Search NASA⌕ Search

SEARCH · Search NASA

Results for “Assessments”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Computational Tools and Workflows for Quantitative Risk Assessment and Decision Support for Geologic Carbon Storage Sites: Progress and Insights from the U.S. DOE’s National Risk Assessment Partnership

The 2005 Intergovernmental Panel on Climate Change (IPCC) Special Report on CCS raised the profile of CO2 capture and storage (CCS) as an important technology for reducing greenhouse gas (GHG) emissions. CCS is now recognized as a key component of most climate change mitigation scenarios. Since publication of that report the international research, development, and deployment (RD&D) community has advanced key technical aspects, clarified regulatory requirements, explored value chain and infrastructure solutions, and developed incentive paradigms to enable and promote large-scale deployment of CCS. These efforts have included research to better characterize geologic storage resources, to improve injection performance and storage efficiency, to assess and manage subsurface environmental risks, and to advance monitoring technologies to assure system conformance. These efforts have helped to build confidence in the viability of geologic carbon storage (GCS), but stakeholder concerns about long-term risks and liability associated with GCS remain a hurdle to broad acceptance and large-scale deployment of CCS. Since 2010, the U.S. DOE’s National Risk Assessment Partnership (NRAP) – a research collaboration between five contributing national laboratories – has worked to establish and demonstrate methods and tools to quantify and manage the subsurface environmental risks associated with GCS, amidst uncertainty. This work supports the Office of Fossil Energy and Carbon Management Carbon Transport and Storage Program’s goal of advancing safe and secure commercial-scale GCS deployment. To address the technical challenge of simulating the physical response of the GCS site to large-scale CO2 injection, NRAP has adopted an approach that relies on coupling computationally efficient reduced-order and/or data-driven proxy models of important system components (i.e., storage reservoir, sealing caprock, leakage pathways, intermediate formations, overlying groundwater aquifers, and the atmosphere) in integrated assessment framework. That integrated model of the physical system is complemented with fit-for purpose functionality to support site characterization and risk-related decisions. The recently released NRAP Phase II toolset includes the Open-Source Integrated Assessment Model (NRAP-Open-IAM) for evaluation of trends in leakage risk and potential impact, tools to support monitoring design optimization (Designs for Risk Evaluation and Management – DREAM v3.0 and Passive Seismic Monitoring Tool - PSMT), and tools for state of stress evaluation (State-of-Stress Analysis Tool - SOSAT) and forecasting induced seismicity risk. The NRAP team has also released a pair of reports describing conceptual workflows to incorporate physics-based, quantitative risk assessment into many of the design, planning, operation, and closure decisions for GCS projects. An online catalogue highlights published studies where these tools and methods are demonstrated. In this presentation, the utility of these products to assess risks and address key stakeholder questions will be highlighted through examples, and related insights about the safety and security of geologic carbon storage in qualified storage sites will be discussed. The prospect of rapid, large-scale deployment of GCS technology to aggressively reduce anthropogenic CO2 emissions requires careful consideration of interference between multiple commercial-scale storage projects within a basin. Going forward, NRAP is expanding and adapting site-scale risk quantification tools and methods to enable assessment of risks and inform management decisions for basin-scale deployment. Increasingly, this work will leverage next-generation approaches for surrogate modelling, fast prediction, and advanced visualization enabled by machine learning and artificial intelligence to promote virtual learning, scenario evaluation, and augment risk-based decision making.

quantitative risk assessment, geologic carbon stor↗

Grid Strength Assessment for High Levels of Inverter-based Resources in the Puerto Rico Power

A system-wide assessment of the Puerto Rico power system grid strength is studied when considering high levels of inverter-based resource penetration. This study is carried out in PSSE and assesses the impact of inverter-based resource (IBR) contributions in response to three-phase ground faults. A hypothetical 100% inverter-based generation scenario is created to assess the extreme impact on short circuit levels and a realistic scenario is considered to assess the impact to short circuit ratios. The overall conclusion is that short circuit capacity and current will drastically decrease in a high IBR scenario, an effect that is quantified in this paper. The short circuit ratio metric is typically used to assess the impact of IBR but generally overestimates grid strength due to not accounting for the impact from multiple IBRs. Other methods such as equivalent circuit based short circuit ratio and weighted short circuit ratio offer a more comprehensive consideration for multiple IBRs and can better account for their mutual interactions. The work presented in this paper is part of the PR100 study.

inverter based resources, PR100, grid strength↗

Assessment Report 76376 Assess the Quality of Center 00600 Completed Assessments for FY2018

Department 00635, Performance Assurance, assessments reveal risks and opportunities for improvement Labs-wide. This assessment was conducted to identify opportunities for improving the Department 00635 Assessment Program. This evaluation was conducted to identify opportunities for improving the Center 00600 assessment process by reviewing the quality of assessments completed by Environment Safety and Health (ES&H) personnel in fiscal year (FY) 2018. Approximately 20 percent of the Center 00600 assessments completed in FY18 were reviewed. One assessment was selected from each Center 00600 department contingent on availability in the Assurance Information System (AIS).

