Search NASA⌕ Search

SEARCH · Search NASA

Results for “BELGIUM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Dry Storage of Encapsulated Defective Fuel Rods at Doel 1 and 2 in Belgium - 17581

The project of removing all fissile and non-fissile material out of the spent fuel ponds of Belgian Doel power plant is on-going and in that framework, a solution was needed for evacuating all used fuel elements from Doel 1 and 2 storage pool, including Defective Fuel Assemblies (DFA) and Defective Fuel Rods (DFR). Following the moving out of storage pool, all used fuel elements are intended to be loaded in dry storage casks, this used fuel management option being the one implemented today in Belgium while waiting for final management. Synatom, in charge of all fuel cycle related activities for the nuclear power plants of Belgium and Engie-Electrabel, the operator of both Belgium power plants (Doel and Tihange), had then to find an industrial solution for emptying Doel 1 and 2 used fuel pool and loading DFR in dry storage casks. After having thoroughly reviewed the possible options for implementing dry storage of DFR, Synatom selected AREVA technology. It consists in: - encapsulating each DFR by loading the fuel rod in a capsule, drying the fuel rod using a process which allows to physically verify with high accuracy the residual water content inside the DFR, and welding the capsule, - assembling the capsules in a capsule canister (a skeleton with external dimensions similar to fuel assembly's) and - transferring this capsule canister along with intact fuel assemblies in an associated dry transport and storage (dual purpose) cask, as already used for interim storage of used fuel at Doel site. The French as well as the Belgian competent authorities are parties to the licensing process project. The purpose of the paper is to present the on-going industrial project related to dry storage of dried and encapsulated DFR - along with intact used fuel in dual purpose casks - at Doel 1 and 2 in Belgium, its challenges and progress. The paper presents: - why the drying method, welded capsule and associated cask is the best available technology for dry storage of DFR; - a focus on fuel assembly repair operations (initial step before encapsulation) per-formed in 2015 which consisted in successful extraction of four DFR from their original fuel assembly, using proven and experienced methods and tools; - in conclusion, an update of Doel 1 and 2 DFR dry storage project: reaching of major qualifications and licensing milestones and overview of the project perspectives. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A techno-economic evaluation of solar-powered green hydrogen production for sustainable energy consumption in Belgium

Here this study focuses on the production and consumption of solar-powered green hydrogen in Belgium by comparing the costs of domestic production with those of imports from Morocco and Namibia. The levelized cost of hydrogen (LCOH) is determined via a techno-economic assessment considering various parameters including, power connectivity, electrolyzer types, location factors, and risk premium. The results show that the lowest LCOH can be achieved by on-grid Proton exchange membrane electrolyzers (PEMEL). LCOH of production in Belgium, Morocco, and Namibia with a PEMEL on-grid system are 5.64, 6.32 and 5.13 euro/kg H 2 , respectively. Thus, importing hydrogen from Namibia to Belgium is more competitive than domestic production. The sensitivity analysis suggests that a target LCOH of 3 euro/kg H 2 is achievable by importing from Namibia through various cost combinations. One of these combinations involves reducing the cost of PV panels to 222.3 euro/kW (70% reduction) and electrolyzers to 363.3 euro/kW (25% reduction).

08 HYDROGEN↗

Cost comparison between private and public collection of residual household waste: Multiple case studies in the Flemish region of Belgium

Highlights: Black-Right-Pointing-Pointer The goal is to compare collection costs for residual household waste. Black-Right-Pointing-Pointer We have clustered all municipalities in order to find mutual comparable pairs. Black-Right-Pointing-Pointer Each pair consists of one private and one public operating waste collection program. Black-Right-Pointing-Pointer All cases show that private service has lower costs than public service. Black-Right-Pointing-Pointer Municipalities were contacted to identify the deeper causes for the waste management program. - Abstract: The rising pressure in terms of cost efficiency on public services pushes governments to transfer part of those services to the private sector. A trend towards more privatizing can be noticed in the collection of municipal household waste. This paper reports the findings of a research project aiming to compare the cost between the service of private and public collection of residual household waste. Multiple case studies of municipalities about the Flemish region of Belgium were conducted. Data concerning the year 2009 were gathered through in-depth interviews in 2010. In total 12 municipalities were investigated, divided into three mutual comparable pairs with a weekly and three mutual comparable pairs with a fortnightly residual waste collection. The results give a rough indication that in all cases the cost of private service is lower than public service in the collection of household waste. Albeit that there is an interest in establishing whether there are differences in the costs and service levels between public and private waste collection services, there are clear difficulties in establishing comparisons that can be made without having to rely on a large number of assumptions and corrections. However, given the cost difference, it remains the responsibility of the municipalities to decide upon the service they offer their citizens, regardless the cost efficiency: public or private.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The large scale in-situ PRACLAY heater and seal tests in URL HADES, Mol, Belgium

