Search NASA⌕ Search

SEARCH · Search NASA

Results for “Audit Report”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Performance Audit Report: Automated Meteorological Monitoring Stations, Lawrence Livermore National Laboratory

The Waste and Air Quality Offices Group at the Lawrence Livermore National Laboratory operates two main meteorological monitoring sites near Livermore, California. The primary met tower (Site 200) is located in the northwest corner of the lab and consists of a fifty-two (52) meter tower with vertical wind speed sensors, horizontal wind speed and direction sensors and air temperature sensors at fifty-two (52) meters, twenty-three (23) meters and ten (10) meters. In addition, there is a temperature and humidity probe at ten (10) meters. At two (2) meters there are upward and downward facing solar and infrared radiation sensors, an air temperature sensor, barometric pressure sensor and a temperature and relative humidity probe. At ground level there is a tipping bucket rain gauge located to the southwest of the tower. The datalogger, communication peripherals and the barometric pressure sensor are housed in a small building near the tower. The Site 300 met site is located approximately 10 miles east of Livermore within the boundary of the LLNL blast test site. This site also consists of a 52-meter tower which is configured the same as the 52-meter tower at Site 200. There is also a building at this site that houses the datalogger, communication peripherals and the barometric pressure sensor. At both Site 200 and Site 300, data are collected by Ethernet with telephone modem collection as a backup. The data collection interval for both sites is fifteen (15) minutes via workstations running Loggernet software located at the main lab facility. The audits of the Lawrence Livermore National Laboratory’s two automated meteorological stations located near Livermore, California were performed on October 24 & 25, 2023. These audits were performed under the guidelines of the Quality Assurance Handbook for Air Pollution Measurement Systems, Volume IV, Version 2 and the On-Site Meteorological Program Guidance for Regulatory Modeling Applications, U.S. EPA.

54 ENVIRONMENTAL SCIENCES↗

NM 502 Road Safety Audit Report

The Texas A&M Transportation Institute (TTI) and the Los Alamos National Laboratory - Parking and Transportation Services (LANL) have been working in close collaboration to seek solutions for parking, traffic operations, traffic safety, and transit issues facing LANL. NM 502 is a main route for employee traffic entering the lab as well as traffic in and out of the Los Alamos Townsite. The section of roadway in the vicinity of Camino Entrada is of particular interest as it was the site of two very serious crashes involving the extended LANL family, and it is also the entry point onto NM 502 for Los Alamos County Operations to include the school district and transit vehicles.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY 2024

Energy Savings Performance Contracts (ESPCs)are a contractual mechanism that allow a federal agency to procure energy savings and facility improvements without upfront capital costs to reduce costs and resiliency. ESPCs are covered under FAR Part 23.2, and 42 USC § 8287. Section 8287(a)(2)(A) of Title 42 of the U.S. Code requires that each energy savings performance contract (ESPC) undergo an annual energy audit, resulting in a separate audit report for every project. The objective of the present report is to compile and analyze all annual ESPC audit reports issued between October 1, 2023, and September 30, 2024, for projects awarded under Generations 1, 2, and 3 of DOE’s ESPC IDIQ contracts. During this period, 205 measurement and verification (M&V) reports were produced for 200 projects; the total number of reports exceeds the number of projects because some projects generated more than one report(for example, a few projects measure savings twice per year and produce two audit reports annually, each covering a different six-month period). By aggregating the results from these individual audits, the report determines the portfolio-wide realization rate of energy and cost savings for all active ESPC projects awarded under DOE’s IDIQ program. For all 205audit reports, sufficient information was available to compare project-level estimated, reported, and guaranteed cost savings. Reported cost savings accounted for ESCO verified savings per each project’s M&V plan. The total reported cost savings for the period addressed were $\$$647.8million,compared with the total guaranteed cost savings of $\$$601.6million. On average across the reported projects: •ESPC contractors guaranteed 92.8% of the estimated cost savings• projects reported achieving 100.0% of the estimated cost savings• projects reported achieving 107.7% of the guaranteed cost savings. The M&V performed for the period indicated adjustments for government operations and maintenance impacts to savings amount to$\$$43.9millionandcould be restored with the original operational parameters for impacted projects. Accounting for this potential cost savings impact, these projects still realized 100.4% of the guaranteed cost savings. The information on estimated and reported energy savings was collected and compared for all 205of the reports examined. Based on site energy, estimated savings totaled 14.88million MMBtu, and reported savings were 15.33million MMBtu; 3.1% greater than the estimated energy savings. All of the reports examined contained sufficient information to calculate source energy savings. Based on site-adjusted source energy, total estimated energy savings were 20.90 million MMBtu, and reported savings were 21.22million MMBtu, 101.5% of the estimated energy savings. For water savings, the estimated savings were 11,539,055 kGal and the reported savings were 13,315,930 kGal. This means 1,776,875 kGal more water was saved than estimated, which is about 15% higher than the estimate. These results indicate that, overall, the reported energy savings slightly exceeded the estimated values, while estimated water savings significantly exceeded estimated values, suggesting that the projects achieved greater cost savings than originally projected. The total annual expense for the ESCOs to perform annual M&V audits and reporting was $\$$10.02million. Through this effort, $\$$647.8 million in annual cost savings was verified. The M&V results indicated that $\$$43.9 million of these verified savings reflected adjustments due to government operations A-6and maintenance impacts, which could be restored under the original operational parameters for the affected projects. These findings show the value of M&V that only costs 1.7%of the guaranteed cost savings to ensure guarantees are met.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY 2024

