Search NASA⌕ Search

SEARCH · Search NASA

Results for “BEB”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Results for the Brine Evaporation Bag (BEB) Brine Processing Test

The recent Brine Processing Test compared the NASA Forward Osmosis Brine Dewatering (FOBD), Paragon Ionomer Water Processor (IWP), UMPQUA Ultrasonic Brine Dewatering System (UBDS), and the NASA Brine Evaporation Bag (BEB). This paper reports the results of the BEB. The BEB was operated at 70 deg C and a base pressure of 12 torr. The BEB was operated in a batch mode, and processed 0.4L of brine per batch. Two different brine feeds were tested, a chromic acid-urine brine and a chromic acid-urine-hygiene mix brine. The chromic acid-urine brine, known as the ISS Alternate Pretreatment Brine, had an average processing rate of 95 mL/hr with a specific power of 5kWhr/L. The complete results of these tests will be reported within this paper.

BEB↗

Results of the FY15 Brine Evaporation Bag (BEB) Technology Down-Select Testing

The Brine Evaporation Bag (BEB) recently participated in the Brine Concentrator Technology (BCT) Technology Down-Select (TDS). It was found that the BEB System is able to process ISS (International Space Station) Alternate Pretreat Brine at a rate high enough for ISS application as well as future deep space missions. The BEB System is also capable of processing the brine to a solid residue which will add to the stability and safety of storing the brine residue. The results of the BEB testing for the BCT-TDS will be presented in this paper.

recycling↗

Development of the Continuous-Fill Brine Evaporation Bag (BEB) System

The existing water recovery system on the International Space Station (ISS) is limited to 70 percent reclamation; consequently, long duration space missions are currently unfeasible due to the large quantity of water necessary to sustain the crew. The Brine Evaporation Bag (BEB) is a proposed system to supplement the existing water recovery system aboard the ISS and future deep space missions that can increase water recovery to 99 percent. The BEB project previously focused on the development of only the bag portion of the system. This paper focuses on the development of the BEB Evaporator. It will discuss the work to understand, optimize, and improve the entire BEB system while implementing a continuous-fill process. The results of that development and the advantages and limitations of the continuous-fill process will be presented.

Water Recovery↗

Results of the FY15 Brine Evaporation Bag (BEB) Technology Down-Select Testing

The Brine Evaporation Bag (BEB) recently participated in the Brine Concentrator Technology (BCT) Technology Down-Select (TDS). It was found that the BEB System is able to process ISS (International Space Station) Alternate Pretreat Brine at a rate high enough for ISS application as well as future deep space missions. The BEB System is also capable of processing the brine to a solid residue which will add to the stability and safety of storing the brine residue. The results of the BEB testing for the BCT-TDS will be presented in this paper.

Delzeit, Lance↗

Development of the Auto-Fill Brine Evaporation Bag (BEB) System

The existing water recovery system on the International Space Station (ISS) is limited to 70 percent reclamation; consequently, long duration space missions are currently unfeasible due to the large quantity of water necessary to sustain the crew. The Brine Evaporation Bag (BEB) is a proposed system to supplement the existing water recovery system aboard the ISS and future deep space missions that can increase water recovery to 99 percent. The BEB project previously focused on the development of only the bag portion of the system. This paper focuses on the development of the BEB Evaporator. It will discuss the work to understand, optimize, and improve the entire BEB system while implementing a continuous-fill process. The results of that development and the advantages and limitations of the continuous-fill process will be presented.

Delzeit, Lance↗

Long Beach Transit BEB Progress Report (Jan-Jun 2019)[Slides]

This report summarizes results of a battery electric bus (BEB) evaluation at Long Beach Transit, located in Southern California. Long Beach Transit is collaborating with the California Air Resources Board and the U.S. Department of Energy’s National Renewable Energy Laboratory (NREL) to evaluate the buses in revenue service. The focus of this evaluation is to compare the performance and the operating costs of the BEBs to that of conventional technology buses and to track progress over time. NREL completed a previous report funded by the Federal Transit Administration that documented results from January 2018 through December 2018. This report extends the data analysis through June 2019. The data period focus of this report is January 2019–June 2019. NREL plans to publish another written report on the Long Beach Transit fleet covering all of 2019.

