Cost analysis of hydrogen production by high-temperature solid oxide electrolysis

In this study, we estimate construction and operation costs of gigawatt-scale solid oxide electrolysis (SOE) facilities for producing high purity hydrogen gas from water. Manufacturing and assembly costs for two types of SOE cell stacks are estimated using a detailed design for manufacture and assembly (DFMA®) analysis. Modular balance of plant (BOP) process equipment is designed and sized with Aspen®, and cost estimated using equipment vendor quotes. Factory and on-site assembly and installation costs for SOEC stack and BOP equipment integration into modular SOE process units are calculated using a simplified DFMA® method. Total stack costs on a stack input power (SIP) basis reduce to <$100/kW e DC SIP for >500 MW e DC SIP /year production rates with electrode cermet, interconnects, and high-temperature heat treatments dominating the total cost. Integration of stacks with larger BOP equipment operating at higher pressures offers ~36% cost reduction in total facility capital cost due to an economies of physical scale effect since BOP equipment comprises >50% of facility costs. Optimized H 2 prices decrease from ~$\$$4/kgH 2 to ~$\$$2/kgH 2 for 1 GWe DCSIP facilities using $\$$0.025/kWh electricity price. All costs are reported in 2021 US dollars.

08 HYDROGEN↗

Cost analysis of alternative large-scale high-temperature solid oxide electrolysis hydrogen production facilities

We extend our past cost analysis of gigawatt-scale solid oxide electrolysis (SOE) facilities that produce high purity hydrogen gas from water by estimating construction and operating costs for three new alternative design cases: (1) offsite feed steam generation; (2) near-atmospheric pressure (NAP) stack; and (3) onsite electric boiler feed steam generation. Pressure effects on hydrogen electrode-(cathode-)supported SOE cell (SOEC) stack performance are estimated for the same assumed cell and stack construction and used to determine facility-wide stack capital costs for achieving a fixed H2 production at different pressures. Modular balance of plant (BOP) process equipment capital costs are estimated for each new alternative design case using our past equipment sizing, design, and cost data and scaling relationships. Furthermore, we update BOP equipment sizing and design for the NAP case using Aspen®. Vendor quotes for electric boilers are used to estimate costs for the electric boiler design case. Factory and onsite assembly and installation costs for SOEC stacks and BOP equipment are calculated using our past simplified first-principles approach. First-of-a-kind (FOAK) and N th -of-a-kind (NOAK) production maturity cost estimates are included for all results. The case with NAP stacks offers the lowest facility total capital cost (TCC, ~23% lower than base) while use of small electric boilers requires the highest TCC (~3% higher than base). H 2 production prices decrease from the base of ~$\$2.17$ /kgH 2 to ~$\$1.92$/kgH 2 for 1 GW e DC SIP facilities utilizing NAP stacks supplied by offsites steam situated in large modules and blocks for $\$0.030$/kWh e and $0.009/kWh t prices for electricity and thermal energy, respectively. We report all costs in 2021 US dollars.

Balance of plant (BOP) process equipment↗

Scaleup and Site-Specific Engineering Design for Global Thermostat Direct Air Capture Technology

The overall goal of the project is completion of an initial design of a commercial-scale, Carbon Capture, Utilization, and Storage Direct Air Capture (CCUS-DAC) plant design at three different sites that captures a net of at least 100,000 tonnes per year (TPY) carbon dioxide (CO 2 ) from the atmosphere and considers compression and conditioning of the captured CO 2 for purpose of pipeline transportation to different geological formation sites for deep well injection and underground storage. In addition to the leading system consisting of a scaled-up Global Thermostat DAC unit, overall plant design includes a combined Heat and Power (CHP) unit integrated with a conventional liquid amine-based carbon capture system (90% capture) and compression facilities. These are considered balance of plant (BOP) systems and are required to provide low carbon-intensity steam and power to the DAC process. A second approach involving provision of DAC units modified to directly capture emissions from the CHP unit was initially assessed as an alternative and it was determined to be less mature than considered approach and not included in the scaled-up plant design efforts. Three geographically diverse continental United States locations were selected to better understand the effect of local/regional ambient conditions on scaled-up DAC system performance and project costs: Bucks, Alabama (hot wet climate), Odessa, Texas (dry hot climate), and Goose Creek, Illinois (mid continental climate). The team focused on initial engineering design activities, including the development of project design criteria, initiation of site-specific studies and investigations, completion of DAC system process and equipment design, and definition of balance of plant (BOP) engineering. The purpose of the activities were to develop Technoeconomic Analysis (TEA), Life-Cycle Analysis (LCA), and Environmental, Health, and Safety (EH&S) analysis, and Business Case Analysis (BCA) to validate that the project engineering and scale-up plans of the DAC systems, at each of the three distinct case studies considered, are technically, economically, and environmentally feasible for commercial-scale operation.