In Belgium, the URL HADES was constructed in the Boom Clay formation at the Mol site to investigate the feasibility of geological disposal in a clay formation. Since 1995, the URL R and D programme has focused on large scale demonstration tests like the PRACLAY Heater and Seal tests. The main objective of the Heater Test is to demonstrate that the thermal load generated by the heat-emitting waste will not jeopardise the safety functions of the host rock. The primary objective of the Seal Test is to provide suitable hydraulic boundary conditions for the Heater Test. The Seal Test also provides an opportunity to investigate the in-situ behaviour of a bentonite-based EBS. The PRACLAY gallery was constructed in 2007 and the hydraulic seal was installed in 2010. The bentonite is hydrated both naturally and artificially. The swelling, total pressure and pore pressure of the bentonite are continuously measured and analysed by numerical simulations to get a better understanding of this hydration processes. The timing of switching on the heater depends on the progress of the bentonite hydration, as a sufficient seal swelling is needed to fulfill its role. A set of conditions to be met for the heater switch-on and its schedule will be given. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

D and D projects of Tecnubel in Belgium and abroad

Safe decontamination is a regular requirement in the lifecycle of a nuclear plant and is integral to the careful maintenance of any nuclear installation for 4 key reasons: - To decrease the risk of radioactive contamination spreading; - To limit the radioactive doses contracted by maintenance personnel; - To limit the radioactive doses incurred during decommissioning; - To downgrade the class of radioactive waste The primary goal of decommissioning is to remove aged and/or contaminated and/or activated components of an installation, safely and securely, in as short a time as possible. There are several reasons why this may be necessary: - To eliminate the risk of radioactive contamination spreading; - To eliminate the risk of radiation; - To downgrade a site or a circuit to a point where it no longer is submitted to regular inspection; - To remove installations or parts that are no longer in service or have aged There are many different D and D techniques, tools and materials available today. What is important is knowing how best to use them. This paper describes the experiences and the future projects of Tecnubel in D and D projects in Belgium and abroad. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Social scientist on board in long-term management of high level and/or long-lived radioactive waste in Belgium

In Belgium, the long-term management of radioactive waste is under the exclusive competence of the Belgian Agency for Radioactive Waste and Enriched Fissile Materials (knew as ONDRAF/NIRAS). Unlike low-level waste, no institutional policy has yet been formally approved for the long-term management of high level and/or long-lived radioactive waste (knew as B and C waste). In this context, ONDRAF/NIRAS considers the public and stakeholders' participation as an essential factor in the formulation of an effective and legitimate policy. This is why it has decided to integrate them in different ways during the elaboration of the Waste Plan (ONDRAF/NIRAS-document containing guidelines to make a principled policy decision about nuclear waste management). To do so, social scientists have been regularly mobilized either as external evaluators, follow-up committee members, or participatory observants. Hence, the Waste Plan is only the first step in a long decision-making process. For a PhD student under contract with ONDRAF/NIRAS, this mandate consists of thinking out a way to construct an inter-organizational innovative communication system that would be participative, transparent and embedded in a long-term perspective, thus integrating all the further legal steps to take throughout the decision-making process. In this regard, two paradoxical constraints must be taken into account: on the one hand, my own influence on the legal decision-making process should remain limited, because of a series of constraints, lock-ins and previous decisions which have to be respected; on the other hand, ONDRAF/NIRAS expects the research conclusions to be policy relevant and useful. In this paper, the purpose is twofold. Firstly, the issues raised by this policy mandate is an opportunity to question the per-formative dimensions of the social scientist in the decision-making process and, more specifically, to have a reflexive view on our position as PhD Student. Secondly, assuming the role of 'embarked' social scientist, numerous of answers will discuss to face the different dilemmas of the researcher 'in action'. Those reflections follow on, among others, those from previous papers discussed in Quimper in April 2013 and in Leuven in June 2013. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The impact of size distribution assumptions in a bulk one-moment microphysics scheme on simulated surface precipitation and storm dynamics during a low-topped supercell case in Belgium

