Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 19 records

Risk associated with the use of barriers in hydrogen refueling stations.

Separation distances are used in hydrogen refueling stations to protect people, structures, and equipment from the consequences of accidental hydrogen releases. Specifically, hydrogen jet flames resulting from ignition of unintended releases can be extensive in length and pose significant radiation and impingement hazards. Depending on the leak diameter and source pressure, the resulting separation distances can be unacceptably large. One possible mitigation strategy to reduce exposure to hydrogen flames is to incorporate barriers around hydrogen storage, process piping, and delivery equipment. The effectiveness of barrier walls to reduce hazards at hydrogen facilities has been previously evaluated using experimental and modeling information developed at Sandia National Laboratories. The effect of barriers on the risk from different types of hazards including direct flame contact, radiation heat fluxes, and overpressures associated with delayed hydrogen ignition has subsequently been evaluated and used to identify potential reductions in separation distances in hydrogen facilities. Both the frequency and consequences used in this risk assessment and the risk results are described. The results of the barrier risk analysis can also be used to help establish risk-informed barrier design requirements for use in hydrogen codes and standards.

08 HYDROGEN↗

Safety moments in chemical safety education.

Chemical safety education is a critical aspect of an integrated culture of safety in academic research settings. Showcasing best practices and sharing practical solutions for recognizing hazards and minimizing risks represent one way of reinforcing a research community's actions, attitudes, and behavior toward safety. For goals of improving chemical safety education with nonformal endeavors, safety moments are similar to 1-2 slides that focus on raising awareness and knowledge for routine safety issues in research laboratories. Intended to catalyze brief discussions at the beginning of meetings and presentations, these materials provide a proactive way for students and faculty to engage in open communication on diverse research safety topics across science and engineering. This commentary provides an overview of designing effective safety moments and tailoring them to highlight practical safety needs and considerations. Key components of model safety moment slides are presented, alongside centralized resources assembled by student-led laboratory safety teams, which can also be extended to posters, social media platforms, online videos, and other forms of scientific communication. Combined with both top-down backing from institution leaders and bottom-up support from student researchers, safety moments remain a low-barrier risk reduction strategy that is easy to implement, encourages local dialogue on safety, combats complacency, and holds potential for facilitating long-term improvements to academic lab safety culture.

Communication/Writing↗

Materials for Advanced Ultra-supercritical (A-USC) Steam Turbines – A-USC Component Demonstration

The work by the United States Department of Energy (U.S. DOE)/Ohio Coal Development Office (OCDO) advanced ultra-supercritical (A-USC) Steam Boiler and Turbine Materials Consortia from 2001 through September 2015 was primarily focused on lab scale and pilot scale materials testing. This testing included air- or steam-cooled “loops” that were inserted into existing utility boilers to gain exposure of these materials to realistic conditions of high temperature and corrosion due to the constituents in the coal. Successful research and development resulted in metallic alloy materials and fabrication processes suited for power generation applications with metal temperatures up to approximately 1472°F (800°C). These materials or alloys have shown, in extensive laboratory tests and shop fabrication studies, to have excellent applicability for high-efficiency low CO 2 transformational power generation technologies previously mentioned. However, as valuable as these material loops have been for obtaining information, their scale is significantly below that required to minimize the risk associated with a power company building a multi-billion dollar A-USC power plant. To decrease the identified risk barriers to full-scale implementation of these advanced materials, the U.S. DOE/OCDO A-USC Steam Boiler and Turbine Materials Consortia identified the key areas of the technology that need to be tested at a larger scale. Based upon the recommendations and outcome of a Consortia-sponsored workshop with the U.S.’s leading utilities, a Component Test (ComTest) Program for A-USC was proposed. The A-USC ComTest program would define materials performance requirements, plan for overall advanced system integration, design critical component tests, fabricate components for testing from advanced materials, and carry out the tests. The AUSC Component Test was premised on the program occurring at multiple facilities, with the operating temperatures, pressure and/or size of these components determining the optimum test location. The first step of the ComTest, the steam turbine test, was determined best suited for a site in Youngstown, Ohio. Efforts were also undertaken to identify and evaluate other potential sites for high pressure testing.

