Search NASA⌕ Search

SEARCH · Search NASA

Results for “BUDGET AND FUNDING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Budget estimates: Fiscal year 1994. Volume 3: Research and program management

The research and program management (R&PM) appropriation provides the salaries, other personnel and related costs, and travel support for NASA's civil service workforce. This FY 1994 budget funds costs associated with 23,623 full-time equivalent (FTE) work years. Budget estimates are provided for all NASA centers by categories such as space station and new technology investments, space flight programs, space science, life and microgravity sciences, advanced concepts and technology, center management and operations support, launch services, mission to planet earth, tracking and data programs, aeronautical research and technology, and safety, reliability, and quality assurance.

Source record↗

Austere Human Missions to Mars

The Design Reference Architecture 5 (DRA 5) is the most recent concept developed by NASA to send humans to Mars in the 2030 time frame using Constellation Program elements. DRA 5 is optimized to meet a specific set of requirements that would provide for a robust exploration program to deliver a new six-person crew at each biennial Mars opportunity and provide for power and infrastructure to maintain a highly capable continuing human presence on Mars. This paper examines an alternate architecture that is scaled back from DRA 5 and might offer lower development cost, lower flight cost, and lower development risk. It is recognized that a mission set using this approach would not meet all the current Constellation Mars mission requirements; however, this 'austere' architecture may represent a minimum mission set that would be acceptable from a science and exploration standpoint. The austere approach is driven by a philosophy of minimizing high risk or high cost technology development and maximizing development and production commonality in order to achieve a program that could be sustained in a flat-funded budget environment. Key features that would enable a lower technology implementation are as follows: using a blunt-body entry vehicle having no deployable decelerators, utilizing aerobraking rather than aerocapture for placing the crewed element into low Mars orbit, avoiding the use of liquid hydrogen with its low temperature and large volume issues, using standard bipropellant propulsion for the landers and ascent vehicle, and using radioisotope surface power systems rather than a nuclear reactor or large area deployable solar arrays. Flat funding within the expected NASA budget for a sustained program could be facilitated by alternating cargo and crew launches for the biennial Mars opportunities. This would result in two assembled vehicles leaving Earth orbit for Mars per Mars opportunity. The first opportunity would send two cargo landers to the Mars surface to preposition a habitat, supplies, and exploration equipment. The next opportunity, two years later, would send to Mars orbit 1) a lander with a Mars Ascent Vehicle (MAV) and 2) a crewed Mars Transit Habitat with an Orion CEV for Earth return. The following opportunity, two years after the first crew, would go back to cargo-only launches. This alternation of cargo and crew opportunities results in a sustainable launch rate of six Ares V launches every two years. It is notable that four of the six launches per Mars opportunity are identical, build-to-print, Tran-Mars Injection stages. This type of production rate could lend itself well to a COTStype service provider, and would make it feasible to have a live spare in place in the event of a single launch failure.

landers↗

Chromospheric Structure and Wind Acceleration in Zeta Aur Stars

This NASA grant supported an analysis of the variability of the wind of the supergiant primary star (K4 Ib) in the eclipsing binary Zeta Aurigae (Zeta Aur). In the ultraviolet, the main-sequence companion star (B5 V) dominates the observed flux, and therefore serves as a convenient probe of the cool supergiant's wind. This study utilized the extensive set of (100+) ultraviolet spectroscopic observations obtained with the International Ultraviolet Explorer (IUE) satellite over its operational lifetime of 1978-1995. Although the resolution of IUE is limited (about 25 km/s), it is adequate to resolve variability in the wind features in Zeta Aur's ultraviolet spectrum, which are blueshifted 70 km/s from line center. Our analysis used the tau-v technique of Cardelli and Savage, which makes full use of the available line profile information. We find that the wind column densities vary by up to an order of magnitude over time. These results are being written up for submission to the Astrophysical Journal as the third paper of a series on the chromosphere and wind of Zeta Aurigae. The first two papers report on the construction of mean chromosphere and wind models respectively, based on HST/GHRS observations and funded by STScI. The third paper - this research - reports on variability of the Zeta Aur wind as determined from our analysis of the long IUE time series. This paper will be completed within the next three months; the delay in publication was to allow the completion of Papers 1 and 2, which logically precede the present work. Therefore, an additional no-cost extension was requested in order to ensure budgeted funds remain available for publication of this work. Unfortunately, this request was denied, and so I am forced to write this final report before publication of Paper 3. Regardless, this paper will be submitted for publication within the next three months.