In this research the impact of modifying the size distribution assumptions of the precipitating hydrometeors in a bulk one-moment microphysics scheme on simulated surface precipitation and storm dynamics has been explored for long-lived low-topped supercells in Belgium. It was shown that weighting the largest precipitating ice species of the microphysics scheme to small graupel results in an increase of surface precipitation because of counteracting effects. On the one hand, the precipitation formation process slowed down, resulting in lower precipitation efficiency. On the other hand, latent heat release associated with freezing favored more intense storms. In contrast to previous studies finding decreased surface precipitation when graupel was present in the microphysics parameterization, storms were rather shallow in the authors simulations. This left little time for graupel sublimation. The impact of size distribution assumptions of snow was found to be small, but more realistic size distribution assumptions of rain led to the strongest effect on surface precipitation. Cold pools shrunk because of weaker rain evaporation at the cold pool boundaries, leading to a decreased surface rain area.

54 ENVIRONMENTAL SCIENCES↗

Dismantling of the Spent Resins Hot Compaction Unit at Tihange NPP, Belgium - 19139

Design, construction and commissioning of the Spent Ion Exchange Resins Hot Compaction Unit at Tihange Nuclear Power Plant took place from 2005 till 2011. In this conditioning process, batches of radioactive resin beads were first dried to less than 4% moisture by a conical vacuum dryer. Resins were then poured in compactable 200-liter drums and super-compacted. Resulting pellets were emplaced in standard 400-liter drums, the packages qualified for final disposal in Belgium, and eventually grouted. The Belgian Waste Management Agency (ONDRAF/NIRAS) was consulted before initiating the project and issued a statement of no objection. The technology turned out to be used for the first time in the particular case of bead shaped resins (unlike powdered resins) and with a grouting requirement. Finally, commissioning tests ended in a safe and reproducible waste form, compliant with prevailing Waste Acceptance Criteria. Volume Reduction Factors of about 2 were recorded after drying and compaction. New tests were carried out to support the Qualification File of the process, which was submitted to ONDRAF/NIRAS. After performing many trials using inactive resins, the Operator dried two batches of radioactive resins and super-compacted four drums: this was a planned qualification step, aiming at the validation of process parameters. In the meantime, ONDRAF/NIRAS made parallel progress in the design of the future Near Surface Repository, where conditioned resins will be disposed of, and found some incompatibility between encapsulated dried resin beads and water intrusion hazards inside the repository. Based on the risk that dried resin beads will swell if they absorb water, causing mechanical stresses likely to compromise the integrity of the disposal site, ONDRAF/NIRAS informed Tihange NPP that the Hot Compaction Unit would not be qualified as spent resins conditioning process. Further to this irrevocable decision, the Operator undertook three actions: - The first one was the qualification and purchase of waste containers to provide additional temporary storage capacity on site for its operational spent resins; - The second one is the selection of a new spent resins conditioning process and the performance of the related qualification tests to demonstrate it meets the updated Waste Acceptance Criteria; - The last one is the dismantling of the Hot Compaction Unit to clear the space and enable the installation of new equipment. This latter task was carried out in 2018, involving decontamination and free release measurements of all the materials, a very limited fraction of it having to be further processed as radioactive waste. Nevertheless, Tihange NPP wishes to keep the super-compactor and its hydraulic unit for a possible resale or reuse for the treatment of mixed waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cyclist exposure to black carbon, ultrafine particles and heavy metals: An experimental study along two commuting routes near Antwerp, Belgium