33 ADVANCED PROPULSION SYSTEMS↗

Role of Alternative Energy Sources: Nuclear Technology Assessment (Report)

This analysis evaluates the role of nuclear power in the future energy portfolio of the U.S. Nuclear power is evaluated with respect to resource base, growth potential, environmental profile, costs, barriers, risks, and expert opinions. Nuclear power provides a stable source of baseload power in the U.S. with a greenhouse gas footprint similar to that of most renewable power sources. Maintaining the existing share of the U.S. electricity demand with nuclear power depends on the number of existing facilities that receive operating license extensions and the number of planned and approved new reactors that are actually constructed. The storage of spent nuclear fuel also continues to be a major concern since progress on the Yucca Mountain nuclear repository was halted in 2010. While the chances of adverse nuclear events are small and newer nuclear technologies are inherently safer than older technologies, the scale of a nuclear event can have far-reaching environmental and societal risks.

air pollutants↗

Role of Alternative Energy Sources: Natural Gas Technology Assessment [Slides]

This peer-reviewed analysis is one of a series of Technology Assessments of power production and evaluates the role of natural gas power in the future energy portfolio of the U.S. Natural gas power is evaluated with respect to resource base, growth potential, environmental profile, costs, barriers, risks, and expert opinions. Natural gas is seen as a cleaner burning and flexible alternative to other fossil fuels, and is used in residential, industrial, and transportation applications in addition to an expanding role in power production. New technologies have allowed increased domestic production of natural gas. The projected supply contributions afforded by new natural gas plays may keep the price of natural gas relatively low for the foreseeable future. Since natural gas is comprised mostly of methane, the control of fugitive emissions is imperative to reduce the greenhouse gas footprint of natural gas.

03 NATURAL GAS↗

Role of Alternative Energy Sources: Nuclear Technology Assessment [Slides]

This analysis evaluates the role of nuclear power in the future energy portfolio of the U.S. Nuclear power is evaluated with respect to resource base, growth potential, environmental profile, costs, barriers, risks, and expert opinions. Nuclear power provides a stable source of baseload power in the U.S. with a greenhouse gas footprint similar to that of most renewable power sources. Maintaining the existing share of the U.S. electricity demand with nuclear power depends on the number of existing facilities that receive operating license extensions and the number of planned and approved new reactors that are actually constructed. The storage of spent nuclear fuel also continues to be a major concern since progress on the Yucca Mountain nuclear repository was halted in 2010. While the chances of adverse nuclear events are small and newer nuclear technologies are inherently safer than older technologies, the scale of a nuclear event can have far-reaching environmental and societal risks.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Role of Alternative Energy Sources: Solar Thermal Technology Assessment [Slides]

This peer-reviewed analysis is one of a series of Technology Assessments of power production and evaluates the role of solar thermal power in the future energy portfolio of the U.S. Solar thermal power is evaluated with respect to resource base, growth potential, environmental profile, costs, barriers, risks, and expert opinions. Solar thermal power is viewed as a clean, renewable alternative to conventional fossil fuels for electricity generation. However, the resource base of solar thermal power is limited by several factors that inform the availability of direct sunlight at any given location. The high cost of solar collectors to support utility level output, water scarcity in areas of high solar potential, and lack of proximity of resources to population centers make it likely that high-quality solar thermal resources are expected to remain untapped for the foreseeable future.