20 FOSSIL-FUELED POWER PLANTS↗

Manufacturing Cost Analysis for PEM Electrolyzers and Perspectives for Future Cost Reduction

Electrolyzer capital costs strongly influence the total levelized cost of hydrogen production and have implications for hydrogen deployment. Current electrolyzer costs are high, and large cost reductions may be needed to achieve competitive hydrogen costs and targets. Understanding pathways for cost reduction via R&D and deployment is a critical research area for informed energy planning and enabling hydrogen use. This work presents bottom-up cost estimates of polymer electrolyte membrane (PEM) electrolyzer systems tied to design specifications and discusses perspectives for cost reduction opportunities based on ongoing research. We use a detailed manufacturing and process model for a 1 MW PEM electrolyzer stack and balance of plant (BOP) for rigorous cost estimation. This allows for robust estimates of component and manufacturing costs and examination of key cost contributors. Stack costs are dominated by material costs such as iridium and platinum catalysts, especially at high manufacturing rates; power electronics and hydrogen purification equipment are the largest contributors to BOP cost. At higher manufacturing rates, better equipment utilization could reduce stack costs significantly, and we estimate that experience and bulk purchasing will allow for cost reductions to some BOP components. Still, many well-established BOP technologies and stack material costs are less likely to see significant cost reductions at high manufacturing rates. As such, manufacturing scale is limited in how much it can reduce electrolyzer costs, and additional advances for cost reduction may be needed to achieve cost targets. It will likely take many combined strategies to achieve significant cost reductions for electrolyzers and enable low-cost hydrogen production. We can use our manufacturing cost model to quantify potential cost reductions from the considerations described above and demonstrate pathways to lower cost electrolyzers. This allows for better understanding of cost reduction strategies and enables more informed research, development, and deployment for electrolyzers.

cost↗

Cost estimation of balance of plant equipment scale up for proton exchange membrane water electrolyzer systems

Water electrolyzers that use electricity to split water into hydrogen and oxygen could be a key technology for increasing hydrogen supply to meet expanded and emerging market applications, although currently the capital costs of these electrolyzers are high. Here we examine cost reductions that might be achieved by scaling up proton exchange membrane (PEM) electrolyzer systems and leveraging economies of scale through balance of plant (BOP) components for system sizes between 1 MW and 1 GW. We estimate BOP equipment capital costs of about $\$$848/kW at 1 MW, potentially decreasing to $\$$87/kW at 1 GW (2022-dollar year basis) with most of the cost reduction happening as systems scale from 1 MW to 100 MW. We find that BOP subsystems hydrogen drying and water knockout benefited the most from economies-of-scale cost reductions, and piping, instrumentation, and housing and power electronics were less impacted. These cost reductions from economies of scale could be more significant than estimated cost reductions from manufacturing scale-up reported in literature. These results add to the knowledge base that could guide optimal system designs that balance process scale-up with plant modularization and numbering-up. We also estimate that scaling up BOP could potentially lower the levelized cost of hydrogen (LCOH) by $\$$1.7-$\$$4.6/kg, depending on the scale-up magnitude and the plant capacity factor.