42 ENGINEERING↗

Accelerating Simulation for High-Fidelity PV Inverter System Reliability Assessment with High-Performance Computing

The overall cost of photovoltaic (PV) systems has shown a downward trend during the last decade; however, PV inverter failures account for the highest cost of operation and maintenance. To address this, reliability tools with powerful computation and better accuracy are required for the lifetime prediction and degradation evaluation of PV inverters. This paper proposes an event-driven parallel computing-based simulator. The proposed simulator applies high-performance computing techniques and other accessory optimization techniques-including cluster merging, adaptive model updates, and steady-state identification-to make reliability assessments for PV inverters under given input mission profiles and operating conditions with high efficiency and high fidelity. The main idea of the simulator and its workflow are introduced. Then, a demo PV inverter system simulator is implemented, and the speedup of the total simulations of the switching model reaches 123.03 times.

high-performance computing↗

Chemical Process Safety at TRISO-Based, Metal-Based, and Salt-Based Fuel Fabrication Facilities: Technical Assessment and Guidance Assessment

As part of efforts to prepare for potential and ongoing safety reviews for licensing of advanced non-light-water reactor fuel cycles, the U.S. Nuclear Regulatory Commission (NRC) tasked Pacific Northwest National Laboratory to prepare an assessment on the state of knowledge of potential chemical processes at fuel cycle facilities supporting the front end of these fuel cycles, and to assess the associated regulatory guidance. This report provides a technical assessment of chemical process safety considerations to support NRC licensing reviews of fabrication processes for tri-structural isotropic (TRISO) based, metallic-based, and salt-based fuels. The assessments involved collecting publicly available information on the fuel fabrication processes to (i) identify the operational process steps, characteristics and chemicals involved, (ii) identify the physical safety considerations and health safety considerations during licensing reviews of the various process steps, and (iii) collect information to support assessments of severity of accidents and potential mitigative measures to be implemented. The assessment provides a foundational basis on chemical process safety considerations for advanced fuel fabrication activities, although it is recognized that licensing reviews may necessitate design-specific considerations. The specific conditions under which chemical hazards emerge will require process-specific considerations, highlighting the importance of process-informed interpretation. The assessment also determined that exposure guidelines and limits to assess the consequences of acute exposures are limited for some chemicals, although alternative limits and supplementary information from databases or safety data sheets provide sufficient information to evaluate consequences of acute exposures. In addition, it was identified that metallic and salt fuel fabrication processes may involve beryllium, which is an exposure hazard. The regulatory framework for the licensing of advanced fuel cycle facilities, per 10 CFR Part 70 Domestic Licensing of Special Nuclear Material, is deemed robust and flexible to address the chemical safety considerations in this report. A review was conducted on various regulatory guidance and technical basis documents. This included reviewing NUREG-1520, Revision 2, Standard Review Plan for Fuel Cycle Facilities License Applications – Final Report and the process descriptions in Appendix A of NUREG/CR-6410, Nuclear Fuel Cycle Facility Accident Analysis Handbook, to address advanced fuel types. As new fuels will involve process-specific chemical uses, process-specific considerations are provided in this report. Additionally, it is noted that the U.S. Department of Energy protective action criteria database includes Temporary Emergency Exposure Limits (TEELs) for process-specific chemicals. This report provides technical information to support chemical safety assessments of new advanced fuel cycle facilities and identifies technical and safety information to support licensing reviews. No regulatory barriers were identified for the licensing of advanced fuel cycle facilities.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Assessment and Commissioning of Electrical Substation Grid Testbed with a Real-Time Simulator and Protective Relays/Power Meters in the Loop

