Search NASA⌕ Search

SEARCH · Search NASA

Results for “BLOWDOWN”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Regional distribution of large blowdown patches across Amazonia in 2005 caused by a single convective squall line: Distribution of Amazonia Blowdown Damage

In mid-January 2005 a convective squall line traversed 4.5 × 10 6 km 2 of Amazonia from southwest to northeast. As seen in Landsat images, this atypical convective storm left blowdown imprints with diffuse geometry, unlike the fan-shaped wind disturbance of much more frequent east-to-west propagating squall lines. Previous work reported 0.2% of the forest area damaged by this one relatively rare event within one Landsat image and assumed similar disturbance across the entire traverse. Here, we mapped convective wind damage impact to the region in 2005 by identifying large-scale (>4 ha) blowdown imprints in 30 Landsat images. The diffuse-type imprints associated with this single squall line contributed up to 60–72% of total 2005 wind-disturbed area detected across the region, but damage was highly concentrated in central Amazonia. Consequently, the distribution of large wind damage patches in 2005 across Amazonia was very different from long-term average. In conclusion, tegional distribution of wind-driven tree mortality for smaller patch sizes remains unknown.

54 ENVIRONMENTAL SCIENCES↗

Recover Heat from Boiler Blowdown - Steam Tip Sheet #10

Heat can be recovered from boiler blowdown by using a heat exchanger to preheat boiler makeup water. Any boiler with continuous blowdown exceeding 5% of the steam rate is a good candidate for the introduction of blowdown waste heat recovery. Larger energy savings occur with high-pressure boilers. This revised AMO tip sheet on recovering heat from boiler blowdown provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Comments on settling chamber design for quiet, blowdown wind tunnels

Transfer of an existing continous circuit supersonic wind tunnel to Langley and its operation there as a blowdown tunnel is planned. Flow disturbance requirements in the supply section and methods for reducing the high level broad band acoustic disturbances present in typical blowdown tunnels are reviewed. Based on recent data and the analysis of two blowdown facilities at Langley, methods for reducing the total turbulence levels in the settling chamber, including both acoustic and vorticity modes, to less than one percent are recommended. The pertinent design details of the damping screens and honeycomb and the recommended minimum pressure drop across the porous components providing the required two orders of magnitude attenuation of acoustic noise levels are given. A suggestion for the support structure of these high pressure drop porous components is offered.

Beckwith, I. E.↗

Blowdown Recovery System for Cooling Tower Water Treatment

From 2014-2017, the U.S. General Services Administration's (GSA's) average nationwide water rates increased 41%. Rapidly escalating costs, mandated water-reduction targets, and the fact that an average of 28% of commercial office building water use is associated with heating and cooling led the GSA Green Proving Ground program to select alternative water treatment technologies for in-field validation. This report summarizes the latest alternative water treatment evaluation completed in 2022 - a Blowdown Recovery System for Cooling Tower Water Treatment. This Green Proving Ground program project assessed the performance of an alternative water treatment system provided by Aqualogix for treating cooling tower blowdown at the Lloyd D. George U.S. Courthouse in Las Vegas, Nevada.

13 HYDRO ENERGY↗

A procedure for predicting internal and external noise fields of blowdown wind tunnels

The noise generated during the operation of large blowdown wind tunnels is considered. Noise calculation procedures are given to predict the test-section overall and spectrum level noise caused by both the tunnel burner and turbulent boundary layer. External tunnel noise levels due to the tunnel burner and circular jet exhaust flow are also calculated along with their respective cut-off frequency and spectrum peaks. The predicted values are compared with measured data, and the ability of the prediction procedure to estimate blowdown-wind-tunnel noise levels is shown.

