Search NASA⌕ Search

SEARCH · Search NASA

Results for “BIM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Creating 3D Web-Based Game Environment Using BIM Models for Virtual On-Site Visiting of Building HVAC Systems

A web-based 3D game project was presented in this paper to demonstrate the process of using building information modeling (BIM) to create an interactive 3D on-line `Green' training environment. The system architecture, the implementation process and major components of this virtual training environment were discussed. Existing studies on BIM-based collaborations mainly focused on local-file-sharing approach using proprietary applications. Limited research focused on using BIM as an online gaming platform to create a web browser-based interactive 3D virtual environment for collaboration, learning and/or training. The gap was partially caused by the lack of understanding how to implement a BIM-based game in web browser environment. In this paper, the authors provided an implementation example using a hospital BIM model to create an interactive web-based 3D BIM game environment to allow users to visualize and interact with the BIM components using regular web browsers. The intention of this project is to create a proprietaryindependent training environment to conduct energy re-commissioning trainings for hospital facility management staff. This virtual BIM environment can potentially be customized for engineering student learning and project collaborations as well. The conclusion was that current BIM and game technology are mature enough to allow us to create serious web-based interactive learning/training virtual environment. The successful integration of BIM and web browsers paved the way for many learning and training applications, which need built-environment as context.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Transforming BIM to BEM: Generation of Building Geometry for the NASA Ames Sustainability Base BIM

Typical processes of whole Building Energy simulation Model (BEM) generation are subjective, labor intensive, time intensive and error prone. Essentially, these typical processes reproduce already existing data, i.e. building models already created by the architect. Accordingly, Lawrence Berkeley National Laboratory (LBNL) developed a semi-automated process that enables reproducible conversions of Building Information Model (BIM) representations of building geometry into a format required by building energy modeling (BEM) tools. This is a generic process that may be applied to all building energy modeling tools but to date has only been used for EnergyPlus. This report describes and demonstrates each stage in the semi-automated process for building geometry using the recently constructed NASA Ames Sustainability Base throughout. This example uses ArchiCAD (Graphisoft, 2012) as the originating CAD tool and EnergyPlus as the concluding whole building energy simulation tool. It is important to note that the process is also applicable for professionals that use other CAD tools such as Revit (“Revit Architecture,” 2012) and DProfiler (Beck Technology, 2012) and can be extended to provide geometry definitions for BEM tools other than EnergyPlus. Geometry Simplification Tool (GST) was used during the NASA Ames project and was the enabling software that facilitated semi-automated data transformations. GST has now been superseded by Space Boundary Tool (SBT-1) and will be referred to as SBT-1 throughout this report. The benefits of this semi-automated process are fourfold: 1) reduce the amount of time and cost required to develop a whole building energy simulation model, 2) enable rapid generation of design alternatives, 3) improve the accuracy of BEMs and 4) result in significantly better performing buildings with significantly lower energy consumption than those created using the traditional design process, especially if the simulation model was used as a predictive benchmark during operation. Developing BIM based criteria to support the semi-automated process should result in significant reliable improvements and time savings in the development of BEMs. In order to define successful BIMS, CAD export of IFC based BIMs for BEM must adhere to a standard Model View Definition (MVD) for simulation as provided by the concept design BIM MVD (buildingSMART, 2011). In order to ensure wide scale adoption, companies would also need to develop their own material libraries to support automated activities and undertake a pilot project to improve understanding of modeling conventions and design tool features and limitations.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Thermal Performance and Reliability Characterization of Bonded Interface Materials (BIMs): Preprint

Thermal interface materials are an important enabler for low thermal resistance and reliable electronics packaging for a wide array of applications. There is a trend towards bonded interface materials (BIMs) because of their potential for low thermal resistivity (< 1 mm2K/W). However, BIMs induce thermomechanical stresses in the package and can be prone to failures and integrity risks. Deteriorated interfaces can result in high thermal resistance in the package and degradation and/or failure of the electronics. DARPA's Thermal Management Technologies program has addressed this challenge, supporting the development of mechanically-compliant, low resistivity nano-thermal interface (NTI) materials. In this work, we describe the testing procedure and report the results of NREL's thermal performance and reliability characterization of an initial sample of four different NTI-BIMs.