Electrical utility substations are wired with intelligent electronic devices (IEDs), such as protective relays, power meters, and communication switches. Substation engineers commission these IEDs to assess the appropriate measurements for monitoring, control, power system protection, and communication applications. Like real electrical utility substations, complex electrical substation grid testbeds (ESGTs) need to be assessed for measuring current and voltage signals in monitoring, power system protection, control (synchro check), and communication applications that are limited by small measurement percentage errors. In the process of setting an ESGT with real-time simulators and IEDs in the loop, protective relays, power meters, and communication devices must be commissioned before running experiments. In this study, an ESGT with IEDs and distributed ledger technology was developed. The ESGT with a real-time simulator and IEDs in the loop was satisfactorily assessed and commissioned. The commissioning and problem-solving tasks of the testbed are described to define a method with flowcharts to assess possible trouble-shooting in ESGTs. This method was based on comparing the simulations versus IED measurements for the phase current and voltage magnitudes, three-phase phasor diagrams, breaker states, protective relay times with selectivity coordination at electrical faults, communication data points, and time-stamp sources.

Piesciorovsky, Emilio↗

Independent Orbiter Assessment: Assessment of the FMEA/CIL Instructions and Ground Rules

The McDonnell Douglas Astronautics Company was selected to conduct an independent assessment of the Orbiter Failure Mode and Effects Analysis/Critical Items List (FMEA/CIL). Part of this effort involved an examination of the FMEA/CIL preparation instructions and ground rules. Assessment objectives were to identify omissions and ambiguities in the ground rules that may impede the identification of shuttle orbiter safety and mission critical items, and to ensure that ground rules allow these items to receive proper management visibility for risk assessment. Assessment objectives were followed during the performance of the assessment without being influenced by external considerations such as effects on budget, schedule, and documentation growth. Assessment personnel were employed who had a strong reliability background but no previous space shuttle FMEA/CIL experience to ensure an independent assessment would be achieved. The following observations were made: (1) not all essential items are in the CIL for management visibility; (2) ground rules omit FMEA/CIL coverage of items that perform critical functions; (3) essential items excluded from the CIL do not receive design justification; and (4) FMEAs/CILs are not updated in a timely manner. In addition to the above issues, a number of other issues were identified that correct FMEA/CIL preparation instruction omissions and clarify ambiguities. The assessment was successful in that many of the issues have significant safety implications.

Traves, S. T.↗

Assessment Report ASMT-1033: Department 635 FY2019 Evaluate Center 600 Assessment Process

This assessment reviewed the Center 600 assessment process; gathered knowledge from 17 assessment points of contact across the Center; piloted an annual assessment planning process; and compared Center 600 Administrative Operating Procedure (AOP) 04-04, Assessments, to current practices and corporate requirements. The assessment identified two observations, three noteworthy practices, and multiple opportunities for improvement beyond the scope of the assessment.

42 ENGINEERING↗

Central Asia Seismic Hazard Assessment (CASHA): A Probabilistic Seismic Hazard Assessment for Kazakhstan, Kyrgyzstan and Tajikistan

Probabilistic seismic hazard assessments (PSHA) underpin the calculation of earthquake loads in most building codes around the world. In Central Asia, the building codes are slowly being updated to incorporate some of the contemporary concepts of seismic hazard representation. There is also a regional desire to coordinate hazard assessments and building code modernization. However, some challenges remain. Expertise in the region related to seismic hazard assessments is still largely compartmentalised, requiring a significant amount of training and capacity building in seismic hazard assessment related topics. In addition, there are vast amounts of seismic data (bulletin and waveforms), both from analogue and digital eras, that the region’s countries stored but until recently did not use or share among themselves or with the broader seismological community around the world. Finally, after the collapse of the Soviet Union in the 1990s, many of the countries’ seismic networks suffered a major setback with the lack of attention and budget to update existing equipment and installation of new instruments. In order to address these issues, the United States Department of Energy through Lawrence Livermore National Laboratory (LLNL) initiated a project in 2016 to engage and train local scientists in Central Asia to install new equipment, to enhance the quality of seismic monitoring and reporting, to improve and harmonise the regional earthquake catalogue, and to conduct national probabilistic seismic hazard assessments using the new and improved datasets. To achieve the seismic hazard assessment related goals, a series of workshops were held in Almaty, Kazakhstan; Bishkek, Kyrgyzstan; and Dushanbe, Tajikistan from 2016 until 2020. During the time that the COVID-19 pandemic restricted travel, workshops continued online (22 online workshops were hosted in two years). Finally, in May 2022, an in-person workshop in Istanbul, Turkey brought together all project participants along with civil engineers engaged with building code activities in their respective countries, providing a platform to discuss the implementation of the hazard models into updates of building codes in each country, as well as to discuss model parameters, sensitivity analyses and model results in terms of hazard maps, uniform hazard spectra and hazard deaggregations. The workshops were a combination of lectures and hands-on exercises, and included international participation as well as local scientists and engineers. The workshops served several purposes, including training, coordination of data collection, interactions between local earth scientists and engineers, and brainstorming and knowledge exchange among local and international experts. This report outlines the new earthquake catalogue compilation effort and the PSHA project undertaken in Kyrgyzstan, Tajikistan, and Kazakhstan as part of this initiative. The southern part of this region is tectonically active with moderate to high levels of both shallow crustal seismic activity and occurrence of deeper earthquakes under the Hindu Kush and Pamir mountain ranges. Deeper earthquakes also occur near southwestern Kazakhstan, under the eastern Greater Caucasus and Caspian Sea. Large portions of central and northern Kazakhstan, on the other hand, are in stable continental regions with low levels of seismic activity. This study systematically compiles and improves all available data on local seismicity, active faults, and ground motion attenuation characteristics of the region; and builds a framework to enable a contemporary PSHA to be carried out with the engagement of local scientists. While the project was regional, the seismic hazard assessments are primarily driven by the countries’ own national preferences and understanding of data collection, interpretation, and validation of results.

