Production of high intensity Beta beams at the ISOLDE facility
We discuss a design study devoted to a construction of the Beta beams facility at CERN, a next generation European facility aiming for a production of pure and collimated ultra-relativistic beam of electron (anti)neutrinos with help of accelerated {beta}-decaying radioactive ions circulating in a storage decay ring. This high intense source of (anti)neutrinos directed towards a remote underground neutrino detector will allow to measure neutrino oscillations with high accuracy offering a unique chance for establishing a value of the {beta}{sub 13} mixing angle and CP violating phase. Recently, a significant progress have been achieved on the conceptual design of high power targets required for a production and an extraction of two baseline isotopes, {sup 6}He and {sup 18}Ne, at the unexampled rate of several 10{sup 13} ions/s. There is a possibility to produce these isotopes using the so-called Isotope Separation On Line (ISOL) method at the ISOLDE facility (CERN). The {sup 6}He production is realized by taking advantage of the {sup 9}Be(n,{alpha}){sup 6}He reaction and with help of spallation neutrons and porous BeO target material. The production of {sup 18}Ne through the {sup 19}F(p,2n){sup 18}Ne reaction at required intensities is even more challenging. Currently, a molten salt (NaF) loop target is proposed for a production of high rate of {sup 18}Ne required for the Beta beams project. The progress on the design study associated with new data and plans for future is briefly presented.