Bennett, Philip D.↗

Ideas on the NASA Senior Review and Mission Extension Process

Extended mission budgets fund a significant part of our community, particularly young scientists who in a relatively short time are exposed to a broad range of experiences and opportunities available in space science and other STEM fields. In particular, mission-funded science offers a relatively stable funding stream that enables meaningful mentoring efforts and interactions, including apprenticeships ranging from project management, to mission operations, to data processing and analysis, to hardware and software development, to STEM-related education and outreach. It moreover provides professional contacts that fuel diversity in mission leadership and in the science and technical workforce at-large. Last but not least, it sustains the scientific productivity of NASA’s missions, which constitute major national investments meriting their full exploitation. Budgets cuts, however, are exercising pressure on the science and operations of the extended mission fleet despite being only a small portion of the overall Division budget. The history of Heliophysics has demonstrated that maintaining the operation of missions beyond their prime phase invariably leads to a much deeper knowledge of the original mission science goals, together with new applications often not foreseen during their original design. Their operation as part of the Heliophysics System Observatory (HSO)---a coordinated, 1eliophysics, multipoint observing system of the heliosphere, is a prime example. Some of the first activities undertaken by the Parker Solar Probe and Solar Orbiter missions required recreating the larger context of their new observations by using the diversity of HSO mission capabilities. The marginal cost of maintaining this valuable, working science resource, in the form of both continuing high quality data access and expertise, is small compared to the cost of the original missions or of new missions to achieve similar objectives, making the operation of extended missions, the best “science per dollar” investment in Heliophysics. We argue that reducing both extended mission operations and science budgets will have a ripple effect across the community, including reducing employment and training opportunities for young scientists, to lowering the quality/impact of the Heliophysics Systems Observatory. Instead, we suggest that the proposal process for mission extension should be re-examined. We offer several ideas for reducing costs of extended missions toward maintaining science output and streamlining the management process.

A. Vourlidas↗

Conceptual Cost Estimating

Kennedy Space Center data aid in efficient construction-cost managment. Report discusses development and use of NASA TR-1508, Kennedy Space Center Aerospace Construction price book for preparing conceptual budget, funding cost estimating, and preliminary cost engineering reports. Report based on actual bid prices and Government estimates.

Brown, J. A.↗

Updated Conceptual Cost Estimating

16-page report discusses development and use of NASA TR-1508, the Kennedy Space Center Aerospace Construction Price Book for preparing conceptual, budget, funding, cost-estimating, and preliminary cost-engineering reports. Updated annually from 1974 through 1985 with actual bid prices and government estimates. Includes labor and material quantities and prices with contractor and subcontractor markups for buildings, facilities, and systems at Kennedy Space Center. While data pertains to aerospace facilities, format and cost-estimating techniques guide estimation of costs in other construction applications.

Brown, J. A.↗

Government conceptual estimating for contracting and management

The use of the Aerospace Price Book, a cost index, and conceptual cost estimating for cost-effective design and construction of space facilities is discussed. The price book consists of over 200 commonly used conceptual elements and 100 systems summaries of projects such as launch pads, processing facilities, and air locks. The cost index is composed of three divisions: (1) bid summaries of major Shuttle projects, (2) budget cost data sheets, and (3) cost management summaries; each of these divisions is described. Conceptual estimates of facilities and ground support equipment are required to provide the most probable project cost for budget, funding, and project approval purposes. Similar buildings, systems, and elements already designed are located in the cost index in order to make the best rough order of magnitude conceptual estimates for development of Space Shuttle facilities. An example displaying the applicability of the conceptual cost estimating procedure for the development of the KSC facilities is presented.

Brown, J. A.↗

Recommendations on Funding Mission Operations and Historical Datasets

The Heliophysics Low Cost Access to Space (H-LCAS) and Flight Opportunities in Research and Technology (H-FORT) grant budgets primarily fund the development and construction of instrumentation. A side effect of this approach is that mission operations, including data collection and data processing, tend to be severely under budget (or unfunded). In order to satisfy the requirements of modern missions, we recommend a new funding source for mission operations. This funding source is increasingly vital going forward as new missions collect exponentially more data compared to past missions. Similarly, to take full advantage of underutilized historical datasets, we recommend adding another funding source to analyze these valuable datasets. Without these funding sources, mission datasets will, in the best case, be significantly underdeveloped and underutilized, and more likely, will fall dramatically short of their required scope.