08 HYDROGEN↗

Solar photochemical process engineering for production of fuels and chemicals

The engineering costs and performance of a nominal 25,000 scmd (883,000 scfd) photochemical plant to produce dihydrogen from water were studied. Two systems were considered, one based on flat-plate collector/reactors and the other on linear parabolic troughs. Engineering subsystems were specified including the collector/reactor, support hardware, field transport piping, gas compression equipment, and balance-of-plant (BOP) items. Overall plant efficiencies of 10.3 and 11.6% are estimated for the flat-plate and trough systems, respectively, based on assumed solar photochemical efficiencies of 12.9 and 14.6%. Because of the opposing effects of concentration ratio and operating temperature on efficiency, it was concluded that reactor cooling would be necessary with the trough system. Both active and passive cooling methods were considered. Capital costs and energy costs, for both concentrating and non-concentrating systems, were determined and their sensitivity to efficiency and economic parameters were analyzed. The overall plant efficiency is the single most important factor in determining the cost of the fuel.

Biddle, J. R.↗

Solar photochemical process engineering for production of fuels and chemicals

The engineering costs and performance of a nominal 25,000 scmd (883,000 scfd) photochemical plant to produce dihydrogen from water were studied. Two systems were considered, one based on flat-plate collector/reactors and the other on linear parabolic troughs. Engineering subsystems were specified including the collector/reactor, support hardware, field transport piping, gas compression equipment, and balance-of-plant (BOP) items. Overall plant efficiencies of 10.3 and 11.6 percent are estimated for the flat-plate and trough systems, respectively, based on assumed solar photochemical efficiencies of 12.9 and 14.6 percent. Because of the opposing effects of concentration ratio and operating temperature on efficiency, it was concluded that reactor cooling would be necessary with the trough system. Both active and passive cooling methods were considered. Capital costs and energy costs, for both concentrating and non-concentrating systems, were determined and their sensitivity to efficiency and economic parameters were analyzed. The overall plant efficiency is the single most important factor in determining the cost of the fuel.

Biddle, J. R.↗

Sensitivity Analysis Tool for Electrochemical Conversion of CO 2 To CO: User Guide

This is the user guide for the tool described here: Development of technologies that convert carbon dioxide (CO 2 ) into products is part of the U.S. Department of Energy's Office of Fossil Energy and Carbon Management Carbon Conversion Program portfolio. One such technology under development converts CO 2 to value-added products via electrochemical reduction, where catalysts are used on the cathode to promote CO 2 conversion across the electrochemical catalyst (ECC) cell. Broadly, the ECC is integrated with balance of plant (BOP) equipment (e.g., compressors, pumps, heat exchangers, purification units) in system configurations to produce the desired product. To guide research and development (R&D) toward advancements that may make such conversion technologies economically competitive, researchers may use sensitivity analyses related to the ECC system cost and performance, including that of the cathodic and anodic catalysts. This tool is intended to inform developers and Program in assessing proposed R&D on ECC systems early in the development process. Results will guide researchers on where efforts would be best directed. The tool may be accessed here: https://www.netl.doe.gov/energy-analysis/details?id=55293cb1-6881-4181-a2b0-d00b711ce74b.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Equipment List Comparing Balance of Plant Containing a Heat Pump against a Reference Electricity Generating Plant