58 GEOSCIENCES↗

Evaluating Probability of Containment Effectiveness at a GCS Sites using integrated assessment modeling approach with Bayesian decision Networks

Improved scientific and engineering understanding of the behavior of geologic CO2 storage together with established regulatory framework and incentive structures raise the prospects for accelerated, large-scale deployment of this greenhouse gas emissions reduction approach. Incentive structures call for the establishment of appropriate verification and accounting approaches to support claims of the integrity of a geologic storage complex and to justify taking credit for long-term storage. In this study, we present a framework for assessing the probability of containment effectiveness over the lifetime of a geologic carbon storage site (e.g., after 70 years of injection and post-injection site performance) using forward stochastic model realizations based on site characterization data and using a monitoring-informed Bayesian network based on hypothetical detectability from surface seismic surveys over the site injection and post-injection phases. The National Risk Assessment Partnership’s open-source Integrated Assessment Model (NRAP-Open-IAM) was utilized to develop an ensemble of 10,000 a priori stochastic forecasts of CO2 containment. Those simulations were used to train the Bayesian network model to estimate the prior probabilities of the CO2 leakage mass into overlying, monitorable aquifers considering the uncertainties in the reservoir properties, permeability of potentially leaky wells and the overlying aquifers. The conditional probabilities in the Bayesian network were either learned from the NRAP-Open-IAM simulations or derived from the predefined detection thresholds for the monitoring method. Observations obtained from monitoring, over time during the site operation phases were then used to generate updated posterior probabilities of containment (and any loss from containment) in the Bayesian network by propagating the prior probabilities through the conditional probabilities. We demonstrate how to construct and use the Bayesian network for verifying the long-term storage complex effectiveness informed by monitoring based on the NRAP-Open-IAM simulations previously developed for the FutureGen 2.0 site. This approach may have relevance for stake holders to demonstrate secure geologic storage, provide a defensible, probabilistic approach to claim credit for geologic storage, and to estimate the likelihood that any fraction of the claimed credit may need to be refunded to the creditor based on available monitoring information.

Bayesian network, Risk assessment, Monitoring, car↗

An Assessment of Additively Manufactured Bonded Permanent Magnets for a Distributed Wind Generator

In this paper, we examine and compare the performance of a generator design optimized using additively manufactured NdFeB-SmFeN in nylon-polymer-bonded permanent magnets (PMs) against a generator design with conventional NdFeB sintered PMs. To realize this, a commercially available 15-kW wind generator's rotor is re-optimized using both additively manufactured and sintered NdFeB magnets using simple geometric parameterization that allowed for two specific magnet shapes, namely, arc-shaped and crown-shaped designs. Results showed that for a similar generator performance, the designs with additively manufactured bonded PMs are more cost-competitive in terms of the estimated PM material cost and also have negligible eddy current magnet losses.