Energy Savings Performance Contracts (ESPCs) are a contractual mechanism that allow a federal agency to procure energy savings and facility improvements without upfront capital costs to reduce costs and enhance mission resiliency. ESPCs are covered under FAR Part 23.2, and 42 USC § 8287. Section 8287(a)(2)(A) of Title 42 of the U.S. Code requires that each energy savings performance contract (ESPC) undergo an annual energy audit, resulting in a separate audit report for every project. The objective of the present report is to compile and analyze all annual ESPC audit reports issued between October 1, 2023, and September 30, 2024, for projects awarded under Generations 1, 2, and 3 of DOE’s ESPC IDIQ contracts. During this period, 205 measurement and verification (M&V) reports were produced for 200 projects; the total number of reports exceeds the number of projects because some projects generated more than one report (for example, a few projects measure savings twice per year and produce two audit reports annually, each covering a different six-month period). By aggregating the results from these individual audits, the report determines the portfolio-wide realization rate of energy and cost savings for all active ESPC projects awarded under DOE’s IDIQ program.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

BuildingSync® v.2.7.0 (released 9.11.2025) [SWR-18-28]

BuildingSync® is a building data exchange schema to better enable integration between software tools and building data workflows. The schema's original use case was focused on commercial building energy audits; however, several additional use cases have been realized including building energy modeling and more high-level generic building data exchange. Version 2.7.0 adds new elements for file attachment feature and FederalBuilding, and generalizes usage of Optional Elements (e.g. EquipmentCondition, EquipmentID) to all assets/systems. BuildingSync helps streamline the data exchange process, improving the value of the data, minimizing duplication of effort for subsequent building data collection efforts (including audits), and facilitating the achievement of greater energy efficiency. This in done in part by standardizing on (a) reporting audits in an electronic format, (b) tracking proposed, implemented, and discarded energy conservation measures, and (c) storing building characteristics (at multiple levels) for audits, benchmarking, and building energy analysis. BuildingSync has several documents and tools available to help users understand how to best leverage BuildingSync. The list below are only a subset of the resources available. If new resources are discovered, then feel free to create a new pull request with the additions. Generic BuildingSync information is available on the DOE website and the project website. BuildingSync Examples - These examples are kept up to date and show a wide range of implementations. Any new update to BuildingSync is required to pass validation on these example files. BuildingSync Use Case Validator allows for users to determine if their instance complies with a specific use case for BuildingSync by checking if the required elements are implemented in an uploaded instance. An API is also provided for automated integration into other tools. Also, the website contains an easy way to view the entirety of the schema and how elements relate to the Building Exchange Data Exchange Specification. The Validator is open sourced here Use Case TestSuite provides a Python package for easier generation of BuildingSync use cases. BuildingSync use cases depend on the generation of schematron documents, which is time-consuming and difficult to implement well. The TestSuite allows users to define a use case using a more palatable CSV template, which it then turns into a Schematron document. The source code is available here. BuildingSync to OpenStudio/EnergyPlus. The translator is open sourced here. This project will translate a Level 1 (and partial Level 2) ASHRAE Energy Audit to a fully defined OpenStudio and EnergyPlus model. This project is in early Beta testing and any feedback is welcome!