33 ADVANCED PROPULSION SYSTEMS↗

Electrifying Transit: A Guidebook for Implementing Battery Electric Buses

This guidebook is organized to give transit decision-makers and relevant stakeholders an overview of BEB facts, data, and considerations important for planning their implementation in a variety of jurisdictions. First, the benefits and barriers for BEB are identified. Second, BEB basics in terms of the major components, including a) the bus, b) the battery, and c) the numerous charging options. BEB introduces new, high demand loads as the buses are charging and thus have a number of interactions with the electricity grid and the utility, which are explored third. Operation and maintenance of BEBs are considered fourth as BEBs should not be operated and maintained in the same approach as diesel buses. Fifth, the costs of BEB prices are summarized – and the choices of bus and battery are explored in how they impact BEB prices. Funding and financing options that support BEBs and their charging stations are also explored. Safety is a key consideration for BEBs and the guidebook touches upon codes and standards, hazards, and emergencies. The final section examines project execution, bringing together information from all the other sections so that long-term planning, route analysis, and fleet and infrastructure planning can be considered in the preparation of BEB deployment, and then deployment can be evaluated on a regular basis. A final conclusion revisits the information covered in the guidebook.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Optimal charging scheduling and management for a fast-charging battery electric bus system

Herein we discuss how battery electric buses (BEBs) are rapidly being embraced by public transit agencies because of their environmental and economic benefits. To address the problems of limited driving range and time-consuming charging for BEBs, manufacturers have developed rapid on-route charging technology that utilizes typical layovers at terminals to charge buses in operation using high power. With on-route fast-charging, BEBs are as capable as their diesel counterparts in terms of range and operating time. However, on-route fast-charging makes it more challenging to schedule and manage charging events for a BEB system. First, on-route fast-charging may lead to high electricity power demand charges. Second, it may increase electricity energy charges because of charging that occurs during on-peak hours. Without careful charging scheduling and management, on-route fast-charging may significantly increase fuel costs and reduce the economic attractiveness of BEBs. The present study proposes a network modeling framework to optimize the charging scheduling and management for a fast-charging BEB system, effectively minimizing total charging costs. The charging schedule determines when to charge a BEB, while the charging management strategically controls the actual charging power. Charging costs include both electricity demand charges and energy charges. The charging scheduling and management problem is first formulated as a nonlinear nonconvex program with time-continuous variables. A discretizing method and a linear reformulation technique are then adopted to reformulate the model as a linear program, which can be easily solved using off-the-shelf solvers, even for large-scale problems. Finally, the model is demonstrated with extensive numerical studies based on two real-world bus networks. The results demonstrate that the proposed model can effectively determine the optimal charging scheduling and management for a fast-charging BEB system, which carries the potential for use in large-scale real-world bus networks.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Riders’ perceptions towards transit bus electrification: Evidence from Salt Lake City, Utah

While battery electric buses (BEBs) can lead to energy savings and reduced emissions, BEB adoption is developing slowly. Although BEBs offer quieter operations, better acceleration, and no smell of diesel or gas fumes, little focus has been placed on the user’s perspective. Here, this study investigates bus riders’ preferences toward BEBs. To achieve these objectives, a survey was designed and administered to solicit riders’ typical travel behaviors and patterns as well as preferences and opinions about BEBs’ performance in terms of emissions and noise. Statistical analysis showed that several factors influence rider perceptions towards transit bus electrification that include trip purpose, attitudes towards environmental issues and environmental impacts of BEBs, and certain non-instrumental ride factors such as ride comfort and social image. A better understanding of the importance of electrification to transit riders can help transit service providers adjust their marketing decisions and their systemwide operations to accommodate preferences towards BEBs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Foothill Transit Battery Electric Bus Evaluation (Final Report)

This report summarizes results of a battery electric bus (BEB) evaluation at Foothill Transit, located in Southern California. Foothill Transit began a demonstration of three Proterra BEBs in October 2010 to evaluate the battery technology and determine if the BEBs could meet Foothill Transit’s service requirements. Since that pilot project, the agency has added 31 BEBs to its fleet. Foothill Transit is collaborating with the California Air Resources Board (CARB) and the U.S. Department of Energy’s (DOE’s) National Renewable Energy Laboratory (NREL) to evaluate the buses in revenue service. The focus of the evaluation is to compare performance and cost of the BEBs to that of conventional technology in similar service and track progress over time. This report summarizes the results of the BEB and baseline fleets through December 2020.