Highlights: • Wearable UFP and BC instrumentation was carried along whilst cycling 2 different commuting routes. • HR-ICP-MS provided elemental information on railway- and roadside-exposed routes. • Heart rate was tracked simultaneously to estimate the personal inhaled pollutant dose. • The bicycle highway route exhibited 300% lower BC and 20% lower UFP concentrations. • Elemental differences are observed between the considered commuting routes. Urban environments typically exhibit large atmospheric pollution variation, in both space and time. In contrast to traditional monitoring networks suffering from a limited spatial coverage, mobile platforms enable personalized high-resolution monitoring, providing valuable insights into personal atmospheric pollution exposure, and the identification of potential pollution hotspots. This study evaluated personal cyclist exposure to UFPs, BC and heavy metals whilst commuting near Antwerp, Belgium, by performing mobile measurements with wearable black carbon (BC) and ultrafine particle (UFP) instruments. Loaded micro-aethalometer filterstrips were chemically analysed and the inhaled pollutant dose determined from the exhibited heart rate. Considerable spatial pollutant variation was observed along the travelled routes, with distinct contributions from spatial factors (e.g. traffic intersections, urban park and market) and temporary events. On average 300% higher BC, 20% higher UFP and changing elemental concentrations are observed along the road traffic route (RT), when compared to the bicycle highway route (BH). Although the overall background pollution determines a large portion of the experienced personal exposure (in this case 53% for BC and 40% for UFP), cyclists can influence their personal atmospheric pollution exposure, by selecting less exposed commuting routes. Our results, hereby, strengthen the body of evidence in favour of further policy investments in isolated bicycle infrastructure.

54 ENVIRONMENTAL SCIENCES↗

Review of passive corrosion studies of carbon steel in concrete in the context of disposal of HLW and spent fuel in Belgium

The Supercontainer (SC) design is the preferred option for the final disposal of high level nuclear waste and spent fuel in Belgium. The SC consists of a carbon steel overpack surrounded by a very thick concrete buffer, contained within a stainless steel envelope. In this highly alkaline environment of the annulus and under normal conditions (without the ingress of aggressive species), the carbon steel overpack will be protected by a passive oxide film, which is believed to result in very low and almost negligible uniform corrosion rates. This paper discusses the modeling efforts simulating the evolution of various parameters that can potentially influence the corrosion processes (temperature, pH, saturation degree and concentration of aggressive species). The outcome of the Belgian experimental program to study the passive uniform corrosion of carbon steel in concrete is also addressed. Long-term uniform corrosion rates are determined using different independent techniques (hydrogen gas measurements by means of manometric gas cells or pressure transducers, long-term passive current density measurements). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Summary Report: INL CDCIS Cask Scanner Testing at Doel, Belgium

In October and November 2012 the INL Compton Dry-Cask Imaging Scanner (CDCIS) was packaged and transported to the Doel Nuclear Power Plant near Antwerp, Belgium to perform a series of measurements on spent fuel storage casks. The task was performed in support of the DOE/NNSA NA-241 IAEA request 09/TAU-10 Restoration of CoK of LWR Fuel Assemblies by Gamma Scanning from the Top of Casks. The purpose of the measurements was to determine whether the system could by passive detection of the gamma rays being emitted by the contained spent fuel, confirm the presence or absence of the nuclear fuel bundles in a known, verified dry storage cask. If successful, the system, would be used to confirm the presence of the nuclear fuel bundles on four casks in storage that had lost continuity of knowledge due to problems verifying the status of the casks’ Tamper Indicating Device (TID) seals.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Regulatory framework for NORM residues in Belgium

The Belgian radiation protection authority (Federal Agency for Nuclear Control - FANC) has published in March 2013 a decree regulating the acceptance of NORM residues by nonradioactive waste treatment facilities. This regulation is based on the concept of 'work activities involving natural radiation sources' in the sense of article 40 of the 96/29/EURATOM directive. The disposal or processing facilities which accept NORM residues with an activity concentration above a generic exemption level will be considered as 'work activities' and submitted to declaration according to the Belgian radiation protection regulations. On basis of this declaration, specific acceptance criteria for the different types of processing/ disposal of the residues (disposal on landfill, recycling into building materials, etc.) are imposed. FANC has drafted guidelines for these acceptance criteria. A methodological guide for the operators of the concerned facilities was also published. Moreover, sites where significant quantities of NORM residues are or have been disposed, are subjected to an environmental monitoring in the framework of the national program of radiological surveillance of FANC. FANC also introduced in its regulations the concept of anthropogenic radon-prone areas: e.g. former phosphogypsum stacks have been defined as anthropogenic radon-prone areas, which allows some form of regulatory control of these sites. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