Mykhaylo Shumko↗

Ares V: Progress Toward Unprecedented Heavy Lift

Every major examination of America s spaceflight capability since the Apollo program has highlighted and reinforced the need for a heavy lift vehicle for human exploration, science, national security, and commercial development. The Ares V is NASA s most recent effort to address this gap and provide the needed heavy lift capability for NASA and the nation. An Ares V-class heavy lift capability is important to supporting beyond earth orbit (BEO) human exploration. Initially, that consists of exploration of the Moon vastly expanded from the narrow equatorial Apollo missions to a global capability that includes the interesting polar regions. It also enables a permanent human outpost. Under the current program of record, both the Ares V and the lunar exploration it enables serve as a significant part of the technology and experience base for exploration beyond the Moon, including Mars, asteroids, and other destinations. The Ares V is part of NASA s Constellation Program architecture. The Ares V remains in an early stage of concept development, while NASA focused on development of the Ares I crew launch vehicle to replace the Space Shuttle fleet. However, Ares V development has benefitted from its commonality with Ares I, the Shuttle, and contemporary programs on which its design is based. The Constellation program is currently slated for cancellation under the proposed 2011 federal budget, pending review by the legislative branch. However, White House guidance on its 2011 budget retains funding for heavy lift research. This paper will discuss progress to date on the Ares V and its potential utility to payload users.

Sumrall, Phil↗

The Business Change Initiative: A Novel Approach to Improved Cost and Schedule Management

Goddard Space Flight Center's Flight Projects Directorate employed a Business Change Initiative (BCI) to infuse a series of activities coordinated to drive improved cost and schedule performance across Goddard's missions. This sustaining change framework provides a platform to manage and implement cost and schedule control techniques throughout the project portfolio. The BCI concluded in December 2014, deploying over 100 cost and schedule management changes including best practices, tools, methods, training, and knowledge sharing. The new business approach has driven the portfolio to improved programmatic performance. The last eight launched GSFC missions have optimized cost, schedule, and technical performance on a sustained basis to deliver on time and within budget, returning funds in many cases. While not every future mission will boast such strong performance, improved cost and schedule tools, management practices, and ongoing comprehensive evaluations of program planning and control methods to refine and implement best practices will continue to provide a framework for sustained performance. This paper will describe the tools, techniques, and processes developed during the BCI and the utilization of collaborative content management tools to disseminate project planning and control techniques to ensure continuous collaboration and optimization of cost and schedule management in the future.

Schedule↗

Space science for applications - The history of Landsat

The history of the Landsat project is discussed in terms of three historical phases, each characterized by a dominant problem. From 1964 to 1967, the challenge was to develop interagency cooperation and to achieve consensus on basic plans for the satellite. Between 1968 and 1971, the cooperating agencies had to persuade the Bureau of the Budget to provide funding for the project. Since 1972, the challenge to NASA has been to encourage applications of the Landsat data and plan the shift from an experimental program to an operational one. The tension between experimental and operational goals has run through all these phases, and the conflicts between agencies is detailed, as well as the interaction between technological and political systems.

Mach, P. E.↗

Activities and Accomplishments of ICAM

A brief historical background on establishing the Institute for Computational and Applied Mechanics (ICAM) is presented and basic goals and objectives are discussed. It is emphasized that the goal of the ICAM has been to develop and maintain a self-sustaining center of excellence in computational methods at Old Dominion University (ODU). Information is provided on funding sources and budget disposition, recent activities and accomplishments, list of graduate students supported on the program, and number of students who received graduate degrees (M.S. as well as Ph.D.). Information is also provided on research coordination with various scientists and engineers, and on different reports specifically written for ICAM. ICAM has been supported, in part, by NASA Langley Research Center through Grant NAG-1-363. This report constitutes the final report for ICAM for the period ending December 1996. The grant has been monitored by the University Affairs Officers at NASA Langley.

Tiwari, S. N.↗

Human Research Initiative (HRI)

A code U initiative starting in the FY04 budget includes specific funding for 'Phase Change' and 'Multiphase Flow Research' on the ISS. NASA GRC developed a concept for two facilities based on funding/schedule constraints: 1) Two Phase Flow Facility (TphiFFy) which assumes integrating into FIR; 2) Contact Line Dynamics Experiment Facility (CLiDE) which assumes integration into MSG. Each facility will accommodate multiple experiments conducted by NRA selected PIs with an overall goal of enabling specific NASA strategic objectives. There may also be a significant ground-based component.