30 DIRECT ENERGY CONVERSION↗

Molecular basis for the interplay of apoptosis and proliferation mediated by Bcl-xL:Bim interactions in pancreatic cancer cells

Highlights: Black-Right-Pointing-Pointer Direct role of Bcl-2 protein interactions in cell proliferation is not clear. Black-Right-Pointing-Pointer Designed Bcl-xL mutants show opposite effects on apoptosis and proliferation. Black-Right-Pointing-Pointer Disrupting Bcl-xL:Bim interaction increased apoptosis in pancreatic cancer. Black-Right-Pointing-Pointer Disrupting Bcl-xL:Bim interaction decreased proliferation in pancreatic cancer. Black-Right-Pointing-Pointer Bcl-xL:Bim interaction can control both apoptosis and proliferation. -- Abstract: A major mechanism through which cancer cells avoid apoptosis is by promoting the association of anti-apoptotic members of the pro-survival Bcl-2 protein family (like Bcl-2 and Bcl-xL) with BH{sub 3} domain-only proteins (like Bim and Bid). Apoptosis and cell proliferation have been shown to be linked for many cancers but the molecular basis for this link is far from understood. We have identified the Bcl-xL:Bim protein-protein interface as a direct regulator of proliferation and apoptosis in pancreatic cancer cells. We were able to predict and subsequently verify experimentally the effect of various Bcl-xL single-point mutants (at the position A142) on binding to Bim by structural analysis and computational modeling of the inter-residue interactions at the Bcl-xL:Bim protein-protein interface. The mutants A142N, A142Q, and A142Y decreased binding of Bim to Bcl-xL and A142S increased this binding. The Bcl-xL mutants, with decreased affinity for Bim, caused an increase in apoptosis and a corresponding decrease in cell proliferation. However, we could prevent these effects by introducing a small interfering RNA (siRNA) targeted at Bim. These results show a novel role played by the Bcl-xL:Bim interaction in regulating proliferation of pancreatic cancer cells at the expense of apoptosis. This study presents a physiologically relevant model of the Bcl-xL:Bim interface that can be used for rational therapeutic design for the inhibition of proliferation and cancer cell resistance to apoptosis.

60 APPLIED LIFE SCIENCES↗

Issues in Bi-Directional Interoperability between BIM and BEM

The state-of-the-art interoperability between Building Information Modeling (BIM) and Building Energy Modeling (BEM) is mainly one-way. BEM software like EnergyPlus takes design input from BIM and simulates the energy consumption of the building. BIM, however, is unable to leverage energy simulation results from BEM smoothly. This lack of bi-directional interoperability between BIM and BEM prevents buildings from seeking more energy-efficient design options and limits BIM applications in optimal generative design. In this research, the authors have conducted the following activities related to two-way interoperability between BIM and BEM: (1) surveyed its current status through literature review, (2) investigated barriers to the bi-directional interoperability, and (3) suggested possible approaches to enable bi-directional interoperability and research outlook in the field. As a result, the authors have identified three main barriers to BIM BEM interoperability, namely, inefficient collaboration, limited scope in information transformation, and lack of BEM to BIM transformation. Future directions are suggested to address these barriers.