Long, Nicholas [National Renewable Energy Lab. (NR↗

2023 Annual Explosives Inventory Completion

The 2023 Lawrence Livermore National Laboratory (LLNL) annual explosives inventory was executed from May 18, 2023 to September 27, 2023 and was verified for accuracy effective September 28, 2023 following the LLNL Explosive Materials Inventory Plan. This year’s annual inventory includes changes incorporated based on the Department of Energy (DOE) Office of Inspector General (OIG) Audit Report DOE-OIG-20-50, The Department of Energy’s Storage and Disposition of Explosives Material at Selected Sites, dated July of 2020. Based on the associated recommendations, explosives at DOE and National Nuclear Safety Administration (NNSA) sites are considered "sensitive personal property" and applicable inventories must comply with 41 CFR 109, Personal Property Management. This regulation adds additional stipulations which require the annual inventory to include accountability of the total site inventory. In addition, the inventory must be performed by personnel other than the property owner, or alternatively must include independent verification. The development of the inventory plan was agreed to by the LLNL Explosives Safety Committee in conjunction with the LLNL Property and Business Division Leader. The LLNL Explosive Materials Inventory Plan was reviewed and approved by the DOE Explosives Safety Committee Chair on May 17, 2023 and by the NNSA Property Management Office on May 25, 2023.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Document Traceability Internal Audit of the Analytical Laboratory Report on 08-26-2021

An internal audit was performed in ALAB 8/25/21 to the NELAC 2016 Standard requirements using the NELAC 2016 checklist (TNI 2016 CSDP-Volume1Checklist-Master-2-15-18-v9). The scope of the internal audit was a document traceability of the environmental testing in LRF-00118, LRF00095, and LRF 00133 performed in ALAB. The internal audit resulted in five deficiencies and two comments. The deficiencies were addressed using the ALAB non-conformance reporting system, see ALAB NCRs 10002742-10002746. FRM-5100 Management Observation and NCRs are attached.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Software Assists in Extensive Environmental Auditing

The Base Enivronmental Management System (BEMS) is a Web-based application program for managing and tracking audits by the Environmental Office of Stennis Space Center in conformity with standard 14001 of the International Organization for Standardization (ISO 14001). (This standard specifies requirements for an environmental-management system.) BEMS saves time by partly automating what were previously manual processes for creating audit checklists; recording and tracking audit results; issuing, tracking, and implementing corrective-action requests (CARs); tracking continuous improvements (CIs); and tracking audit results and statistics. BEMS consists on an administration module and an auditor module. As its name suggests, the administration module is used to administer the audit. It helps administrators to edit the list of audit questions; edit the list of audit locations; assign manditory questions to locations; track, approve, and edit CARs; and edit completed audits. The auditor module is used by auditors to perform audits and record audit results: It helps the auditors to create audit checklists, complete audits, view completed audits, create CARs, record and acknowledge CIs, and generate reports from audit results.

Callac, Christopher↗

Software Assists in Extensive Environmental Auditing

The Base Environmental Management System (BEMS) is a Web-based application program for managing and tracking audits by the Environmental Office of Stennis Space Center in conformity with standard 14001 of the International Organization for Standardization (ISO 14001). (This standard specifies requirements for an environmental-management system.) BEMS saves time by partly automating what were previously manual processes for creating audit checklists; recording and tracking audit results; issuing, tracking, and implementing corrective-action requests (CARs); tracking continuous improvements (CIs); and tracking audit results and statistics. BEMS consists of an administration module and an auditor module. As its name suggests, the administration module is used to administer the audit. It helps administrators to edit the list of audit questions; edit the list of audit locations; assign mandatory questions to locations; track, approve, and edit CARs; and edit completed audits. The auditor module is used by auditors to perform audits and record audit results: it helps the auditors to create audit checklists, complete audits, view completed audits, create CARs, record and acknowledge CIs, and generate reports from audit results.