25 ENERGY STORAGE↗

Continued Development of the Brine Evaporation Bag

The Brine Evaporation Bag (BEB) is a membrane-based bag system for the dewatering of brine. Previous studies showed the ability of the BEB to dewater brine at low temperatures with a 96 percent mass reduction. Additionally, a microgravity flight showed the BEB is microgravity compatible. Current work focuses on the effects of temperature, vacuum, purge gas flow rate, membrane area, and membrane permeability on the rate of dewatering within a vacuum oven configured to mimic the Heat Melt Compactor. Within this study, it was found that changing the temperature or level of vacuum would change the rate of dewatering. The purge gas, membrane area, and membrane permeability did not affect the dewater rate. The reason for this behavior may be that the dewatering is heat transfer limited, and out of all the parameters studied, only the temperature and vacuum have an effect on the heat transfer rate. The ISS (International Space Station) produces brine at a rate of 1.2 liters per day. This initial study showed that it is possible to remove water from a BEB at a rate of 1.6 liters per day in this breadboard configuration; even at moderate temperatures. Development of a dedicated BEB Evaporator will be discussed. In addition, it is further postulated that a specifically designed BEB Evaporator would result in an increased dewatering rate allowing for even lower operating temperatures or faster dewatering rates.

Recycling↗

Economic Analysis of On-Route Fast Charging for Battery Electric Buses: Case Study in Utah

Battery electric buses (BEBs) are increasingly being embraced by transit agencies as an energy-efficient and emission-free alternative to bus fleets. However, because of the limitations of battery technology, BEBs suffer from limited driving range, great battery cost, and time-consuming charging processes. On-route fast charging technology is gaining popularity as a remedy, reducing battery cost, extending driving range, and reducing charging time. With on-route fast charging, BEBs are as capable as their diesel counterparts in relation to range and operating time. However, transit agencies may have the following concerns about on-route fast charging: 1) on-route fast charging stations require massive capital costs; 2) on-route fast charging may lead to high electricity power demand charges; and 3) charging during peak hours may increase electricity energy charges. This study conducts a quantitative economic analysis of on-route fast charging for BEBs, thereby providing some guidelines for transit agencies. An integrated optimization model is first proposed to determine battery size, charger type, and recharging schedule for a general BEB route. Based on the model, an economic analysis of on-route fast charging is then performed on 10 real-world bus routes and a simplified general bus route with different parameters. The results demonstrate that given the current prices of on-route fast charging stations and batteries, it is always beneficial to install on-route fast charging stations for BEBs. A sensitivity analysis is also conducted to show the impact of potential price reductions of batteries.

Engineering↗

Foothill Transit Battery Electric Bus Demonstration Results: Second Report

This report summarizes results of a battery electric bus (BEB) evaluation at Foothill Transit, located in the San Gabriel and Pomona Valley region of Los Angeles County, California. Foothill Transit is collaborating with the California Air Resources Board and the U.S. Department of Energy's (DOE's) National Renewable Energy Laboratory to evaluate its fleet of Proterra BEBs in revenue service. The focus of this evaluation is to compare performance of the BEBs to that of conventional technology and to track progress over time toward meeting performance targets. This project has also provided an opportunity for DOE to conduct a detailed evaluation of the BEBs and charging infrastructure. This is the second report summarizing the results of the BEB demonstration at Foothill Transit and it provides data on the buses from August 2015 through December 2016. Data are provided on a selection of compressed natural gas buses as a baseline comparison.

33 ADVANCED PROPULSION SYSTEMS↗

National Park Service Bus Electrification Study: 2020 Report

This report summarizes important considerations for implementing BEBs in the three national park fleets, detailing information about current buses at each fleet, electric bus demonstration vehicles, as well as performance evaluations of BEBs in Zion, Bryce, and Yosemite. Results include in-use data collection results reporting metrics such as average bus speed, energy usage per trip, and daily distance traveled, as well as effects of high heating, ventilation, and air conditioning (HVAC) system use to both heat and cool the buses, emissions estimations before and after use of electric buses, operating costs, electric vehicle infrastructure, maintenance, and bus driver user experience survey information. Analysis results from this project will help the NPS understand how BEBs and future expansion of BEBs could assist in meeting their bottom line and operational goals and assist NPS in choosing appropriate locations for future BEB deployments.