building design↗

A BIM-based system for demolition and renovation waste estimation and planning

Highlights: ► We developed a waste estimation system leveraging the BIM technology. ► The system can calculate waste disposal charging fee and pick-up truck demand. ► We presented an example scenario demonstrating this system. ► Automatic, time-saving and wide applicability are the features of the system. - Abstract: Due to the rising worldwide awareness of green environment, both government and contractors have to consider effective construction and demolition (C and D) waste management practices. The last two decades have witnessed the growing importance of demolition and renovation (D and R) works and the growing amount of D and R waste disposed to landfills every day, especially in developed cities like Hong Kong. Quantitative waste prediction is crucial for waste management. It can enable contractors to pinpoint critical waste generation processes and to plan waste control strategies. In addition, waste estimation could also facilitate some government waste management policies, such as the waste disposal charging scheme in Hong Kong. Currently, tools that can accurately and conveniently estimate the amount of waste from construction, renovation, and demolition projects are lacking. In the light of this research gap, this paper presents a building information modeling (BIM) based system that we have developed for estimation and planning of D and R waste. BIM allows multi-disciplinary information to be superimposed within one digital building model. Our system can extract material and volume information through the BIM model and integrate the information for detailed waste estimation and planning. Waste recycling and reuse are also considered in our system. Extracted material information can be provided to recyclers before demolition or renovation to make recycling stage more cooperative and more efficient. Pick-up truck requirements and waste disposal charging fee for different waste facilities will also be predicted through our system. The results could provide alerts to contractors ahead of time at project planning stage. This paper also presents an example scenario with a 47-floor residential building in Hong Kong to demonstrate our D and R waste estimation and planning system. As the BIM technology has been increasingly adopted in the architectural, engineering and construction industry and digital building information models will likely to be available for most buildings (including historical buildings) in the future, our system can be used in various demolition and renovation projects and be extended to facilitate project control.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fluid shear stress suppresses TNF-α-induced apoptosis in MC3T3-E1 cells: Involvement of ERK5-AKT-FoxO3a-Bim/FasL signaling pathways

TNF-α is known to induce osteoblasts apoptosis, whereas mechanical stimulation has been shown to enhance osteoblast survival. In the present study, we found that mechanical stimulation in the form of fluid shear stress (FSS) suppresses TNF-α induced apoptosis in MC3T3-E1 cells. Extracellular signal-regulated kinase 5 (ERK5) is a member of the mitogen-activated protein kinase (MAPK) family that has been implicated in cell survival. We also demonstrated that FSS imposed by flow chamber in vitro leads to a markedly activation of ERK5, which was shown to be protective against TNF-α-induced apoptosis, whereas the transfection of siRNA against ERK5 (ERK5-siRNA) reversed the FSS-medicated anti-apoptotic effects. An initial FSS-mediated activation of ERK5 that phosphorylates AKT to increase its activity, and a following forkhead box O 3a (FoxO3a) was phosphorylated by activated AKT. Phosphorylated FoxO3a is sequestered in the cytoplasm, and prevents it from translocating to nucleus where it can increase the expression of FasL and Bim. The inhibition of AKT-FoxO3a signalings by a PI3K (PI3-kinase)/AKT inhibitor (LY294002) or the transfection of ERK5-siRNA led to the nuclear translocation of non-phosphorylated FoxO3a, and increased the protein expression of FasL and Bim. In addition, the activation of caspase-3 by TNF-α was significantly inhibited by aforementioned FSS-medicated mechanisms. In brief, the activation of ERK5-AKT-FoxO3a signaling pathways by FSS resulted in a decreased expression of FasL and Bim and an inhibition of caspase-3 activation, which exerts a protective effect that prevents osteoblasts from apoptosis. - Highlights: • Fluid shear stress inhibits osteoblast apoptosis induced by TNF-α. • Inhibition of ERK5 activity by transfection of ERK5 siRNA blocks FSS-mediated anti-apoptotic effect in osteoblast. • Activated ERK5-AKT-FoxO3a-Bim/FasL signaling pathways by FSS is required to protect osteoblast from apoptosis.

60 APPLIED LIFE SCIENCES↗

Monitoring installation of partially occluded subassemblies in modular construction factories using BIM, ray tracing, and computer vision