Motil, Brian↗

An Exploration Perspective of Beamed Energy Propulsion

The Vision for Exploration is currently focused on flying the Space Shuttle safely to complete our Space Station obligations, retiring the Shuttle in 2010, then returning humans to the Moon and learning how to proceed to Mars and beyond. The NASA budget still includes funds for science and aeronautics but the primary focus is on human exploration. Fiscal constraints have led to pursuing exploration vehicles that use heritage hardware, particularly existing boosters and engines, with the minimum modifications necessary to satisfy mission requirements. So, pursuit of immature technologies is not currently affordable by NASA. Beamed energy is one example of an immature technology, from a human exploration perspective, that may eventually provide significant benefits for human exploration of space, but likely not in the near future. Looking to the more distant future, this paper will examine some of the criteria that must be achieved by beamed energy propulsion to eventually contribute to human exploration of the solar system. The analysis focuses on some of the implications of increasing the payload fraction of a launch vehicle, with a quick look at trans-lunar injection. As one would expect, there is potential for benefit, and there are concerns. The analysis concludes with an assessment of the Technology Readiness Level (TRL) for some beamed energy propulsion components, indicating that TRL 2 is close to being completed.

Cole, John W.↗

Measuring CO2 from Space: The NASA Orbiting Carbon Observatory-2

The Orbiting Carbon Observatory (OCO) was the first NASA satellite designed to measure atmospheric carbon dioxide (CO2) from space with the precision, resolution, and coverage needed to detect CO2 surface fluxes. OCO was designed to collect 0.5 to 1 million soundings each day. Typical measurements over land were expected to have precisions of 0.3% within surface footprints smaller less than 3 square km. This project suffered a major setback in February 2009 when the OCO launch vehicle failed to achieve orbit and the satellite was lost. The U.S. Congress has since authorized a restart of the OCO project, and the President's 2010 budget proposal includes funding to develop and fly a replacement for OCO that could be ready for launch no later than February 2013. This mission has been designated OCO-2. While this mission will be a near "carbon copy" of OCO, some changes were needed to replace components that were no longer available. Here, we describe the capabilities, of the OCO-2 mission, highlighting its differences from OCO.

carbon cycle↗

Budget estimates, fiscal year 1995. Volume 1: Agency summary, human space flight, and science, aeronautics and technology

The NASA budget request has been restructured in FY 1995 into four appropriations: human space flight; science, aeronautics, and technology; mission support; and inspector general. The human space flight appropriations provides funding for NASA's human space flight activities. This includes the on-orbit infrastructure (space station and Spacelab), transportation capability (space shuttle program, including operations, program support, and performance and safety upgrades), and the Russian cooperation program, which includes the flight activities associated with the cooperative research flights to the Russian Mir space station. These activities are funded in the following budget line items: space station, Russian cooperation, space shuttle, and payload utilization and operations. The science, aeronautics, and technology appropriations provides funding for the research and development activities of NASA. This includes funds to extend our knowledge of the earth, its space environment, and the universe and to invest in new technologies, particularly in aeronautics, to ensure the future competitiveness of the nation. These objectives are achieved through the following elements: space science, life and microgravity sciences and applications, mission to planet earth, aeronautical research and technology, advanced concepts and technology, launch services, mission communication services, and academic programs.

Source record↗

Integrated Budget Office Toolbox

The Integrated Budget Office Toolbox (IBOT) combines budgeting, resource allocation, organizational funding, and reporting features in an automated, integrated tool that provides data from a single source for Johnson Space Center (JSC) personnel. Using a common interface, concurrent users can utilize the data without compromising its integrity. IBOT tracks planning changes and updates throughout the year using both phasing and POP-related (program-operating-plan-related) budget information for the current year, and up to six years out. Separating lump-sum funds received from HQ (Headquarters) into separate labor, travel, procurement, Center G&A (general & administrative), and servicepool categories, IBOT creates a script that significantly reduces manual input time. IBOT also manages the movement of travel and procurement funds down to the organizational level and, using its integrated funds management feature, helps better track funding at lower levels. Third-party software is used to create integrated reports in IBOT that can be generated for plans, actuals, funds received, and other combinations of data that are currently maintained in the centralized format. Based on Microsoft SQL, IBOT incorporates generic budget processes, is transportable, and is economical to deploy and support.

Rushing, Douglas A.↗