33 ADVANCED PROPULSION SYSTEMS↗

Balloon-Expandable Biodegradable Stents Versus Self-Expandable Metallic Stents: A Comparison Study of Stent-Induced Tissue Hyperplasia in the Rat Urethra

Purpose: To compare the degrees of stent-induced tissue hyperplasia of balloon-expandable, biodegradable stents (BEBSs) with those of self-expandable metallic stents (SEMSs) in a rat urethral model. Materials and Methods: A total of 20 rats were randomized into two groups. The BEBS group (n = 10) received a poly-l-lactic acid (PLLA) biodegradable stent. The SEMS group (n = 10) received a nitinol bare stent. All rats were killed eight weeks after stent placement. The degree of stent-induced tissue hyperplasia was assessed by comparing the results of retrograde urethrography and histologic examination between the two groups. Results: Stent placement was technically successful in all rats. Two rats in the BEBS group were excluded due to procedure-related death. The mean luminal diameter of stented urethra on urethrograms was not significantly different at 4 and 8 weeks between the two groups. On histologic analysis, the percentage of granulation tissue area (p < 0.001) and the thickness of papillary projection (p < 0.001) were significantly higher in the BEBS group compared with the SEMS group. The inflammatory cell infiltration showed a clear tendency to significance (p = 0.050). There were no statistical differences in the number of epithelial layers and the thickness of submucosal fibrosis between the two groups. Conclusion: Formation of stent-induced tissue hyperplasia was significantly evident in the rat urethra with similar degrees between the BEBS and the SEMS. The BEBS was associated with a thicker papillary projection and larger granulation tissue area resulting from higher inflammation compared with the SEMS.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Time-Dependent Electric Bus and Charging Station Deployment Problem

Battery electric buses (BEBs) have gained popularity due to their emission-free and energy-efficient features. Many transit authorities worldwide have set goals to gradually replace their bus fleets with BEBs. Considering the potential decline in BEB battery and charger prices, this study proposes a time-dependent bus fleet transition model to determine the optimal bus fleet transition plan, which includes selecting the bus lines to be electrified, determining the timing and type of BEBs to be purchased, and deploying on-route fast chargers and depot chargers. The model is a bi-objective integer linear program that considers the trade-off between electrified transit mileages and bus electrification costs. A normalized normal constraint method is applied to solve the bi-objective optimization model. The effectiveness of the proposed model is tested using a real-world bus network. Additionally, sensitivity analyses are conducted to better understand the impact of different parameter values on the optimal solutions. Our proposed model can provide transit authorities with a powerful tool to make informed decisions about their BEB fleet replacement plans.

ADVANCED PROPULSION SYSTEMS↗

Design of the Brine Evaporation Bag for Increased Water Recovery in Microgravity

The existing water recovery system on the International Space Station (ISS) is limited to 75% reclamation; consequently, long duration space missions are currently unfeasible due to the large quantity of water necessary to sustain the crew. The Brine Evaporation Bag (BEB) is a proposed system to supplement the existing water recovery system aboard the ISS that can to increase water recovery to 99%. The largest barrier to high water recovery is mineral scaling inside the water recovery equipment, which leads to equipment failure; therefore, some water must remain to keep the minerals dissolved. This waste stream is liquid brine containing salts, acids, organics, and water. The BEB is designed to recover this remaining water while protecting the equipment from scale. The BEB consists of a sealed bag containing a hydrophobic membrane that allows water vapor and gas to pass through. It is operated under vacuum, heated, and continuously filled with brine to boil away the water. The water vapor is recovered and the solids are contained inside the bag for disposal. The BEB can dry the brine to a solid block. Ongoing work includes improving the design of the BEB and the evaporator to prevent leaks, maximize the rate of water removal, and minimize energy use and weight. Additional testing will determine whether designs are heat- or mass-transfer limited and the optimal water recovery rate.

Brine Evaporation Bag↗

Duluth Transit Authority Battery-Electric Bus Evaluation

Duluth Transit Authority (DTA) collaborated with the U.S. Department of Energy's National Renewable Energy Laboratory (NREL) to evaluate a fleet of seven battery-electric buses (BEBs) in revenue service in Duluth, Minnesota. The focus of the evaluation was to compare performance and cost of the BEBs to that of conventional technology buses in similar service and track progress over time. DTA enlisted the help of the Center for Transportation and the Environment (CTE) to manage the project and provide technical services with the BEB fleet and infrastructure. This report summarizes the results of the BEB evaluation and contains a combination of analyses performed by NREL and by CTE during the overall data collection period of December 2018 through February 2022.

33 ADVANCED PROPULSION SYSTEMS↗