additive manufacturing↗

FRMAC Assessment Manual Volume 1 - Assessment Division Operations

In the event of a major radiological incident or accident, the Federal Radiological Monitoring and Assessment Center (FRMAC) will coordinate the federal agencies that have various statutory responsibilities and/or capabilities for responding to such incidents (Ref. FRMAC10). The FRMAC is responsible for coordinating all environmental radiological monitoring, sampling, and assessment activities for the response. For less severe radiological incidents, elements of the Department of Energy (DOE) Consequence Management (CM) program, such as the CM Response Team (CMRT) or CM Home Team (CMHT) may be activated to provide similar support activities to regional or local response assets. This manual describes the roles and responsibilities of the Assessment Division of the FRMAC during a response to a radiological incident. Every effort will be made in this manual in accordance with the Implementation of the National Incident Management System (NIMS)/Incident Command System (ICS) in the Federal Radiological Monitoring and Assessment Center (FRMAC) – Emergency Phase (Ref. RSL07) to use terminology consistent with the National Incident Management System (NIMS) for Incident Command System (ICS) organizations, planning processes, and leadership positions (Ref. FEMA17). This manual also applies to smaller scale CM responses that may involve the CMRT or CMHT elements without the formation of a FRMAC. It details the concept of operations for the Assessment Division, including common tasks performed by the Division. This manual also describes the organizational structure of the Assessment Division and roles of the personnel within the Division.

61 RADIATION PROTECTION AND DOSIMETRY↗

Independent Orbiter Assessment (IOA): FMEA/CIL assessment

The McDonnell Douglas Astronautics Company (MDAC) was selected to perform an Independent Orbiter Assessment (IOA) of the Failure Modes and Effects Analysis (FMEA) and Critical Items List (CIL). Direction was given by the Orbiter and GFE Projects Office to perform the hardware analysis and assessment using the instructions and ground rules defined in NSTS 22206. The IOA analysis featured a top-down approach to determine hardware failure modes, criticality, and potential critical items. To preserve independence, the analysis was accomplished without reliance upon the results contained within the NASA and Prime Contractor FMEA/CIL documentation. The assessment process compared the independently derived failure modes and criticality assignments to the proposed NASA post 51-L FMEA/CIL documentation. When possible, assessment issues were discussed and resolved with the NASA subsystem managers. Unresolved issues were elevated to the Orbiter and GFE Projects Office manager, Configuration Control Board (CCB), or Program Requirements Control Board (PRCB) for further resolution. The most important Orbiter assessment finding was the previously unknown stuck autopilot push-button criticality 1/1 failure mode. The worst case effect could cause loss of crew/vehicle when the microwave landing system is not active. It is concluded that NASA and Prime Contractor Post 51-L FMEA/CIL documentation assessed by IOA is believed to be technically accurate and complete. All CIL issues were resolved. No FMEA issues remain that have safety implications. Consideration should be given, however, to upgrading NSTS 22206 with definitive ground rules which more clearly spell out the limits of redundancy.

Hinsdale, L. W.↗

Independent Orbiter Assessment (IOA): FMEA/CIL assessment

The results of the Independent Orbiter Assessment (IOA) of the Failure Modes and Effects Analysis (FMEA) and Critical Items List (CIL) are presented. Direction was given by the Orbiter and GFE Projects Office to perform the hardware analysis and assessment using the instructions and ground rules defined in NSTS 22206. The IOA analysis features a top-down approach to determine hardware failure modes, criticality, and potential critical items. To preserve independence, the anlaysis was accomplished without reliance upon the results contained within the NASA and prime contractor FMEA/CIL documentation. The assessment process compares the independently derived failure modes and criticality assignments to the proposed NASA Post 51-L FMEA/CIL documentation. When possible, assessment issues are discussed and resolved with the NASA subsystem managers. The assessment results for each subsystem are summarized. The most important Orbiter assessment finding was the previously unknown stuck autopilot push-button criticality 1/1 failure mode, having a worst case effect of loss of crew/vehicle when a microwave landing system is not active.

Saiidi, Mo J.↗

Module 5: End Use Assessment - Lesson 5.1: Introduction to End Use Assessment [Slides]

End use assessment is the process of performing a technical evaluation of the stated end use in relation to the requested commodity and the activities of the end user. An end use assessment requires sufficiently detailed information on the procurement request, commodity technical specifications, end use conditions, end user business activities, industry norms and trends, and WMD or delivery system applications of stated end use. Reviewers should be aware of red flags related to end use assessment. Use best practices when writing an end use assessment. Be familiar with technical resources for end use assessments.