14 SOLAR ENERGY↗

Role of Alternative Energy Sources: Wind Technology Assessment Brief [Slides]

This peer-reviewed analysis is one of a series of Technology Assessments of power production and evaluates the role of wind power in the future energy portfolio of the U.S. Wind power is evaluated with respect to resource base, growth potential, environmental profile, costs, barriers, risks, and expert opinions. Wind can be an important energy resource for the U.S., but as its contribution to total U.S. electricity generation increases, it will require a significant amount of fossil resources for backup power to maintain grid reliability. Wind power has exhibited significant growth over the last decade, but most of this growth was made possible through financial incentives such as temporary renewable energy tax credits. Technology advances that result in lower project costs and energy storage devices that enable better power reliability remain crucial research and development areas for the long-term integration of wind power.

17 WIND ENERGY↗

Role of Alternative Energy Sources: Pulverized Coal and Biomass Co-firing Technology Assessment [Slides]

This analysis evaluates the role of coal and biomass co-firing power in the future energy portfolio of the U.S. Coal and biomass co-firing power is evaluated with respect to resource base, growth potential, environmental profile, costs, barriers, risks, and expert opinions. Co-firing is seen as a way of reducing the greenhouse gas emissions of existing coal-fired power plants, but the incorporation of biomass into an existing coal-fired system increases the complexity of feedstock acquisition. Further, the acquisition of biomass has unique GHG burdens that offset, in part, the GHG reductions from the displacement of coal with biomass. Due to the higher feedstock prices of biomass, the co-firing of biomass at a 10 percent share of feedstock energy can increase the cost of electricity by as much as 31 percent. Other risks include regulatory uncertainty; without policies that encourage the use of renewable feedstocks, there is no incentive for producers to invest in co-fired systems.

01 COAL, LIGNITE, AND PEAT↗

Materials for Advanced Ultra-Supercritical (A-USC) Steam Turbines --- A-USC Component Demonstration

