days, so the “keep alive” power is 144 hours (6 days to include margin). A 12v ArLSEP will use rechargeable LiFePO4 cells, which are common in the Electric Vehicle (EV) industry. With a current of 5 amps and a 125 watt system, the mass is about 90kg. The comm. system and structure adds another 10kg, thus the “Central Station” is approximately 100kg. The solar power is collected on four arrays (each 2m above the surface), and the entire ArLSEP is designed to stow in a 2m x 1m x 1m volume. The experiment and instrument design will vary for each installation and add mass to the total (although they are expected to fit within the 2m3 volume). Seismic wave generation will likely not be provided with mortars, thus an electric “thumper” will be required. Active instruments such as imaging systems and sensing instruments will benefit from the additional power and communication capability provided by ArLSEP. Passive systems such as retroreflectors, witness plates, and cosmic dust collectors can be added to either the landing vehicle and/or the ArLSEP. With repeated HLS missions to the same human site, the ArLSEP can be expanded and easily maintained for long duration science collection on the lunar surface.

ALSEP↗

Validation of Multiphase CFD Predictions of the SLS Launch Environment against Artemis I Flight Data

NASA’s Space Launch System (SLS) is powered by four Aerojet-Rocketdyne RS-25 engines, previously referred to as Space Shuttle Main Engines (SSMEs), with two RSRMV solid rocket boosters (SRBs) derived from the Shuttle booster as seen in Fig. 1. Ignition and the start transient of the SRBs, each of which generate 3.6 million pounds of thrust, create a series of large magnitude pressure waves separate from launch acoustics that have the potential to damage the vehicle if unmitigated. This portion of the SLS launch environment consists of igniter shock (IS), ignition overpressure (IOP), and duct overpressure (DOP).

T. Rivord↗

NASA’s Space Launch System: New Launch Capability for Artemis Lunar and Deep Space Science Missions

With stacking and integration of the initial Block 1 Space Launch System (SLS) expected to begin in 2020, NASA’s powerful new launch vehicle is ready to take center stage in the agency’s Artemis program to return astronauts to the Moon. Combining the highest launch thrust and largest payload capacity ever developed, SLS also enables a new generation of high-C3 science missions to destinations such as the gas and ice giants, the Kuiper Belt, and even beyond the solar system. Block 1 is only the beginning, as the vehicle has a planned evolution path to progressively more powerful variants. In addition to these block upgrades providing increased lift capability, the vehicle can be configured to fly in crew configuration with the Orion spacecraft or in cargo configuration with payload fairings for launching science mission or large infrastructure, providing a flexible launch option. For Artemis I, the first SLS flight, the Block 1 vehicle in the crew configuration will send an uncrewed Orion spacecraft to lunar orbit for a thorough systems checkout before the crewed Artemis II flight. The Block 1 vehicle uses a proven propulsion system consisting of solid rocket boosters and RS-25 engines to lift more than 27 metric tons [t] to trans-lunar injection (TLI). In its cargo configuration, Block 1 can be fitted with a 5 m payload fairing. The second variant, Block 1B, uses a more powerful upper stage to increase payload mass to TLI to 38-42 t, depending on crew or cargo configuration. In the crew configuration, a co-manifested payload of up to 10 t can ride along in the Universal Stage Adapter (USA), which has as much volume for payloads as a 5 m-class payload fairing. The Block 2 evolved variant will lift 43-46 t to TLI, depending on crew or cargo configuration. The Block 1B and Block 2 vehicles can be outfitted with an 8.4 m-diameter payload fairing, available in 19.1 m and 27.4 m lengths, providing unprecedented volume for payloads. Larger-diameter 10 m fairings may also be an option in the future on the Block 2 vehicle. The unrivalled mass, volume and high-energy launches of SLS can provide significant mission flexibility for payloads and/or additional upper stages to open trade space for a new generation of exploration missions. SLS was designed to meet requirements for launching large-volume infrastructure as outlined in numerous studies of missions to cislunar space or Mars. Mission concept studies from the science community also point toward new possibilities enabled by SLS. Probes with more robust science packages can be sent to the gas giants. Dual spacecraft can be manifested for missions to Uranus and Neptune. Additional third or fourth payload stages can be encapsulated in the payload fairings to achieve missions to the Kuiper Belt or beyond. In addition, the large volume can be used to design and deploy wide-aperture mirrors on future space telescopes and to enable nuclear-thermal propulsion missions. At AIAA Ascend, the SLS Program will provide technical information on vehicle capabilities as well as descriptions of ongoing discussions with mission planners for utilizing the vehicle for an array of deep space missions.