Modular and offsite construction methods are being increasingly adopted due to the advantages they offer in terms of project completion time, quality, and energy-efficiency. Despite these advantages, the current state of monitoring systems in modular construction factories highly relies on labor-intensive, subjective, and error-prone observational methods. A large body of research has aimed to automate the monitoring process using an array of sensors, such as IMUs and RFIDs, during the past two decades. Recently, computer vision-based methods have gained increasing interest as a non-intrusive technology to monitor the process inside modular construction factories. However, partial occlusion challenges have impeded their practical application on a large scale. This challenge is specifically important for monitoring the installation of subassemblies since they can obstruct the view of the monitoring camera, especially those that enable long-term monitoring like closed-circuit television (CCTV) fixed-view surveillance cameras. Here, this paper aims to address this challenge by proposing a novel computer vision-based method to monitor the installation of new subassemblies inside modular factories in highly occluded scenes. The proposed methodology identifies the subassemblies in the CCTV video footage using computer vision, analyzes the occlusions using BIM and ray casting techniques, and estimates the progress of assembly by comparing the BIM model with the detected subassemblies in the video. The proposed methodology was successfully validated on surveillance videos captured from a volumetric modular construction factory in the U.S., achieving 93% accuracy in identifying the installation of subassemblies. The results from this research show that the integration of BIM and computer vision is a promising method for monitoring the installation processes inside modular factories under severe occlusion.

97 MATHEMATICS AND COMPUTING↗

Low-Temperature Rotational Tunneling of Tetrahydroborate Anions in Lithium Benzimidazolate-Borohydride Li 2 (bIm)BH 4

To investigate the dynamical properties of the novel hybrid compound, lithium benzimidazolate-borohydride Li 2 (bIm)BH 4 (where bIm denotes a benzimidazolate anion, C 7 N 2 H 5 - ), we have used a set of complementary techniques: neutron powder diffraction, ab initio density functional theory calculations, neutron vibrational spectroscopy, nuclear magnetic resonance, neutron spin echo, and quasi-elastic neutron scattering. Our measurements performed over the temperature range from 1.5 to 385 K have revealed the exceptionally fast low-temperature reorientational motion of BH 4 - anions. This motion is facilitated by the unusual coordination of tetrahedral BH 4 - anions in Li2(bIm)BH4: each anion has one of its H atoms anchored within a nearly square hollow formed by four coplanar Li+ cations, while the remaining -BH 3 fragment extends into a relatively open space, being only loosely coordinated to other atoms. As a result, the energy barriers for reorientations of this fragment around the anchored B-H bond axis are very small, and at low temperatures, this motion can be described as rotational tunneling. The tunnel splitting derived from the neutron spin echo measurements at 3.6 K is 0.43(2) ueV. With increasing temperature, we have observed a gradual transition from the regime of low-temperature quantum dynamics to the regime of classical thermally activated jump reorientations. The jump rate of the uniaxial 3-fold reorientations reaches 5 x 10 11 s -1 at 80 K. Nearer room temperature and above, both nuclear magnetic resonance and quasi-elastic neutron scattering measurements have revealed the second process of BH4- reorientations characterized by the activation energy of 261 meV. This process is several orders of magnitude slower than the uniaxial 3-fold reorientations; the corresponding jump rate reaches ~7 x 10 8 s -1 at 300 K.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Bim-to-fea Conversion Program

The purpose of this program is to enable interoperability between BIM-based architectural design software (i.e., Revit, ArchiCAD, AVEVA E3D) to structural analysis software (i.e., SAP2000). The program takes in BIM building model data via the IFC file format, automatically transforms the architectural coordination entities (structural beams, columns, slabs, walls) to structural analysis entities (i.e., finite element space frames and shells), automatically adjusts the connectivity of the structural analysis entities, and finally exports the structural analysis entities as a structural analysis model contained within a new IFC file. For example, a 3D building in Revit can be exported to an IFC file, run through this BIM-to-FEA program, then the exported IFC can be inputted into SAP2000.

Crowder, Nicholas [Idaho National Laboratory (INL)↗

Virtual Construction of Space Habitats: Connecting Building Information Models (BIM) and SysML

Current trends in design, construction and management of complex projects make use of Building Information Models (BIM) connecting different types of data to geometrical models. This information model allow different types of analysis beyond pure graphical representations. Space habitats, regardless their size, are also complex systems that require the synchronization of many types of information and disciplines beyond mass, volume, power or other basic volumetric parameters. For this, the state-of-the-art model based systems engineering languages and processes - for instance SysML - represent a solid way to tackle this problem from a programmatic point of view. Nevertheless integrating this with a powerful geometrical architectural design tool with BIM capabilities could represent a change in the workflow and paradigm of space habitats design applicable to other aerospace complex systems. This paper shows some general findings and overall conclusions based on the ongoing research to create a design protocol and method that practically connects a systems engineering approach with a BIM architectural and engineering design as a complete Model Based Engineering approach. Therefore, one hypothetical example is created and followed during the design process. In order to make it possible this research also tackles the application of IFC categories and parameters in the aerospace field starting with the application upon the space habitats design as way to understand the information flow between disciplines and tools. By building virtual space habitats we can potentially improve in the near future the way more complex designs are developed from very little detail from concept to manufacturing.