The U.S. Advanced Ultra-Supercritical (A-USC) Consortium was formed in 2001 as a government/industry program, sponsored by the U.S. Department of Energy (DOE) and the Ohio Coal Development Office (OCDO) and cost shared by industrial and not-for-profit partners. The purpose of the consortium was to advance the state of the art for power generation by evaluating and developing materials that allow the use of advanced steam cycles in coal-based power plants. These advanced cycles, with steam temperatures up to 1400°F (760°C), can increase the efficiency of coal-fired boilers from an average of 35% (current U.S. fleet) to more than 45% higher heating value (HHV) (>49% lower heating value [LHV]). The increase in a plant’s efficiency is limited unless new materials able to withstand these higher operating temperatures and pressures are identified and approved for use. The A-USC Consortium identified these needed materials during earlier phases of the program. It developed the welding and joining techniques along with manufacturing processes for casting and wrought products made from these new high-nickel alloys. It subjected these materials to extensive laboratory and steam loop testing. It then obtained ASME code approval for their use in U.S. boiler systems. The program’s successes leave this last remaining activity (ComTest Phase 2) that the U.S. utility industry has recommended to be accomplished prior to commercialization. The focus of the activity is the evaluation and demonstration of commercial readiness for “full scale” components to be made from these nickel-based alloy materials and provided by a U.S. domestic supply chain that is new to working with these alloys. According to studies completed by the Electric Power Research Institute (EPRI), the cost of an A-USC plant is approximately 20% higher than a non-A-USC plant because of its use of nickel-based alloys needed for the high temperature operating conditions. However, CO 2 reductions of approximately 30% from the current fleet average provide a strong incentive for its consideration. The actual costs and perceived value for CO 2 abatement will determine whether new or retrofitted plants are undertaken, although decisions to build A-USC plants in India would indicate its economic feasibility while also being part of a global carbon emissions strategy. The work by the A-USC Consortium, prior to the start of the ComTest project, has included lab scale and pilot scale materials testing, both in air and oxy-combustion. This testing has included air-cooled and steam-cooled “loops” that were installed into existing operating utility boilers to gain exposure of these materials to realistic conditions of high temperature and corrosion caused by the constituents in the coal ash. The A-USC Consortium also gained ASME Code approval of the Inconel 740 material, has cast and extruded the largest high nickel precipitation hardened alloys, and developed unique welding techniques to avoid problems identified by the competing European program. However, as valuable as these material test loops and accomplishments have been for obtaining information, their scale is below that required to minimize the risk associated for a U.S. utility to build a multibillion-dollar A-USC power plant. To reduce the final identified risk barrier to full-scale commercialization of these advanced materials and systems, the A-USC Consortium (guided by a utility industry advisory committee) has identified the key areas of the technology they desire to see as being capable of full-scale manufacturing and/or fabrication from an identified, capable U.S. domestic supplier base. A significant amount of work was accomplished during Phase 1 to identity the components, as well as the component size, that would be manufactured from advanced alloys such as Inconel 740H or Haynes 282 alloys. Pathways to supply these components for ComTest have been identified, as well as any further development that would be required. The Phase 2 effort used Phase 1 findings for designing these key full-scale components for A-USC boilers and turbines to include large castings; extrusions, forgings, fabrication of water walls and steam loops with headers from advanced materials, raw material (such as pipe extrusion billets) are at the commercial readiness level to permit advancement to a demonstration project. The Phase 2 work scope was addressed by a diverse team, including government, industry, and not-for-profit partners. The work scope under Phase 2 addressed fabrication of components identified as being outside of the proven capabilities of the existing supply chain, including the following: Steam turbine rotor forging and Haynes 282 nozzle carrier casting Superheater and reheater header and tube assemblies Large-diameter pipe extrusions and forgings Test valve articles to support ASME Code approval. In addition, key fabrication steps were completed, including boiler weld overlays and simulated field repairs. Throughout, extensive inspection and quality assurance testing of the components were performed. The team worked to advance ASME Code approval for key components and processes. Although much of the focus of ComTest Phase 2 was the high-temperature nickel-based alloy materials, a broader range of materials were incorporated, which would be representative of the materials used in full-scale A-USC power plant applications and have cross-cutting applicability on other high-temperature power generation options, such as advanced nuclear, supercritical CO 2 cycles, and central solar receivers. This report that has been submitted is organized in the following manner: Section 1 contains an Executive Summary. Section 2 discusses the ComTest project background and organization. Section 3 discusses project management and reporting. Section 4 discusses the procurement of nickel-based alloy and other A-USC materials and components. Section 5 discusses the fabrication of procurement of nickel-based alloy and other A-USC materials and components. Section 6 discusses the fabrication of cast nickel-based A-USC steam turbine components. Section 7 discusses the fabrication of forged nickel-based A-USC steam turbine piping and steam pipe components. Section 8 discusses the qualification of pressure relieve valves (PRVs) for A-USC power plants. Section 9 discusses proposed plans for future evaluation of A-USC components. Section 10 contains the summary and conclusion.

01 COAL, LIGNITE, AND PEAT↗

Progress Towards Prolonged Deployment of SiC JFET-R ICs Into Previously Inaccessible Hostile Environments

This invited presentation describes demonstration of semiconductor integrated circuits (ICs) and ceramic packaging that are arguably the most environmentally durable transistor electronics ever demonstrated. SiC junction field effect transistor-resistor (JFET-R) ICs with two-level interconnect have successfully operated for over 1 year in 500 °C air-ambient [1], 60 days in 460 °C and 9.3 MPa pressure caustic Venus surface environment test chamber [2], and radiation exposure through 7 Mrad(Si) total ionizing dose (TID) and 86 MeV-cm2/mg heavy ion strikes [3]. Furthermore, these ICs have also demonstrated operation from -190 °C to +812 °C (over 1000 °C T-span) without significant change in signal (input /output) or power supply voltages [4]. With modest adjustments, the SiC JFET-R fabrication process is compatible with semiconductor mass-production tools and materials. As an initial step towards this end, the processing that forms the SiC JFETs and resistors (without interconnect) for the NASA Glenn “Generation 12” design prototype JFET-R ICs was conducted at GE Research. Once the COVID-delayed IC interconnect and bond pad fabrication processing on these wafers is completed at NASA Glenn, the resulting chips will be packaged and oven-tested [5]. It is expected that further technology transfer to complete commercial production will lower investment and risk barriers to useful application deployment. For NASA, an initial high-value deployment is opening the Venus surface to extended missions for robotic scientific exploration.

