Search NASA⌕ Search

SEARCH · Search NASA

Results for “BOILER ARGON”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

Bubblers Speed Nuclear Waste Processing at SRS

At the Department of Energy's Savannah River Site, American Recovery and Reinvestment Act funding has supported installation of bubbler technology and related enhancements in the Defense Waste Processing Facility (DWPF). The improvements will accelerate the processing of radioactive waste into a safe, stable form for storage and permit expedited closure of underground waste tanks holding 37 million gallons of liquid nuclear waste.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Novel Nanocrystalline Intermetallic Coatings for Metal Alloys in Coal-fired Environments

Intermetallic coatings (iron aluminide and nickel aluminide) were prepared by a novel reaction process. In the process, the aluminide coating is formed by an in-situ reaction between the aluminum powder fed through a plasma transferred arc (PTA) torch and the metal substrate (steel or Ni-base alloy). Subjected to the high temperature within an argon plasma zone, aluminum powder and the surface of the substrate melt and react to form the aluminide coatings. The prepared coatings were found to be aluminide phases that are porosity-free and metallurgically bonded to the substrate. The coatings also exhibit excellent high-temperature corrosion resistance under the conditions which simulate the steam-side and fire-side environments in coal-fired boilers. It is expected that the principle demonstrated in this process can be applied to the preparation of other intermetallic and alloy coatings.

36 MATERIALS SCIENCE↗

Gear Test Assembly - Status Report FY2018

The gear test assembly completed testing in air and distilled water successfully under a range of loading conditions. An external torque sensor assembly was designed and added to confirm the torque readings provided by the Parker control system. Hand calculations were performed to determine the time range that the heaters could be turned on without exceeding the ASME Boiler and Pressure Vessel code Fatigue Stress Limits for 1,000,000 cycles. Transient computational fluid dynamics analyses were performed to determine the heater cycle on/off time. Steady state computational fluid dynamics analyses were performed to determine the final temperature distribution throughout the insulated assembly using a thinner but more effective insulation configuration. The initial heating tests were completed (without insulation installed) to check the heater control system. Testing of the argon pressurized seal chambers were performed and indicated the need for re-machining of several components to eliminate some leaks. Nondestructive examination of the gears continued successfully using eddy current and ultrasonic inspection techniques.

42 ENGINEERING↗