Approximately two-thirds of U.S. energy consumption in the industrial and transportation sectors relies on fossil fuels. These sectors require high-quality heat, i.e., thermal energy at very high temperatures, for molecular transformation processes. The Integrated Energy Systems (IES) program aims to assess the economic potential of utilizing nuclear-grade heat from Advanced Reactors (ARs) to meet the high-quality heat demands. By having industrial processes (IPs) supplied with nuclear-generated heat, manufacturers could benefit from more stable and potentially lower energy costs, reducing reliance on volatile fossil fuel markets. The main outcome of the FY24 research was the thermodynamic assessment and gap analysis of steam generation for IP applications. The study completed in June 2024 demonstrated that the required steam temperatures could be achieved by integrating a heat pump into an AR power plant. After identifying the thermal demands of target IPs, multiple balance of plant configurations for the Xe-100 reactor by X-energy, incorporating a heat pump, were analyzed. Their technical feasibilities were assessed, including the design of suitable axial compressors for these applications. Comparative performance analysis showed that thermal efficiency alone is insufficient to evaluate system suitability. To address this, a new indicator (heat factor) was introduced in the report released in September 2024 to quantify the low-quality thermal power needed to produce one unit of high-quality heat for the IP. Results showed that integrating heat pumps into Rankine cycles enables higher steam temperatures, though at the expense of increased thermal energy input. This report builds upon and completes the foundational work previously undertaken. It focuses on the design of two Balance of Plant (BOP) configurations, both based on Rankine energy conversion cycles: “Case 1”, which involves electricity generation only, and “Case 2”, which combines electricity and high-temperature heat generation for industrial use. For each configuration, a comprehensive equipment list was developed, detailing all major components such as turbines, compressors, heat exchangers, pumps, and control systems. These lists will serve as the basis for future comparative cost analyses, with the goal of assessing the number and type of components required to integrate a heat pump into the Rankine cycle and to establish a heat transport system capable of delivering thermal energy from the nuclear plant to an industrial facility. Using the constitutive equations presented in the June 2024 milestone, the operating conditions of all BOP components for both “Case 1” and “Case 2” were evaluated. These parameters—such as temperature, pressure, mass flow rate, and steam quality—served as the basis for calculating the associated thermal and mechanical power flows. The net power required from the heat pump to raise the steam temperature to the target level was also determined. The thermodynamic performance of the configuration was then assessed using the heat factor metric. The key outcome of this analysis is a comparative table that presents the equipment that was used in the “Case 1” and “Case 2” configurations. This study offers a preliminary comparison of the two designs, providing insight into the impact of integrating a heat pump in terms of component requirements and thermal efficiency. This equipment list, together with the evaluated operating conditions, also serves as a foundation for the economic analyses scheduled for the current fiscal year.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Application of FARM to an IES scenario within the FORCE ecosystem

The FARM (Feasible Actuator Range Modifier) software module is a component of the RAVEN-based FORCE framework for analysis of Integrated Energy Systems (IES). FARM supports the HERON software module in the evaluation of the optimal dispatch by evaluating feasible set-points for the different IES unit components. Set-points are required to satisfy limits on both production variables (i.e., the variables to be optimized such as the electrical power, the hydrogen production rate, etc.) and process variables tied to the service life of equipment (e.g., steam flowrate, vessel pressure, turbine firing temperature, etc.). This problem is addressed by adopting a two-stage approach. First, the HERON power dispatcher determines set-points that meet the constraints on the former variables (e.g., power levels and power ramp rate limits). These constraints are called explicit constraints. Then, FARM adjusts these set-points to ensure the respect of the limits on the latter variables given the knowledge of the system physics acquired through machine learning algorithms. These constraints are called implicit constraints. From this standpoint, FARM constitutes a bridge between the HERON power dispatcher that adopts a simplified description of the IES unit (low-resolution physics) and the HYBRID high-fidelity models (high-resolution physics). The original version of the FARM software module (FARM-Alpha) was released by Argonne National Laboratory in January 2021. In the latest version of the code released in July 2022 (FARM-Delta), the Reference Governor (RG) algorithm was upgraded to a Multi-Input Multi-Output version from its original Single-Input Single-Output form. The RG algorithm acts to enforce constraints. With this improvement an IES unit is now treated as a single dynamic system from the standpoint of control. The crosstalk among components in an IES unit is now fully considered thereby ensuring a true optimization is obtained for those units that have multiple set-points. In this report, the capabilities of FARM-Delta operating within the FORCE ecosystem are demonstrated for an IES test case. The specific configuration of IES unit for this case was selected by the IES team with consultation from the Advanced Reactor IES Expert Group. A full TEA analysis that invoked HERON, HYBRID, FARM, and RAVEN was performed and serves to demonstrate how the latest modification to FARM algorithms (i.e., state variable selection, state-space matrices derivation, set-point verification) can shape setpoints that might otherwise compromise the health of equipment through accelerated wear and tear. In this specific test case, it was demonstrated that these algorithms ensure a more efficient utilization of steam resources to be shared by two different subsystems, namely Balance of Plant (BOP) and High-Temperature Steam Electrolysis (HTSE). Finally, some code improvements that can further enhance the user-friendliness are suggested.

97 MATHEMATICS AND COMPUTING↗