Silicon Carbide↗

Progress Towards SiC ASICs for Extreme Temperature and Radiation Environments

This presentation describes development and demonstrations of semiconductor integrated circuits (ICs) and ceramic packaging that are arguably the most environmentally durable transistor electronics ever demonstrated. Silicon carbide (SiC) junction field effect transistor-resistor (JFET-R) ICs fabricated by NASA Glenn Research Center with two-level interconnect have successfully operated for over 1 year in 500 °C air-ambient, 60 days in 460 °C and 9.3 MPa pressure caustic Venus surface environment test chamber, and radiation exposure through 7 Mrad(Si) total ionizing dose (TID) and 86 MeV-cm2/mg heavy ion strikes. Furthermore, these ICs have also demonstrated operation from -190 °C to +812 °C (over 1000 °C temperature span) without significant change in signal (input /output) or power supply voltages. While the operating frequency and functional complexity is far below silicon-based ICs, these SiC application specific ICs (ASICs) are nevertheless becoming capable of providing unique and advantageous harsh-environment circuit functionality without cooling/sheltering overhead. With modest adjustments, the SiC JFET-R fabrication process is compatible with semiconductor mass-production tools and materials. As an initial step towards manufacture, a majority of processing steps to realize the next SiC JFET-R IC prototype wafer run have been outsourced to commercial foundry. It is expected that further upscaling combined with technology transfer to commercial production will lower investment and risk barriers to useful application deployment.

high temperature↗

Materials for Advanced Ultra-Supercritical (AUSC) Steam Turbines – AUSC Component Demonstration