Callac, Christopher↗

Software Assists in Extensive Environmental Auditing

The Base Environmental Management System (BEMS) is a Web-based application program for managing and tracking audits by the Environmental Office of Stennis Space Center in conformity with standard 14001 of the International Organization for Standardization (ISO 14001). (This standard specifies requirements for an environmental-management system.) BEMS saves time by partly automating what were previously manual processes for creating audit checklists; recording and tracking audit results; issuing, tracking, and implementing corrective-action requests (CARs); tracking continuous improvements (CIs); and tracking audit results and statistics. BEMS consists of an administration module and an auditor module. As its name suggests, the administration module is used to administer the audit. It helps administrators to edit the list of audit questions; edit the list of audit locations; assign mandatory questions to locations; track, approve, and edit CARs; and edit completed audits. The auditor module is used by auditors to perform audits and record audit results: it helps the auditors to create audit checklists, complete audits, view completed audits, create CARs, record and acknowledge CIs, and generate reports from audit results.

Callac, Christopher↗

GHG Emissions Reduction Audit: A Checklist for Owners

This guidance and accompanying checklist detail recommended services and deliverables for a building-level greenhouse gas (GHG) emissions reduction audit focused on Scope 1 and 2 GHG emissions.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

INL Waste Management Program Assessment Report

This is an INL annual internal waste management program assessment report that will need to be sent to NNSS for review. The report includes a summary and completed checklists based on the NNSS Waste Acceptance Criteria.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Virtualization - A Key Cost Saver in NASA Multi-Mission Ground System Architecture

With science team budgets being slashed, and a lack of adequate facilities for science payload teams to operate their instruments, there is a strong need for innovative new ground systems that are able to provide necessary levels of capability processing power, system availability and redundancy while maintaining a small footprint in terms of physical space, power utilization and cooling.The ground system architecture being presented is based off of heritage from several other projects currently in development or operations at Goddard, but was designed and built specifically to meet the needs of the Science and Planetary Operations Control Center (SPOCC) as a low-cost payload command, control, planning and analysis operations center. However, this SPOCC architecture was designed to be generic enough to be re-used partially or in whole by other labs and missions (since its inception that has already happened in several cases!)The SPOCC architecture leverages a highly available VMware-based virtualization cluster with shared SAS Direct-Attached Storage (DAS) to provide an extremely high-performing, low-power-utilization and small-footprint compute environment that provides Virtual Machine resources shared among the various tenant missions in the SPOCC. The storage is also expandable, allowing future missions to chain up to 7 additional 2U chassis of storage at an extremely competitive cost if they require additional archive or virtual machine storage space.The software architecture provides a fully-redundant GMSEC-based message bus architecture based on the ActiveMQ middleware to track all health and safety status within the SPOCC ground system. All virtual machines utilize the GMSEC system agents to report system host health over the GMSEC bus, and spacecraft payload health is monitored using the Hammers Integrated Test and Operations System (ITOS) Galaxy Telemetry and Command (TC) system, which performs near-real-time limit checking and data processing on the downlinked data stream and injects messages into the GMSEC bus that are monitored to automatically page the on-call operator or Systems Administrator (SA) when an off-nominal condition is detected. This architecture, like the LTSP thin clients, are shared across all tenant missions.Other required IT security controls are implemented at the ground system level, including physical access controls, logical system-level authentication authorization management, auditing and reporting, network management and a NIST 800-53 FISMA-Moderate IT Security plan Risk Assessment Contingency Plan, helping multiple missions share the cost of compliance with agency-mandated directives.The SPOCC architecture provides science payload control centers and backup mission operations centers with a cost-effective, standardized approach to virtualizing and monitoring resources that were traditionally multiple racks full of physical machines. The increased agility in deploying new virtual systems and thin client workstations can provide significant savings in personnel costs for maintaining the ground system. The cost savings in procurement, power, rack footprint and cooling as well as the shared multi-mission design greatly reduces upfront cost for missions moving into the facility. Overall, the authors hope that this architecture will become a model for how future NASA operations centers are constructed!

Ground System Architecture↗

NASA Audit Follow-up Handbook

This NASA Audit Follow-up Handbook is issued pursuant to the requirements of the Office of Management and Budget (OMB) Circular A-50, Audit Follow-up, dated September 29, 1982. It sets forth policy, uniform performance standards, and procedural guidance to NASA personnel for use when considering reports issued by the Office of Inspector General (OIG), other executive branch audit organizations, the Defense Contract Audit Agency (DCAA), and the General Accounting Office (GAO). It is intended to: specify principal roles; strengthen the procedures for management decisions (resolution) on audit findings and corrective action on audit report recommendations; emphasize the importance of monitoring agreed upon corrective actions to assure actual accomplishment; and foster the use of audit reports as effective tools of management. A flow chart depicting the NASA audit and management decision process is in Appendix A. This handbook is a controlled handbook issued in loose-leaf form and will be revised by page changes. Additional copies for internal use may be obtained through normal distribution channels.