Stephen Creech↗

Enabling Universal Access to Power on the Lunar Surface

The National Aeronautics and Space Administration (NASA) Artemis Missions will return human astronauts to the lunar surface, demonstrate technologies that establish a sustained presence on the lunar surface and enable human missions to Mars, and help create a lunar commercial economy. Creating a sustained permanent presence on the lunar surface will require access to continuous and highly reliable power to support mission needs. During Artemis, lunar surface operations will evolve and grow over time (years), requiring an increase in the amount of power needed (100s of kW) and distance that the power must be transmitted (up to 10 km during early Artemis missions). A lunar commercial economy is likely to exceed this power demand to the MW level and distance in the 100s of km. This increased distance and demand for highly reliable power drives the need to create an electric power grid by connecting localized lunar power systems (e.g., habitats, in-situ resource utilization plants, etc.), each containing one or more loads and/or sources. Developing a lunar surface power grid will allow lunar surface operations to resemble electrical utility operations on Earth; it allows power to be generated where it is convenient and allows power to be consumed where it is convenient and required. A lunar surface electric power grid will facilitate the growth of a lunar commercial economy because it provides a means to connect new loads to an existing electrical power system. A common standardized interface to the grid and a set of standardized voltages is required to take full advantage of the benefits of an electric power grid, similar to the terrestrial power grid. NASA Glenn Research Center is leading an effort to create universal access to power through the development of the Universal Modular Interface Converter (UMIC). The UMIC is designed to have a common interface that connects sources and loads compliant with the International Space Power System Interoperability Standard (ISPSIS) to a higher voltage AC transmission system or power grid. This presentation will further discuss the evolution of power during the Artemis missions, challenges associated with creating a sustained presence on the lunar surface, progress made on the UMIC, and future opportunities for technology development and standards.

space power systems↗

ISRU Potential Water Mine Sites; Preliminary Evaluation for NASA Artemis Campaign

The NASA Artemis Campaign aims to return to the Moon to maintain a sustainable presence [1], and In-Situ Resource Utilization (ISRU)is a key part of sustainability. The regions of interest for the Artemis campaign, as outlined in [1] and shown in Fig 1, are at Lunar the South Pole where water ice has been identified. The potential use of this water, and oxygen/hydrogen, for NASA and commercial applications such as refueling vehicles and power systems, and supplying life support consumables is one of the considerations the NASA Artemis team is using to evaluate these regions. As such, analyses are underway to evaluate the ISRU ice mining potential of these regions of interest. To do so, a set of ground rules for ISRU sites have been developed to align with current assumptions for customer needs, hardware capabilities, initially limited infrastructure, and lunar environments/terrain. The customer could be a lander, habitat, or other asset that makes use of ISRU product within the Artemis architecture. At this time, four of the regions of influence (the ‘western’ cluster in Fig. 1) have undergone preliminary ISRU evaluation. It should be noted that variety of other efforts have done similar evaluations of this nature with different assumptions or viewpoints, such as the most recent[2]. However, most evaluations focus on large permanently shadowed regions (PSRs) and craters due to orbital data resolution limitations, whereas early ice mining operations will likely occur in much smaller PSRs

In situ resource utilization↗

Single-Photon Counting Detector Scalability for High Photon Efficiency Optical Communications Links

For high photon-efficiency deep space or low power optical communications links, such as the Orion Artemis-2 Optical Communications System (O2O) project, the received optical signal is attenuated to the extent that single- photon detectors are required. For direct-detection receivers operating at 1.55 µm wavelength, single-photon detectors including Geiger-mode InGaAs avalanche photon diodes (APDs), and in particular superconducting nanowire single-photon detectors (SNSPDs) offer the highest sensitivity and fastest detection speeds. However, these photon detectors exhibit a recovery time between registered input pulses, effectively reducing the detection efficiency over the recovery interval, resulting in missed photon detections, reduced count rate, and ultimately limiting the achievable data rate. A method to overcome this limitation is to divide the received optical signal into multiple detectors in parallel. Here we analyze this approach for a receiver designed to receive a high photon efficiency serially concatenated pulse position modulation (SCPPM) input waveform. From measured count rate and efficiency data using commercial SNSPDs, we apply a model from which we determine the effective detection efficiency, or blocking loss, for different input signal rates. We analyze the scalability of adding detectors in parallel for different modulation orders and background levels to achieve desired data rates. Finally we show tradeoffs between the number of detectors and the required received optical power, useful for real link design considerations.

Vyhnalek, Brian E.↗

Artemis I Orion ESM Propulsion System Engine Performance

NASA's Orion spacecraft transports humans and cargo into cislunar space for the Artemis program. The European Service Module (ESM), supplied by ESA and its European industry partners, provides Orion with power and in-space propulsion. The Orion-ESM propulsion system is a bipropellant hypergolic propulsion system using monomethyl hydrazine (MMH) and nitrogen tetroxide (MON-3). Primary translational propulsion is provided by the Orbital Maneuvering System Engine(OMS-E), with backup translational propulsion provided by eight Auxiliary thrusters (AUX). Attitude control and small translational maneuvers are provided by twenty four Reaction Control System (RCS) engines. The 2022 Artemis I mission was the first integrated flight test of the Orion-ESM spacecraft and its propulsion system. The OMS-E used on Artemis I was a refurbished Space Shuttle OMS-E that previously flew on nineteen missions ranging f rom STS-41G in 1984 to STS-112 in 2002. The Auxiliary engines are modified Aerojet Rocketdyne R4D-11 engines produced specifically for the Orion program. The RCS engines are Ariane Group engines originally used for the Automated Transfer Vehicle (ATV) program. This paper will discuss the unique operational requirements for each engine on Orion and the development and qualification effort sat both the engine and system-level that were completed to enable a successful Artemis I mission. Next the paper will evaluate the in-f light performance of the engines during the Artemis I mission showing nominal performance as expected. Additionally, comparisons to models will be presented showing very good correlation. Finally, the paper will address the plan for the engines on future Orion missions and the evolution of the system operation.

liquid propulsion systems↗