The work by the United States Department of Energy (U.S. DOE)/Ohio Coal Development Office (OCDO) Advanced Ultra-Supercritical (AUSC) Steam Boiler and Turbine Materials Consortia from 2001 through September 2015 was primarily focused on lab scale and pilot scale materials testing. The field testing included air-cooled probes and steam-cooled “loops” that were installed into existing utility boilers to gain exposure of these materials to realistic conditions of high temperature and corrosion due to the constituents in the coal ash. Successful research and development resulted in identification of metallic alloy materials and fabrication processes suited for power generation applications with metal temperatures up to approximately 1472°F (800°C). These materials or alloys have shown, in extensive laboratory tests and shop fabrication studies, to have excellent applicability for high-efficiency low CO2 transformational power generation technologies. However, as valuable as these material field tests have been for obtaining information, their scale is significantly below that required to minimize the risk associated with a power company building a multi-billion-dollar AUSC power plant. To decrease the identified risk barriers to full-scale implementation of these advanced materials, the U.S. DOE/OCDO AUSC Steam Boiler and Turbine Materials Consortia identified the key areas of the technology that need to be tested at a larger scale. Based upon the recommendations and outcome of a Consortia-sponsored workshop with the U.S.’s leading utilities, a Component Test (ComTest) Program for AUSC was proposed. The AUSC ComTest program would define materials performance requirements, plan for overall advanced system integration, design critical component tests, fabricate components for testing from advanced materials, and carry out the tests. A Pre-FEED evaluation of the test facility including the evaluation of three potential sites has been completed and previously reported. This report describes the Front-End Engineering Design (FEED), Detailed Engineering and the Environmental Assessment of the ComTest project. A significant amount of work was accomplished during Phase 1 to identity the components, as well as the component size, that would be manufactured from advanced alloys such as INCONEL 740H or HAYNES 282 alloys. Pathways to supply these components for ComTest have been identified as well as any further development that would be required. Every project of this nature has challenges and this project was no exception. The greatest challenge has been the project cost. Largely due to the infrastructure and balance of plant equipment upgrades required for Youngstown Thermal, the estimated project cost for the “base case” project was greater than originally budgeted. The project team spent a significant amount of time exploring opportunities for reducing the project cost. These options included: • Youngstown Thermal was exploring building a Combined Heat and Power (CHP) unit at their facility. The Youngstown Thermal staff, supported by Thermal Engineering Group, worked with the project team to determine whether it was economically desirable to supply ComTest with steam and other utilities, which would be supplied by the CHP project. • The project team also evaluated opportunities to optimize the project scope to reduce cost, such as reducing project scope by eliminating the Superheater Outlet Header test. • Southern Company had offered two sites as possible host locations for ComTest. Both sites had infrastructure in place such as steam from an existing unit, natural gas, cooling water and ample electrical power that would be required to be added at the Youngstown Thermal site. Utilizing this existing infrastructure could reduce the project cost. An additional project challenge was the departure of Babcock and Wilcox from the project in September 2016. This project setback was overcome by GE Power’s willingness to assume the design of the ComTest superheater. Since the project could not proceed without the superheater, this was a very positive project development. The merger of the GE Power and Alstom Power steam turbine divisions created synergies leading to the conclusion that instead of building a small-scale turbine, a more practical and useful endeavor would be to validate the manufacturing technology and supplier readiness for fabricating and machining full scale steam turbine components. Consequently, in March 2017, GE Power decided that a steam turbine test would not be necessary as part of the ComTest demonstration. Removing the operational testing of the steam turbine from ComTest further reduced the total project cost. Additionally, there was an opportunity to move ComTest from Youngstown Thermal to one of the Southern Company sites and operate ComTest at supercritical steam conditions and test the steam turbine main stop/control valve at a temperature and pressure that would be representative of the conditions of a high pressure steam turbine inlet valve. The steam could also possibly be returned to the host boiler so there would be no economic penalty of using this steam for ComTest. Relocating the project could further reduce the project cost due to the infrastructure already in place, including high pressure natural gas and cooling water, and the potential for heat integration, allowing a reduction of operating costs. Due to these potential cost reductions, it was decided to move the project away from Youngstown Thermal in March 2017. As integrating ComTest at the Southern Company site was explored, an issue was raised regarding the integration of the ComTest cycle with the plant steam cycle. Steam would be supplied to ComTest at nominally ~3865 psia and 775°F. The steam would be heated with natural gas to 1400°F for the valve test and then cooled to 1000°F so that the steam would be returned to the host boiler at the same conditions as their high pressure steam turbine inlet. However, there were concerns raised that the addition of the energy (natural gas) to the steam could trigger a New Source Review on the unit. Southern Company did not want ComTest to cause this review, so condensing all of the steam exiting ComTest and returning it to the host steam cycle as condensate was explored to insure there would be no implication that ComTest was adding energy to the host plant’s steam cycle. Ultimately, Southern Company decided that they wanted to “decouple” ComTest from the operating unit, making ComTest self-supporting, similar to the Youngstown Thermal “base case.” Without the steam turbine, the project team reached a consensus that operating the ComTest Superheater and steam turbine valves at the typical pressure of a package boiler (~1000 psig) would not generate enough useful technical information to justify the cost of the test. Therefore, it was decided in the December 2017 project quarterly meeting to cancel the operational phase of ComTest. Throughout the engineering phase of ComTest, manufacturing and supply chain challenges were identified. When GE Power recommended dropping the steam turbine test from ComTest, they identified many important manufacturing issues that should be evaluated and demonstrated. Other challenges had been raised by the GE Power group designing the superheater as well as those engineering components such as pressure relief and steam turbine bypass valves. In the December 2017 meeting, the project team decided that it was more beneficial to the AUSC technology to pursue these manufacturing and supply chain issues as Phase 2 of the ComTest project. This report is organized in the following manner: • Section 2 discusses the ComTest project background and organization. • Section 3 discussed project management. • Section 4 discusses the design of the ComTest AUSC components – the Superheater, steam turbine and Superheater Outlet Header. • Section 5 discusses the implementation of ComTest at Youngstown Thermal and the Southern Company site. • Section 6 discusses the development of the AUSC Supply Chain • Section 7 discusses the recommended plan for Phase 2 of ComTest