Source record↗

Failure analysis of solid rocket apogee motors

The analysis followed five selected motors through initial design, development, test, qualification, manufacture, and final flight reports. An audit was conducted at the manufacturing plants to complement the literature search with firsthand observations of the current philosophies and practices that affect reliability of the motors. A second literature search emphasized acquisition of spacecraft and satellite data bearing on solid motor reliability. It was concluded that present practices at the plants yield highly reliable flight hardware. Reliability can be further improved by new developments of aft-end bonding and initiator/igniter nondestructive test methods, a safe/arm device, and an insulation formulation. Minimum diagnostic instrumentation is recommended for all motor flights. Surplus motors should be used in margin testing. Criteria should be established for pressure and zone curing. The motor contractor should be represented at launch. New design analyses should be made of stretched motors and spacecraft/motor pairs.

Martin, P. J.↗

KSC Integration Office Documentation and Support

This report details the process of document management within the KSC Integration Office throughout my internship in the fall term of the year 2020. During this term, I was mentored by Felix A. Soto-Toro and my main objective was to support the Audit Liaison Representatives (ALR) in their documentation processes. I worked alongside the members of the KSC Integration Office to streamline the auditing process in order to facilitate the interchangement of documents and communication between auditors and our agency. My approach to this situation was to document the events of each audit in a report, which would be updated weekly every Monday following a specific format. As support I was required to gather, organize, and release data relevant to current audits in an online server for ALRs to use across the entire NASA Agency.

Ana C Arvelo Serrano↗

Annual report to the Chairman and Ranking Minority Members, House and Senate Committees on Appropriations. Status of open recommendations: Improving operations of federal departments and agencies

Each year, GAO's work contributes to many legislative and executive branch actions that result in significant financial savings and other improvements in government operations. Some, but not all, are identified through GAO's system for periodically following up to determine the status of actions taken on the recommendations made in its audit and evaluation reports. In fiscal year 1994, GAO made 1,450 recommendations, but, more importantly, about 4,400 GAO recommendations made over the past 5 years have been implemented. This report includes summary information on the status of all GAO recommendations that have not been fully implemented and highlights some of the key ones. This information should help congressional and agency leaders prepare for upcoming appropriations and oversight activities and stimulate further actions to achieve the desired improvements in government operations. In addition to including printed issue area summaries highlighting the ipact of GAO's work and the key open recommendations, this volume includes a set of computer diskettes with details on all open recommendations.

Source record↗

Using AI to Reproduce Neutrino Cross Section Analysis - Prototyping the Neutrino Discovery Platform

The Neutrino Discovery Platform (NDP) aims to accelerate DUNE-era science by making the neutrino program's existing datasets analyzable through fast, reproducible, and auditable workflows. We report a working version of two of its layers, data curation and agentic orchestration, built and tested end to end on MINERvA open data. The guiding lesson throughout is that a cross section is a measurement, and not just a plotted shape, only if it carries a defensible systematic-uncertainty budget, a trustworthy unfolding, and a reproducible record. Using a single medium-energy playlist pair from the MINERvA open-data release (about $2.05\times10^{17}$ protons on target of data), we first reproduced the shapes of two published charged-current inclusive $\nu_\mu$ measurements through a complete extraction ladder: selection, background subtraction, D'Agostini unfolding, efficiency correction, and flux normalization. These shape-level reproductions ran and tracked the published results, but they lacked the systematic-uncertainty machinery that defines a MINERvA cross section. To supply it, we vendored and built the MINERvA Analysis Toolkit and developed a many-universe systematic-uncertainty tool that produces a portable covariance artifact, a parallel event-loop runner, and a per-run auditability harness. Validated against a published covariance release, the toolchain reproduces the released statistical, flux, and muon-energy-scale terms and shows that they account for roughly 63\% of the total variance, with the remainder unreleased. Using this same infrastructure, we then performed a measurement of our own design, the hadronic recoil-energy distribution of low-energy ($E_\nu<2.5$~GeV) charged-current inclusive events, and found data/simulation shape agreement of $\chi^2/\mathrm{ndf}=1.26$. Together these results show that the platform supports original physics and not only reproductions.

Breaux, Auto [Tulane U. (main)]↗