space architecture↗

BIM Interoperability Tool for Improving IFC-based Model Data Exchange Between Architectural Design and Structural Analysis for Linear Piping Components

There is a growing need in the AEC industry for the digitalization of model-based data exchange in BIM workflows. However, users continue to face difficulties exchanging data between BIM-based computer-aided design (CAD) and computer-aided engineering (CAE) software, even with the open, non-proprietary data exchange format called Industry Foundation Classes (IFC). Proposed solutions in academic research focus primarily on building systems, with comparatively little attention to piping models. Therefore, this paper introduces an interoperability tool for enabling piping model data exchange between architectural and structural analysis domains. The tool is tested using a piping model created in Autodesk Revit and shows marked improvement for IFC-based CAD-to-CAE interoperability over existing practice.

97 MATHEMATICS AND COMPUTING↗

Data Reliability in BIM and Performance Analytics: A Survey of Contemporary AECO Practice

As awareness around building energy consumption increases, practitioners are encouraged to consider performance aspects regarding the built environment more closely and find ways to improve its efficiency. Improvements in building information modeling (BIM) and building performance simulation (BPS) tools present opportunities to facilitate information communication with a wider range of stakeholders. The building sector can benefit from the integration of performance informatics; however, there has been limited success in utilizing available technologies that promote data integration and management in favor of enriching our knowledge and understanding of buildings as artifacts of information. This phenomenon was investigated by conducting a survey, together with a review of relevant literature, to depict the relevant challenges and opportunities for the architecture, engineering, construction, and owner-operated (AECO) industry, as it undergoes digital transformation, as well as the working practices that have formed around them. It is argued that the current tools available to practitioners do not support effective data serialization between design and analytics processes, affecting the collaboration between team members. Lastly, a series of functional goals are proposed to support a higher level of reliability in the ways information is mobilized, by rethinking the technologies and methods for organizing information systems.

42 ENGINEERING↗

Automated compatibility checking of prefabricated components using 3D as-built models and BIM

There have been recent efforts to use reality capture technologies to perform remote quality control in construction. However, there is a lack of research efforts in detecting construction incompatibilities in modular construction using reality capture technologies. The construction incompatibilities in modular construction often cause reworks and delays in the project schedule. To address this issue, this paper presents a general compatibility analysis method that propose scanning the modules in manufacturing plant and construction site, and check module-to-module compatibility remotely, prior to the shipment and installation. This study provides three sample module-to-module compatibility scenarios to validate the proposed compatibility analysis. The case study results show that the compatibility analysis method was able to identify the compatibility issues with high accuracy. Lastly, the compatibility analysis method was validated in terms of accuracy and time performance in six scenarios that was defined on the modules.

42 ENGINEERING↗

Continuously Doping BiM 2 Sr 2 CaCu 2 O 8+δ into Electron-Doped Superconductor by CaH 2 Annealing Method

As a typical hole-doped cuprate superconductor, Bi 2 Sr 2 CaCu 2 O 8+δ (Bi2212) carrier doping is mostly determined by its oxygen content. Traditional doping methods can regulate its doping level within the range of hole doping. Here we report the first application of CaH 2 annealing method in regulating the doping level of Bi2212. By continuously controlling the anneal time, a series of differently doped samples can be obtained. The combined experimental results of x-ray diffraction, scanning transmission electron microscopy, resistance and Hall measurements demonstrate that the CaH 2 induced topochemical reaction can effectively change the oxygen content of Bi2212 within a very wide range, even switching from hole doping to electron doping. Further, we also found evidence of a low-T c superconducting phase in the electron doping side.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