General approach to the long-term management at a former radium production site in Olen, Belgium

The paper describes the methodology that ONDRAF/NIRAS, the Belgian Agency for Radioactive Waste and Enriched Fissile Materials, in consultation with the metallurgical company who aims the Olen-site, is developing and wants to apply to arrive at a safe and sustainable long-term solution in Olen. The complex problematic in Olen and how this does fit in the legal missions of ONDRAF/NIRAS is also presented. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Seismic Monitoring at the Underground Nuclear Research Laboratory in Mol, Belgium - 12461

Micro-seismic piezoelectric transmitters installed in the Boom Clay at HADES produce predominantly high frequency signals, above 5 kHz, which favour the generation of P waves. However, above 5 kHz shear (S) waves are not detected by the installation. Recent studies at HADES indicate that it is possible to detect S waves with the current setup when applying a low (5 kHz) cut-off filter. The results also show that S waves have frequencies mainly below 1 kHz, while P waves are detectable at all of the eight transmitted frequencies but show optimum resolution in the range of 7 to 23 kHz. Although the system offers great potential for monitoring the evolution of a geological disposal site, further improvements in signal generation and treatment are necessary. One of these includes the design and testing of a new S-wave source at HADES planned in the framework of the EC MoDeRn project (http://www.modern-fp7.eu/). The seismic installation at HADES continues to provide useful information on the changing properties of the Boom Clay in the near and far field around the PRACLAY gallery since its start of operation in 2006. In the future, the system will also monitor the PRACLAY heater experiment that will start in 2012 and go on for 10 years. So far, the results of long term seismic monitoring show that S waves contain frequencies mainly below 1 kHz. The P waves are detectable at all of the eight transmitted frequencies but show optimum resolution in the range of 7 to 23 kHz. To improve the signal-to-noise ratio and detection of S waves at HADES it is, therefore, necessary to apply a strong low-pass filter that matches the S-wave frequency content. Due to the different frequency ranges observed for the P and S waves, it is recommended to treat them separately. The evolution of both P and S wave velocities in the EDZ around the PRACLAY gallery show continued recovery since its construction in 2007. Modelling results of the variation in crack density obtained from the inversion of the modelled P-wave transmission velocities further confirm the recovery of the EDZ and the self-healing properties of the Boom Clay. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Belgian regulatory framework for decontamination and decommissioning - lessons learned and new initiatives

Belgium can rely on significant experience in the field of decontamination and decommissioning of nuclear facilities. Several projects are ongoing and include research reactors (BR3, Thetis), uranium and MOX fuel fabrication plants (FBFC International, Belgonucleaire), fuel reprocessing facilities (Eurochemic) and radwaste processing facilities (Belgoprocess). Additional projects are expected in the coming years with the planned final shutdown of the oldest nuclear power reactor units. Two national authorities are involved in the decontamination and decommissioning process of nuclear facilities. The FANC (together with its subsidiary Bel V) is concerned for all matters related to nuclear safety and radiation protection, while NIRAS/ONDRAF is concerned for all matters related to radioactive waste and fuel management and financial provisions. These attributions ensure that all safety and material concerns are addressed and that both the licensees and the national authorities bear their own responsibilities. They rely on an existing regulatory framework covering both the procedural and the technical aspects of the decontamination and decommissioning activities. However, opportunities for regulatory improvement were raised after some recent events in Belgium, among which the bankruptcy of a nuclear company producing radioisotopes, involving numerous additional interested parties in a complex judiciary context. Amendments in the current regulations are considered to increase the prerogatives of the authorities regarding the management of radioactive waste by a licensee, the transfer of an operating license from an operator to another, and the general decommissioning strategy of a facility. Furthermore, a dedicated 'waste and decommissioning' working group within WENRA defined new reference levels applying to the decontamination and decommissioning of nuclear facilities. Belgium committed to include these requirements explicitly in its national legislation, even though most of them were already included in the existing decommissioning authorizations. Amendments will cover the safety provisions inherent to the decontamination and decommissioning phase, such as the decommissioning strategy, the qualification of techniques, the experience feedback valorization, the periodic safety reviews, the radioactive waste management, or the final characterization of the sites. Additionally, requirements regarding the authorization process will be detailed, such as the content of the licensee's application file or the structure of the safety report covering the decontamination and decommissioning phase. These changes will contribute to a more secure regulatory framework for all interested parties. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Encapsulation of Defective Fuel Rods for Transport and Dry Storage - 18190