99 GENERAL AND MISCELLANEOUS↗

It's the Heat AND the Humidity -- Assessment of Extreme Heat Scenarios to Enable the Assessment of Climate Impacts on Public Health

In the United States, extreme heat is the most deadly weather-related hazard. In the face of a warming climate and urbanization, which contributes to local-scale urban heat islands, it is very likely that extreme heat events (EHEs) will become more common and more severe in the U.S. In a NASA-funded project supporting the National Climate Assessment, we are providing historical and future measures of extreme heat to enable assessments of the impacts of heat on public health over the coterminous U.S. We use atmospheric temperature and humidity information from meteorological reanalysis and from Global Climate Models (GCMs) to provide data on past and future heat events. The project s emphasis is on providing assessments of the magnitude, frequency and geographic distribution of extreme heat in the U.S. to facilitate public health studies. In our approach, long-term climate change is captured with GCM output, and the temporal and spatial characteristics of short-term extremes are represented by the reanalysis data. Two future time horizons, 2040 and 2090, are the focus of future assessments; these are compared to the recent past period of 1981-2000. We are characterizing regional-scale temperature and humidity conditions using GCM output for two climate change scenarios (A2 and A1B) defined in the Special Report on Emissions Scenarios (SRES). For each future period, 20 years of multi-model GCM output have been analyzed to develop a heat stress climatology based on statistics of extreme heat indicators. Differences between the two future and past periods have been used to define temperature and humidity changes on a monthly time scale and regional spatial scale. These changes, combined with hourly historical meteorological data at a spatial scale (12 km) much finer than that of GCMs, enable us to create future climate realizations, from which we compute the daily heat stress measures and related spatially-specific climatological fields. These include the mean annual number of days above certain thresholds of maximum and minimum air temperatures, heat indices and a new heat stress variable that gives an integrated measure of heat stress (and relief) over the course of a day. Comparisons are made between projected (2040 and 2090) and past (1990) heat stress statistics. All output is being provided at the 12 km spatial scale and will also be aggregated to the county level, which is a popular scale of analysis for public health researchers. County-level statistics will be made available by our collaborators at the Centers for Disease Control and Prevention (CDC) via the Wide-ranging Online Data for Epidemiologic Research (WONDER) system. CDC WONDER makes the information resources of the CDC available to public health professionals and the general public. This addition of heat stress measures to CDC WONDER will allow decision and policy makers to assess the impact of alternative approaches to optimize the public health response to EHEs. It will also allow public health researchers and policy makers to better include such heat stress measures in the context of national health data available in the CDC WONDER system. The users will be able to spatially and temporally query public health and heat-related data sets and create county-level maps and statistical charts of such data across the coterminous U.S.

Crosson, William L↗

Cybersecurity Assessment for a Behind-the-Meter Solar PV System: A Use Case for the DER-CF

The world's energy production is shifting toward lower-cost, cleaner, more efficient, and sustainable sources. The increasing numbers of distributed energy resources (DERs) are allowing for the rapid transformation of electric grids toward achieving the goal of energy decarbonization. Along with cleaner and more efficient energy, however, we must also aim for a secure energy future. Solar photovoltaic (PV) systems are an important part of this transition. This paper discusses a cybersecurity risk assessment for behind-the-meter DERs using a solar PV system as a use case of the Distributed Energy Resource Cybersecurity Framework (DER-CF) developed by the National Renewable Energy Laboratory. This poster presents a conference paper on the risk assessment processes and summarizes the DER-CF's use case recommendations to strengthen the cybersecurity posture of the electric grid.

cybersecurity↗

A Fast and Accurate Transient Stability Assessment Method Based on Deep Learning: WECC Case Study

Transient stability is one of the critical aspects of power system stability assessment. The increasing integration of inverter-based resources and the retirement of conventional synchronous generators result in the decreasing system inertia and growing complexity of system operating conditions. Using a few selected typical operating conditions cannot guarantee system transient stability in all operating conditions, and the time-domain simulation of all operating conditions requires tremendous time and is often infeasible. This paper proposes a more efficient transient stability assessment method based on deep learning. The binary search method is used to determine the critical clearing time (CCT) in creating training databased by time-domain simulation. This method is fast and accurate with 1 ms resolution. The buses whose CCTs are lower than 200 ms are considered critical buses. Buses close to each other are grouped based on their mutual admittance matrix to reduce the search space of the critical buses. This paper also proposes the generator feature normalization based on the physical model. Case study on the reduced 240-bus WECC system model demonstrates that the proposed method can predict CCT accurately and efficiently.

critical clearing time↗