01 COAL, LIGNITE, AND PEAT↗

Efficiency Improvement through Reduction in Friction and Wear in Powertrain Systems

The objective of this project is to improve the efficiency of truck drivelines through reduction of friction and parasitic losses in transmission and drive axles. Known efficiencies for these products exceeded 97 percent, so the task was not trivial. The project relied on a working relationship between modeling and hardware testing. Modeling was to shorten the development cycle by guiding the selection of materials, processes and strategies. Bench top and fixture tests were to validate the models. Modeling was performed at a world class, high academic level, but in the end, modeling did not impact the hardware development as much as intended. Insights leading to the most significant accomplishments came from bench top and fixture tests and full scale dynamometer tests. A key development in the project was the formulation of the implementation strategy. Five technical elements with potential to minimize friction and parasitic losses were identified. These elements included churning, lubrication, surface roughness, coatings and textures. An interesting fact is that both Caterpillar and Eaton independently converged on the same set of technical elements in formulating their implementation strategies. Exploiting technical elements of the implementation strategy had a positive impact on transmission and drive axle efficiencies. During one dynamometer test of an Eaton Best Tech 1 transmission, all three gear ranges tested: Under drive, direct drive and over drive, showed efficiencies greater than 99 percent. Technology boosts to efficiency for transmissions reached 1 percent, while efficiency improvements to drive axle pushed 2 percent. These advancements seem small, but the accomplishment is large considering that these products normally run at greater than 97 percent efficiency. Barriers and risks to implementing these technology elements are clear. Schemes using a low fill sump and spray tubes endanger the gears and bearings by lubricant starvation. Gear coatings have exhibited durability issues, stripping away under conditions less demanding than 750,000 miles in service on the road. Failed coatings compound the problem by contaminating the lubricant with hard particles. Under the most severe conditions, super finished surfaces may polish further, reaching a surface roughness unable to support the critical oil film thickness. Low viscosity and low friction lubricants may not protect the gears and bearings adequately leading to excessive pitting, wear and noise. Additives in low friction oils may not stay in solution or suspended thus settling to the bottom and unavailable when they are needed most. Technical barriers and risks can be overcome through engineering, but two barriers remain formidable: (1) cost of the technology and (2) convincing fleet owners that the technology provides a tangible benefit. Dry sumps lower lubricant operating temperatures so the removal of heat exchangers and hoses and reduced demand on engine cooling systems justify their use. The benefits of surface texturing are varied and remain unproven. Lubricant costs seem manageable, but the cost of super finishing and gear coating are high. These are issues of scale and processing technology. Going across the board with gear super finishing and coating will reduce costs. Pushing the envelope to applications with higher torque and higher power density should drive the adoption of these technologies. Fleet owners are an educated and seasoned lot. Only technology measureable in dollars returned is used on truck fleets. To convince fleet owners of the benefit of these technologies, new precision in measuring fuel efficiency must be introduced. Legislation for a minimum standard in truck miles per gallon would also enable the use of these technologies. Improving the efficiency of truck transmissions and axle will make a noticeable impact on the fuel consumption by heavy vehicles in the United States. However, the greatest benefit will come when all the individual efficiency technologies like hybrid power, aerodynamic fairings, auxiliary power units, super single aluminum wheels, single wide tires and reduced cross section radiators are combined synergistically in a single vehicle, the high efficiency truck.

33 ADVANCED PROPULSION SYSTEMS↗