Removing of the whole inventory of fissile and non-fissile material out of the spent fuel pool is performed when the power plant is about to start its last operation phases or may occur during the extended operating life cycle due to plant storage space limitation. Removal of defective spent fuel is then definitely required for emptying the pool and may in addition also be performed in the course of plant operation for reducing pool contamination. Depending on the general used fuel management solution chosen for post-storage pool operations, specific management of a defective fuel assembly (DFA) and/or a defective fuel rod (DFR) should be implemented accordingly to the regulation requirements to be followed. For meeting these DFA and/or DFR management needs, Framatome together with New AREVA offer wide portfolio of solutions with flexibility and adaptability advantages: - from simple to advanced technologies; - for several types of fuel assemblies and/or defective rods; - for suitable and compatible cask designs; - for compatible solution with both used fuel final management strategies (closed and open fuel cycles). For instance, a technology is jointly proposed and developed by New AREVA and Framatome for implementing dry storage of DFR. It consists in: - encapsulating each DFR by loading the fuel rod in a respective capsule, drying the fuel rod using a process which allows to physically verify with high accuracy the dryness inside the DFR, and seal welding the capsule - assembling the capsules in a capsule canister (a skeleton with external dimensions similar to a respective fuel assembly) and - transferring the capsule canister along with intact spent fuel assemblies in an associated dry transport and storage (dual purpose) cask. Such a project is currently being implemented in Belgium. After successfully obtaining the cask transport and storage license extensions for including the encapsulated DFR content, the first encapsulation campaign has been started in 2017. The purpose of the paper is to present the industrial solutions proposed by Framatome and New AREVA together, for management of DFR, notably the one related to dry storage of encapsulated DFR implemented in Belgium and the perspectives opened by this successful project. The paper presents: - the available solutions for management of DFA and/or DFR depending on applicable requirements - the drying method, welding of a capsule and associated cask as the state of art technology for dry storage of DFR and/or DFA; - lessons learned from project management and encapsulation campaign performed in Belgium; - perspectives for management of DFR and/or DFA. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Activities ONDRAF/NIRAS related to the decommissioning of nuclear facilities