Hosier, R. N.↗

Performance of Blowdown Turbine Driven by Exhaust Gas of Nine-Cylinder Radial Engine

An investigation was made of an exhaust-gas turbine having four separate nozzle boxes each covering a 90 degree arc of the nozzle diaphragm and each connected to a pair of adjacent cylinders of a nine-cylinder radial engine. This type of turbine has been called a "blowdown" turbine because it recovers the kinetic energy developed in the exhaust stacks during the blowdown period, that is the first part of the exhaust process when the piston of the reciprocating engine is nearly stationary. The purpose of the investigation was to determine whether the blow turbine could develop appreciable power without imposing any large loss in engine power arising from restriction of the engine exhaust by the turbine.

Turner, L Richard↗

Simplified Analysis of Pulse Detonation Rocket Engine Blowdown Gasdynamics and Performance

Pulse detonation rocket engines (PDREs) offer potential performance improvements over conventional designs, but represent a challenging modellng task. A simplified model for an idealized, straight-tube, single-shot PDRE blowdown process and thrust determination is described and implemented. In order to form an assessment of the accuracy of the model, the flowfield time history is compared to experimental data from Stanford University. Parametric Studies of the effect of mixture stoichiometry, initial fill temperature, and blowdown pressure ratio on the performance of a PDRE are performed using the model. PDRE performance is also compared with a conventional steady-state rocket engine over a range of pressure ratios using similar gasdynamic assumptions.

Morris, C. I.↗

Treatment process for produced water and blowdown water

This invention provides processes for treating a mixture of produced water and blowdown water comprising introducing produced water (PW) into blowdown water (BD) for forming a PW-BD water mixture, softening the PW-BD water mixture, subjecting the PW-BD water mixture to activated carbon filtration and reverse osmosis membrane desalination. The process generates a product water and a brine by-product.

Lin, Lian-Shin↗

Electrocoagulation Combined with Ultrafiltration Membranes as Pretreatment for RO Desalination of Synthetic Cooling Tower Blowdown Water

Electrocoagulation (EC), an electrochemical water treatment process, is commonly used to remove particulate and colloidal matter from water. Here, in this study, we demonstrate that EC, when coupled with membrane filtration, is also capable of removing dissolved species, such as Ca + , Mg 2+ , and SiO x . The removal of such species is important for downstream membrane-based desalination treatment of the water that can suffer from reduced performance due to membrane scaling. Here, we describe how EC can be combined with a low-pressure membrane (LPM) system to offer efficient (and potentially universal) pretreatment for downstream membrane desalination. Synthetic water, simulating cooling tower blowdown (CTBD) with elevated concentrations of hardness and silicates (Ca: 418 ppm, Mg: 63 ppm, SiO 2 : 50 ppm) is treated using EC coupled to ultrafiltration (UF) to remove Mg up to 30 ± 1%, Ca up to 29 ± 1%, and silica up to 99 ± 1%. We evaluated the effectiveness of the EC-UF pretreatment system in reducing downstream RO scaling using thermodynamic modeling to predict the saturation index (SI) at the RO membrane/water interface. An SI value below zero (SI < 0) indicates under-saturated conditions (with respect to a particular mineral) where mineral scaling does not take place, which correlates with improved water recovery. Our findings suggest that the EC-UF pretreatment system was able to increase water recovery by up to 30%, compared to 0% recovery without pretreatment, under optimal conditions (feed solution pH of 7 and an EC charge loading of 1800 C/L). Finally, we conducted an economic analysis showing that implementing an EC-UF system for CTBD water could yield a cost benefit of up to $\$$14.13 per m 3 compared to direct brine disposal.

cooling tower blowdown↗

Removal of Calcium and Silica from Simulated Blowdown Water Using CO 2 -Assisted Magnesium Electrocoagulation