Since 1980, the Agency is responsible by law for the safe management of all radioactive waste produced in Belgium, including decommissioning wastes. By the law of 11 January 1991 and the implementing Royal Decree of 16/10/1991, ONDRAF/NIRAS has been entrusted with a mission concerning the decommissioning of nuclear facilities. This mission involves the collection and assessment of data concerning decommissioning forecasts for nuclear facilities, the approval of facilities' decommissioning programmes, the establishment - in consultation with operators - of financing conditions for decommissioning, as well as the implementation of these programmes on request by the operator, or in the case of its failure to do so. This is the case for the company Best Medical Belgium SA located at Fleurus (MDS Nordion SA, till April 2011), which produced radioisotopes for medical applications and went bankrupt in 2012. These installations have been entrusted to ONDRAF/NIRAS. A plan of action was developed for taking over the operations in the framework of remediation and decommissioning. Steps have been taken to integrate his new role as a nuclear operator. The installations of Best Medical Belgium SA are now referred to as the 'O/N - Site Fleurus.' Nuclear facility operators, or any person requesting to operate a nuclear facility, are obliged to provide ONDRAF/NIRAS, under their responsibility and in due time, with all the necessary information concerning these facilities' decommissioning forecasts, the nature, quantities and dates of transfer of the resulting waste, and the financing conditions for these facilities' decommissioning. In order to make the necessary funds available for decommissioning a nuclear facility when it will be shut down, operators are obliged to establish provisions during the facility's active life. These provisions are calculated in such a way that the total amount established at the time of the final shutdown covers all costs resulting from the facility's final phase, namely the preparation of decommissioning, decontamination, more or less long-term maintenance, dismantling, treatment, conditioning and disposal of waste produced during this phase. In order to face to multiple and repeated evaluation processes, the Agency, already in the early 90's, started with the implementation of its own integrated data processing system, recording the physical and radiological inventories of nuclear facilities, and allowing the evaluation of the quantities of decommissioning materials and wastes as well as of the decommissioning costs of these facilities. The cost evaluations cover all decommissioning activities from final shutdown of the facility until final release from nuclear control, as well as conventional demolition and site restoration if required. Beside the information related to the inventories, the database involves so called auxiliary tables integrating unit prices of the various decontamination and dismantling techniques, unit rates for radioactive waste processing, interim storage and final disposal. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radioactive Spent Ion-Exchange Resins Conditioning by the Hot Supercompaction Process at Tihange NPP - Early Experience - 12200

Spent ion-exchange resins are considered to be problematic waste that, in many cases, requires special approaches and precautions during their conditioning to meet the acceptance criteria for disposal. In Belgium, for economical reasons, the Volume Reduction Factor is a key criterion. After Tractebel Engineering performed a technical and economical comparison of the industrially available systems, Tihange NPP decided to install a spent ion-exchange resins hot supercompaction unit with Tractebel Engineering in the role of architect-engineer. The treatment and conditioning unit processes the spent ion-exchange resins through the following steps: dewatering of the resins, drying the resins under deep vacuum, discharging the dried resins into compactable drums, super-compacting the drums to generate pellets, grouting the pellets into standard 400 litres waste drums (overpacks) licensed for final disposal in the near-surface repository in Belgium. Several developments were required to adapt the reference process and equipment to PWR spent ion-exchange bead resins and Belgian radioactive waste acceptance criteria. In order to avoid cracks on the compacted drum, and external surface contamination from resin leaks, some improvements were achieved to minimize spring-back as well as the risk of cracking the drum wall. Placing the compactable drum inside a second, slightly larger drum, guarantees clean and reproducible pellets. Currently the commissioning phase is on-going. Numerous process validation tests have been completed. An acceptance file was transmitted to the Belgian Waste Management Authority recently. This will be followed by demonstration tests necessary to obtain their final acceptance of the installation. More than 3 800 drums of mixed powdered and bead resins have been processed by the reference Hot Compaction process, achieving a Volume Reduction Factor (VRF) of 2.5. The equipment has been proven to be a reliable technology with low operation and maintenance costs. Tractebel Engineering has managed the construction of a new application of this process in Belgium at Tihange NPP. Several developments were required to adapt the reference process and equipment to PWR spent ion-exchange bead resins and Belgian radioactive waste acceptance criteria. The chosen method of conditioning (draining, drying and compaction of the spent resins followed by grouting of the pellets in a 400 litres drum) immobilizes the spent resins under the form of a solid, compact, stable, and non dispersible block free of interstitial water. The various series of inactive tests which were conducted at Tihange NPP, helped among others to determine the best design of the compactable drum and lid and to set the value of critical parameters such as vapour temperature at the end of drying, speed, force and duration of compaction. In an environment of very limited space for interim storage and in the absence of an operational final repository site, or in the case of high final disposal costs, the process exhibits the following key advantages: - Achieving a Volume Reduction Factor (VRF) close to 1 (overpack included) for the interim storage instead of increased volumes observed with other currently available processes; - Achieving a water free end product; - Creating a flexible waste product for interim storage (pellet), which can be retrieved and routed into alternative types of package later, if not initially grouted; - Using well proven standard technologies like drying and compaction; - Flexible use of the system components for the supercompaction of other operational solid waste streams when not conducting resins conditioning campaigns. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