Blowdown water from various industries and cooling facilities contains high concentrations of calcium (Ca), magnesium (Mg), silica, and corrosion inhibitors, which render the water unsuitable for discharge into surface water and wastewater treatment plants. Electrocoagulation (EC) is effective at removing Ca and silica. Here, in this study, Mg-alloy electrodes EC resulted in ∼91% silica removal at a 5400 C/L charge loading. Ca removal, however, was only 31%. To enhance Ca removal, carbon dioxide (CO 2 ) containing gas was introduced. CO 2 addition formed carbonate ions, which reacted with Ca/Mg ions to generate carbonate precipitates. Introducing 5% and 14% CO 2 , simulating natural gas-fired and coal-fired flue gas, enhanced Ca removal to 38% and 47%, respectively. Pure CO 2 facilitated 70% Ca removal, more than two times higher than that without CO 2 , while maintaining high silica removal. FTIR, XRD, and SEM-EDS analyses confirmed enhanced Ca/Mg carbonate formation upon CO 2 . In situ Raman spectroscopy was employed to monitor carbonate-ions formation. The results demonstrated carbonate-ions removal through Ca-carbonate formation after CO 2 addition. A techno-economic assessment showed that recycled electrode materials and flue gas lead to ∼3 times lower cost compared with conventional silica/Ca removal through chemical coagulation, softening, or membrane filtration. The study demonstrated that CO 2 addition removes high concentrations of Ca and silica ions from wastewaters at a competitive cost.

blowdown water↗

Produced Water and Waste Heat-aided Blowdown Water Treatment: Using Chemical and Energy Synergisms for Value Creation

The project objective was to develop a cooling blowdown water (BDW) treatment process utilizing produced water (PW) and low-grade heat to maximize water reuse and saleable by-product generation while reducing chemical and energy footprints of the treatment. The proposed treatment process consists of mixing, softening, organics and suspended solids removal, reverse osmosis (RO), thermal desalination, and brine electrolysis. BDW samples collected from a local coal-fired power plant and PW samples from two shale gas production wells were used in this study. Each treatment unit was first designed and tested to quantify its treatment efficiency, and its chemical and energy requirements. In addition, a process model was developed and model simulations were conducted based on the experimental results and literature data to optimize the treatment process. A techno-economic analysis was conducted to quantify chemical and energy savings as well as production of 10-lb brine as a saleable product. With the field-collected BDW and PW samples, mixing experiments determined a volumetric mixing ratio 10:1 (BDW:PW) resulted in the best performance of multivalent ions removal and largest chemical savings for softening. Softening of the BDW/PW mixtures using alkaline chemicals (Na 2 CO 3 and NaOH) achieved 95%-100% removal of scaling-forming cations (Ca, Mg, Fe, Ba, Sr) and 60% of silicon, and 10% of total organic carbon (TOC). The mixing and softening treatments yielded an effluent with total dissolved solids (TDS) concentration of 23 g/L. Activated carbon (AC) filtration removed TOC to a low level (< 3 mg/L) and further removed remaining scale-forming divalent metals and silica from the softened water. The AC filtration resulted in a slight reduction of TDS from 23 g/L to 20 g/L, leaving behind only mostly monovalent ions (i.e., sodium and chloride) in the filtered water. These pretreatments yielded a feed water that met the criteria of the downstream reverse osmosis (RO) to prevent membrane fouling. A cross-flow RO system was used to further concentrate the TDS of the AC effluent. Various factors including TDS, pH, and applied pressure were examined and optimal conditions were determined for the co-treatment process. An integrated process consisting of mixing, softening, AC filtration and RO was used to treat a continuous flow (0.25 – 1.2 L/min, or 0.07 – 0.32 gpm) and successfully generated RO permeate as product water (TDS < 0.5 g/L) for reuse in cooling operation, and a concentrate (TDS ~ 45 g/L) to be further treated in a thermal desalination unit. These flow rates meet the FOA’s criterion of 0.01 – 1 gpm. Overall, the co-treatment of BDW/PW allowed shorter ramp-up time compared to treatment of BDW alone. It resulted in 40% and 55% savings of Na 2 CO 3(s) and NaOH, respectively, compared to treating the BDW and PW individually for the same level of softening. The co-treatment also resulted in a 29% energy saving compared to treatment of BDW only for the level of TDS concentration. A thermal desalination system was designed using CFD simulations and manufactured in the WVU Innovation Hub for further treatment of the RO concentrate to generate 10-lb brine. The system has a design flow rate of 2 gpm and has been successfully tested. A bench-scale brine electrolysis system was developed for on-site generation of chlorine/hypochlorite (Cl 2 /OCl - ) and caustic soda (NaOH) as useful chemicals for the co-treatment process. Using salt solutions (0.5 M and 1 M), the system achieved faradaic efficiencies of 93%-97% and 70%-77% for caustic soda and chlorine/hypochlorite generation, respectively. An economic analysis showed that the electricity costs for on-site generation of these chemicals were significantly lower than the chemical prices offered by suppliers. An industrial-scale process model consisting of mixing, softening, AC filtration, RO, thermal desalination, and brine electrolysis was developed using the Aspen Plus V9 in conjunction with Aspen Custom Modeler V9. The model serves as a solvable Aspen Plus model and as basis to form the costing infrastructure. In addition, techno-economic analysis considering capital, operating, and transportation costs was conducted. An optimization solution showed that produced water for mixing is still advantageous in low quantities. The optimum solution approaches a leveled cost of water (LCW) of 2 $/m 3 which becomes cost competitive with nominal water treatment prices.

20 FOSSIL-FUELED POWER PLANTS↗

Minimize Boiler Blowdown - Steam Tip Sheet #9

This revised AMO tip sheet on minimizing boiler blowdown provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Minimize Boiler Blowdown - Steam Tip Sheet #9

This revised AMO tip sheet on minimizing boiler blowdown provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

industry, manufacturing, AMO, boiler, blowdown, st↗

High speed blowdown system provides rapid pressure loss

High speed blowdown takes advantage of discretely maintained differential pressures to vent a test chamber from high to ambient pressure with minimum time lag. This technique is advantageous where the use of pyrotechnics is undesirable.

Brittan, H. C.↗

Prediction of internal and external noise fields for blowdown wind tunnels.

Empirical methods have been developed to estimate the test section noise levels and the outside noise radiation patterns of blowdown wind tunnels. Included are considerations of noise generation by control valves, burners, turbulent boundary layers, and exhaust jets as appropriate. Sample test section and radiation field noise estimates are presented. The external estimates are noted to be in good agreement with the limited amount of available measurements.

Hosier, R. N.↗

Flutter tests (IS4) of the 0.0125-scale shuttle reflection plane model 30-OTS in the Langley Research Center 26-inch transonic blowdown tunnel test no. 547

A series of slab wing flutter models with rigid orbiter fuselage, external tank, and SRB models of the space shuttle were tested, in a reflection plane arrangement, in the NASA Langley Research Center's 26-inch Transonic Blowdown Tunnel. Model flutter boundaries were obtained for both a wing-alone configuration and a wing-with-orbiter, tank and SRB configuration. Additional test points were taken of the wing-with-orbiter configuration, as a correlation with the wing-alone condition. A description of the wind tunnel models and test procedures utilized in the experiment are provided.

Kotch, M. A.↗

The M.I.T. Blowdown compressor facility

A blowdown compressor test facility has been developed which allows time-resolved aerodynamic testing of full-scale transonic compressor rotors at low cost. The rotor is brought to speed in vacuum, a diaphragm is opened, and the test gas is allowed to flow for a time of the order of 0.1 sec, during which the rotor is driven by its own inertia. Both 'steady-state' performance evaluation and detailed time resolution of the flow on the blade-passing time scale have been demonstrated for a two-ft-diam transonic rotor with a tangential Mach number of 1.2 and a nominal pressure ratio of 1.6. The steady-state performance as determined in the experiments includes an efficiency of 0.92 and a pressure ratio of 1.55 at design speed. The time-resolved measurements include the combination tone structure in the upstream flow field, resolved both axially and radially, and the wake structure downstream of the rotor, also resolved both radially and axially.

Kerrebrock, J. L.↗